MaRIE 1.0: The Matter-Radiation Interactions in Extremes Project, and the Challenge of Dynamic Mesoscale Imaging

The Matter-Radiation Interactions in Extremes project will build the experimental facility for the time-dependent control of dynamic material performance. An x-ray free electron laser at up to 42-keV fundamental energy and with photon pulses down to sub-nanosecond spacing, MaRIE 1.0 is designed to meet the challenges of time-dependent mesoscale materials science. Those challenges will be outlined, the techniques of coherent diffractive imaging and dynamic polycrystalline diffraction described, and the resulting requirements defined for a coherent x-ray source. The talk concludes with the role of the MaRIE project and science in the future.

36 MATERIALS SCIENCE↗

The Fast-spectrum Transmutation Experimental Facility FASTEF: Main design achievements (part 2: Reactor building design and plant layout) within the FP7-CDT collaborative project of the European Commission

MYRRHA (Multi-purpose hybrid Research Reactor for High-tech Applications) is the flexible experimental accelerator-driven system (ADS) in development at SCK-CEN in replacement of its material testing reactor BR2. SCK-CEN in association with 17 European partners from industry, research centres and academia, responded to the FP7 (Seventh Framework Programme) call from the European Commission to establish a Central Design Team (CDT) for the design of a Fast Spectrum Transmutation Experimental Facility (FASTEF) able to demonstrate efficient transmutation and associated technology through a system working in subcritical and/or critical mode. The project has started on April 01, 2009 for a period of three years. In this paper, we present the latest concept of the reactor building and the plant layout. The FASTEF facility has evolved quite a lot since the intermediate reporting done at the ICAPP'10 and ICAPP'11 conferences 1,2. Many iterations have been performed to take into account the safety requirements. The present configuration enables an easy operation and maintenance of the facility, including the possibility to change large components of the reactor. In a companion paper 3, we present the latest configuration of the reactor core and primary system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Single Bunch Stability in LER of PEP II

The note describes results of studies of the single bunch stability in the low energy ring (LER) of the PEP-II B-factory. Simulations describe the potential well distortion (PWD) obtained by numerical solution of the Haiisinski equation and results on the beam stability obtained with the code TRISIM. Both longitudinal and transverse wake fields are taken into account. Preliminary estimates indicate that single bunch in the LER of the PEP-II B-factory has to be stable, both longitudinally and transversely, at the maximum design bunch current 1.8 mA (beam current 3A). However, realistic wakes of the machine has been constructed only recently using results of the extensive numerical simulations of the vacuum components of the ring. Additional to that, the code TRISIM, a simulation program for single-bunch collective effects written by one of the authors (G. S.), became recently available. This allows us to study beam stability in a more reliable way than it is possible analytically.

43 PARTICLE ACCELERATORS↗

IDR Neutrino Factory Front End and Variations

The International Design Report (IDR) neutrino factory scenario for capture, bunching, phase-energy rotation and initial cooling of {mu}'s produced from a proton source target is explored. It requires a drift section from the target, a bunching section and a {phi}-{delta}E rotation section leading into the cooling channel. Optimization and variations are discussed. Important concerns are rf limitations within the focusing magnetic fields and large losses in the transport.

43 PARTICLE ACCELERATORS↗

Interaction-Region Design Options for a Linac-Ring LHeC

The interaction-region design for a linac-ring electron-proton collider based on the LHC ('LR-LHeC') poses numerous challenges related to collision scheme, synchrotron radiation, aperture, magnet technology, and optics. We report a first assessment and various options.

43 PARTICLE ACCELERATORS↗

Beta* and beta-waist measurement and control at RHIC

During the course of last RHIC runs the beta-functions at the collision points ({beta}*) have been reduced gradually to 0.7m. In order to maximize the collision luminosity and ensure the agreement of the actual machine optics with the design one, more precise measurements and control of {beta}* value and {beta}-waist location became necessary. The paper presents the results of the implementation of the technique applied in last two RHIC runs. The technique is based on well-known relation between the tune shift and the beta function and involves precise betatron tune measurements using BBQ system as well as specially developed knobs for {beta}-waist location control.

