Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mars Mars exploration program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Multi-Mission Radioisotope Thermoelectric Generator (MMRTG) program overview

Future NASA missions require safe, reliable, long-lived power systems for surface exploration of planetary bodies such as Mars as well as exploration of the solar system in the vacuum of space beyond Earth orbit. To address this need, the Department of Energy and NASA have initiated the development radioisotope power systems.

Peterson, Craig E.↗

From IMM to IMPACT: Enhanced Functionality for Exploration Missions

The Integrated Medical Model (IMM) is an evidence-based decision support tool used to assess medical risk and optimize medical systems for manned spaceflight missions. The IMM is baselined to the International Space Station (ISS) in terms of the spaceflight environment of low earth orbit and the ISS medical resource capability. IMPACT is the next generation evidence-based decision support tool currently under development by the Human Research Program to assess medical risk and optimize medical systems for future exploration missions to the moon and Mars. IMPACT is being designed to provide a comprehensive integrated suite of decision support tools for mission planners. This presentation will focus on the lessons learned from IMM and the enhanced functionalities of IMPACT.

E L Kerstman↗

The Beyond Low Earth Orbit (BLEO) Instrumentation and Science Series

The Beyond Low Earth Orbit Instrumentation and Science Series is an initiative in the NASA Space Biology Program to support fundamental biological research as we move beyond the ISS to explore the Moon and Mars. Centered at NASA's Ames Research Center, its activities include a Science Working Group; resources for the community such conferences and open science resources; hardware conceptualization and development; and two flight missions. This talk will present an overview of the specific components of the Series and ways in which the community can contribute.

Jessica Audrey Lee↗

ISRU: An Overview of NASA'S Current Development Activities and Long-Term Goals

The concept of "living off the land" by utilizing the indigenous resources of the Moon, Mars, or other potential sites of robotic and human exploration has been termed In-Situ Resource Utilization (ISRU). It is fundamental to any program of extended human presence and operation on other extraterrestrial bodies that we learn how to utilize the indigenous resources. The chief benefits of ISRU are that it can reduce the mass, cost, and risk of robotic and human exploration while providing capabilities that enable the commercial development of space. In January 1997, the American Institute of Aeronautics and Astronautics (AIAA) Space Processing Technical Committee released a position paper entitled, "Need for A NASA Indigenous Space Resource Utilization (ISRU) Program". Besides outlining some of the potential advantages of incorporating ISRU into Lunar and Mars human mission plans and providing an overview of technologies and processes of interest, the position paper concluded with a list of seven recommendations to NASA. This paper will examine the seven recommendations proposed and provide an overview of NASA's current ISRU development activities and possible long term goals with respect to these recommendations.

Sanders, Gerald B.↗

Back to Stay: NASA’s Campaign to Sustainably Return Humans to the Moon

The Artemis program has catalyzed NASA to develop principles of sustainability as the agency and its partners contemplate returning humans to the Moon, and then to Mars, for long-term exploration. The Office of Chief Scientist collaborates with directorates within NASA, as well as with other government agencies and stakeholders, to represent the scientific endeavors in the agency, including developing a working definition of sustainability. The stays on the lunar surface under the Artemis program will be longer that those via the Apollo missions. Studying the requirements, challenges, and lessons learned from decades of human spaceflight and from analog sites in hostile environments on Earth will inform a framework for human sustainability requirements. This paper will provide an overview of the core sustainability goals as identified by NASA’s Office of the Chief Scientist and describe several activities underway to support a broad-based lunar program with a long-term view of success and achievement.

analog↗

Crew Health and Performance (CHP) Technology Roadmaps

The Environmental Control and Life Support System (ECLSS) – Crew Health and Performance (CHP) Systems Capability Leadership Team (SCLT) is a community of practice (not a funded program) sponsored by Headquarters to develop, retain, and infuse the ECLSS and CHP capabilities necessary to enable the human exploration of the Moon and Mars through the integration and empowerment of experts across NASA, other government agencies, commercial industry, and academia. The goals of the SCLT are as follows: Use the Architecture Definition Document use cases and functions to identify gaps in NASA’s current technological capabilities to meet Agency objectives and develop strategies and roadmaps for closing such gaps Make technical/strategic recommendations on ECLSS and CHP technology development efforts and investments for PPBE, acquisition strategies, and leveraging NASA’s critical capabilities Establish key performance parameters and participate in key program and project reviews Maintain cognizance of relevant ECLSS and CHP national and international technology activities in government, industry, and academia, specifically, emerging innovations and technologies, trends, and opportunities Coordinate with commercial and international partners to identify areas of mutual interest and cooperation Support future mission and system architecture studies for human exploration This document is intended to be a comprehensive overview of the strategic development plans, or Roadmaps, of key technologies and capabilities identified by the SCLT. Each Roadmap is organized by Capability Gap as the gap name and number appears in STARPort, follows a fiscal year timeline, and displays any additional information on milestones, decision points, or important details on the right-hand side of the page. The Roadmaps should be used to facilitate discussion, decision making, and planning for programs and development projects, but are not expected to accurately depict the details and statuses of the projects and tasks appearing within the plans.

