Search NASA⌕ Search

SEARCH · Search NASA

Results for “Permitting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Stormwater Pollution Prevention Plan for the TA-03-38 Carpenter's Shop, Los Alamos National Laboratory, Revision 3, January 2018

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector A–Timber Products, Subsector A4 (Wood Products Facilities not elsewhere classified) as a guide. This SWPPP applies to discharges of stormwater from the operational areas of the TA-03-38 Carpenter’s Shop at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-03-38 Carpenter’s Shop and associated areas. The current permit expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

Stormwater Pollution Prevention Plan for the TA-03-22 Power and Steam Plant, Los Alamos National Laboratory, Revision 3, January 2018

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector O-Steam Electric Generating Facilities as a guide. This SWPPP applies to discharges of stormwater from the operational areas of the TA-03-22 Power and Steam Plant at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-03-22 Power and Steam Plant and associated areas. The current permit expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

Stormwater Pollution Prevention Plan for the TA-60-01 Heavy Equipment Shop, Los Alamos National Laboratory, Revision 3, January 2018

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. This SWPPP applies to discharges of stormwater from the operational areas of the TA-60-01 Heavy Equipment Shop at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-60-01 Heavy Equipment Shop and associated areas. The current permit expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

Integrated Pre-Feasibility Assessment for a Northern Michigan Basin CarbonSAFE CO 2 Storage Complex

One of the key gaps in the critical path toward carbon capture and storage (CCS) deployment is the development of commercial-scale (50+ million metric tons carbon dioxide [CO2]) geologic storage sites for CO 2 from industrial sources. There has been relatively little effort by the private sector to identify and certify (i.e., regulatory permit) geologic storage sites that are capable of storing commercial-scale volumes of CO 2 , primarily because of the lack of immediate economic incentives. As a result, commercial-scale CO 2 sources that want to develop CCS projects face the risk of not finding a suitable saline storage site for their captured CO 2 . Carbon Storage Assurance Facility Enterprise (CarbonSAFE) is a U.S. Department of Energy (DOE)-sponsored effort to develop an integrated CCS storage complex constructed and permitted for operation in the 2025 timeframe over a series of sequential phases of development: Integrated CCS Pre-Feasibility, Storage Complex Feasibility, Site Characterization, and Permitting and Construction. Subject to availability of funds, a series of funding opportunity announcements (FOAs) are planned to accomplish this mission. This document describes a project that addresses DOE FOA-1584 Phase I: Integrated Carbon Capture and Storage (CCS) Pre-Feasibility. The objective of this project was to take the first step in developing an integrated commercial geologic CO 2 storage complex in the Northern Michigan Basin, herein referred to as the CarbonSAFE – Northern Michigan Basin (CS-NMB) storage complex. This includes demonstrating that the storage sites within the complex have the potential to store more than 50 million metric tons (MMT) of industrially-sourced CO 2 emissions safely, permanently and economically. To achieve the overall objective of the Phase I pre-feasibility study, FOA-1584 required three activities: • Perform a high-level technical sub-basinal evaluation to identify a potential storage complex with storage site(s), including a description of the geology and risks associated with the potential storage site; identify and evaluate potential CO 2 sources. • Develop a plan for the storage complex and storage site(s) including a strategy that would enable an integrated capture and storage project to be economically feasible and publicly acceptable. • Form a CCS coordination team capable of addressing regulatory, legislative, technical, public policy, commercial, financial, etc. challenges specific to commercial-scale deployment of the CO 2 storage project.

20 FOSSIL-FUELED POWER PLANTS↗

2017 Workshop Summary: MHK Environmental Compliance Cost Reduction Strategies Workshop

This three year effort started in FY17 with the objectives of capturing environmental compliance costs and lessons learned from MHK developments that have gone through the permitting and compliance process. The goal is to find ways to improve the efficiency and effectiveness of the permitting and compliance process and reduce costs to encourage investment in MHK projects. The project team is composed of Sandia National Laboratories, Integral Consulting, Kearns & West, and H. T. Harvey & Associates. Step one of the project process, collect data to determine permitting and compliance costs, is currently underway. Step two of the project process, identify cost reduction pathways and step three, develop cost reduction strategies, will follow and are envisioned as an iterative approach to best meet the project goal.

