Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Radium/Barium Waste Project

The treatment, shipping, and disposal of a highly radioactive radium/barium waste stream have presented a complex set of challenges requiring several years of effort. The project illustrates the difficulty and high cost of managing even small quantities of highly radioactive Resource Conservation and Recovery Act (RCRA)-regulated waste. Pacific Northwest National Laboratory (PNNL) research activities produced a Type B quantity of radium chloride low-level mixed waste (LLMW) in a number of small vials in a facility hot cell. The resulting waste management project involved a mock-up RCRA stabilization treatment, a failed in-cell treatment, a second, alternative RCRA treatment approach, coordinated regulatory variances and authorizations, alternative transportation authorizations, additional disposal facility approvals, and a final radiological stabilization process.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Earned Value Management (EVM) System Description

The purpose of this Earned Value Management (EVM) System Description is to provide guidance in NASA’s Earned Value Management Capability for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts. EVM is a project management process that effectively integrates a project’s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions. This system description contains detailed information on implementation of EVM processes, procedures, roles and responsibilities.

Schumann, Deborah C.↗

Earned Value Management (EVM) System Description

The purpose of this Earned Value Management (EVM) System Description is to provide guidance in NASA’s Earned Value Management Capability for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts. EVM is a project management process that effectively integrates a project’s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions. This system description contains detailed information on implementation of EVM processes, procedures, roles and responsibilities.

Christopher Lewis Sadler↗

Creating Jobs through Energy Efficiency Using Wisconsin's Successful Focus on Energy Program

The purpose of this project was to provide administrative and technical support for the completion of energy efficiency projects that reduce energy intensity and create or save Wisconsin industrial jobs. All projects have been completed. Details in the attached reports include project management, job development, and energy savings for each project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Schedule Management Optimization (SMO) Domain Model (V.1.2)

Schedule Management Optimization (SMO) is a tool for automatically generating a schedule of project tasks. Project scheduling is traditionally achieved with the use of commercial project management software or case-specific optimization formulations. Commercial software packages are useful tools for managing and visualizing copious amounts of project task data. However, their ability to automatically generate optimized schedules is limited. Furthermore, there are many real-world constraints and decision variables that commercial packages ignore. Case-specific optimization formulations effectively identify schedules that optimize one or more objectives for a specific problem, but they are unable to handle a diverse selection of scheduling problems. SMO enables practitioners to generate optimal project schedules automatically while considering a broad range of real-world problem characteristics. SMO has been designed to handle some of the most difficult scheduling problems – those with resource constraints, multiple objectives, multiple inventories, and diverse ways of performing tasks. This report contains descriptions of the SMO modeling concepts and explains how they map to real-world scheduling considerations.

97 MATHEMATICS AND COMPUTING↗

State Strategies to Bring Solar to Low- and Moderate-Income Communities

This Final Technical Report describes the goals, objectives, activities, results, and accomplishments of the State Strategies to Bring Solar to Low- and Moderate-Income Communities Project, managed by the Clean Energy States Alliance. This project enabled five states (Connecticut, Minnesota, New Mexico, Oregon, and Rhode Island) and the District of Columbia to develop and implement strategies for expanding market penetration of solar PV among LMI residents and communities. The project disseminated successful strategies and lessons learned from those states to other states and stakeholders across the country.

14 SOLAR ENERGY↗

Processes and process development in Taiwan

Silicon material research in the Republic of China (ROC) parallels its development in the electronic industry. A brief outline of the historical development in ROC silicon material research is given. Emphasis is placed on the recent Silane Project managed by the National Science Council, ROC, including project objectives, task forces, and recent accomplishments. An introduction is also given to industrialization of the key technologies developed in this project.

Hwang, H. L.↗

Structured prototyping as risk management

A methodology is presented for integrating the systems-engineering management recommendation of prototyping into the traditional project-management process for developing large-scale systems. The suggested methodology begins with the identification of life-cycle risk areas, outlines the structure and conduct of the prototyping process, and defines the composition of the prototyping team. The methodology includes a step-by-step procedure for creating, executing, and documenting a prototyping test plan to evaluate design alternatives. It is argued that managers who adopt this methodology and apply it rigorously will increase the likelihood that the systems they build will be operationally effective and will be accepted by the intended users.