43 PARTICLE ACCELERATORS↗

The design of the fundamental mode damper and the HOM dampers for the 56 MHz SRF cavity

A 56 MHz Superconducting RF cavity is under development for the Relativistic Heavy Ion Collider (RHIC) aiming at luminosity enhancement The 56 MHz SRF cavity can adiabatically rebucket the beam from the 28 MHz accelerating cavities, provide shorter bunches and significantly enhance the luminosity. The 56 MHz SRF cavity will be turned on at store, therefore, the fundamental mode should be damped while the beam is injected and accelerated. The feature requires a fundamental mode damper (FD). The mechanical design of the FD is challenging since the fundamental mode damper has to be physically withdrawn while the cavity is turned on. This motion introduces a frequency change of the cavity. Since for stability the cavity frequency must be kept below the beam frequency in this phase, we chose a judicious axial placement of the FD to minimize the frequency shift. Various studies of the FD were done with prototype cavity tests and numerical simulations. The engineering issues were addressed. Higher-order mode (HOM) dampers are necessary for stable operation of RHIC with the 56 MHz SRF cavity. The physics study of the HOM dampers will be presented in the paper. Based on the stability criteria of the cavity, the HOMs are properly damped by having two HOM dampers. The fundamental mode is filtered out by a 5 element high pass filter. The HOMs were identified and the external Q factors were obtained from tests of the prototype cavity and compared to simulations with the CST Microwave Studio{reg_sign} program.

43 PARTICLE ACCELERATORS↗

Superconducting Thin Films for The Enhancement of Superconducting Radio Frequency Accelerator Cavities

Bulk niobium (Nb) superconducting radio frequency (SRF) cavities are currently the preferred method for acceleration of charged particles at accelerating facilities around the world. However, bulk Nb cavities have poor thermal conductance, impose material and design restrictions on other components of a particle accelerator, have low reproducibility and are approaching the fundamental material-dependent accelerating field limit of approximately 50MV/m. Since the SRF phenomena occurs at surfaces within a shallow depth of ~1 μm, a proposed solution to this problem has been to utilize thin film technology to deposit superconducting thin films on the interior of cavities to engineer the active SRF surface in order to achieve cavities with enhanced properties and performance. Two proposed thin film applications for SRF cavities are: 1) Nb thin films coated on bulk cavities made of suitable castable metals (such as copper or aluminum) and 2) multilayer films designed to increase the accelerating gradient and performance of SRF cavities. While Nb thin films on copper (Cu) cavities have been attempted in the past using DC magnetron sputtering (DCMS), such cavities have never performed at the bulk Nb level. However, new energetic condensation techniques for film deposition, such as High Power Impulse Magnetron Sputtering (HiPIMS), offer the opportunity to create suitably thick Nb films with improved density, microstructure and adhesion compared to traditional DCMS. Clearly use of such novel technique requires fundamental studies to assess surface evolution and growth modes during deposition and resulting microstructure and surface morphology and the correlation with RF superconducting properties. Here we present detailed structure-property correlative research studies done on Nb/Cu thin films and NbN- and NbTiN-based multilayers made using HiPIMS and DCMS, respectively. Experiment Numbers:

