Search NASA⌕ Search

SEARCH · Search NASA

Results for “GAS WELDING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Laser absorption phenomena in flowing gas devices

A theoretical and experimental investigation is presented of inverse Bremsstrahlung absorption of CW CO2 laser radiation in flowing gases seeded with alkali metals. In order to motivate this development, some simple models are described of several space missions which could use laser powered rocket vehicles. Design considerations are given for a test call to be used with a welding laser, using a diamond window for admission of laser radiation at power levels in excess of 10 kW. A detailed analysis of absorption conditions in the test cell is included. The experimental apparatus and test setup are described and the results of experiments presented. Injection of alkali seedant and steady state absorption of the laser radiation were successfully demonstrated, but problems with the durability of the diamond windows at higher powers prevented operation of the test cell as an effective laser powered thruster.

Chapman, P. K.↗

Ring connection for porous combustor wall panels

A gas turbine engine combustor assembly of unique configuration has an outer wall made up of a plurality of axially extending multi-layered porous metal panels joined together at butt joints therebetween by a reinforcing and heat dissipation ring and a unique weld configuration to prevent thermal erosion of the ends of the porous metal panels at the butt joints; the combustor further including a unique inner wall made up of a plurality of like axially extending multi-layered porous metal panels joined at butt joints by a reinforcing and heat dissipation ring on the inner surface of the inner wall panels and an improved butt weld joint that prevents thermal erosion of the ends of the porous metal inner wall panels.

Verdouw, Albert J.↗

Wind turbine tower for storing hydrogen and energy

A wind turbine tower assembly for storing compressed gas such as hydrogen. The tower assembly includes a wind turbine having a rotor, a generator driven by the rotor, and a nacelle housing the generator. The tower assembly includes a foundation and a tubular tower with one end mounted to the foundation and another end attached to the nacelle. The tower includes an in-tower storage configured for storing a pressurized gas and defined at least in part by inner surfaces of the tower wall. In one embodiment, the tower wall is steel and has a circular cross section. The in-tower storage may be defined by first and second end caps welded to the inner surface of the tower wall or by an end cap near the top of the tower and by a sealing element attached to the tower wall adjacent the foundation, with the sealing element abutting the foundation.

17 WIND ENERGY↗

Thermal Hydraulic Experimental Test Article (FY21 Final Report)

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that will be used to develop sodium components and instrumentation as well as acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility will simulate nominal conditions as well as protected/unprotected loss of flow accidents in a sodium-cooled fast reactor (SFR). High fidelity distributed temperature profiles of the developed flow field will be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility is being designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. THETA is comprised of a traditional primary and secondary system. The primary system is submerged in the pool of sodium and consists of a pump, electrically heated core, intermediate heat exchanger, and connected piping and thermal barriers (redan). The secondary system, located outside of the sodium pool, consists of a pump, sodium to air heat exchanger, and connected piping and valves. Figure 1 illustrates the main components of the primary system. THETA has been installed in the Mechanisms Engineering Test Loop (METL) with the primary system in the 28 inch Test Vessel #4, Figure 2 and Figure 3. Since the FY20 THETA status report, further water shakedown testing was performed, some final welding modifications were performed, all system components were sanitized, dry assembled, and commissioned. The THETA submersible electromagnetic flowmeter was welded closed to hermetically seal internal components from sodium followed by a helium leak check for the final time. Following installation of THETA into vessel #4, all data acquisition and control systems were brought online and commissioned at room temperature in the argon gas space of the empty vessel. The vessel zone 1 heaters were reinstalled and the flange was then insulated. The vessel 4 heaters were brought to a temperature of 100 °C and the THETA pump was jogged at 600 RPM to ensure it was functioning correctly. The secondary, AC Conduction based electromagnetic pump from CMI Novacast (product number CA-15) was ordered and will be delivered in late calendar year 2021. The custom designed permanent magnet based secondary flowmeter was designed, a drawing package and manufacturing specification created and quote requested from a machine shop. The intermediate heat exchanger design was completed and a drawing package is currently in progress. During the middle of calendar year 2021 the Building 308 sodium scrubber system was shut down in order to replaced some corroded piping and facilitate improvements on the system, thus requiring the sodium in METL to remain frozen. This has imposed a delay in filling vessel 4 with sodium to begin THETA testing. Sodium testing is expected to begin in early fiscal year 2022 as all THETA primary systems are operational.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Decontaminating Aluminum/Ammonia Heat Pipes