54 ENVIRONMENTAL SCIENCES↗

2018 Webinar Summary: MHK Environmental Compliance Cost Reduction Strategies Workshop

This three-year effort started in FY17 with the primary objective of detailing the environmental compliance costs and lessons learned from U.S. based MHK projects that have gone through the permitting and compliance process. The project goal is to find ways to improve the efficiency and effectiveness of the permitting and compliance process that reduce deployment uncertainties and associated risks/costs; ultimately encouraging investment in MHK projects. The project team is composed of Sandia National Laboratories, H. T. Harvey & Associates, Integral Consulting, and Kearns & West. Step one of the project process, collect data to determine permitting and compliance costs, was a focus during 2017, but is an ongoing process to ensure the project team is working with the most recent and accurate data as possible. Currently, the project team is focusing on step two of the project process, identify cost reduction pathways. Step three, develop cost reduction strategies, will follow during Fall 2018 and Winter 2019. Each step is envisioned as an iterative approach working with industry and regulators to best meet the project goal.

54 ENVIRONMENTAL SCIENCES↗

2018 Workshop Summary: MHK Environmental Compliance Cost Reduction Strategies Workshop

This three-year effort started in FY17 with the primary objective of detailing the environmental compliance costs and lessons learned from U.S. based MHK projects that have gone through the permitting and compliance process. The project goal is to find ways to improve the efficiency and effectiveness of the permitting and compliance process that reduce deployment uncertainties and associated risks/costs; ultimately encouraging investment in MHK projects. The project team is composed of Sandia National Laboratories, H. T. Harvey & Associates, Integral Consulting, and Kearns & West. Step one of the project process, collect data to determine permitting and compliance costs, was a focus during 2017, but is an ongoing process to ensure the project team is working with the most recent and accurate data as possible. Currently, the project team is focusing on step two of the project process, identify cost reduction pathways. Step three, develop cost reduction strategies, will follow during Fall 2018 and Winter 2019. Each step is envisioned as an iterative approach working with industry and regulators to best meet the project goal.

54 ENVIRONMENTAL SCIENCES↗

Nevada National Security Site 2018 Data Report: Groundwater Monitoring Program, Area 5 Radioactive Waste Management Site

This report is a compilation of the groundwater and waste cell leachate sampling results from the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada National Security Site, Nye County, Nevada. Groundwater samples from the aquifer immediately below the Area 5 RWMS have been collected and analyzed and static water levels have been measured in this aquifer since 1993. These groundwater data are evaluated for evidence of effects on the aquifer related to the Area 5 RWMS. Leachate from one lined mixed waste cell at the Area 5 RWMS (Cell 18) has been sampled since the cell opened in 2011. These leachate data are analyzed for hazardous contaminants to determine appropriate leachate handling and disposal. A second lined mixed waste cell at the Area 5 RWMS (Cell 25) began receiving waste in August 2018, but no leachate samples were collected or analyzed during 2018. This report includes data from 2014 through 2018 but focuses on the 2018 data. During 2018, groundwater samples were collected and static water levels were measured at three wells surrounding the Area 5 RWMS. Groundwater samples were collected at wells UE5PW-1, UE5PW-2, and UE5PW-3 on March 6 and August 14, 2018. Static water levels were measured at each of these wells on March 5, June 4, August 13, and October 25, 2018. Groundwater monitoring at the Area 5 RWMS complies with Title 40 Code of Federal Regulations (CFR) Part 264.97, General ground-water monitoring requirements , and 40 CFR 264.98, Detection monitoring program. Groundwater samples were analyzed for indicators of contamination (pH, specific conductance [SC], total organic carbon, total organic halides, and tritium) and, beginning in 2017, toxicity characteristic metals (arsenic, barium, cadmium, chromium, lead, mercury, selenium, and silver). General water chemistry parameters (calcium, iron, magnesium, manganese, potassium, sodium, sulfate, chloride, fluoride, bicarbonate, and silicate) were also measured. Results from samples collected in 2018 are within the limits for each parameter established by the Nevada Division of Environmental Protection in Resource Conservation and Recovery Act (RCRA) Permit NEV HW0101, Revision 6. Data from the shallow aquifer indicate there has been no measurable impact to the uppermost aquifer from the Area 5 RWMS, and there were no significant changes in measured groundwater parameters compared to previous years. Leachate from lined mixed waste Cell 18 drains into a sump and is pumped into an above ground tank. Samples are collected from the tank when the leachate volume approaches the 3,000-gallon tank capacity. During 2018, leachate samples were collected on March 1, 2018 and August 1, 2018. All leachate analysis results are below the regulatory levels for toxicity characteristic contaminants (40 CFR 261.24) and below the investigation levels for polychlorinated biphenyls (PCBs), tritium, pH, and SC specified in RCRA Permit NEV HW0101, Revision 6. No quantifiable PCB levels were detected in any leachate sample. Based on the leachate analysis results, RCRA Permit NEV HW0101 allowed all leachate collected from Cell 18 to be pumped from the collection tank and used for dust control at Cell 18.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Calendar Year 2018 (Revision 0)