Burton, Matthew↗

High-energy high-luminosity electron-ion collider eRHIC

In this paper, we describe a future electron-ion collider (EIC), based on the existing Relativistic Heavy Ion Collider (RHIC) hadron facility, with two intersecting superconducting rings, each 3.8 km in circumference. The replacement cost of the RHIC facility is about two billion US dollars, and the eRHIC will fully take advantage and utilize this investment. We plan adding a polarized 5-30 GeV electron beam to collide with variety of species in the existing RHIC accelerator complex, from polarized protons with a top energy of 325 GeV, to heavy fully-striped ions with energies up to 130 GeV/u. Brookhaven's innovative design, is based on one of the RHIC's hadron rings and a multi-pass energy-recovery linac (ERL). Using the ERL as the electron accelerator assures high luminosity in the 10{sup 33}-10{sup 34} cm{sup -2} sec{sup -1} range, and for the natural staging of eRHIC, with the ERL located inside the RHIC tunnel. The eRHIC will provide electron-hadron collisions in up to three interaction regions. We detail the eRHIC's performance in Section 2. Since first paper on eRHIC paper in 2000, its design underwent several iterations. Initially, the main eRHIC option (the so-called ring-ring, RR, design) was based on an electron ring, with the linac-ring (LR) option as a backup. In 2004, we published the detailed 'eRHIC 0th Order Design Report' including a cost-estimate for the RR design. After detailed studies, we found that an LR eRHIC has about a 10-fold higher luminosity than the RR. Since 2007, the LR, with its natural staging strategy and full transparency for polarized electrons, became the main choice for eRHIC. In 2009, we completed technical studies of the design and dynamics for MeRHIC with 3-pass 4 GeV ERL. We learned much from this evaluation, completed a bottom-up cost estimate for this $350M machine, but then shelved the design. In the same year, we turned again to considering the cost-effective, all-in-tunnel six-pass ERL for our design of the high-luminosity eRHIC. In it, electrons from the polarized pre-injector will be accelerated to their top energy by passing six times through two SRF linacs. After colliding with the hadron beam in up to three detectors, the e-beam will be decelerated by the same linacs and dumped. The six-pass magnetic system with small-gap magnets will be installed from the start. We will stage the electron energy from 5 GeV to 30 GeV stepwise by increasing the lengths of the SRF linacs. We discuss details of eRHIC's layout in Section 3. We considered several IR designs for eRHIC. The latest one, with a 10 mrad crossing angle and {beta}* = 5 cm, takes advantage of newly commissioned Nb{sub 3}Sn quadrupoles. Section 4 details the eRHIC lattice and the IR layout. The current eRHIC design focuses on electron-hadron collisions. If justified by the EIC physics, we will add a 30 GeV polarized positron ring with full energy injection from eRHIC ERL. This addition to the eRHIC facility provide for positron-hadron collisions, but at a significantly lower luminosity than those attainable in the electron-hadron mode. As a novel high-luminosity EIC, eRHIC faces many technical challenges, such as generating 50 mA of polarized electron current. eRHIC also will employ coherent electron cooling (CeC) for the hadron beams. Staff at BNL, JLab, and MIT is pursuing vigorously an R&D program for resolving addressing these obstacles. In collaboration with Jlab, BNL plans experimentally to demonstrate CeC at the RHIC. We discuss the structure and the status of the eRHIC R&D in Section 5.

43 PARTICLE ACCELERATORS↗

Muon Collider design status

Muon Collider (MC) - proposed by G.I. Budker and A.N. Skrinsky a few decades ago - is now considered as the most exciting option for the energy frontier machine in the post-LHC era. A national Muon Accelerator Program (MAP) is being formed in the USA with the ultimate goal of building a MC at the Fermilab site with c.o.m. energy in the range 1.5-3 TeV and luminosity of {approx} 1.5 {center_dot} 10{sup 34} cm{sup -2} s{sup -1}. As the first step on the way to MC it envisages construction of a Neutrino Factory (NF) for high-precision neutrino experiments. The baseline scheme of the NF-MC complex is presented and possible options for its main components are discussed.

43 PARTICLE ACCELERATORS↗

The Design of the Positron Source for the International Linear Collider

The high luminosity requirements and the option of a polarized positron beam present a great challenge for the positron source of a future linear collider. This paper provides a comprehensive overview of the latest proposed design for the baseline positron source of the International Linear Collider (ILC). We report on recent progress and results concerning the main components of the source: including the undulator, capture optics, and target.

43 PARTICLE ACCELERATORS↗

The status of the LANSCE refurbishment project (LANSCE-R)

The Los Alamos Neutron Science Center (LANSCE) accelerator is an 800-MeV proton linac that drives user facilities for isotope production, proton radiography, ultra-cold neutrons, weapons neutron research and various sciences using neutron scattering. The LANSCE Refurbishment Project (LANSCE-R) is an ambitious project to refurbish key elements of the LANSCE accelerator that are becoming obsolete or nearing end-of-life. The conceptual design phase for the project is funded and underway. The 5 year, $170M (US) project will enable future decades of reliable, high-performance operation. It will replace a substantial fraction of the radio-frequency power systems (gridded tubes and klystrons) with modern systems, completely refurbish the original accelerator control and timing systems, replace obsolete diagnostic devices, and modernize other ancillary systems. An overview of the LANSCE-R project will be presented. The functional and operating requirements will be discussed, the proposed technical solutions presented, and the plan for successful project execution while meeting annual customer expectations for beam delivery will be reviewed.

