Search NASA⌕ Search

SEARCH · Search NASA

Results for “Design Verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Achieving Higher Fidelity Pulsed-Power Simulations Using Advanced Gap Closure Modeling

This project has progressed several physics models in the EMPIRE plasma simulation code to achieve higher fidelity simulations of high-current diode operation in pulsed-power accelerators. In this report, we present details for the following major work products: (1) a set of verification problems covering all key processes involved in gap closure physics has been designed; this suite has facilitated feature vetting and overall model maturation, (2) a new EMPIRE exemplar has been developed: the Radiographic Integrated Test Stand 6 (RITS-6) diode, and (3) An exemplar for the Saturn accelerator exemplar was enabled by the models matured under this work to self-consistently simulate further into the diode pulse than previously possible (bipolar flow regime). These developments have lead to the highest confidence EMPIRE power flow predictions of the Saturn accelerator to date. Additionally, three modeling approaches for simulating electrode plasmas have been investigated. We report on these results and provide recommendations.

43 PARTICLE ACCELERATORS↗

Annual Summary Report for the Remote-Handled Low-Level Waste Disposal Facility—FY 2024

This Fiscal Year (FY) 2024 annual summary report (ASR) documents the continued adequacy of the performance assessment (PA), the composite analysis (CA), and associated operating disposal- authorization statement (ODAS) technical-basis documents for the Remote-Handled (RH) Low-Level Waste (LLW) Disposal Facility at Idaho National Laboratory (INL). Annual review of the adequacy of the PA and CA for the Remote-Handled Low-Level Waste (RHLLW) Disposal Facility ensures that conclusions of the analyses remain valid in accordance with requirements of Department of Energy (DOE) Order 435.1, “Radioactive Waste Management.” In FY 2024, no significant operational changes or other activities occurred that would cause deviation from the assumptions in the PA and CA pertaining to disposal geometry, verification of waste characteristics, tracking disposal inventories against total limits, facility-closure design, or institutional controls. Nineteen waste canister shipments were received at the RHLLW Disposal Facility, and all nineteen waste canisters were emplaced in disposal vaults.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE↗

CYVET: A Cyber-Physical Assurance Framework Based on a Semi-Supervised Vetting Approach

The project is designed to directly address the needs described in the Topic Area 4 (“Cybersecurity Verification and Validation”) of the CEDS’19 Research Call. The proposed CYVET system directly addresses the need to elevate the current industry capabilities to verify and validate OT cybersecurity and associated control system infrastructure. Currently, there is a significant gap in the energy sector’s capability in that regard during infrastructure improvement, equipment procurement, and compliance certification. CYVET provides that needed capability. CYVET is device and architecture agnostic and thus broadly applicable across the energy sector. The goal of this project is to develop and deliver a cybersecurity verification and validation framework testing capability to verify and validate OT equipment, software, and the underlying control system architecture. The primary project objectives are (i) Verification: the synthesis and reconciliation of standards and vendor supplied features, (ii) Validation: the generation, execution, and presentation of testing scripts of verified security features, and (3) Demonstration: apply the developed technology capabilities for verification and validation at a relevant end-user facility in the energy sector.

Lopez Jr, Juan↗

Preparatory Verification of a New Monte Carlo Code cosRMC based on VERA Core Physics Benchmark

To promote nuclear power plant system design and simulation software self-reliance development, DOE of China approved a R and D key project to develop an integrated engine for pressurized water reactor core and system design and analysis, referred as COSINE hereafter. The scope of this code package includes reactor physics, thermal hydraulics, safety analysis, severe accidents, probability safety assessment and etc. Many universities, research institutes and nuclear related corporations in China are involved in the code development, among which the State Nuclear Power Software Development Center (SNPSDC) plays the leading role. With the requirement of accurate three-dimensional modeling of the advanced, special or new complex core in reactor neutronics and shielding analysis, Monte Carlo method is becoming a more powerful tool for reactor analysis. Thus, a new Monte Carlo transport code named cosRMC (abbreviation for COSINE Reactor Monte Carlo) has been developed jointly by SNPSDC and Department of Engineering Physics, Tsinghua University, the main developer of RMC code. The cosRMC now has many functions as criticality calculation, fixed-source calculation, burnup calculation, and etc. Some techniques for geometry treatment, new burnup algorithm, source convergence acceleration, massive tally and parallel calculation have been implemented in cosRMC to improve the efficiency. In order to ensure its reliability, several types of V and V work have been and are being carried out for cosRMC. In this paper, some preparatory verification results based on VERA Core Physics Benchmark are presented. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