Internal gas slugs reduced or eliminated. Manufacturing method increases efficiency of aluminum heat pipes in which ammonia is working fluid by insuring pipe filled with nearly pure charge of ammonia. In new process heat pipe initially closed with stainless-steel valve instead of weld so pipe put through several cycles of filling, purging, and accelerated aging.

Jones, J. A.↗

Report on the Production by Mechanical Alloying of New Heats of 14YWT

This report provides a summary of the new heats of 14YWT produced by mechanical alloying. Compared to the past heats of 14YWT, which were based on the nominal composition of Fe-14Cr-3W-0.4Ti-0.3Nb + 0.3Y 2 O 3 (wt. %), the three new heats of 14YWT contain a lower W level (1% vs. 3%) and various Ti levels of 0.2%, 0.3% and 0.4%. Powders with compositions of Fe-14Cr-1W-0.2Ti, Fe-14Cr-1W-0.3Ti and Fe- 14Cr-1W-0.4Ti were produced by ATI Powder Metals via Ar gas atomization. The mechanical alloying procedure consisted of ball milling the powder, canning and degassing the milled powder followed by consolidation of the powder by hot extrusion. Powder consisting of 1 kg mass containing 0.3% Y 2 O 3 powder was ball milled using the high kinetic energy ball mill for 40 h in Ar gas atmosphere. A total of 2 kg of powder from each of the three compositions of 14YWT was produced. The 3 batches of milled powder were added to 4 inch diameter cans that were fabricated from low carbon steel and sealed by electron beam welding. Each of the cans were degassed for 24 h at 300ºC under vacuum. For consolidation of the milled powder, the cans were solutionized at 850ºC for 2 h and then at 1000ºC for 2 h followed by extrusion through a rectangular shaped die to form the 14YWT billets. The 14YWT heat containing 0.4%Ti (14YW4T) was successfully extruded before a critical component on the extrusion press failed, thus preventing any further extrusions until it is repaired.

36 MATERIALS SCIENCE↗

Directionally solidified article with weld repair

A directionally solidified nickel-base superalloy article has a defect therein extending parallel to the solidification direction. The article is repaired by removing any foreign matter present in the defect, and then heating the article to a repair temperature of from about 60 to about 98 percent of the solidus temperature of the base material in a chamber containing a protective gas that inhibits oxidation of the base material. The defect is filled with a filler metal while maintaining the article at the repair temperature. The filling is accomplished by providing a source of the filler metal of substantially the same composition as the base material of the directionally solidified article, and melting the filler metal into the defect progressively while moving the source of the filler metal relative to the article in a direction parallel to the solidification direction. Optionally, additional artificial heat extraction is accomplished in a heat-flow direction that is within about 45 degrees of the solidification direction, as the filler metal solidifies within the defect. The article may thereafter be heat treated.

Smashey, Russell W.↗

Oxidation resistant porous material for transpiration cooled vanes

Porous metal sheet with controlled permeability was made by space winding and diffusion bonding fine wire. Two iron-chromium-aluminum alloys and three-chromium alloys were used: GE 1541 (Fe-Cr-Al-Y), H 875 (Fe-Cr-Al-Si), TD Ni Cr, DH 245 (Ni-Cr-Al-Si) and DH 242 (Ni-Cr-Si-Cb). GE 1541 and H 875 were shown in initial tests to have greater oxidation resistance than the other candidate alloys and were therefore tested more extensively. These two materials were cyclic furnace oxidation tested in air at 1800 and 2000 F for accumulated exposure times of 4, 16, 64, 100, 200, 300, 400, 500, and and 600 hours. Oxidation weight gain, permeability change and mechanical properties were determined after exposure. Metallographic examination was performed to determine effects of exposure on the porous metal and electron beam weld joints of porous sheet to IN 100 strut material. Hundred hour stress rupture life and tensile tests were performed at 1800 F. Both alloys had excellent oxidation resistance and retention of mechanical properties and appear suitable for use as transpiration cooling materials in high temperature gas turbine engines.

