Search NASA⌕ Search

SEARCH · Search NASA

Results for “Program verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Advanced Global Atmospheric Gases Experiment (AGAGE)

We seek funding from NASA for the third year (2005) of the four-year period January 1, 2003 - December 31, 2006 for continued support of the MIT contributions to the multi-national global atmospheric trace species measurement program entitled Advanced Global Atmospheric Gases Experiment (AGAGE). The case for real-time high-frequency measurement networks like AGAGE is very strong and the observations and their interpretation are widely recognized for their importance to ozone depletion and climate change studies and to verification issues arising from the Montreal Protocol (ozone) and Kyoto Protocol (climate). The proposed AGAGE program is distinguished by its capability to measure over the globe at high frequency almost all of the important species in the Montreal Protocol and almost all of the significant non-CO2 gases in the Kyoto Protocol.

Prinn, Ronald G.↗

A Sustainable, Reliable Mission-Systems Architecture that Supports a System of Systems Approach to Space Exploration

A mission-systems architecture based on a highly modular "systems of systems" infrastructure utilizing open-standards hardware and software interfaces as the enabling technology is absolutely essential for an affordable and sustainable space exploration program. This architecture requires (a) robust communication between heterogeneous systems, (b) high reliability, (c) minimal mission-to-mission reconfiguration, (d) affordable development, system integration, and verification of systems, and (e) minimum sustaining engineering. This paper proposes such an architecture. Lessons learned from the space shuttle program are applied to help define and refine the model.

Watson, Steve↗

A real-time simulator of a turbofan engine

A real-time digital simulator of a Pratt and Whitney F100 engine has been developed for real-time code verification and for actuator diagnosis during full-scale engine testing. This self-contained unit can operate in an open-loop stand-alone mode or as part of closed-loop control system. It can also be used for control system design and development. Tests conducted in conjunction with the NASA Advanced Detection, Isolation, and Accommodation program show that the simulator is a valuable tool for real-time code verification and as a real-time actuator simulator for actuator fault diagnosis. Although currently a small perturbation model, advances in microprocessor hardware should allow the simulator to evolve into a real-time, full-envelope, full engine simulation.

Litt, Jonathan S.↗

Pre-Installation Acceptance (PIA) Functional Performance of the Design Verification Test (DVT) Exploration Extra-vehicular Mobility Unit (xEMU)

In an effort that began with technology investment by NASA in a few key components during the Constellation Program and then evolved to demonstrate a packaged Portable Life Support System (PLSS) as part of the Advanced Exploration Systems (AES) Program, the next evolution of the PLSS is now a key component of the Exploration Extra-vehicular Mobility Unit (xEMU) and is assembled as a Design Verification Test (DVT) unit. The xEMU has been detailed with respect to completing a demonstration on the International Space Station (ISS) with support of units for initial lunar capability. The xEMU completed the Preliminary Design Review (PDR) with subsequent Safety Review Panel (SRP) Phase I reviews in 2019-2020. The objectives for DVT are to validate requirements, train the team, learn how to fabricate the hardware with appropriate process controls, assemble the hardware, test the hardware, determine the failure mechanisms/limits of the hardware design and buy down the most risk possible for the qualification and flight phases of the development. With completion of the assembly and initial functional testing of the DVT PLSS in laboratory ambient conditions and vacuum conditions the xEMU has progressed significantly into the DVT objectives. A key part of the test sequences for DVT and all future phases is the Pre-Installation Acceptance (PIA) functional testing which validates the performance of integrated systems including: primary thermal control, auxiliary thermal control, suit ventilation, primary oxygen, secondary oxygen, power distribution, as well as caution and warning all with respect to the applied requirements. This discussion will include an overview of the assembly, summary of the PIA functional testing, lessons learned, and corrective actions implemented moving forward into the remainder of the DVT phase for xEMU.

