Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Estimating Precommercial Heterogeneous Catalyst Price: A Simple Step-Based Method

Developers of novel catalysts often have limited access to information on the costs of their catalytic materials. The R&D and commercialization decisions made by these researchers would benefit from cost estimates that are accurate and directly comparable to the prices of incumbent catalytic materials, but developing such estimates requires detailed knowledge of industrial synthesis methods and their costs. In order to address one critical part of this need for cost information, namely, the capital and operating costs of using catalyst manufacturing process equipment, a simple and researcher-accessible 'step method' is described herein. This method is based on the estimating techniques that contract manufacturers of industrial catalysts use to develop price quotes for their services. It allows the development of an estimate of catalyst synthesis costs by selection of individual processing steps from a list. Data and methods to allow estimation of processing cost via the step method are provided for synthesis quantities of 1-1000 tons. Price estimates for three example materials, including Pt/C, Ni/Al 2 O 3 , and fluid catalytic cracking catalysts, are described in detail and shown to compare favorably (within +/-20%) with market prices for those materials. Lastly, the step method is placed in the context of a forthcoming free and publicly available catalyst cost estimation tool that will incorporate raw materials pricing, dedicated catalyst plants for higher-volume syntheses, spent catalyst value, and other features.

09 BIOMASS FUELS↗

Chemical Looping Combustion Sensitivity Analyses: CLOU Concepts

The objective of the National Energy Technology Laboratory (NETL) effort described in this report is to generate a reference-CLOU power plant performance and cost screening assessment and associated sensitivity analyses. To do this, a review of the CLOU literature was first performed to establish a complete design basis for a reference-CLOU power plant. While complete design-basis information is not available for any CLOU oxygen carrier, a representative design basis was compiled from a variety of literature sources. The design basis was then applied to generate reference-CLOU power plant material and energy balances, the unique CLOU process equipment was approximately sized and specified, equipment cost estimates were developed, and total power plant performance, capital investment, and cost of electricity (COE) estimates were compiled. Major performance and cost sensitivity parameters were identified, and performance and cost sensitivity analyses were performed. The results are these analyses relate not only the performance and cost potential of CLOU power generation, but also provide guidance to CLOU oxygen carrier and process researchers and developers.

20 FOSSIL-FUELED POWER PLANTS↗

KSC Construction Cost Index

Kennedy Space Center cost Index aids in conceptual design cost estimates. Report discusses development of KSC Cost Index since January 1974. Index since January 1974. Index provides management, design engineers, and estimators an up-to-data reference for local labor and material process. Also provides mount and rate of change in these costs used to predict future construction costs.

Brown, J. A.↗

Cost and size estimates for an electrochemical bulk energy storage concept

Preliminary capital cost and size estimates were made for an electrochemical bulk energy storage concept. The electrochemical system considered was an electrically rechargeable flow cell with a redox couple. On the basis of preliminary capital cost estimates, size estimates, and several other important considerations, the redox-flow-cell system emerges as having great promise as a bulk energy storage system for power load leveling. The size of this system would be less than 2 percent of that of a comparable pumped hydroelectric plant. The capital cost of a 10-megawatt, 60- and 85-megawatt-hour redox system is estimated to be $190 to $330 per kilowatt. The other important features of the redox system contributing to its load leveling application are its low adverse environmental impact, its high efficiency, its apparent absence of electrochemically-related cycle life limitations, and its fast response.

Warshay, M.↗

Cost and size estimates for an electrochemical bulk energy storage concept

Preliminary capital cost and size estimates were made for a titanium trichloride, titanium tetrachloride, ferric chloride, ferrous chloride redox-flow-cell electric power system. On the basis of these preliminary estimates plus other important considerations, this electrochemical system emerged as having great promise as a bulk energy storage system for power load leveling. The size of this system is less than two per cent of that of a comparable pumped hydroelectric plant. The estimated capital cost of a 10 MW, 60- and 85-MWh redox-flow system compared well with that of competing systems.

Warshay, M.↗

A Higher Fidelity Cost Analysis of Wind and Uranium from Seawater Acquisition symbiotic Infrastructure