CIAE-ANL CRADA for SFR SAFETY ANALYSIS: Final CRADA Report

The purpose of this project is joint verification and validation of system analysis code capabilities for Sodium-cooled Fast Reactor (SFR) design and licensing. As the researchers and code developers at the Argonne National Laboratory (ANL) and China Institute of Atomic Energy (CIAE) independently build their own SFR system analysis capabilities, this collaboration facilitated exchange of information on, and evaluation of alternative approaches for, modeling the key phenomena (such as decay heat removal and natural circulation) and the safety-related components (such as pumps, heat exchangers, and outlet plenum) common in SFR systems. The analysis at ANL and CIAE also applied their respective computational capabilities and methods (in SAS4A/SASSYS-1 computer code at ANL and FR-Sdaso computer code at CIAE) on jointly identified benchmark problems for verification, and publicly available integral tests for validation, of their results. ANL team also shared the expertise on the established software quality assurance practices and the techniques for component reliability estimates to support probabilistic risk assessments.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

User Guidelines and Best Practices for CASL VUQ Analysis Using Dakota

Sandia’s Dakota software (available at http://dakota.sandia.gov) supports science and engineering transformation through advanced exploration of simulations. Specifically it manages and analyzes ensembles of simulations to provide broader and deeper perspective for analysts and decision makers. This enables them to enhance understanding of risk, improve products, and assess simulation credibility. In its simplest mode, Dakota can automate typical parameter variation studies through a generic interface to a physics-based computational model. This can lend efficiency and rigor to manual parameter perturbation studies already being conducted by analysts. However, Dakota also delivers advanced parametric analysis techniques enabling design exploration, optimization, model calibration, risk analysis, and quantification of margins and uncertainty with such models. It directly supports verification and validation activities. Dakota algorithms enrich complex science and engineering models, enabling an analyst to answer crucial questions of - Sensitivity: Which are the most important input factors or parameters entering the simulation, and how do they influence key outputs?; Uncertainty: What is the uncertainty or variability in simulation output, given uncertainties in input parameters? How safe, reliable, robust, or variable is my system? (Quantification of margins and uncertainty, QMU); Optimization: What parameter values yield the best performing design or operating condition, given constraints? Calibration: What models and/or parameters best match experimental data? In general, Dakota is the Consortium for Advanced Simulation of Light Water Reactors (CASL) delivery vehicle for verification, validation, and uncertainty quantification (VUQ) algorithms. It permits ready application of the VUQ methods described above to simulation codes by CASL researchers, code developers, and application engineers.

97 MATHEMATICS AND COMPUTING↗

Verification of AZTRAN v1.2 code with a PWR-MOX benchmark problem

The AZTLAN platform project is an effort focused on developing a modeling Mexican platform to design and analyze nuclear reactors. It is a national initiative lead by the National Institute of Nuclear Research (ININ), in collaboration with the main Mexico's public universities: the National Polytechnic Institute (IPN), the National Autonomous University of Mexico (UNAM) and the Autonomous Metropolitan University (UAM). The AZTRAN code is a module of AZTLAN that solves the 3D neutron transport equation using the discrete ordinates (SN) method and the nodal scheme RTN-0 on steady state and Cartesian geometry. AZTRAN works with cross sections generated externally by other code. It provides a solution to the eigenvalue problem and determine the neutron distribution for a specific medium at desired conditions. On the other hand, it is important to mention that the Working Group 4 (users group) of AZTLAN platform is responsible of verify and validate the codes development, in order to give feedback to the group of developers: neutronics and thermal-hydraulics. In this work, the AZTRAN v1.2 performance was studied for a PWR-MOX lattice, using as example the Yamamoto's benchmark for LWR fuels, comparing AZTRAN v1.2 results again those obtained with the well-known neutronic code SERPENT-2 (v1.27), and some results from an article presented at PHYSOR-2002. Results from AZTRAN for a BWR fuel lattice is presented in a companion paper in this meeting.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Random selection as a confidence building tool