Colin Campbell↗

Apollo experience report: Electronic systems test program accomplishments and results

A chronological record is presented of the Electronic Systems Test Program from its conception in May 1963 to December 1969. The original concept of the program, which was primarily a spacecraft/Manned Space Flight Network communications system compatibility and performance evaluation, is described. The evolution of these concepts to include various levels of test detail, as well as systems level design verification testing, is discussed. Actual implementation of these concepts is presented, and the facility to support the program is described. Test results are given, and significant contributions to the lunar landing mission are underlined. Plans for modifying the facility and the concepts, based on Apollo experience, are proposed.

Ohnesorge, T. E.↗

Revisiting the Soyuz-1 Parachute Failure in the Context of Safety in the Modern Era

The Soyuz‑1 accident remains one of the most consequential parachute related failures in human spaceflight history and provides enduring lessons for modern Entry, Descent, and Landing (EDL) system design. Occurring during the height of the Cold War and the Space Race, the mission unfolded under extraordinary political and schedule pressure as the Soviet Union sought to maintain its early leadership in space achievements following the death of chief designer Sergei Korolev. Despite unresolved propulsion, electrical, and parachute system deficiencies, Soyuz‑1 proceeded to launch and immediately encountered critical inflight anomalies, including a failed solar panel deployment, attitude control issues, and communication dropouts. Upon reentry, a malfunction in the parachute system, driven by a primary main canopy that failed to deploy, and subsequent entanglement of the reserve main canopy with the primary drogue parachute, resulted in insufficient deceleration and the fatal crash of cosmonaut Vladimir Komarov. Subsequent investigations revealed deep rooted cultural and organizational issues within the Soviet space program, including inadequate testing, suppression of dissent, undocumented last minute design changes, and the absence of integrated parachute system verification. More than 200 design flaws were identified after the accident, and firsthand accounts, including those from Yuri Gagarin, highlighted widespread concern prior to launch. Over time, the Soviet program implemented substantial reforms: systematic design corrections, rigorous process documentation, and an extensive series of drop tests that ultimately transformed the Soyuz system into one of the world’s most reliable human-rated return vehicles. This paper examines the technical architecture of the Soyuz‑1 parachute system, reconstructs the likely deployment sequence and failure mechanism, and analyzes the cultural contributors that shaped the accident. The study draws parallels to modern spacecraft parachute development, emphasizing the critical importance of integrated system testing, transparent engineering culture, and continuous hardware surveillance. These lessons remain directly relevant to today’s NASA and Commercial Crew Programs (CCP), where the Government continues to refine its understanding of aggregate risk and strengthen overall astronaut safety in the face of increasingly complex parachute systems.

Aaron L Morris↗

Assessment of Thermal Control and Protective Coatings

This final report is concerned with the tasks performed during the contract period which included spacecraft coating development, testing, and applications. Five marker coatings consisting of a bright yellow handrail coating, protective overcoat for ceramic coatings, and specialized primers for composites (or polymer) surfaces were developed and commercialized by AZ Technology during this program. Most of the coatings have passed space environmental stability requirements via ground tests and/or flight verification. Marker coatings and protective overcoats were successfully flown on the Passive Optical Sample Assembly (POSA) and the Optical Properties Monitor (OPM) experiments flown on the Russian space station MIR. To date, most of the coatings developed and/or modified during this program have been utilized on the International Space Station and other spacecraft. For ISS, AZ Technology manufactured the 'UNITY' emblem now being flown on the NASA UNITY node (Node 1) that is docked to the Russian Zarya (FGB) utilizing the colored marker coatings (white, blue, red) developed by AZ Technology. The UNITY emblem included the US American flag, the Unity logo, and NASA logo on a white background, applied to a Beta cloth substrate.