The vastness of the worlds oceans makes the low concentration of naturally existing uranium, 3.3 ppb, appealing as a recoverable natural resource. Although ample uranium is available currently through conventional means, uranium from seawater is a widely studied topic due to the long term security it can assure the nuclear fuel cycle. It is important to mention that seawater uranium is not meant to act as a direct competitor to terrestrial uranium, but instead create a cost ceiling that provides economic stability and potential savings. Additionally, seawater uranium could circumvent some of the environmental impacts associated with recovery of any land based resource. The system currently studied by a nation-wide consortium of national lab and university partners involves the passive recovery of uranium using polymer based adsorbents. High Density Polyethylene fibers undergo a radiation induced graft co-polymerization process involving amidoxime, to attract uranium, and a polar co-monomer to increase hydrophilicity. After further chemical conditioning adsorbent fibers are braided into 60 meter strands for marine deployment. Braids are moored to the ocean floor for the duration of their soaking campaign. After sufficient seawater exposure they are winched up so the adsorbed uranium may be eluted off the braids. This deployment and elution process is repeated multiple times before the adsorbent's ultimate disposal, where its lifetime is dictated by the degradation it suffers with each re-cycle. Previous economic analyses have identified the adsorbent production and mooring as the most expensive components of the recovery process. Therefore, a later publication by Picard et al. proposed an alternative deployment method in an effort to reduce seawater uranium production cost. The Wind and Uranium from Seawater Acquisition symbiotic Infrastructure (WUSABI) couples uranium recovery with off shore wind to reduce mooring capital cost. The uranium harvesting structure attached to the underwater base of the wind turbine supports elution tanks and an adsorbent pulley system. This allows for a nearly autonomous mooring and elution procedure as adsorbent is in constant motion, reaching the elution tanks at the end of its soaking campaign. Although the original publication did include a short economic section, further analysis was carried out to provide a higher fidelity production cost estimate for uranium recovered by this system. Sufficient detail was provided regarding the capital and operating costs of the novel uranium harvesting units. The adsorbent production and uranium elution and purification steps however were estimated by simpler methods, for example applying a previously reported cost for producing a unit mass of adsorbent. This methodology, although satisfactory for the zeroth-order approximation desired in the original publication, overlooks many of the complexities and feedbacks embedded in the full cost model, which are necessary to provide a more accurate estimate. Perhaps more importantly, given the constant updates regarding adsorbent synthesis and performance this value quickly become outdated. Syncing an improved estimate for the WUSABI harvesting units with the existing economic analysis for adsorbent production and elution, which evolves in tandem with the technology, provides a more robust production cost estimate that will remain current over time. In addition to the updates and higher level of detail provided in this independent analysis, consistency in methodology allows for accurate comparison of uranium production costs across recovery methods. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Applying large solid boosters.

Large solid propellant booster rocket engine performance characteristics and development and operating cost estimates for several manned launched vehicle concepts

COST ESTIMATE↗

Estimating acreage by double sampling using LANDSAT data

Double sampling techniques employing LANDSAT data for estimating the acreage of corn and soybeans was investigated and evaluated. The evaluation was based on estimated costs and correlations between two existing procedures having differing cost/variance characteristics, and included consideration of their individual merits when coupled with a fictional 'perfect' procedure of zero bias and variance. Two features of the analysis are: (1) the simultaneous estimation of two or more crops; and (2) the imposition of linear cost constraints among two or more types of resource. A reasonably realistic operational scenario was postulated. The costs were estimated from current experience with the measurement procedures involved, and the correlations were estimated from a set of 39 LACIE-type sample segments located in the U.S. Corn Belt. For a fixed variance of the estimate, double sampling with the two existing LANDSAT measurement procedures can result in a 25% or 50% cost reduction. Double sampling which included the fictional perfect procedure results in a more cost effective combination when it is used with the lower cost/higher variance representative of the existing procedures.

Pont, F.↗

Algae Farm Cost Model: Considerations for Photobioreactors

Cost estimates and assumptions for a vertical hanging-bag type photobioreactor (PBR) system are reported here for a preliminary model developed to elucidate major cost drivers and opportunities for reducing the costs of algae cultivation. The design inputs and assumptions for this system are described in the report. A baseline case is presented, and alternative cases with differing areal algal productivities are used to compare to an open-pond case. The baseline algae production cost is estimated to be 1,137/short ton (st) algae, on an ash-free dry weight (AFDW) basis (2016 US$). Sensitivity analyses probe the areal productivity, support structure cost, and PBR bag replacement cost and life as significant impact factors affecting the system cost. A preliminary comparison of the PBR system and an open pond system is also developed to indicate the cost difference between these two systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A low-rank control variate for multilevel Monte Carlo simulation of high-dimensional uncertain systems

Multilevel Monte Carlo (MLMC) is a recently proposed variation of Monte Carlo (MC) simulation that achieves variance reduction by simulating the governing equations on a series of spatial (or temporal) grids with increasing resolution. Instead of directly employing the fine grid solutions, MLMC estimates the expectation of the quantity of interest from the coarsest grid solutions as well as differences between each two consecutive grid solutions. When the differences corresponding to finer grids become smaller, hence less variable, fewer MC realizations of finer grid solutions are needed to compute the difference expectations, thus leading to a reduction in the overall work. Here this paper presents an extension of MLMC, referred to as multilevel control variates (MLCV), where a low-rank approximation to the solution on each grid, obtained primarily based on coarser grid solutions, is used as a control variate for estimating the expectations involved in MLMC. Cost estimates as well as numerical examples are presented to demonstrate the advantage of this new MLCV approach over the standard MLMC when the solution of interest admits a low-rank approximation and the cost of simulating finer grids grows fast.

97 MATHEMATICS AND COMPUTING↗

Estimated Value of Service Reliability for Electric Utility Customers in the United States

Information on the value of reliable electricity service can be used to assess the economic efficiency of investments in generation, transmission and distribution systems, to strategically target investments to customer segments that receive the most benefit from system improvements, and to numerically quantify the risk associated with different operating, planning and investment strategies. This paper summarizes research designed to provide estimates of the value of service reliability for electricity customers in the US. These estimates were obtained by analyzing the results from 28 customer value of service reliability studies conducted by 10 major US electric utilities over the 16 year period from 1989 to 2005. Because these studies used nearly identical interruption cost estimation or willingness-to-pay/accept methods it was possible to integrate their results into a single meta-database describing the value of electric service reliability observed in all of them. Once the datasets from the various studies were combined, a two-part regression model was used to estimate customer damage functions that can be generally applied to calculate customer interruption costs per event by season, time of day, day of week, and geographical regions within the US for industrial, commercial, and residential customers. Estimated interruption costs for different types of customers and of different duration are provided. Finally, additional research and development designed to expand the usefulness of this powerful database and analysis are suggested.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