Any verification measurement performed on potentially classified nuclear material must satisfy two seemingly contradictory constraints. First and foremost, no classified information can be released. At the same time, the monitoring party must have confidence in the veracity of the measurement. The first concern can be addressed by performing the measurements within the host facility using instruments under the host's control. Because the data output in this measurement scenario is also under host control, it is difficult for the monitoring party to have confidence in that data. One technique for addressing this difficulty is random selection. The concept of random selection can be thought of as four steps: (1) The host presents several 'identical' copies of a component or system to the monitor. (2) One (or more) of these copies is randomly chosen by the monitors for use in the measurement system. (3) Similarly, one or more is randomly chosen to be validated further at a later date in a monitor-controlled facility. (4) Because the two components or systems are identical, validation of the 'validation copy' is equivalent to validation of the measurement system. This procedure sounds straightforward, but effective application may be quite difficult. Although random selection is often viewed as a panacea for confidence building, the amount of confidence generated depends on the monitor's continuity of knowledge for both validation and measurement systems. In this presentation, we will discuss the random selection technique, as well as where and how this technique might be applied to generate maximum confidence. In addition, we will discuss the role of modular measurement-system design in facilitating random selection and describe a simple modular measurement system incorporating six small {sup 3}He neutron detectors and a single high-purity germanium gamma detector.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Controller Verification of a Smart-Grid Compatible 200 kHz Single-stage Photovoltaic Microinverter

This paper presents control system design, implementation, and experimental validation of a single-stage 400 W, 200 kHz solar photovoltaic (PV) microinverter using hardware-in-the-loop (HIL) and hardware testing. The selected circuit topology is based on a Gallium Nitride (GaN) direct-matrix based dual active bridge (DAB) converter with a low voltage active power decoupler (APD) circuit. Control performance is verified, smart-grid compatibility is tested, and circuit operation is confirmed. Controller HIL (CHIL) is shown to aid in a complex power electronics system design by 1) enabling detailed control development prior to hardware implementation, 2) expanding the use of automated testing, and 3) increasing confidence in control performance prior to prototype testing. Altogether, these factors make HIL a valuable tool in complex power electronic designs.

14 SOLAR ENERGY↗

CTF Validation and Verification Manual

Coolant-Boiling in Rod Arrays- Two Fluids (COBRA-TF) is a Thermal/Hydraulic (T/H) simulation code designed for Light Water Reactor (LWR) analysis. It uses a two-fluid, three-field (i.e. fluid film, fluid drops, and vapor) modeling approach. Both sub-channel and 3D Cartesian forms of nine conservation equations are available for LWR modeling. The code was originally developed by Pacific Northwest Laboratory in 1980 and has been used and modified by several institutions over the last several decades. COBRA-TF is also used at the Pennsylvania State University (PSU) by the Reactor Dynamics and Fuel Management Group (RDFMG), and has been improved, updated, and subsequently became the PSU RDFMG version of COBRA-TF (CTF). One part of the improvement process includes validating the methods in CTF. This document seeks to provide a certain level of certainty and confidence in the predictive capabilities of the code for the scenarios it was designed to model--rod bundle geometries with operating conditions that are representative of prototypical Pressurized Water Reactor (PWR)s and Boiling Water Reactor (BWR)s in both normal and accident conditions. This is done by modeling a variety of experiments that simulate these scenarios and then presenting a qualitative and quantitative analysis of the results that demonstrates the accuracy to which CTF is capable of capturing specific quantities of interest.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

CTF Validation and Verification (V.4.2)

Coolant-Boiling in Rod Arrays- Two Fluids (COBRA-TF) is a thermal/hydraulic (T/H) simulation code designed for Light Water Reactor (LWR) analysis. It uses a two-fluid, three-field (i.e. fluid film, fluid drops, and vapor) modeling approach. Both sub-channel and 3D Cartesian forms of nine conservation equations are available for LWR modeling. The code was originally developed by Pacific Northwest Laboratory in 1980 and has been used and modified by several institutions over the last several decades. COBRA-TF is also used at the Pennsylvania State University (PSU) by the Reactor Dynamics and Fuel Modeling Group (RDFMG) and has been improved, updated, and subsequently became the PSU RDFMG version of COBRA-TF (CTF). One part of the improvement process includes validating the methods in CTF. This document seeks to provide a certain level of certainty and confidence in the predictive capabilities of the code for the scenarios it was designed to model-rod bundle geometries with operating conditions that are representative of prototypical Pressurized Water Reactor (PWR)s and Boiling Water Reactor (BWR)s in both normal and accident conditions. This is done by modeling a variety of experiments that simulate these scenarios and then presenting a qualitative and quantitative analysis of the results that demonstrates the accuracy to which CTF is capable of capturing specific quantities of interest.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Fit for Purpose: An Evolutionary Strategy for the Implementation and Verification of the Treaty on the Prohibition of Nuclear Weapons