Mell, Richard J.↗

The post Challenger era Get Away Special program January 1992

The Get Away Special (GAS) program is described in terms of the changes that have taken place in both NASA and the GAS itself. Attention is given to the relationships developed between NASA and GAS customers in the context of programmatic and technical issues. The background of the GAS program is outlined with reference given to policy publications, the design of the Flight Verification Payload, and the first GAS payload launched. A review process is described that facilitates the management of the payloads through flight certification. The GAS Bridge was developed to carry up to 12 payloads simultaneously, and the recent period of GAS inactivity is explained. A price increase is introduced for future GAS payloads with negotiable access to optional services, and the ease and accessibility of the GAS programs for private experiments is emphasized.

Prouty, Clarke↗

Digital command system

The correct processing of the Digital Command System (DCS), which provides a limited real-time means of controlling specific flight program functions, was verified. The ability of the flight program to correctly read and process DCS commands was verified. Tests made by the flight program after reading the contents of the command decoder register to establish the validity of the received data were verified through the following: DCS mode command verification, DCS data command verification, DCS data validation, and DCS error message. The operation of the following DCS commands accepted and processed by the flight program was tested: time base update, navigation update, generalized switch selector, memory dump, terminate, execute generalized maneuver, return to nominal timeline, ECS water control valve logic inhibit, execute maneuver, execute alternate sequence, targeting load, ladder magnitude limit, S-IVB/IU de-orbit, compressed data dump, and remove inhibit on the extraction maneuver.

Source record↗

Effects of rotation on coolant passage heat transfer. Volume 2: Coolant passages with trips normal and skewed to the flow

An experimental program was conducted to investigate heat transfer and pressure loss characteristics of rotating multipass passages, for configurations and dimensions typical of modem turbine blades. This experimental program is one part of the NASA Hot Section Technology (HOST) Initiative, which has as its overall objective the development and verification of improved analysis methods that will form the basis for a design system that will produce turbine components with improved durability. The objective of this program was the generation of a data base of heat transfer and pressure loss data required to develop heat transfer correlations and to assess computational fluid dynamic techniques for rotating coolant passages. The experimental work was broken down into two phases. Phase 1 consists of experiments conducted in a smooth wall large scale heat transfer model. A detailed discussion of these results was presented in volume 1 of a NASA Report. In Phase 2 the large scale model was modified to investigate the effects of skewed and normal passage turbulators. The results of Phase 2 along with comparison to Phase 1 is the subject of this Volume 2 NASA Report.

Johnson, B. V.↗

The NASA Space Launch System Program Systems Engineering Approach for Affordability

The National Aeronautics and Space Administration is currently developing the Space Launch System to provide the United States with a capability to launch large Payloads into Low Earth orbit and deep space. One of the development tenets of the SLS Program is affordability. One initiative to enhance affordability is the SLS approach to requirements definition, verification and system certification. The key aspects of this initiative include: 1) Minimizing the number of requirements, 2) Elimination of explicit verification requirements, 3) Use of certified models of subsystem capability in lieu of requirements when appropriate and 4) Certification of capability beyond minimum required capability. Implementation of each aspect is described and compared to a "typical" systems engineering implementation, including a discussion of relative risk. Examples of each implementation within the SLS Program are provided.

Hutt, John J.↗

Transonic flow over wing/fuselage configurations

Wing Body Code (WIBCO) program simulates flow-field configurations for reduction of design cost and improvement of aircraft performance. Inputs to WIBCO consist of ambient flow conditions and geometric configuration data; grid control and relaxation parameters are internally set. Outputs include input data echo, grid system verification, relaxation-solution convergence history, and computed velocities, pressures, forces, moments, reference lengths, and areas. Program is written in FORTRAN IV for batch execution.

Boppe, C. W.↗

Adaption of space station technology for lunar operations

Space Station Freedom technology will have the potential for numerous applications in an early lunar base program. The benefits of utilizing station technology in such a fashion include reduced development and facility costs for lunar base systems, shorter schedules, and verification of such technology through space station experience. This paper presents an assessment of opportunities for using station technology in a lunar base program, particularly in the lander/ascent vehicles and surface modules.