Human Health and Performance↗

To Mars by the Way of the Moon

The Vision for Space Exploration defines a new U.S. space exploration policy. In support of this policy, through a renewed spirit of discovery, NASA will: a) Implement a sustained and affordable human and robotic program to explore the Solar System and beyond; b) Extend human presence across the Solar System, staring with a human return to the moon by the year 2020, in preparation for human exploration of Mars and other destinations; c) Develop the innovative technologies, knowledge, and infrastructures both to explore and to support decisions about destination for future human exploration; and d) Promote international and commercial participation in exploration to further U.S. scientific, security, and economic interests.

Carpenter, Joyce↗

Planetary Protection Technologies: Technical Challenges for Mars Exploration

The search for life in the solar system, using either in situ analysis or sample return, brings with it special technical challenges in the area of planetary protection. Planetary protection (PP) requires planetary explorers to preserve biological and organic conditions for future exploration and to protect the Earth from potential extraterrestrial contamination that could occur as a result of sample return to the Earth-Moon system. In view of the exploration plans before us, the NASA Solar System Exploration Program Roadmap published in May 2003 identified planetary protection as one of 13 technologies for "high priority technology investments." Recent discoveries at Mars and Jupiter, coupled with new policies, have made this planning for planetary protection technology particularly challenging and relevant.New missions to Mars have been formulated, which present significantly greater forward contamination potential. New policies, including the introduction by COSPAR of a Category IVc for planetary protection, have been adopted by COSPAR in response. Some missions may not be feasible without the introduction of new planetary protection technologies. Other missions may be technically possible but planetary protection requirements may be so costly to implement with current technology that they are not affordable. A strategic investment strategy will be needed to focus on technology investments designed to enable future missions and reduce the costs of future missions. This presentation will describe some of the potential technological pathways that may be most protective.

planetary protections↗

Near-Earth Phase Risk Comparison of Human Mars Campaign Architectures

A risk analysis of the launch, orbital assembly, and Earth-departure phases of human Mars exploration campaign architectures was completed as an extension of a probabilistic risk assessment (PRA) originally carried out under the NASA Constellation Program Ares V Project. The objective of the updated analysis was to study the sensitivity of loss-of-campaign risk to such architectural factors as composition of the propellant delivery portion of the launch vehicle fleet (Ares V heavy-lift launch vehicle vs. smaller/cheaper commercial launchers) and the degree of launcher or Mars-bound spacecraft element sparing. Both a static PRA analysis and a dynamic, event-based Monte Carlo simulation were developed and used to evaluate the probability of loss of campaign under different sparing options. Results showed that with no sparing, loss-of-campaign risk is strongly driven by launcher count and on-orbit loiter duration, favoring an all-Ares V launch approach. Further, the reliability of the all-Ares V architecture showed significant improvement with the addition of a single spare launcher/payload. Among architectures utilizing a mix of Ares V and commercial launchers, those that minimized the on-orbit loiter duration of Mars-bound elements were found to exceed the reliability of no spare all-Ares V campaign if unlimited commercial vehicle sparing was assumed

Manning, Ted A.↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations program is transforming Kennedy Space Center into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton (t) Block 1 configuration, and will then evolve to an ultimate capability of 130 t. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS -- Exploration Mission-1 (EM-1), an un-crewed mission to orbit the moon and return. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

An Accelerated Development, Reduced Cost Approach to Lunar/Mars Exploration Using a Modular NTR-Based Space Transportation System