The Treaty on the Prohibition of Nuclear Weapons requires States Parties to designate a “competent international authority or authorities” for negotiating and verifying the irreversible elimination of nuclear-weapons programs. Ensuring that such an authority or authorities is able to be fit for purpose when required to meet these tasks will be crucial for both the future implementation and legitimacy of the Treaty. To address this challenge, this article proposes the early creation of a two-part organizational structure, comprising an implementation support unit and a dedicated scientific and technical advisory body, to begin the process of institutionalizing the treaty, and build the technical basis for meeting its verification goals should a nuclear-weapon-possessing state decide to join. The article then discusses how such two-part structure could be scaled-up as a standing international organization tasked with the coordination of an ad hoc inspectorate, which would also cooperate and complement the work of existing nuclear verification organizations, such as the International Atomic Energy Agency. This evolutionary and adaptive strategy to institution building could empower the new Treaty by supporting the emergence of a new regime complex for nuclear disarmament, while taking into account the initially limited financial and technical resources of its member states.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Review of Evaluation, Measurement and Verification Approaches Used to Estimate the Load Impacts and Effectiveness of Energy Efficiency Programs

Public and private funding for end-use energy efficiency actions is expected to increase significantly in the United States over the next decade. For example, Barbose et al (2009) estimate that spending on ratepayer-funded energy efficiency programs in the U.S. could increase from $3.1 billion in 2008 to $7.5 and 12.4 billion by 2020 under their medium and high scenarios. This increase in spending could yield annual electric energy savings ranging from 0.58% - 0.93% of total U.S. retail sales in 2020, up from 0.34% of retail sales in 2008. Interest in and support for energy efficiency has broadened among national and state policymakers. Prominent examples include {approx}$18 billion in new funding for energy efficiency programs (e.g., State Energy Program, Weatherization, and Energy Efficiency and Conservation Block Grants) in the 2009 American Recovery and Reinvestment Act (ARRA). Increased funding for energy efficiency should result in more benefits as well as more scrutiny of these results. As energy efficiency becomes a more prominent component of the U.S. national energy strategy and policies, assessing the effectiveness and energy saving impacts of energy efficiency programs is likely to become increasingly important for policymakers and private and public funders of efficiency actions. Thus, it is critical that evaluation, measurement, and verification (EM&V) is carried out effectively and efficiently, which implies that: (1) Effective program evaluation, measurement, and verification (EM&V) methodologies and tools are available to key stakeholders (e.g., regulatory agencies, program administrators, consumers, and evaluation consultants); and (2) Capacity (people and infrastructure resources) is available to conduct EM&V activities and report results in ways that support program improvement and provide data that reliably compares achieved results against goals and similar programs in other jurisdictions (benchmarking). The National Action Plan for Energy Efficiency (2007) presented commonly used definitions for EM&V in the context of energy efficiency programs: (1) Evaluation (E) - The performance of studies and activities aimed at determining the effects and effectiveness of EE programs; (2) Measurement and Verification (M&V) - Data collection, monitoring, and analysis associated with the calculation of gross energy and demand savings from individual measures, sites or projects. M&V can be a subset of program evaluation; and (3) Evaluation, Measurement, and Verification (EM&V) - This term is frequently seen in evaluation literature. EM&V is a catchall acronym for determining both the effectiveness of program designs and estimates of load impacts at the portfolio, program and project level. This report is a scoping study that assesses current practices and methods in the evaluation, measurement and verification (EM&V) of ratepayer-funded energy efficiency programs, with a focus on methods and practices currently used for determining whether projected (ex-ante) energy and demand savings have been achieved (ex-post). M&V practices for privately-funded energy efficiency projects (e.g., ESCO projects) or programs where the primary focus is greenhouse gas reductions were not part of the scope of this study. We identify and discuss key purposes and uses of current evaluations of end-use energy efficiency programs, methods used to evaluate these programs, processes used to determine those methods; and key issues that need to be addressed now and in the future, based on discussions with regulatory agencies, policymakers, program administrators, and evaluation practitioners in 14 states and national experts in the evaluation field. We also explore how EM&V may evolve in a future in which efficiency funding increases significantly, innovative mechanisms for rewarding program performance are adopted, the role of efficiency in greenhouse gas mitigation is more closely linked, and programs are increasingly funded from multiple sources often with multiple program administrators and intended to meet multiple purposes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Type A Verification Report for the High Flux Beam Reactor Stack and Grounds Brookhaven National Laboratory Upton, New York