This report serves as the combined annual report for post-closure activities for the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; and CAU 112, Area 23 Hazardous Waste Trenches. The locations of the sites are shown in Figure ES-1. This report covers calender year 2018. The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted annually at CAUs 90, 91, and 112; semiannually at CAUs 92 and 110; and quarterly at CAU 111. Additional inspections are conducted at CAUs 92 and 111 if precipitation occurs in excess of 1.0 inch in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. At CAUs 110 and 111, soil moisture monitoring and subsidence surveys are conducted in addition to the visual inspections. At CAU 110 the site fence, gate, lock and use restriction signs are evaluated. At CAU 111, an ecological survey, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are also conducted. This report will address all monitoring item notes above except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 6 of Permit NEV HW0101 was issued effective December 10, 2015, and remains in effect until December 10, 2020.

54 ENVIRONMENTAL SCIENCES↗

Site Environmental Report for 2016

Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab) is a multi-program scientific facility operated by the University of California (UC) for the U.S. Department of Energy (DOE). Berkeley Lab’s research is focused on the physical, biological, environmental, and computational sciences with the objective of delivering scientific knowledge and discoveries pertinent to DOE’s mission. This annual report describes environmental protection activities and potential impacts resulting from LBNL operations conducted in 2016. The format and content of this report satisfy the requirements of both DOE Order 231.1B Admin Chg 1, Environment, Safety, and Health Reporting, and the operating contract between UC and DOE (DOE Contract No. DE-AC02-05CH11231, also known as Contract 31). Activities are planned and conducted with full regard to protecting employees, the public, and the environment, as well as complying with all applicable environmental, safety, and health laws and regulations. Berkeley Lab implements an Environmental Management System (EMS) to oversee these compliance activities and improve overall environmental performance while maintaining operational capability and sustaining its overall mission. The effectiveness of the EMS and environmental programs is reviewed annually as part of the operating contract’s performance evaluation process. For fiscal year (FY) 2016, which began October 1, 2015, and ended September 30, 2016, the EMS was given a performance rating of A minus for its management of environmental activities (on a scale from A plus as the highest grade to F as the lowest). The measurement and rating system was developed jointly by Berkeley Lab, UC, and DOE. The FY 2016 rating was based on how Berkeley Lab met the objective in DOE’s FY 2017 Performance Evaluation and Measurement Plan (Appendix B in Contract 31, Section J) of providing an efficient and effective EMS. To support this rating, Berkeley Lab prepared a list of projects completed during the performance period that achieved reduced environmental impacts. The EMS was also graded through the federal Office of Management and Budget’s EMS Annual Report Data, in which elements of the International Organization for Standardization (ISO) 14001 standard are rated and the degree of integration between the EMS and Berkeley Lab’s sustainable practices is measured. Overall scores fall into one of three categories: green (highest), yellow (middle), or red (lowest). For FY 2016, Berkeley Lab received a score of green, as described in more detail in Chapter 2. An overview of environmental protection and restoration programs is provided (Chapter 3), including information about compliance activities, operating permits, and regulatory agency inspections that occurred during 2016. Six minor violations issued during these inspections are discussed, one of which was rescinded in 2017. This report also includes information on environmental monitoring performed in 2016 (Chapter 4). The results of these monitoring activities confirmed that groundwater cleanup actions continue to show improving conditions, and all emissions and discharges from LBNL operations were within environmental compliance release limits with the exception of some stormwater discharges. While most stormwater discharges measured throughout the LBNL site fall within acceptable levels established by the state's stormwater permit, iron and aluminum exceeded permitted levels. Berkeley Lab is aggressively implementing controls to reduce iron and aluminum discharge levels. The controls include construction of asphaltic berms to restrain and filter runoff to storm drains, and installation of filtration units in storm drain basins to absorb metal contaminants. The radiological dose assessments (Chapter 5) performed in 2016 concluded that the maximum dose to a hypothetical resident from Berkeley Lab’s airborne radionuclide releases was approximately 0.12% of the DOE and U.S. Environmental Protection Agency annual limit of 10 millirem per year (mrem/year); the dose from all radiation sources at Berkeley Lab was approximately 0.1% of the average natural background radiation dose of 310 mrem/yr in the United States, and about 0.4% of the DOE annual limit of 100 mrem/yr from all sources.