Madsen, P.↗

Measurement of thermal gap conductance using the laser flash method

Thermal gap conductance refers to overall heat conductance through a gas-filled gap as interface thermal resistance between the gas and surface has to be considered. The analysis of new ATR (Advanced Test Reactor) fuel experiments requires experimental data and models for the gap conductance of the cladding/fuel capsule gap, which typically varies from 5 μm to 50 μm and is filled with He at 1-3 atm. Although past research has studied the gap conductance between UO{sub 2} fuel and Zircaloy cladding, new experiments are needed to provide the gap conductance data between HT9 and stainless steel 316, and between advanced fuels and advanced cladding in the Accident Tolerant Fuels program. In this paper, the laser flash method is modified to measure the gap conductance. The gap is formed by welding two stainless steel 316 disks with three spacers. The temperature at the rear surface, after exposure to the laser pulse at the front surface, is modeled with 1D heat transfer through three layers. The analytic solution is then fitted with the measured temperature to determine gap conductance. The sensitivity analysis based on the 1D assumption and 3D numerical simulations were performed to assess the sensitivity and uncertainty of the measurement. It is concluded the heat capacity of the gas in the gap has minimal impact on the measurement, which indicates that the thermal property determined by this method is the thermal conductance, instead of the thermal diffusivity. Convective heat loss through sidewalls under the current experimental design has insignificant influences. Heat transfer through spacers may cause up to 10% overestimation of thermal gap conductance, but the effects can be mostly eliminated by the design of grooves on samples. The result established a pathway for gap conductance determination. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Creep of A508/533 Pressure Vessel Steel

ABSTRACT Evaluation of potential Reactor Pressure Vessel (RPV) steels has been carried out as part of the pre-conceptual Very High Temperature Reactor (VHTR) design studies. These design studies have generally focused on American Society of Mechanical Engineers (ASME) Code status of the steels, temperature limits, and allowable stresses. Initially, three candidate materials were identified by this process: conventional light water reactor (LWR) RPV steels A508 and A533, 2¼Cr-1Mo in the annealed condition, and Grade 91 steel. The low strength of 2¼Cr-1Mo at elevated temperature has eliminated this steel from serious consideration as the VHTR RPV candidate material. Discussions with the very few vendors that can potentially produce large forgings for nuclear pressure vessels indicate a strong preference for conventional LWR steels. This preference is based in part on extensive experience with forging these steels for nuclear components. It is also based on the inability to cast large ingots of the Grade 91 steel due to segregation during ingot solidification, thus restricting the possible mass of forging components and increasing the amount of welding required for completion of the RPV. Grade 91 steel is also prone to weld cracking and must be post-weld heat treated to ensure adequate high-temperature strength. There are also questions about the ability to produce, and very importantly, verify the through thickness properties of thick sections of Grade 91 material. The availability of large components, ease of fabrication, and nuclear service experience with the A508 and A533 steels strongly favor their use in the RPV for the VHTR. Lowering the gas outlet temperature for the VHTR to 750°C from 950 to 1000°C, proposed in early concept studies, further strengthens the justification for this material selection. This steel is allowed in the ASME Boiler and Pressure Vessel Code for nuclear service up to 371°C (700°F); certain excursions above that temperature are allowed by Code Case N-499-2 (now incorporated as an appendix to Section III Division 5 of the Code). This Code Case was developed with a rather sparse data set and focused primarily on rolled plate material (A533 specification). Confirmatory tests of creep behavior of both A508 and A533 are described here that are designed to extend the database in order to build higher confidence in ensuring the structural integrity of the VHTR RPV during off-normal conditions. A number of creep-rupture tests were carried out at temperatures above the 371°C (700°F) Code limit; longer term tests designed to evaluate minimum creep behavior are ongoing. A limited amount of rupture testing was also carried out on welded material. All of the rupture data from the current experiments is compared to historical values from the testing carried out to develop Code Case N-499-2. It is shown that the A508/533 basemetal tested here fits well with the rupture behavior reported from the historical testing. The presence of weldments significantly reduces the time to rupture. The primary purpose of this report is to summarize and record the experimental results in a single document.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Weld repair of directionally solidified articles