Garvey, J. M.↗

Sustainable, Reliable Mission-Systems Architecture

A mission-systems architecture, based on a highly modular infrastructure utilizing: open-standards hardware and software interfaces as the enabling technology is essential for affordable and sustainable space exploration programs. This mission-systems architecture requires (a) robust communication between heterogeneous system, (b) high reliability, (c) minimal mission-to-mission reconfiguration, (d) affordable development, system integration, and verification of systems, and (e) minimal sustaining engineering. This paper proposes such an architecture. Lessons learned from the Space Shuttle program and Earthbound complex engineered system are applied to define the model. Technology projections reaching out 5 years are mde to refine model details.

O'Neil, Graham↗

Sustainable, Reliable Mission-Systems Architecture

A mission-systems architecture, based on a highly modular infrastructure utilizing open-standards hardware and software interfaces as the enabling technology is essential for affordable md sustainable space exploration programs. This mission-systems architecture requires (8) robust communication between heterogeneous systems, (b) high reliability, (c) minimal mission-to-mission reconfiguration, (d) affordable development, system integration, end verification of systems, and (e) minimal sustaining engineering. This paper proposes such an architecture. Lessons learned from the Space Shuttle program and Earthbound complex engineered systems are applied to define the model. Technology projections reaching out 5 years are made to refine model details.

O'Neil, Graham↗

Integrated design of the CSI evolutionary structure: A verification of the design methodology

One of the main objectives of the Controls-Structures Interaction (CSI) program is to develop and evaluate integrated controls-structures design methodology for flexible space structures. Thus far, integrated design methodologies for a class of flexible spacecraft, which require fine attitude pointing and vibration suppression with no payload articulation, have been extensively investigated. Various integrated design optimization approaches, such as single-objective optimization, and multi-objective optimization, have been implemented with an array of different objectives and constraints involving performance and cost measures such as total mass, actuator mass, steady-state pointing performance, transient performance, control power, and many more. These studies have been performed using an integrated design software tool (CSI-DESIGN CODE) which is under development by the CSI-ADM team at the NASA Langley Research Center. To date, all of these studies, irrespective of the type of integrated optimization posed or objectives and constraints used, have indicated that integrated controls-structures design results in an overall spacecraft design which is considerably superior to designs obtained through a conventional sequential approach. Consequently, it is believed that validation of some of these results through fabrication and testing of a structure which is designed through an integrated design approach is warranted. The objective of this paper is to present and discuss the efforts that have been taken thus far for the validation of the integrated design methodology.

Maghami, Peiman G.↗

A methodology for evaluation of an interactive multispectral image processing system

Because of the considerable cost of an interactive multispectral image processing system, an evaluation of a prospective system should be performed to ascertain if it will be acceptable to the anticipated users. Evaluation of a developmental system indicated that the important system elements include documentation, user friendliness, image processing capabilities, and system services. The criteria and evaluation procedures for these elements are described herein. The following factors contributed to the success of the evaluation of the developmental system: (1) careful review of documentation prior to program development, (2) construction and testing of macromodules representing typical processing scenarios, (3) availability of other image processing systems for referral and verification, and (4) use of testing personnel with an applications perspective and experience with other systems. This evaluation was done in addition to and independently of program testing by the software developers of the system.

Kovalick, William M.↗

Space Station Freedom - Technical and management challenges

The development of the Space Station is reviewed, focusing on the technical and managerial aspects of the program. The optimization of the Space Station configuration, utilization impacts on design, technical aspects of the distribution systems, and the problems of designing for a lifetime of 30 years or more are discussed. In addition, cost reduction studies, testing and verification, determining the assembly sequence, and operational communications and support systems are examined. Managerial aspects of the program include organization, program control, management tools and processes, and the integration of elements from the international partners.

Moser, Thomas L.↗