54 ENVIRONMENTAL SCIENCES↗

Monthly Sewer Monitoring Report for LLNL Livermore Site, April 2020

Lawrence Livermore National Laboratory (LLNL) collects effluent samples from its sewer outfall at the B196 Sewer Monitoring Station (SMS). Effluent flow-proportional composite samples are collected at the SMS on a daily (midnight-to-midnight), weekly (Thursday through Wednesday), and “monthly” (composited from daily) basis; effluent grab samples are also collected each month at that same location. Certified contract laboratories analyzes these compliance samples, and results (Tables 1–3) are used to establish LLNL compliance with the 2019–2020 Wastewater Discharge Permit (Permit 1250) granted by the City of Livermore Water Resources Division (WRD). Supplemental analyses for biochemical oxygen demand (BOD) and total suspended solids (TSS) are performed onsite and reported (Table 4) for the calculation and assessment of sewer service charges. Quarterly, effluent is sampled for metals (24-hour composite) and cyanide (grab sample) concentrations (mg/L). The results are presented in Table 5. In addition to the sampling noted above, the SMS continuously monitors LLNL sewage effluent in real-time for flow rate, pH, metals, and radioactivity. Standard measurement methods are used to monitor flow and pH to determine permit compliance. Unique nonstandard analytical methods monitor for the presence of metals and radioactivity using x-ray fluorescence (XRF) and gamma spectroscopy, respectively. If an anomalous condition is detected by the monitoring system, an alarm activates LLNL’s Sewer Diversion Facility (SDF) and Livermore Water Reclamation Plant (LWRP) operators are notified that a potential release has occurred.

54 ENVIRONMENTAL SCIENCES↗

Integrated Mid-Continent Stacked Carbon Storage Hub Project Phase II (Final Summary Report)