A directionally solidified nickel-base superalloy article has a defect therein extending parallel to the solidification direction. The article is repaired by removing any foreign matter present in the defect, and then heating the article to a repair temperature of from about 60 to about 98 percent of the solidus temperature of the base material in a chamber containing a protective gas that inhibits oxidation of the base material. The defect is filled with a filler metal while maintaining the article at the repair temperature. The filling is accomplished by providing a source of the filler metal of substantially the same composition as the base material of the directionally solidified article, and melting the filler metal into the defect progressively while moving the source of the filler metal relative to the article in a direction parallel to the solidification direction. Optionally, additional artificial heat extraction is accomplished in a heat-flow direction that is within about 45 degrees of the solidification direction, as the filler metal solidifies within the defect. The article may thereafter be heat treated.

Smashey, Russell W.↗

Testing of an Arcjet Thruster with Capability of Direct-Drive Operation

Electric thrusters typically require a power processing unit (PPU) to convert the spacecraft provided power to the voltage-current that a thruster needs for operation. Testing has been initiated to study whether an arcjet thruster can be operated directly with the power produced by solar arrays without any additional conversion. Elimination of the PPU significantly reduces system-level complexity of the propulsion system, and lowers developmental cost and risk. The work aims to identify and address technical questions related to power conditioning and noise suppression in the system and heating of the thruster in long-duration operation. The apparatus under investigation has a target power level from 400-1,000 W. However, the proposed direct-drive arcjet is potentially a highly scalable concept, applicable to solar-electric spacecraft with up to 100's of kW and beyond. A direct-drive electric propulsion system would be comprised of a thruster that operates with the power supplied directly from the power source (typically solar arrays) with no further power conditioning needed between those two components. Arcjet thrusters are electric propulsion devices, with the power supplied as a high current at low voltage; of all the different types of electric thruster, they are best suited for direct drive from solar arrays. One advantage of an arcjet over Hall or gridded ion thrusters is that for comparable power the arcjet is a much smaller device and can provide more thrust and orders of magnitude higher thrust density (approximately 1-10 N/sq m), albeit at lower I(sub sp) (approximately 800-1000 s). In addition, arcjets are capable of operating on a wide range of propellant options, having been demonstrated on H2, ammonia, N2, Ar, Kr, Xe, while present SOA Hall and ion thrusters are primarily limited to Xe propellant. Direct-drive is often discussed in terms of Hall thrusters, but they require 250-300 V for operation, which is difficult even with high-voltage solar arrays. The arcjet requires under 100 V, which is more in-line with what is easily possible with a solar array. Direct-drive of an electric propulsion system confers the advantage of reducing or eliminating the power processing unit (PPU) that is typically needed to convert the spacecraft-provided power to the voltage and current needed for thruster operation. Since the PPU is typically the most expensive piece of an electric thruster system, from both a fabrication and qualification standpoint, its elimination offers the potential for major reductions in system cost and risk. The design of the arcjet built for this effort was based on previous low power (1 kW class) arcjets. It has a precision machined 99.95% pure tungsten anode which also serves as the nozzle. The anode constrictor region is 1 mm (0.040-in) diameter and 1 mm (0.040-in) long. The cathode is a tungsten welding electrode doped with LaO2; its tip was precision ground to a 30◦ angle ending in a blunt end. The two electrodes are separated by a boron-nitride insulator which also serves as the propellant injection manifold; it ends in six small holes which introduce the propellant gas in the diverging section of the nozzle, directly adjacent to the cathode. The electrodes and insulator are housed in a stainless-steel outer-body, with a Macor insulator at the mid-plane to provide thermal isolation between the front and back halves of the device. The gas seals were made using Grafoil gaskets. Figure 1A shows the assembled thruster in the vacuum chamber; figure 1B shows the thruster in operation on argon at a flow rate of 676 sccm (20 mg/s). Initial testing was conducted in a 3.5-ft diameter vacuum chamber; the ultimate pressure reached during quasi-steady operation of the thruster was about 330 millitorr. The thruster was powered with a high-current, 0-100A, 15 kW power supply. The discharge was initiated with a high-voltage (approximately 10 kV) spark initiator that was isolated from the supply by a stack of diodes. The testing indicated that an operating point exists within the I-V characteristics that is compatible with direct-drive solar-electric operation; for a flow rate of 20 mg/s (argon) the arc could be sustained at a voltage of about 20 V and a current of 25 A (500W).

