Search NASA⌕ Search

SEARCH · Search NASA

Results for “ROADS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Long and Winding Road to Higher Efficiency-The RTU Story: Preprint

Rooftop units (RTUs) and other packaged heating, ventilating, and air-conditioning (HVAC) equipment consume more than four quads of energy annually while conditioning more than 50% of the commercial building floor area in the United States. Historically, these systems have low operating efficiencies and receive infrequent maintenance. In addition, the market has a low first cost, run-to-failure, like-for-like replacement mentality and has been slow to adopt change. This paper explores the broad market transformation that has resulted in higher efficiencies and tremendous energy savings. Although there are many factors in this market transformation, this paper highlights: research behind advancements in components and controls; adoption of an operational efficiency metric; raising the bar for high efficiency with the RTU Challenge; market barriers overcome through the Advanced RTU Campaign; upstream and midstream incentive programs and HVAC distribution networks; alignment of the market efficiency drivers of ASHRAE Standard 90.1, federal minimum efficiency standards, the ENERGY STAR® program, and the Consortium for Energy Efficiency's (CEE's) efficiency tiers. Measures of the market transformation include more than 50% increase in RTU efficiencies, more than 1 billion kWh saved and 160,000 RTUs upgraded with high-efficiency measures by the Advanced RTU Campaign partners, large increases of high-efficiency RTUs purchased through incentive programs, and the largest energy savings from any federal minimum standards action. Although these results are impressive, the market transformation is just beginning, and there remain exciting opportunities for improvements in equipment efficiencies and improved operating performance with advanced controls and fault detection and diagnostics.

30 DIRECT ENERGY CONVERSION↗

Coupling the Modeled Structural Transmissibility of a Used Nuclear Fuel Conveyance to Over the Road Data – 16215

The U.S. Department of Energy Office of Nuclear Energy (DOE-NE), Office of Fuel Cycle Technology, has established the Used Fuel Disposition Campaign (UFDC) to conduct research and development activities related to storage, transportation, and disposal of used nuclear fuel (UNF) and high-level radioactive waste (HLW). The mission of the UFDC is to identify alternatives and conduct scientific research and technology development to enable storage, transportation and disposal of used nuclear fuel and HLW generated by existing and future nuclear fuel cycles. The Storage and Transportation staff within the UFDC is responsible for addressing issues regarding the long-term or extended storage (ES) of UNF and its subsequent transportation.

Jensen, Philip J.↗

FRJ-1 Research Reactor (Merlin) Makes Way for a 'Green Field' Milestones on the Road to Paradise Regained

This report describes the previous path of the research reactor FRJ-1 (MERLIN) from shutdown to 'green field site', whereby primary focus is placed on milestones representing distinctive phases of dismantling. However, not only the milestones, but also the stumbling blocks are worth mentioning, because even negative events are painful and therefore provide good examples of what not to do in future projects. Dismantling of FRJ-1 began in 1995 with rather unspectacular demolition of the conventional air cooling system. Nevertheless, this was a significant milestone because it marked the beginning of the nuclear decommissioning era for Research Center Juelich. From this time on the most significant milestones along the path to 'green field site' are represented by: - Demolishing the system circuits and removal of experimental equipment; - Removal of built-in equipment in the reactor tank; - Demolition of the reactor block; - Decontamination and clearance measurement of the reactor building followed by dismissal from the German Atomic Energy Act. - Conventional demolition of the reactor hall with the objective of converting to 'green field site' These steps are explained below in greater or less detail depending on their degree of controversy and interest. At the time this report is published, the reactor building will be dismissed from the German Atomic Energy Act. The last step in conventional demolition should also be completed at this time according to the original planning. However this was prevented by one of the many stumbling blocks on the way to success. Nevertheless it is assumed at the present time that this step will also be concluded before the middle of 2008. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