The Phase II Integrated Midcontinent Stacked Carbon Storage Hub (IMSCS-HUB) is part of the Carbon Storage Assurance Facility Enterprise (CarbonSAFE) established by the United States Department of Energy (DOE) National Energy Technology Laboratory (NETL). CarbonSAFE is phased to support the development of commercial-scale (50 million metric tonnes [Mt] over a 30-year period) carbon capture, utilization, and storage (CCUS) in the United States. The IMSCS-HUB study area comprises carbon dioxide (CO 2 ) sources in Iowa, Kansas, and Nebraska (the source corridor), and CO 2 sinks in Kansas and Nebraska (the storage corridor), representing the first large-scale project for the Midcontinent region. The stacked storage corridor is characterized by alternating sequences of deep saline formations, oil-bearing reservoirs, shale, and evaporite units that are conducive to vertically stacked CO 2 injection for geologic storage and enhanced oil recovery (EOR). Three sites within the IMSCS-HUB stacked storage corridor were evaluated in Phase II for commercial CCUS feasibility: one in southwest-central Nebraska, Sleepy Hollow Field (SHF), a second in southwestern Nebraska near Madrid (Madrid), and a third in southwestern Kansas, the Patterson Site (composed of the Patterson, Heinitz, Hartland, and Oslo fields). In Phase II, the team assessed the feasibility of storage complexes at the potential storage sites in Nebraska and Kansas to support a commercial-scale storage hub that integrates proven CO 2 capture technology and transport from nearby ethanol sources. Building on lessons learned from the DOE-NETL Regional Carbon Sequestration Partnerships (RCSPs), the Project Team has identified a clear strategy to meet DOE’s 2025 objective of commercial carbon capture and storage (CCS) implementation by developing a CO 2 market and infrastructure that relies on multiple ethanol-based CO 2 sources in the short term and the incorporation of multiple coal-fired power plant CO 2 sources when commercial capture is economically viable. The team also leveraged the updated 45Q tax credit to develop capture and transport infrastructure. Commercial-scale CCUS is feasible at two candidate storage sites studied, the Madrid, Nebraska Site and the Patterson Site in Kearny County, Kansas. The Sleepy Hollow Field in Nebraska was found to be an attractive candidate for stacked storage with CO 2 -EOR (Battelle 2020e). Outreach efforts facilitated engagement from industry, government, and research sectors (Battelle and GPI, 2020) and an outreach plan for future phases of the project was developed to address issues that are of concern in the IMSCS-HUB project area (Battelle, 2020f). All components of a CCUS project were determined to be feasible in the IMSCS-HUB region and Risk Mitigation Plan was developed and includes strategies to mitigate risks associated with each project component (Battelle, 2020j). A roadmap was developed to obtain the required UIC permits for an integrated CCUS project (Battelle, 2020k). The regional storage resource characterization demonstrated significant opportunity for commercial-scale projects in the IMSCS-HUB storage corridor with 577.4 Mt of stacked CO 2 storage capacity and the potential to produce 181.9 MMbbls of oil via EOR across 17 individual storage areas (Battelle and ARI, 2020). The pipeline assessment study found viable pipeline routes that connected 45Q-eligible ethanol plants, coal fired power plants, and other sources in the IMSCS-HUB corridor. The comprehensive results of subsurface characterization, modeling efforts, outreach assessment, and regulatory analysis from were integrated to develop a Detailed Commercial Development Plan for the IMSCS-HUB (Battelle, 2020n). Commercialization efforts will involve obtaining Class VI UIC permits, establishing and finalizing the pipeline route, and evaluating capture projects at participating CO 2 sources. Phases I and II of the IMSCS-HUB CarbonSAFE provide a strong foundation for safely, efficiently, and cost-effectively characterizing and permitting commercial-scale project sites in the region. The plan for implementation of commercial-scale CCUS projects in the IMSCS-HUB is aligned with the objectives of CarbonSAFE Phase III: Site Characterization and CO 2 Capture Assessment.

