Search NASA⌕ Search

SEARCH · Search NASA

Results for “LUNAR PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Overview of the Altair Lunar Lander Thermal Control System Design

NASA's Constellation Program has been developed to successfully return humans to the Lunar surface prior to 2020. The Constellation Program includes several different project offices including Altair, which is the next generation Lunar Lander. The planned Altair missions are very different than the Lunar missions accomplished during the Apollo era. These differences have resulted in a significantly different thermal control system architecture. The Altair project has employed a rather unique development approach as compared with previous manned spacecraft programs. Altair started the design process by developing a single-string (no fault tolerance), minimum functionality design. This first design and analysis cycle resulted in the baseline design for the entire process. From this point of departure, Altair continued the development process by adding vehicle functionality for the purposes of minimizing the risk of Loss Of Crew (LOC) and Loss Of Mission (LOM). Through the subsequent design and analysis cycles, the project office compared the added mass associated with the reduction of LOC/LOM and selected the most mass efficient design solutions. The current paper will summarize the Altair mission profile, the operational phases, and the LOC/LOM decisions that were made during the various design cycles. The evolution of the thermal control system design through Lunar Design and Analysis Cycle 3 (LDAC-3) will also be described in this paper.

Stephan, Ryan A.↗

The Lunar GNSS Receiver Experiment (LuGRE)

The Lunar GNSS Receiver Experiment (LuGRE) is a joint NASA-Italian Space Agency (ASI) payload on the Firefly Blue Ghost Mission 1 (BGM1) with the goal to demonstrate GNSS-based positioning, navigation, and timing at the Moon. LuGRE was chosen by the NASA Commercial Lunar Payload Services (CLPS) program as one of ten payloads on its “19D” task order for delivery to the lunar surface in 2023. The LuGRE payload consists of a weak-signal GNSS receiver, a high-gain L-band patch antenna, a low-noise amplifier, and an RF filter. The receiver will track GPS L1 C/A and L5, and Galileo E1 and E5a signals and will return pseudorange, carrier phase, and Doppler measurements to the ground. It will also calculate least-squares point solutions and Kalman-filter based navigation solutions onboard. In addition, the receiver features the capability to record raw I/Q baseband samples for downlink and ground processing. LuGRE will build on the legacy of prior missions in the Space Service Volume (SSV) including the initial experiments by AMSAT-OSCAR 40 and others, the GOES-R series of geostationary weather satellites, and the NASA Magnetospheric Multiscale (MMS) mission currently operating on GPS-based navigation at nearly 50% of lunar distance. Further, LuGRE will be one of the very first demonstrations of GNSS signal reception and navigation in the lunar environment and on the lunar surface, paving the way for operational use by future lunar missions such as Orion, Gateway, robotic and human landers, and surface rovers. Ultimately, all LuGRE science data will be released to a public data archive for the benefit of the GNSS and space communities. This paper provides a detailed overview of the LuGRE payload, including its design, concept of operations, and its predicted ability to meet its core science objectives. The baseline science investigations and priorities are outlined. Simulated performance results are shown based on the latest calibrated models including signal strength, signal availability, onboard navigation performance and convergence properties, and ground-based post-processed navigation performance.

LuGRE↗

The Apollo program and amino acids

Apollo lunar sample analyses designed to detect the presence of organic compounds are reviewed, and the results are discussed from the viewpoint of relevance to laboratory experiments on the synthesis of amino acids and to theoretical models of cosmochemical processes resulting in the formation of organic compounds. Glycine, alanine, glutamic acid, aspartic acid, serine, and threonine have been found repeatedly in the hydrolyzates of hot aqueous extracts of lunar dust. These compounds represent an early step in the sequence of events leading to the rise of living material and were probably deposited by the solar wind. The results of the Apollo program so far suggest that the pathway from cosmic organic matter to life as it evolved on earth could have been pursued on the moon to the stage of amino acid precursors and then may have been terminated for lack of sufficient water.