43 PARTICLE ACCELERATORS↗

A 10-Hz Terawatt Class Ti:Sapphire Laser System: Development and Applications

We developed a two stage Ti:Sapphire laser system to generate 16 mJ/80fs laser pulses at the pulse repetition rate of 10 Hz. The key deriver for the present design is implementing a highly efficient symmetric confocal pre-amplifier and employing a simple, inexpensive synchronization scheme relying only on a commercial digital delay-generator. We characterized the amplified pulses in spatial-, spectral-, and temporal-domains. The laser system was used to investigate various nonlinear optical processes, and to modify the optical properties of metal- and semiconductor-surfaces. We are currently building a third amplifier to boost the laser power to the multi-terawatt range.

43 PARTICLE ACCELERATORS↗

Design of an Optical Diffraction Radiation Beam Size Monitor at SLAC FETB

We design a single bunch transverse beam size monitor which will be tested to measure the 28.5 GeV electron/positron beam at the SLAC FFTB beam line. The beam size monitor uses the CCD images of the interference pattern of the optical diffraction radiation from two slit edges which are placed close to the beam path. In this method, destruction of the accelerated electron/positron beam bunches due to the beam size monitoring is negligible, which is vital to the operation of the Linear Collider project.

43 PARTICLE ACCELERATORS↗

Spin tune dependence on closed orbit in RHIC

Polarized proton beams are accelerated in RHIC to 250 GeV energy with the help of Siberian Snakes. The pair of Siberian Snakes in each RHIC ring holds the design spin tune at 1/2 to avoid polarization loss during acceleration. However, in the presence of closed orbit errors, the actual spin tune can be shifted away from the exact 1/2 value. It leads to a corresponding shift of locations of higher-order ('snake') resonances and limits the available betatron tune space. The largest closed orbit effect on the spin tune comes from the horizontal orbit angle between the two snakes. During RHIC Run in 2009 dedicated measurements with polarized proton beams were taken to verify the dependence of the spin tune on the local orbits at the Snakes. The experimental results are presented along with the comparison with analytical predictions.

43 PARTICLE ACCELERATORS↗

Recent ground motion studies at Fermilab

Understanding slow and fast ground motion is important for the successful operation and design for present and future colliders. Since 2000 there have been several studies of ground motion at Fermilab. Several different types of HLS (hydro static level sensors) have been used to study slow ground motion (less than 1 hertz) seismometers have been used for fast (greater than 1 hertz) motions. Data have been taken at the surface and at locations 100 meters below the surface. Data of recent slow ground motion measurements with HLSs, many years of alignment data and results of the ATL-analysis are presented and discussed.

43 PARTICLE ACCELERATORS↗

An overview of the planned Jefferson Lab 12-GeV helium refrigerator upgrade

In February 2006, Jefferson Laboratory in Newport News, VA, received â Critical Decision 1â (CD-1) approval to proceed with the engineering and design of the long anticipated upgrade to increase the beam energy of CEBAF, the Continuous Electron Beam Accelerator Facility, from 6 GeV to 12 GeV. This will require the installation of 10 new cryomodules, and additional 2.1-K refrigeration beyond the available 4600 W to handle the increased heat loads. Additionally, a new experimental hall, Hall D, is planned that will require the installation of a small, available refrigerator. This paper will present an overview of the integration of the new proposed refrigeration system into CEBAF, the installation of the available refrigerator for Hall D, and includes planned work scope, current schedule plans and project status.

43 PARTICLE ACCELERATORS↗

LCLS Injector Drive Laser

Requirements for the LCLS injector drive laser present significant challenges to the design of the system. While progress has been demonstrated in spatial shape, temporal shape, UV generation and rep-rate, a laser that meets all of the LCLS specifications simultaneously has yet to be demonstrated. These challenges are compounded by the stability and reliability requirements. The drive laser and transport system has been installed and tested. We will report on the current operational state of the laser and plans for future improvements.

43 PARTICLE ACCELERATORS↗