20 FOSSIL-FUELED POWER PLANTS↗

Solar Steam on Demand

INTRODUCTION: This Report summarizes the research and development project performed by Sunvapor and the subrecipient National Renewable Energy Laboratory (NREL) during the period of 10/01/2018-9/30/2021. The work was aimed at the economic integration of solar steam with an industrial process, and in particular, the advantages that a novel type of thermal energy storage and collector design could bring to the system. The completed work includes experimental research on the storage material, design of the collector, engineering of a complete solar steam plant, and economic analysis. The plant was, in the end, not constructed, due to COVID-19 impacts to the project host. PURPOSE: The purpose of the project was to test the hypothesis that a levelized cost of heat (LCOH) of 2¢/kWh delivered to a steam-consuming process, including energy discharged from storage, could be feasibly achieved. PROJECT OBJECTIVES: For Budget Period 1 our objectives were to engineer a prototype industrial solar steam generation system, and design and test a Latent Heat Energy Storage (LHES) lab-scale system. For Budget Period 2 our objectives were to construct and test the solar steam prototype plant, and to build and factory-test a full LHES module. For Budget Period 3 our objective was to integrate the storage module with the solar steam generator, show successful long duration energy tests of the combined system, and use the results to project the LCOH of delivered steam to a second-generation plant. PROJECT OUTCOMES: Various phase change materials (PCMs) for the LHES were tested for compatibility with industrial steam uses as measured by phase change temperature, stability of latent heat of fusion, and their corrosive effects on steel (the heat exchanger material). Two of these materials (sodium formate and sodium/ potassium) showed potential to meet the technical criteria. The estimated cost of a complete LHES module with these materials did not meet economic targets. The developmental collector design builds from previous work to exploit the potential cost advantages of a spaceframe of lumber construction. Design improvements were achieved in assembly efficiency and structural performance. A complete engineering package was completed for the solar steam system without storage that included the developmental as well as commercial arrays. The plant was permitted for construction. The storage CAPEX for a reference plant was estimate to be greater than $\$ 57$/kWh. The LCOH of the system without storage and with developmental collectors of lumber construction was projected to be 2¢/kWh, assuming a FCR of 8.2% over thirty years. PROJECT MILESTONES: The Milestones fully achieved in the first Budget Period includes obtaining a Letter of Intent from an industrial steam-consuming project host, issuance of a construction permit, and corrosion resistance. The Milestone that was partly achieved was the degradation in the latent heat of fusion. Milestones associated with Budget Periods 2 and 3, related to the construction and operation of the plant were not achieved as a result of the host shutting down the plant due to COVID-19 impacts. CONCLUSIONS: Sunvapor was able to secure an agreement with a host to build a fully engineered and permitted solar steam plant that met the host’s economic goals. As a basis for comparison, the solar field design was comprised of eight commercial collector arrays and one developmental Green Parabolic Trough Collector (GPTC) array. The projected LCOH with a solar field entirely populated with a second generation GPTC met the goal of 2¢/kWh. The experimental program concerning the PCM indicated the feasibility of meeting their technical requirements for industrial steam uses. The cost of the complete LHES exceeded its $\$ 14$/kWh target, and therefore the inclusion of LHES could not be economically justified. Due to COVID-19 impacts on the host, the solar steam plant was not constructed.

14 SOLAR ENERGY↗

Sewer System Management Plan

The Sandia National Laboratories is a multi-mission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC (NTESS), a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy's National Nuclear Security Administration (DOE/NNSA) under contract DE-NA0003525. In 2008, a Notice of Intent (NOI) was filed for the Sandia National Laboratories, California (SNL/CA) facility to be covered under the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit) and was issued the WDID No. 2SSO11605. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. Provision D.11 of the General Permit requires the development and implementation of a written Sewer System Management Plan (SSMP). This SSMP is prepared according to the mandatory elements required by Provision D.13 and D.14, as well as the schedule for a population less than 2,500 as outlined in Provision D.15.

42 ENGINEERING↗

Industrial Stormwater Pollution Prevention Plan (SWPPP) for SNL/CA Reporting Year 2022-2023

The Sandia National Laboratories, California (SNL/CA) site comprises approximately 410 acres and is located in the eastern portion of Livermore, Alameda County, California. The property is owned by the United States Department of Energy and is being managed and operated by National Technology & Engineering Solutions of Sandia, LLC. The facility location is shown on the Site Map(s) in Appendix A. This Stormwater Pollution Prevention Plan (SWPPP) is designed to comply with California’s General Permit for Stormwater Discharges Associated with Industrial Activities (General Permit) Order No. 2015-0122-DWQ (NPDES No. CAS000001) issued by the State Water Resources Control Board (State Water Board) (Ref. 6.1). This SWPPP has been prepared following the SWPPP Template provided on the California Stormwater Quality Association Stormwater Best Management Practice Handbook Portal: Industrial and Commercial (CASQA 2014). In accordance with the General Permit, Section X.A, this SWPPP contains the following required elements: Facility Name and Contact Information; Site Map; List of Significant Industrial Materials; Description of Potential Pollution Sources; Assessment of Potential Pollutant Sources; Minimum BMPs; Advanced BMPs, if applicable; Monitoring Implementation Plan (MIP); Annual Comprehensive Facility Compliance Evaluation (Annual Evaluation); and, Date that SWPPP was Initially Prepared and the Date of Each SWPPP Amendment, if Applicable.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Compliance and Tracking System (WCATS) Version 3 Requirements Document