Fox, S. W.↗

Developing a Medical System Foundation for Level of Care IV: Short-Duration Lunar Orbit

The Human Research Program (HRP) Exploration Medical Capability (ExMC) element has developed a Medical System Foundation for Level of Care IV, as defined by NASA’s space flight human-system standards, for short-duration lunar orbit missions by employing a systems engineering approach using model-based systems engineering tools. This Foundation includes a concept of operations, medical system architecture, associated functional and non-functional requirements and rationales, and medical conditions, capabilities, and resources. Collectively, these serve as a starting point (“Foundation”) for a medical system that meets the Level of Care IV requirement. The Foundation also includes traces to the current versions of NASA standards documents and lower (e.g., sub-system) and higher (e.g., vehicle system) level requirements. Stakeholders can use the Foundation to analyze the traces between medical capabilities, medical conditions, medical resources, and requirements; identify medical system interfaces with other vehicle systems/subsystems; and as a basis for performing trades on risks vs. medical system mass and volume allocation. To facilitate communication of the Foundation to stakeholders who do not have access to the modeling tools used, an HTML representation of the Foundation was created. This discussion will focus on the processes through which the Medical System Foundation was developed, how the Foundation builds a bridge between the medical and engineering domains and facilitates communication between these communities, and how these processes can be applied more broadly to a crew health and performance system and other system domains.

S. Lumpkins↗

Double-lunar swingby trajectories for the spacecraft of the International Solar Terrestrial Physics program

The ISEE-3 satellite carried out the first extensive exploration of the distant geomagnetic tail during 1983. ISEE-3's orbit was altered with four lunar gravity assists that alternately decreased and increased its orbital energy while keeping the apogees aligned in the antisolar direction. Two spacecraft of the International Solar Terrestrial Physics program will use similar double-lunar swingby orbits to study the solar wind and the geomagnetic environment. Geotail will be built in Japan for the Institute of Space and Astronautical Sciences; its main purpose will be to explore the earth's geomagnetic tail. Wind is a NASA spacecraft that will monitor the solar wind upstream from the earth and will also study the bowshock region of the magnetosphere. Current plans call for launches of both by NASA with expendable launch vehicles during the second half of 1992.

Dunham, David W.↗

Did We Really Land on the Moon? Suggestions for Science Teachers

On Feb. 15, 2001, the FOX network broadcast a one hour TV program claiming that the Apollo lunar landings had all been staged in a studio set in Nevada, and that astronauts had never landed on the Moon. This claim can be refuted on many points, focused on the supposed photographic evidence indicating studio lighting or other aspects of the Apollo missions. The TV program ignored the returned lunar samples. Science teachers have been swamped with questions about the program, and this paper has been written to suggest how they can use it to stimulate interest in lunar geology. The article shows how the NASA Lunar Disk kits, available on loan to schools, can be studied by students. These samples are visibly different from terrestrial soils and rocks in several ways. There is no quartz in the lunar soil; there are no true reds and browns resulting from ferric oxides; and the textures of the soil (agglutinates and glass beads) can only be formed on an airless planet. The article has several pictures of the lunar surface and the Apollo samples, and a short bibliography for background reading.

Lowman, Paul D., Jr.↗

Cislunar space infrastructure: Lunar technologies

Continuing its emphasis on the creation of a cisluar infrastructure as an appropriate and cost-effective method of space exploration and development, the University of Colorado explores the technologies necessary for the creation of such an infrastructure, namely (1) automation and robotics; (2) life support systems; (3) fluid management; (4) propulsion; and (5) rotating technologes. The technological focal point is on the development of automated and robotic systems for the implementation of a Lunar Oasis produced by automation and robotics (LOARS). Under direction from the NASA Office of Exploration, automation and robotics have been extensively utilized as an initiating stage in the return to the Moon. A pair of autonomous rovers, modular in design and built from interchangeable and specialized components, is proposed. Utilizing a 'buddy system', these rovers will be able to support each other and to enhance their individual capabilities. One rover primarily explores and maps while the second rover tests the feasibility of various materials-processing techniques. The automated missions emphasize availability and potential uses of lunar resources and the deployment and operations of the LOAR program. An experimental bio-volume is put into place as the precursor to a Lunar Environmentally Controlled Life Support System. The bio-volume will determine the reproduction, growth and production characteristics of various life forms housed on the lunar surface. Physiochemical regenerative technologies and stored resources will be used to buffer biological disturbances of the bio-volume environment. The in situ lunar resources will be both tested and used within this bio-volume. Second phase development on the lunar surface calls for manned operations. Repairs and reconfiguration of the initial framework will ensue. An autonomously initiated, manned Lunar Oasis can become an essential component of the United States space program. The Lunar Oasis will provide support to science, technology, and commerce. It will enable more cost-effective space exploration to the planets and beyond.

