Search NASA⌕ Search

SEARCH · Search NASA

Results for “Transactive”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Cybersecurity Lessons Learned from Vehicle to Grid Engagement

As the transportation industry continues to become electrified, introduction of additional digital devices within associated actions such as recharging bring additional potential for cybersecurity attacks. Devices that are designed, implemented, and operated with cybersecurity as a crucial consideration exacerbate these concerns by failing to provide strict boundaries on access to and use of the equipment. Emerging use cases such as Vehicle to Grid (V2G) charging may expand the potential physical effects of a cybersecurity attack by providing indirect access to electrical components of a building microgrid or portions of the larger power grid. This paper serves as an overview of findings and recommendations based on cybersecurity testing performed at a V2G implementation site operated by a member of the Memorandum of Understanding (MOU) to Establish the Vehicle-to-Everything (V2X) Collaboration [1]. The Department of Energy Office of Cybersecurity, Energy Security, and Emergency Response is a signatory of the MOU, and has funded this research paper and associated body of work regarding V2X cybersecurity. Sandia has a large background of previous research focused on Electric Vehicle (EV) cybersecurity, such as reference [2], which includes an overall survey of EV infrastructure cybersecurity and recommendations based on those findings. This report seeks to expand knowledge of EV cybersecurity status and needs by focusing on a specific implementation of V2G charging, and providing recommendations based on the relevant findings. This report serves as a publicly available, sanitized description of applied vulnerability testing on an operational V2G implementation. A more in-depth technical version of the report is provided to the MOU partner, but not available at the time of writing due to inclusion of proprietary information. V2G charging comes with many research problems that must be solved before the technology can securely implemented in sites with unrestricted public access or where cybersecurity attacks could have increased consequences, such as government offices. V2G charging requires many stakeholders such as end users, host sites, equipment vendors, and integrators, which all rely on operational safety and security as well as security and trustworthiness of any associated financial transactions.

33 ADVANCED PROPULSION SYSTEMS↗

Combinatoric Researchers at Sandia National Laboratories: An ethnographic study

Combinatorial research, the incorporation of multiple domains in a unified research agenda, is a strong contributor to the growing corpus of scientific knowledge and technological advancements worldwide. In 2019, a study team at Sandia National Laboratories (Sandia, the Labs) used a systems approach to understand if and how combinatorial research agendas were playing out at Sandia, one of America’s premiere national security research venues. The study team used the data collection effort described in this report to ground the discussion of the broad social environment and particular organizational environments within which combinatorial research agendas are developed, as described in the full study. The team interviewed twenty-five staff members engaged in combinatorial research at Sandia in New Mexico and California during the months of June – September 2019. Analysis of this corpus of ethnographic data, combined with knowledge drawn from relevant literature, concluded that there is an individual type who would be most likely to engage in combinatoric research, described by both demographic and psychographic components. This type demonstrates both intellectual depth and the curiosity which leads to breadth. The analysis also showed that Sandia as an organization and as perceived by the respondents, set up tension for the combinatorial researcher. While Sandia was generally agnostic towards combinatorial research, that agnostic posture depended on whether the researcher was able to fulfill all her customer obligations – obligations that are structured primarily in transactional relationships with customers with relatively short time horizons. This report concludes with suggestions for additional research in the ethnographic domain.

99 GENERAL AND MISCELLANEOUS↗

Avista CEF2 Shared Energy Economy: Modeling and Simulation

This research project supported Avista’s Shared Energy Economy (SEE) Project in Spokane’s University District (UDistrict), as funded by the WA Department of Commerce Clean Energy Fund (CEF) Phase 2. The SEE project comprises a microgrid with two campus buildings, two solar photovoltaic generators, and two batteries. The microgrid can operate grid-connected or off-grid. This research project included modeling the buildings and other microgrid components, simulating a transactive energy system, and supporting Avista’s testing of different use cases for the WA Department of Commerce. The main research finding is that buildings can be modeled successfully in a data-driven approach.

14 SOLAR ENERGY↗

Connecting Nitrogen Transformations Mediated by the Rhizosphere Microbiome to Perennial Cropping System Productivity in Marginal Lands