This document describes the end-user requirements for the Waste Compliance and Tracking System (WCATS) project in accordance with the WCATS Software Quality Management Plan, EPC-WMP-WCATSPLAN-001. The WCATS application shall support the generation, characterization, processing, and shipment of LANL radioactive, hazardous, and industrial waste. Regulatory drivers include RCRA hazardous waste, DOT shipping, NNSA nuclear material control and accountability, DOE nuclear safety, TSDF permit, and transuranic waste certification requirements. The system will utilize a task-based architecture that supports the spectrum of treatment, storage, disposal, administrative, and characterization based unit operations necessary to manage waste from cradle to grave. The application design shall readily accommodate new facilities, processes, workflow, signature requirements, and so forth, via end-user established metadata. WCATS will provide support for representing waste storage and disposal facilities, buildings, rooms, and grid layouts (x, y, z) to support waste and radioactive material inventory management. Nuclear material at risk (MAR), DOE hazard rating (e.g., Category II facility) compliance per DOE-STD-1027, and permit inventory requirements will be configurable for any storage or disposal facility, or waste operation, and the system will automatically evaluate and enforce those requirements. In addition, the application will support the characterization and management of the entire range of hazardous and radioactive wastes (TRU, MTRU, LLW, MLLW, hazardous waste, etc.) that might be colocated or processed at a permitted facility. Some capabilities not found in traditional systems include user-defined tank systems for liquid waste, user-defined work paths (i.e., sequence of operations), and an equipment subsystem for tracking the calibration, maintenance, and inspection of tools used to process waste, such as torque wrenches, scales, pH probes, etc. The application incorporates a desktop and mobile user interface as shown in Figure 1. The mobile interface supports field operations, such as waste item characterization, intra-facility transfers, internal and external audits, and shipment preparation and receipt.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Technical Report