W. Faller↗

Dual Mission Scenarios for the Human Lunar Campaign - Performance, Cost and Risk Benefits

Scenarios for human lunar operations with capabilities significantly beyond Constellation Program baseline missions are potentially feasible based on the concept of dual, sequential missions utilizing a common crew and a single Ares I/CEV (Crew Exploration Vehicle). For example, scenarios possible within the scope of baseline technology planning include outpost-based sortie missions and dual sortie missions. Top level cost benefits of these dual sortie scenarios may be estimated by comparison to the Constellation Program reference two-mission-per-year lunar campaign. The primary cost benefit is the accomplishment of Mission B with a "single launch solution" since no Ares I launch is required. Cumulative risk to the crew is lowered since crew exposure to launch risks and Earth return risks are reduced versus comparable Constellation Program reference two-mission-per-year scenarios. Payload-to-the-lunar-surface capability is substantially increased in the Mission B sortie as a result of additional propellant available for Lunar Lander #2 descent. This additional propellant is a result of EDS #2 transferring a smaller stack through trans-lunar injection and using remaining propellant to perform a portion of the lunar orbit insertion (LOI) maneuver. This paper describes these dual mission concepts, including cost, risk and performance benefits per lunar sortie site, and provides an initial feasibility assessment.

Saucillo, Rudolph J.↗

On the Moon to Stay: Challenges Presented to Power Electronics Technology by Sustained Operations on the Lunar Surface

NASA’s Artemis Program seeks not only to return humans to the Moon for the first time since the 1970’s but also to provide the technological basis for infrastructure that will enable permanent and expanding scientific and industrial exploitation of the Lunar surface. The primary purpose of this infrastructure is to generate and distribute power to a diverse and growing range of scientific and industrial assets, and the keys to success for this function are power management and control circuits that are highly reliable and maintainable for a decade of operation in the extreme thermal, radiation, and dust environment of the Lunar surface. While various combinations of wide band gap semiconductors, electronic devices, circuit topologies, and shielding schemes have been successfully developed for mission environments ranging from low Earth orbit to the Jovian system, power management technology has not been optimized to meet the full combination of mission requirements for the Lunar surface. To accomplish this, NASA requests the dedicated focus of the power electronics industry.

semiconductors↗

Use of Taguchi design of experiments to optimize and increase robustness of preliminary designs

The research performed this summer includes the completion of work begun last summer in support of the Air Launched Personnel Launch System parametric study, providing support on the development of the test matrices for the plume experiments in the Plume Model Investigation Team Project, and aiding in the conceptual design of a lunar habitat. After the conclusion of last years Summer Program, the Systems Definition Branch continued with the Air Launched Personnel Launch System (ALPLS) study by running three experiments defined by L27 Orthogonal Arrays. Although the data was evaluated during the academic year, the analysis of variance and the final project review were completed this summer. The Plume Model Investigation Team (PLUMMIT) was formed by the Engineering Directorate to develop a consensus position on plume impingement loads and to validate plume flowfield models. In order to obtain a large number of individual correlated data sets for model validation, a series of plume experiments was planned. A preliminary 'full factorial' test matrix indicated that 73,024 jet firings would be necessary to obtain all of the information requested. As this was approximately 100 times more firings than the scheduled use of Vacuum Chamber A would permit, considerable effort was needed to reduce the test matrix and optimize it with respect to the specific objectives of the program. Part of the First Lunar Outpost Project deals with Lunar Habitat. Requirements for the habitat include radiation protection, a safe haven for occasional solar flare storms, an airlock module as well as consumables to support 34 extra vehicular activities during a 45 day mission. The objective for the proposed work was to collaborate with the Habitat Team on the development and reusability of the Logistics Modules.