Martin, Adam K.↗

Torch End-Effector and TIG Electrode Changeout Design for a TIG Welding Robot Used in Metal Big Area Additive Manufacturing

Metal Big Area Additive Manufacturing (mBAAM) is a promising approach to large-scale metal additive manufacturing (AM) or 3D printing. The mBAAM system uses an arc-based wire-fed welding robot to build metal parts. A multi-degree-of-freedom robotic arm is known for its extensive range of motion and reliable tool handling. Attaching a torch end-effector to a robotic arm gives it welding capabilities; however, this decreases the motion range and dynamics of the robot. As a result, build volume and printing accuracy are decreased. Additionally, only a portion of time is spent printing in an arc-based process. Maintenance leads to downtime on the system. In a tungsten inert gas (TIG)-based process, the torch electrode wears out over time and must be changed to avoid defective deposition. This paper proposes an approach for a compact torch end-effector to improve the robot’s build volume. This paper also proposes an approach to reducing non-printing process time by designing and implementing a semi-automated electrode changing system.

Masuo, Chris↗

Operation, maintenance, and installation instructions for HLW thermal catalytic oxidizer/reducer (TCO)

The HLW TCO Units are a combination of four rectangular vessels; the Recuperative Heat Exchanger, Electric Heater, Selective Catalytic Oxidizer (SCO), and the Selective Catalytic Reducer (SCR). Each housing is simply a closed rectangular box with formed angle stiffeners welded to the outside perimeter. The housings are connected with process piping and sit on a skid. There is an external frame to support all major process piping and the Electric Heater. The process piping consists of a 14" inlet which enters the heat exchanger. Then the off-gas flows through 18" cross over piping which leads to the heater. Once the off-gas is heated, another section of 18" process piping leads the off-gas through the SCO and SCR. The off-gas then flows through the heat exchanger before exiting through 16" process piping which leads to the customer's piping. The other equipment associated with the HLW TCO is the Ammonia Dilution Skid. The dilution skid controls the ammonia injection into the off-gas. The dilution skid supports two process lines, a 2" line and a 1" line which carries process air and anhydrous ammonia respectively. Ammonia injection into the off-gas is required prior to entering the SCR to ensure the NOx reduction occurs through the SCR catalyst bank.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SCR-TCP Installation and Operating Manual, 24590-CM-POA-MBT0-00002-01-00002_00C

The HLW TCO Units are a combination of four rectangular vessels; the Recuperative Heat Exchanger, Electric Heater, Selective Catalytic Oxidizer (SCO), and the Selective Catalytic Reducer (SCR). Each housing is simply a closed rectangular box with formed angle stiffeners welded to the outside perimeter. The housings are connected with process piping and sit on a skid. There is an external frame to support all major process piping and the Electric Heater. The process piping consists of a 14” inlet which enters the heat exchanger. Then the off-gas flows through 18” cross over piping which leads to the heater. Once the off-gas is heated, another section of 18” process piping leads the off-gas through the SCO and SCR. The off-gas then flows through the heat exchanger before exiting through 16” process piping which leads to the customer's piping. The other equipment associated with the HLW TCO is the Ammonia Dilution Skid. The dilution skid controls the ammonia injection into the off-gas. The dilution skid supports two process lines, a 2” line and a 1” line which carries process air and anhydrous ammonia respectively. Ammonia injection into the off-gas is required prior to entering the SCR to ensure the NOx reduction occurs through the SCR catalyst bank.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation on Microstructure and Mechanical Properties of TA10–Q245R Composite Plate Formed by Explosive Welding