Hornstein, Rhoda SH.↗

Voyager Briefing: Expectations of the Neptune Encounter

This NASA KSC video release presents a news briefing held Aug. 4, 1989 at NASA Headquarters three weeks after Voyager 2's official "encounter" with Neptune began. The video is comprised of two slide presentations followed by a short question and answer period. The press conference is moderated by Charles Redmond, (NASA Public Affairs), includes an introduction by Dr. Geoffrey A Briggs (Dir., Solar System Exploration Div.), and features Norman R. Haynes (Voyager Project Manager, JPL) and Dr. Edward C. Stone (Voyager Project Scientist, Cal Tech). Mr. Haynes' presentation centers on Voyager's history, engineering changes, and spacecraft trajectories while Dr. Stone presents the scientific aspects of Voyager, including the 11 scientific investigations planned for the mission, instruments used, and imaging techniques.

Source record↗

The Storyboard's Big Picture

At Science Applications International Corporation (SAIC), Cape Canaveral Office, we're using a project management tool that facilitates team communication, keeps our project team focused, streamlines work and identifies potential issues. What did it cost us to install the tool? Almost nothing.

Malloy, Cheryl A.↗

San Marco C-2 Explorer

The San Marco C-2 spacecraft will be launched no earlier than 18 February 1974 from the San Marco Range located off the coast of Kenya, Africa, by a Scout launch vehicle. The launch will be conducted by an Italian crew. The San Marco C-2 is the fourth cooperative satellite project between Italy and the United States. The purpose of the mission is to obtain measurements of the diurnal variations of the equatorial neutral atmosphere density, composition, and temperature and to use these data for correlation with AE-C (Explorer 51) data for studies of the physics and dynamics of the thermosphere. The San Marco C-2 project is a joint undertaking of the National Aeronautics and Space Administration (NASA) and the Italian Space Commission officially initiated with a Memorandum of Understanding in August of 1973. Project management responsibility for the Italian portion of the project has been assigned to the Centro Ricerche Aerospaziali (CRA) while the Goddard Space Flight Center (GSFC) has responsibility for the United States portion.

Source record↗

Developing the Next Generation of Science Data System Engineers

At Goddard, engineers and scientists with a range of experience in science data systems are needed to employ new technologies and develop advances in capabilities for supporting new Earth and Space science research. Engineers with extensive experience in science data, software engineering and computer-information architectures are needed to lead and perform these activities. The increasing types and complexity of instrument data and emerging computer technologies coupled with the current shortage of computer engineers with backgrounds in science has led the need to develop a career path for science data systems engineers and architects.The current career path, in which undergraduate students studying various disciplines such as Computer Engineering or Physical Scientist, generally begins with serving on a development team in any of the disciplines where they can work in depth on existing Goddard data systems or serve with a specific NASA science team. There they begin to understand the data, infuse technologies, and begin to know the architectures of science data systems. From here the typical career involves peermentoring, on-the-job training or graduate level studies in analytics, computational science and applied science and mathematics. At the most senior level, engineers become subject matter experts and system architect experts, leading discipline-specific data centers and large software development projects. They are recognized as a subject matter expert in a science domain, they have project management expertise, lead standards efforts and lead international projects. A long career development remains necessary not only because of the breadth of knowledge required across physical sciences and engineering disciplines, but also because of the diversity of instrument data being developed today both by NASA and international partner agencies and because multidiscipline science and practitioner communities expect to have access to all types of observational data.This paper describes an approach to defining career-path guidance for college-bound high school and undergraduate engineering students, junior and senior engineers from various disciplines.

Next Generation of Science↗

AN APPROACH TO SAFETY DESIGN BASIS DOCUMENTATION CHANGE CONTROL

This paper describes a safety design basis documentation change control process. The process identifies elements that can be used to manage the project/facility configuration during design evolution through the Initiation, Definition, and Execution project phases. The project phases addressed by the process are defined in US Department of Energy (DOE) Order (O) 413.3A, Program and Project Management for the Acquisition of Capital Assets, in support of DOE project Critical Decisions (CD). This approach has been developed for application to two Hanford Site projects in their early CD phases and is considered to be a key element of safety and design integration. As described in the work that has been performed, the purpose of change control is to maintain consistency among design requirements, the physical configuration, related facility documentation, and the nuclear safety basis during the evolution of the design. The process developed (1) ensures an appropriate level of rigor is applied at each project phase and (2) is considered to implement the requirements and guidance provided in DOE-STD-1189-2008, Integration of Safety into the Design Process. Presentation of this work is expected to benefit others in the DOE Complex that may be implementing DOE-STD-1189-2008 or managing nuclear safety documentation in support of projects in-process.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Earned Value Management (EVM) Implementation Handbook

The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

Source record↗

Earned Value Management (EVM) Implementation Handbook

The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project?s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

Planning Package↗