The U.S. Department of Energy (DOE) Order 458.1 requires independent verification (IV) of DOE cleanup projects (DOE 2011). The Oak Ridge Institute for Science and Education (ORISE) has been designated as the responsible organization for IV of the High Flux Beam Reactor (HFBR) Stack and Grounds area at Brookhaven National Laboratory (BNL) in Upton, New York. The IV evaluation may consist of an in-process inspection with document and data reviews (Type A Verification) or a confirmatory survey of the site (Type B Verification). DOE and ORISE determined that a Type A verification of the documents and data for the HFBR Stack and Grounds: Survey Units (SU) 6, 7, and 8 was appropriate based on the initial survey unit classification, the walkover surveys, and the final analytical results provided by the Brookhaven Science Associates (BSA).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Type A Verification Report for the High Flux Beam Reactor Stack and Grounds, Brookhaven National Laboratory, Upton, New York

The U.S. Department of Energy (DOE) Order 458.1 requires independent verification (IV) of DOE cleanup projects (DOE 2011). The Oak Ridge Institute for Science and Education (ORISE) has been designated as the responsible organization for IV of the High Flux Beam Reactor (HFBR) Stack and Grounds area at Brookhaven National Laboratory (BNL) in Upton, New York. The IV evaluation may consist of an in-process inspection with document and data reviews (Type A Verification) or a confirmatory survey of the site (Type B Verification). DOE and ORISE determined that a Type A verification of the documents and data for the HFBR Stack and Grounds: Survey Units (SU) 6, 7, and 8 was appropriate based on the initial survey unit classification, the walkover surveys, and the final analytical results provided by the Brookhaven Science Associates (BSA). The HFBR Stack and Grounds surveys began in June 2011 and were completed in September 2011. Survey activities by BSA included gamma walkover scans and sampling of the as-left soils in accordance with the BSA Work Procedure (BNL 2010a). The Field Sampling Plan - Stack and Remaining HFBR Outside Areas (FSP) stated that gamma walk-over surveys would be conducted with a bare sodium iodide (NaI) detector, and a collimated detector would be used to check areas with elevated count rates to locate the source of the high readings (BNL 2010b). BSA used the Mult- Agency Radiation Survey and Site Investigation Manual (MARSSIM) principles for determining the classifications of each survey unit. Therefore, SUs 6 and 7 were identified as Class 1 and SU 8 was deemed Class 2 (BNL 2010b). Gamma walkover surveys of SUs 6, 7, and 8 were completed using a 2X2 NaI detector coupled to a data-logger with a global positioning system (GPS). The 100% scan surveys conducted prior to the final status survey (FSS) sampling identified two general soil areas and two isolated soil locations with elevated radioactivity. The general areas of elevated activity identified were investigated further with a collimated NaI detector. The uncollimated average gamma count rate was less than 15,000 counts per minute (cpm) for the SU 6, 7, and 8 composite area (BNL 2011a). Elevated count rates were observed in portions of each survey unit. The general areas of elevated counts near the Building 801 ventilation and operations and the entry to the Stack were determined to be directly related to the radioactive processes in those structures. To compensate for this radioactive shine, a collimated or shielded detector was used to lower the background count rate (BNL 2011b and c). This allowed the surveyor(s) to distinguish between background and actual radioactive contamination. Collimated gamma survey count rates in these shine affected areas were below 9,000 cpm (BNL 2011a). The average background count rate of 7,500 cpm was reported by BSA for uncollimated NaI detectors (BNL 2011d). The average collimated background ranged from 4,500-6,500 cpm in the westernmost part of SU 8 and from 2,000-3,500 cpm in all other areas (BNL 2011e). Based on these data, no further investigations were necessary for these general areas. SU 8 was the only survey unit that exhibited verified elevated radioactivity levels. The first of two isolated locations of elevated radioactivity had an uncollimated direct measurement of 50,000 cpm with an area background of 7,500 cpm (BNL 2011f). The second small area exhibiting elevated radiation levels was identified at a depth of 6 inches from the surface. The maximum reported count rate of 28,000 cpm was observed during scanning (BNL 2011g). The affected areas were remediated, and the contaminated soils were placed in an intermodal container for disposal. BSA's post-remediation walkover surveys were expanded to include a 10-foot radius around the excavated locations, and it was determined that further investigation was not required for these areas (BNL 2011 f and g). The post-remediation soil samples were collected and analyzed with onsite gamma spectroscopy equipment. These samples were also included with the FSS samples that were analyzed at an offsite facility for the primary radionuclides of concern (ROCs) (i.e., cesium-137, strontium-90, and radium-226). Analysis included full spectrum gamma spectroscopy for all samples. Sr-90 analysis was completed on all samples from SUs 6 and 7. However Sr-90 was only completed on the cores, composites, field blank and duplicate samples in SU 8. Alpha spectroscopy as well as liquid scintillation performed for tritium, carbon-14, and nickel-63 concentrations were completed on the composite samples from SUs 6 and 7. Various cores, composites, and samples from the remediated areas of SU 8 received alpha spectroscopy as well as liquid scintillation analyses for tritium, carbon-14, and nickel-63 to determine respective ROC concentrations (BNL 2011 h, i, and j). BSA submitted the FSS data and analytical results to demonstrate that remediation efforts complied with the specified cleanup goal of less than or equal to 15 millirem per year (mrem/yr) above background to a resident in 50 years (BNL 2011a through j). ORISE has reviewed the project documentation and FSS data for the HFBR Stack and Grounds: SUs 6, 7, and 8. The highest concentrations of the primary ROCs reported were 5.92 picocuries per gram (pCi/g) for Cs-137 and 2.03 pCi/g for Sr-90, with both ROCs having the qualifier for the sample result as less than the minimum detectable activity (MDA). For Ra-226, the highest detected concentration from the FSS data provided was 0.682 pCi/g. Other potential secondary contaminants were below their respective MDAs. Therefore, ORISE is of the opinion that BSA has provided sufficient evidence to demonstrate compliance with the 15 mrem/yr cleanup objectives for the final status survey data provided.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