Statement of the problem or situation that is being addressed in your application. The DOE and its national laboratories developed the Home Energy Score™ (HES) to encourage homeowners to improve their energy performance, lower costs and to share energy information through the MLS listing, appraisal, and financing channels. While the HES is an instrumental tool, it is currently underutilized and consists of technical, structural and sector barriers which need to be addressed in order to scale and many energy efficiency contractors are understandably overwhelmed by the added time and effort and lack of incentive to sell and deliver deep retrofit projects while simultaneously meeting the DOE HES program requirements; consequently, contractors may decide to forgo participation. Home Energy Rating System (HERS) Raters have the opportunity to play the critical Assessor role in producing a Home Energy Score (HES); this role has immense potential but currently is unfulfilled. Lastly, while utilities are interested in their customer base achieving greater energy efficiency, especially to help offset growing residential loads in states like California that are accelerating electrification, utilities do not have access to the market actors who are on the front line of influence to homeowners or review and approve their permits: HERS Raters, assessors, contractors and building departments. General statement of how this problem is being addressed: ConSol will integrate the Home Energy Score™ (HES) to its State of California, approved home energy rating services (HERS) platform (CHEERS) to develop a single tool for contractors nationwide to assess, record and install recommended cost, energy, and emissions saving measures to the 140 million single-family homes throughout the U.S. and 14 million homes in California (CHEERS+HES). The CHEERS high fidelity energy code permitting data will be integrated with HES for simple, accurate, easy-to-use home energy estimation and analysis and will directly gain access to the retrofit and renovations markets with the same upgraded platform. This innovative project will assist the utilities in supporting existing homes in their jurisdictions with HES and develop measures to improve energy efficiency and reduce emissions. How is this problem being addressed? What is the overall project approach? In effort to expand the Home Energy Score™ (HES) by increasing the use of aggregable home energy asset data, ConSol proposes to integrate the DOE HES via Application Programming Interface (API) to its State of California approved home energy rating services platform (CHEERS). Once the CHEERS platform and HES are integrated (CHEERS+HES), this enhanced platform will be instantly available and actively deployed via Phase 1 pilot to HERS Raters, assessors and contractors in California to market-test the solution, understand the rate of adoption and identify opportunities for improvement prior to scaling nationally. The CHEERS high fidelity energy code permitting data will be integrated with HES for simple, accurate, easy-to-use home energy estimation and analysis and will directly gain access to the retrofit and renovations markets with the same upgraded platform. This innovative project will assist the building industry and homeowners with an easy-to-use assessment if energy and carbon impacts of existing homes, and assist the utilities in supporting existing homes in their jurisdictions with HES to improve energy efficiency and reduce emissions. What is to be done in Phase I? During Phase I of this proposed project, ConSol will (1) design software architecture that links CHEERS to the Home Energy ScoreTM via API, (2) solicit partnership from one or more California utilities for a regional pilot, (3) test the new software with its HERS Raters and contractor network in the partnership utility jurisdiction, (4) launch a pilot version of the newly developed software with HERS Raters and contractors in the utility territory, and (5) explore California’s GoGreen energy efficiency homeowner lending program in parallel with the pilot. Commercial Applications and Other Benefits. Summarize the future applications or public benefits if the project is carried over into Phase II or Phase III and beyond. The CHEERS+HES commercialized product will be ready for national market scale following a successful Phase 1 performance. The CHEERS+HES adoption is estimated to reach a 5% adoption growth rate versus the 110,000 baseline, starting in Year 1 after Phase I completion, and continuing each year. As a direct benefit to the DOE, CHEERS will set a goal of 100,000 Home Energy Score assessments for existing home alterations within the first 10 years following Phase 1 performance. The technical benefits of this proposed project include the harmonized, automated, and seamless integration of the DOE HES into the widely used and market leading California energy registry, CHEERS. The social benefits include the aggregate energy, cost and GHG savings by allowing the broader public streamlined access to the CHEERS+HES measurement and the energy efficiency recommended measures that may result. Key Words: Home Energy ScoreTM (HES); Application Programming Interface (API); Home Energy Rating Services (HERS); HERS Raters; contractors; assessors; existing homes, energy asset data; cost, energy, and emissions saving measures; energy code (Title 24) compliance; document repository; utilities; pilot; newly developed software; energy efficiency; homeowner. Summary for Members of Congress: The DOE Home Energy Score™ (HES) is a tool to encourage homeowners to improve their energy performance, lower costs and share energy information but is underutilized and consists of barriers which need to be addressed in order to scale. In effort to expand the HES, CHEERS, Inc. will integrate the HES to its State of California, approved home energy rating services (HERS) platform (CHEERS) to develop a single tool for contractors nationwide to assess, record and install recommended cost, energy, and emissions saving measures to the 140 million single-family homes throughout the U.S. and 14 million homes in California.

Application Programming Interface (API)↗

Radioisotope Analysis of Wastewater from Livermore Site Retention Tanks by Gel Laboratory Gross Alpha, Gross Beta and Tritium Sampling Method

Lawrence Livermore National Laboratory discharged approximately 4.4% of the City of Livermore’s total wastewater in 2022 (LLNL’s Annual Site Environmental Report, Chapter 5, 2022). This volume includes wastewater from Sandia National Laboratories (SNL) and some process wastewater from Site 300. Due to the high volume and constituents of the discharge, LLNL works alongside the City of Livermore under permit #1250, requiring wastewater generated to be monitored and sampled in accordance with permit limits. Process wastewater, from buildings with the highest risk to sewer, is collected by wastewater retention tanks throughout the Livermore Site and sampled prior to discharge. Domestic wastewater directly discharges to sanitary sewer. To maintain permit requirements and ensure proper wastewater discharge practices, an internal wastewater audit was conducted during the summer of 2023. Current wastewater practices, regulatory knowledge and risk management across various Livermore Site buildings were evaluated. Workspaces connected to a wastewater retention tank and sanitary sewer drains were major focus areas. Data collected from walk-throughs prompted further evaluation as many practices were reported to be done based on historical usage. A table of concerns was created to showcase reasons for auditing and proceeding action. An analysis of current and historical retention tank usage throughout LLNL Livermore Site buildings with radioisotope results over a 5-year period from 2019 to 2024, was done to assess building trends and any significant changes throughout the 5-year period. Analytes evaluated were Gross Alpha, Gross Beta and Tritium (GABT) of eleven buildings at the Livermore Site, posing the highest risk to sanitary sewer for radioisotopes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