The results of integrated systems and mission studies are presented which quantify the benefits and rationale for developing a common, modular lunar/Mars space transportation system (STS) based on nuclear thermal rocket (NTR) technology. At present NASA's Exploration Program Office (ExPO) is considering chemical propulsion for an 'early return to the Moon' and NTR propulsion for the more demanding Mars missions to follow. The time and cost to develop these multiple systems are expected to be significant. The Nuclear Propulsion Office (NPO) has examined a variety of lunar and Mars missions and heavy lift launch vehicle (HLLV) options in an effort to determine a 'standardized' set of engine and stage components capable of satisfying a wide range of Space Exploration Initiative (SEI) missions. By using these components in a 'building block' fashion, a variety of single and multi-engine lunar and Mars vehicles can be configured. For NASA's 'First Lunar Outpost' (FLO) mission, an expendable NTR stage powered by two 50 klbf engines can deliver approximately 96 metric tons (t) to translunar injection (TLI) conditions for an initial mass in low earth orbit (IMLEO) of approximately 198 t compared to 250 t for a cryogenic chemical TLI stage. The NTR stage liquid hydrogen (LH2) tank has a 10 m diameter, 14.5 m length, and 66 t LH2 capacity. The NTR utilizes a UC-ZrC-graphite 'composite' fuel with a specific impulse (Isp) capability of approximately 900 s and an engine thrust-to-weight ratio of approximately 4.3. By extending the size and LH2 capacity of the lunar NTR stage to approximately 20 m and 96 t, respectively, a single launch Mars cargo vehicle capable of delivering approximately 50 t of surface payload is possible. Three 50 klbf NTR engines and the two standardized LH2 tank sizes developed for lunar and Mars cargo vehicle applications would be used to configure the Mars piloted vehicle for a mission as early as 2010. The paper describes the features of the 'common' NTR-based moon/Mars STS, examines performance sensitivities resulting from different 'mission mode' assumptions, and quantifies potential schedule and cost benefits resulting from this modular moon/Mars NTR vehicle approach.

Borowski, S.↗

NASA Crew Launch Vehicle Overview

The US. Vision for Space Exploration, announced January 2004, outlines the National Aeronautics and Space Administration s (NASA) strategic goals and objectives. These include: 1) Flying the Shuttle as safely as possible until its retirement, not later than 2010. 2) Bringing a new Crew Exploration Vehicle (CEV) into service as soon as possible after Shuttle retirement. 3) Developing a balanced overall program of science, exploration, and aeronautics at NASA, consistent with the redirection of the human spaceflight program to focus on exploration. 4) Completing the International Space Station (ISS) in a manner consistent with international partner commitments and the needs of human exploration. 5) Encouraging the pursuit of appropriate partnerships with the emerging commercial space sector. 6) Establishing a lunar return program having the maximum possible utility for later missions to Mars and other destinations. Following the confirmation of the new NASA Administrator in April 2005, the Agency commissioned a team of aerospace subject matter experts from government and industry to perform the Exploration Systems Architecture Study (ESAS), which provided in-depth information for selecting the follow-on launch vehicle designs to enable these goals, The ESAS team analyzed a number of potential launch systems, with a focus on: (1) a human-rated launch vehicle for crew transport and (2) a heavy lift launch vehicle (HLLV) to carry cargo. After several months of intense study utilizing technical performance, budget, and schedule objectives, the results showed that the optimum architecture to meet the challenge of safe, reliable crew transport is a two-stage variant of the Space Shuttle propulsion system - utilizing the reusable Solid Rocket Booster (SRB) as the first stage, along with a new upper stage that uses a derivative of the RS-25 Space Shuttle Main Engine to deliver 25 metric tons to low-Earth orbit. The CEV that this new Crew Launch Vehicle (CLV) lofts into space early next decade will initially ferry astronauts to the Space Station and be capable of carrying crews back to lunar orbit and of supporting missions to Mars orbit. The HLLV system will utilize the Shuttle External Tank combined with SRBs. The focus of this paper is on the CLV system, giving an overview of plans and progress to date.