OSIRIS Validation and Verification Report

The On-Site Inspection RadioIsotopic Spectroscopy (OSIRIS) system is a gamma-ray spectroscopy instrument for on-site inspections conducted under the Comprehensive Nuclear-Test-Ban Treaty (CTBT). The OSIRIS software filters spectral analysis data, revealing information to users on only 17 CTBT-relevant fission-product isotopes. In this report, we review the CTBT requirements for on-site inspection radionuclide identifiers, plus additional requirements imposed by the design team. Then a series of validation tests conducted during OSIRIS development are described. The validation tests were designed to gauge if the nascent OSIRIS system met those requirements. We conclude with a set of recommended verification tests to ensure that newly-manufactured OSIRIS systems also will meet the requirements.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

SU-F-J-30: Application of Intra-Fractional Imaging for Pretreatment CBCT of Breath-Hold Lung SBRT

Purpose: Clinical implementation of gated lung SBRT requires tools to verify the accuracy of the target positioning on a daily basis. This is a particular challenge on Elekta linacs where the XVI imaging system does not interface directly to any commercial gating solution. In this study, we used the Elekta’s intra-fractional imaging functionality to perform the pretreatment CBCT verifications and evaluated both the image quality and gating accuracy. Methods: To use intrafraction imaging tools for pretreatment verifications, we planned a 360-degree arc with 1mmx5mm MLC opening. This beam was designed to drive the gantry during the gated CBCT data collection. A Catphan phantom was used to evaluate the image quality for the intra-fractional CBCT. A CIRS lung phantom with a 3cm sphereinsert and a moving chest plate were programmed with a simulated breathhold breathing pattern was used to check the gating accuracy. A C-Rad CatalystHD surface mapping system was used to provide the gating signal. Results: The total delivery time of the arc was 90 seconds. The uniformity and low contrast resolution for the intra-fractional CBCT was 1.5% and 3.6%, respectively. The values for the regular CBCT were 1.7% and 2.5%, respectively. The spatial resolution was 7 line-pairs/cm and the 3D spatial integrity was less than 1mm for the intra-fractional CBCT. The gated CBCT clearly demonstrated the accuracy of the gating image acquisition. Conclusion: The intra-fraction CBCT capabilities on an Elekta linac can be used to acquire pre-treatment gated images to verify the accuracy patient positioning. This imaging capability should provide for accurate patient alignments for the delivery of lung SBRT. This research was partially supported by Elekta.

60 APPLIED LIFE SCIENCES↗