Carrasco, Hector R.↗

Analysis of Alternative Architectures for Cargo Lunar Landers

NASA’s Human Landing System (HLS) program has been working with commercial partners to develop human-class lunar landers to return the first American woman and next American man to the lunar surface in the mid 2020’s. In an effort to expand human presence beyond low Earth orbit, NASA’s Artemis program aims to facilitate a sustainable, long-term human presence in cis-lunar space. A component of this will require significant infrastructure to be delivered to the lunar surface. Delivering this infrastructure will require a significant lander capability that has yet to be developed. A thorough understanding of cargo lunar lander architectures is required such that select alternatives can be identified that best support the Artemis program’s objective of sustainability. The goal of this study is to aid NASA and its partners in the understanding of the cargo lunar lander trades space, as well as identify potential robust alternatives. The results will support NASA as it moves forward with key activities such as requirements formulation, agency strategic planning, and potential cargo lunar lander procurements. The study builds off of recent work performed by the Human Landing System program’s Architecture and Systems Analysis group to encompass a broad trade space of cargo lunar lander architecture alternatives. The current trade space as depicted by the morphological matrix and mission graph in Fig. 1 and Fig. 2, respectively, includes key alternative options that have become highly relevant due to current HLS activities and include on-orbit refueling, active cryogenic fluid management, Earth orbit aggregation, and global lunar access. The authors believe that there is also a statistically relevant impact of lander-payload configuration on the primary structure of the vehicle that could greatly impact alternative selection. Because of this, several conceptual lander-payload configurations will be evaluated to determine the level of impact. The current set of conceptual configurations are shown in Fig. 3 and Fig. 4. To aid the conceptual evaluation of these configurations, a catalogue of notional payloads has been developed that represent a wide range of masses and volumes that are expected to be delivered in support of a sustained human lunar presence, including pressurized and unpressurized rovers, surface habitats, power systems, and other support infrastructure. In order to execute this study in a timely fashion, a similar approach to that utilized in a similar 2019 study focused on 2024 human lunar sorties will be employed [1]. The team utilized a novel architecture synthesis framework currently being developed by NASA/MSFC to evaluate over 600,000 lunar lander architectures over a two month time frame [2]. From this large data set, varying ground rules and assumptions were applied as filters to explore the trade space to identify alternatives which exhibited robustness, as measured by launch vehicle payload margin, to absorb the natural growth that occurs during design maturation. The set of Earth-Moon system Delta-Vs assumed from the 2019 study, shown in Fig. 5, will be repurposed to accelerate model formulation for this effort. Additionally, current efforts in collaboration with the Georgia Institute of Technology’s Aerospace System Design Lab will be integrated to provide probabilistic modeling of the cargo lunar lander architectures to aid in identifying robust design alternatives [3]. The approach will help minimize potential impacts due to large levels of uncertainty inherent to pre phase-A conceptual design. By leveraging these past and present studies and partnerships, a highly detailed set of data can be generated in a short time period to aid NASA in the coming years to support the goal of a sustained human lunar presence.

Architectures↗

Particle Loading Tests on HEPA Flat Sheet Media at Sub-Ambient Pressures Using a Lunar Dust Simulant