The titanium alloy TA10 and the carbon steel Q245R are welded by explosive welding, and post-weld heat treatment (PWHT) is carried out for the TA10–Q245R composite plate. Microstructure and mechanical properties of the composite plate are investigated both in as-welded (AW) condition and after PWHT, respectively. Results show that, in AW condition, the bonding interface of composite plate presents wavy morphology, and at both sides of the interface plastic deformation is generated to a certain degree. Near the interface interdiffusion zone of alloying elements exists, and no Fe-Ti intermetallic compound is produced at the interface. SEM images indicate that the tensile fracture of composite plate presents the characteristic of ductile fracture, and no defects such as gas pores or impurities are found on the surface of shear fracture. After PWHT, the interfacial microstructure of the composite plate is obviously changed. Compared with the mechanical properties of the composite plate in AW condition, both tensile strength and shear strength of the composite plate are decreased to a certain extent after PWHT. With various factors into consideration, the suitable heat treatment procedure of TA10–Q245R composite plate is determined as follows: 550 °C × 1.5 h.

36 MATERIALS SCIENCE↗

Direct Drive Solar-Powered Arcjet Thruster

Electric thrusters typically require a power processing unit (PPU) to convert the spacecraft-provided power to the voltage and current that a thruster needs for operation. NASA Marshall Space Flight Center has initiated fundamental studies on whether an arcjet thruster can be operated directly with the power produced by solar arrays without any additional conversion. Elimination of the PPU significantly reduces system-level complexity of the propulsion system, and lowers developmental cost and risk. The proposed work will aim to refine the proof-of-concept presently being assembled and begin to identify and address technical questions related to power conditioning and noise suppression in the system, and heating of the thruster in long-duration operation. The apparatus proposed for investigation has a target power level of 400 to 1,000 W. The proposed direct-drive arcjet is potentially a highly scalable concept, applicable to spacecraft with up to hundreds of kilowatts and beyond. The design of the arcjet built for this effort was based on previous low power (1 kW class) arcjets.1-3 It has a precision machined 99.95% pure tungsten anode that also serves as the nozzle with a 0.040-in- (1-mm-) diameter, 0.040-in-long constrictor region. An additional anode with a 0.020-in- (0.5-mm-) diameter, 0.020-inlong constrictor region was purchased, but has not yet been used. The cathode is a 0.125-in-diameter tungsten welding electrode doped with lanthum-oxygen; its tip was precision ground to a 308deg angle and terminates in a blunt end. The two electrodes are separated by a boron-nitride insulator that also serves as the propellant manifold; it ends in six small holes which introduce the propellant gas in the diverging section of the nozzle, directly adjacent to the cathode. The electrodes and insulator are housed in a stainless-steel outer body, with a Macor insulator at the mid-plane to provide thermal isolation between the front and back halves of the device. The gas seals were made using Grafoil gaskets. Figure 1(a) shows the assembled thruster; figure 1(b) shows the thruster in the vacuum chamber with electrical and propellant connections.

Polzin, Kurt↗

Heat Flux Analysis of a Reacting Thermite Spray Impingent on a Substrate

Spray combustion from a thermite reaction is a new area of research relevant to localized energy generation applications, such as welding or cutting. In this study, we characterized the heat flux of combustion spray impinging on a target from a nozzle for three thermite mixtures. The reactions studied include aluminum (Al) with iron oxide (Fe2O3), Al with copper oxide (CuO), and Al with molybdenum oxide (MoO3). Several standoff distances (i.e., distance from the nozzle exit to the target) were analyzed. A fast response heat flux sensor was engineered for this purpose and is discussed in detail. Results correlated substrate damage to a threshold heat flux of 4550 W/cm2 for a fixed-nozzle configuration. Also, higher gas-generating thermites were shown to produce a widely dispersed spray and be less effective at imparting kinetic energy damage to a target. These results provide an understanding of the role of thermal and physical properties (i.e., such as heat of combustion, gas generation, and particle size) on thermite spray combustion performance measured by damaging a target substrate.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