Dumbacher, Daniel L.↗

Human Space Exploration: The Moon, Mars, and Beyond

America is returning to the Moon in preparation for the first human footprint on Mars, guided by the U.S. Vision for Space Exploration. This presentation will discuss NASA's mission, the reasons for returning to the Moon and going to Mars, and how NASA will accomplish that mission in ways that promote leadership in space and economic expansion on the new frontier. The primary goals of the Vision for Space Exploration are to finish the International Space Station, retire the Space Shuttle, and build the new spacecraft needed, to return people to the Moon and go to Mars. The Vision commits NASA and the nation to an agenda of exploration that also includes robotic exploration and technology development, while building on lessons learned over 50 years of hard-won experience. Why the Moon? Many questions about the Moon's potential resources and how its history is linked to that of Earth were spurred by the brief Apollo explorations of the 1960s and 1970s. This new venture will carry more explorers to more diverse landing sites with more capable tools and equipment for extended expeditions. The Moon also will serve as a training ground before embarking on the longer, more difficult trip to Mars. NASA plans to build a lunar outpost at one of the lunar poles, learn to live off the land, and reduce dePendence on Earth for longer missions. America needs to extend its ability to survive in hostile environments close to our home planet before astronauts will reach Mars, a planet very much like Earth. NASA has worked with scientists to define lunar exploration goals and is addressing the opportunities for a range of scientific study on Mars. In order to reach the Moon and Mars within a lifetime and within budget, NASA is building on common hardware, shared knowledge, and unique experience derived from the Apollo Saturn, Space Shuttle and contemporary commercial launch vehicle programs. The journeys to the Moon and Mars will require a variety of vehicles, including the Ares I Crew Launch Vehicle, which transports the Orion Crew Exploration Vehicle, and the Ares V Cargo Launch Vehicle, which transports the Lunar Surface Access Module. The architecture for the lunar missions will use one launch to ferry the crew into orbit, where it will rendezvous with the Lunar Module in the Earth Departure Stage, which will then propel the combination into lunar orbit. The imperative to explore space with the combination of astronauts and robots will be the impetus for inventions such as solar power and water and waste recycling. This next chapter in NASA's history promises to write the next chapter in American history, as well. It will require this nation to provide the talent to develop tools, machines, materials, processes, technologies, and capabilities that can benefit nearly all aspects of life on Earth. Roles and responsibilities are shared between a nationwide Government and industry team. The Exploration Launch Projects Office at the Marshall Space Flight Center manages the design, development, testing, and evaluation of both vehicles and serves as lead systems integrator. A little over a year after it was chartered, the Exploration Launch Projects team is testing engine components, refining vehicle designs, performing wind tunnel tests, and building hardware for the first flight test of Ares I-l, scheduled for spring 2009. The U.S. Vision for Space Exploration lays out a roadmap for a long-term venture of discovery. This endeavor will inspire and attract the best and brightest students to power this nation successfully to the Moon, Mars, and beyond. If one equates the value proposition for space with simple dollars and cents, the potential of the new space economy is tremendous, from orbital space delivery services for the International Space Station to mining and solar energy collection on the Moon and asteroids. The Vision for Space Exploration is fundamentally about bringing the resources of the solar system within the economic sphere of humaind. Given the immense size of our solar system, the amount of available material and energy within it present an enormous economic opportunity.

Sexton, Jeffrey D.↗

Enabling the space exploration initiative: NASA's exploration technology program in space power

Space power requirements for Space Exploration Initiative (SEI) are reviewed, including the results of a NASA 90-day study and reports by the National Research Council, the American Institute of Aeronautics and Astronautics (AIAA), NASA, the Advisory Committee on the Future of the U.S. Space Program, and the Synthesis Group. The space power requirements for the SEI robotic missions, lunar spacecraft, Mars spacecraft, and human missions are summarized. Planning for exploration technology is addressed, including photovoltaic, chemical and thermal energy conversion; high-capacity power; power and thermal management for the surface, Earth-orbiting platform and spacecraft; laser power beaming; and mobile surface systems.

Bennett, Gary L.↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton Block 1 configuration, and will then evolve to an ultimate capability of 130 metric tons. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS - Exploration Mission-1 (EM-1), an uncrewed mission to orbit the moon and return, and progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance (ULA) in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

The Next Decade of Mars Exploration

Following a 20-year hiatus in missions to Mars, the planet has again become a focus of planetary research for space-faring nations. NASA and space agencies worldwide are returning to Mars with scientific research and public engagement sharing top priority. Collectively, the work to be performed within a decade will address much of the research associated with planetary evolution, past and present climates, and astrobiology. NASA's science goals are centered on the study of potential habitats - past and present environments that may have been suitable for the origin of life. These goals are approached through in situ measurements and through sample return. CNES has teamed with NASA to return samples, while also extending the research base by adding geophysical measurements via a network of landers. ASI has joined NASA and CNES by providing a drill to access the near sub-surface. ESA will fly an orbiter and, potentially, a lander to Mars with the goal of addressing mineralogy, geochemistry, geology, and biology. ISAS will study the planet's aeronomy using an orbiter. Many other nations are contributors to these programs of exploration. The desire for national participation, presence on the Martian surface and, most importantly, samples to analyze motivate all nations involved. So important is public engagement that NASA and CNES will launch a network of communication satellites to improve public participation and enhance scientific data return. Further, NASA is currently preparing a Mars airplane that will undoubtedly engage the public's imagination. Additional research investigations will be sought; particularly those able to utilize small spacecraft on and above the surface. A recently announced NASA/CNES series of MicroMissions offers a means of pursuing discoveries, scouting potential landing sites for sample return, and further broadening the scope of scientific research. The timing for these opportunities will be presented.

McCleese, D. J.↗