When humans return to the moon under the NASA Artemis program, their activities on the lunar surface will inevitably lead to the intrusion of some level of lunar dust into the lander cabin. Therein the crew would be exposed to the potential hazards of lunar dust and the possibility of subsequent transfer into orbiting segments after docking. The spacecraft’s cabin filtration system will need to be effective at removing the airborne lunar dust to properly purify the breathable cabin air and minimize the spreading of the dust throughout the vehicle and orbital segments through the mission duration. The fine nature of the lunar dust will require high efficiency filtration, such as HEPA. A series of tests were performed in a specially designed recirculating sealed flow loop, for testing filter media and filter elements at the NASA Glenn Research Center. The flow loop was used to assess the performance and capacity of flat sheet filter media at representative cabin pressures using JSC-1AF lunar dust simulant and at high rates of particle loading. The pressure drop across the filter media was measured as a function of accumulated particle mass load at ambient pressure and at two sub-ambient pressures, 0.0703MPa and 0.0565MPa, and at a media velocity that was scaled relative to its pleated configuration. The challenge particle flows were generated by a custom designed particle generator that introduces dispersed particles of the lunar simulant at high concentrations. An optical particle counting instrument provided filter efficiency measurements within the sealed environment. The pressure drop was found to increase linearly with the amount of dust load on the media, for all test conditions, while the starting pressure drop was found to be lower at the lowest sub-ambient pressure case. High filter efficiency was maintained after high particle loads on the media.

Sub-ambient↗

Particle Loading Tests on HEPA Flat Sheet Media at Sub-Ambient Pressures Using a Lunar Dust Simulant

When humans return to the moon under the NASA Artemis program, their activities on the lunar surface will inevitably lead to the intrusion of some level of lunar dust into the lander cabin. Therein the crew would be exposed to the potential hazards of lunar dust and the possibility of subsequent transfer into orbiting segments after docking. The spacecraft’s cabin filtration system will need to be effective at removing the airborne lunar dust to properly purify the breathable cabin air and minimize the spreading of the dust throughout the vehicle and orbital segments through the mission duration. The fine nature of the lunar dust will require high efficiency filtration, such as HEPA. A series of tests were performed in a specially designed recirculating sealed flow loop, for testing filter media and filter elements at the NASA Glenn Research Center. The flow loop was used to assess the performance and capacity of flat sheet filter media at representative cabin pressures using JSC-1AF lunar he filter media was measured as a function of accumulated particle mdust simulant and at high rates of particle loading. The pressure drop across tass load at ambient pressure and at two sub-ambient pressures, 0.0703MPa and 0.0565MPa, and at a media velocity that was scaled relative to its pleated configuration. The challenge particle flows were generated by a custom designed particle generator that introduces dispersed particles of the lunar simulant at high concentrations. An optical particle counting instrument provided filter efficiency measurements within the sealed environment. The pressure drop was found to increase linearly with the amount of dust load on the media, for all test conditions, while the starting pressure drop was found to be lower at the lowest sub-ambient pressure case. High filter efficiency was maintained after high particle loads on the media

Sub-ambient↗

Addressing CFM Modeling Gaps for Application into NASA’S Future Cutting Edge Missions

NASA, the US industry, and international partners are crafting frameworks to enable sustaining lunar missions. The ongoing programs, led by the agency, and prominent industry players, encompass plans for the sustained use of cryogenic propellants in lunar landers and in-space propellant refueling depots. NASA’s proactive funding initiatives have fueled the advancement of predictive computational models tailored to enhance the storage and transfer of cryogenic propellant. This paper aims to spotlight the latest advancements in this arena and delve into the collaborative efforts surrounding predictive model development within internal NASA programs as well as current and previous collaborations with industry and international partners. The paper presents an overview of recent advancements in cryogenic fluid management model development, along with their correlation with recent microgravity and large-scale cryogenic ground tests. The tests include key experiments such as the ISS Zero-Boil-Off Tank (ZBOT) series of experiments and the (Robotic Refueling Mission 3) RRM3 test during which liquid methane was stored on-orbit for an extended period of five months. The paper also highlights the anchoring of propellant tank pressurized drain tests involving sloshing that were conducted with liquid methane propellant during the Apollo/Saturn Era. Additionally, the paper discusses model anchoring against more recent sloshing tests carried out with liquid hydrogen propellant. Notable large-scale tests, such as a liquid oxygen propellant transfer test conducted by SpaceX were also used to help correlate a two-phase propellant transfer model using the valuable data measured during the test. The paper further showcases model correlations against a substantial oxygen liquefaction test undertaken by NASA to validate In-Situ-Resource-Utilization (ISRU) technologies that will prove pivotal for a sustained lunar presence.

Low-gravity fluid modeling↗