The demand for energy from biofuel production is increasing, prompting concerns about the environmental impact and long-term sustainability of bioenergy cropping systems. These cropping systems will make up much of our future landscapes, and threaten to take the place of food cropping systems. Many life cycle analyses of bioenergy sustainability focus on carbon accrual and budgets, since they want to maximize carbon accrual while producing alternative fuel. Less attention has been given to nitrogen (N) dynamics in these systems. N is the most commonly limiting nutrient for plants, but applying nitrogen fertilizer- as we do for most cropping systems – is harmful to the environment, energetically costly, and produces greenhouse gases. In other words, adding nitrogen by fertilizer bioenergy systems could add to the very problems (climate change) it is trying to address. This is especially true for the areas that are proposed for bioenergy systems: marginal lands. These more degraded lands do not complete with food crops, but do have limited nitrogen. If we are to use these marginal lands for bioenergy, we need to understand the mechanisms regulating nutrient acquisition, and identify ways that bioenergy crops can get nitrogen in sustainable ways. Nutrient acquisition in the soil is performed by microbes in the root zone, or rhizosphere. Microbes can either mineralize nitrogen in the soil (from organic forms) or fix nitrogen from the air, in a process called nitrogen fixation. The goal of our project was thus to understand how the rhizosphere microbiome provides nutrients to bioenergy crops on marginal lands. We focus especially on the process of nitrogen fixation, since it has potential to get “fertilizer for free” that has much less environmental harm. We investigated this goal using sites from the DOE Great Lakes Bioenergy Research Center (GLBRC) in the upper Midwest, and associated lab and ‘omics methods. We group our findings into three major areas. First, we showed that nitrogen fixation, the conversion of N2 gas from the air to ammonium that is usable by plants, is performed in bioenergy soils, and benefits switchgrass crops. While more well-studied in leguminous plants, free-living nitrogen fixation can occur in some systems, and represents a potential opportunity to gain ‘free’ sustainable nitrogen source. We identified the nitrogen fixing bacteria that were most active in providing switchgrass with N, and showed that the drivers of nitrogen fixation occurred at a microscale; it is not well-predicted by bulk variables like soil moisture or plant phenology. Second, we showed that nitrogen fixation is not suppressed by long-term fertilizer. We expected that plentiful nitrogen would reduce the symbiotic relationship between nitrogen fixers and plants, and ‘downregulate’ fixation. We did not find evidence for this, either after long-term fertilizer in the field, or short-term fertilizer in the greenhouse. Finally, we identified the root exudates, carbon compounds that are emitted from the root, that best stimulate nitrogen fixation. We found that carbohydrates were better at stimulating fixation than organic acids. We expected these exudates to be emitted from the plant in periods of high N demand, but we found they are emitted when N is plentiful. This suggests that the stimulation of N fixation by plants is a passive process. Overall, we show that nitrogen fixation has potential to support bioenergy cropping system, and future management could develop ways to maximize it. However, this may not be best achieved via the plant – we found very little evidence of a ‘transactional’ system by which plants are controlling when and where nitrogen fixation is stimulated. It will be better to understand how management practices like planting and fertilizer application affect the microscale soil dynamics, which will determine nitrogen fixation rates.

59 BASIC BIOLOGICAL SCIENCES↗

Implementation Guide of Customer-Focused Key Performance Indicators for Electric Vehicle Charging

This report describes how individual and unique messages that are sent over in OCPP sessions and/or transactions are used to calculate the interim set of key performance indicators (KPI) established by ChargeX Consortium’s Working Group 1: Defining the Charging Experience in the report entitles “Customer-Focused Key Performance Indicators for Electric Vehicle Charging.

33 ADVANCED PROPULSION SYSTEMS↗

Enabling Evaluation of a Southern Company Distribution Feeder on NREL ADMS Test Bed: Cooperative Research and Development (Final Report)

The objective of this project is to enable evaluation of a Southern Company distribution feeder on the Advanced Distribution Management System (ADMS) test bed. The long-term goal is to evaluate a federated distributed energy resource (DER) management solution that aggregates DERs through either direct control, transactive control or an aggregator to provide bulk services while observing distribution system voltage and power constraints. The DER aggregation needs to be coordinated with an ADMS that is responsible for reliable power delivery across the distribution systems. This project takes the first step towards enabling such evaluation by deploying an ADMS from Oracle (Southern Company's ADMS supplier) with a Southern Company feeder at NREL.

24 POWER TRANSMISSION AND DISTRIBUTION↗

LEED: A Lightwave Energy-Efficient Datacenter

The Lightwave Energy-Efficient Datacenter (LEED) program is a disruptive “green-field” approach that provides a quantum leap in the energy efficiency of datacenters. LEED’s fundamental value proposition is that a novel and re-architected optical network—RotorNet— can deliver “more bandwidth per buck” as well as unique system-level attributes that significantly improve overall datacenter energy efficiency and performance. LEED has developed three system-level testbeds. The first testbed uses calibrated hardware and software power measurements to determine server energy efficiency as a function of network bandwidth and workload. These measurements have shown that increasing network communications bandwidth dramatically increases server energy efficiency providing a realistic path to the overall ENLITENED program goal of doubling the number of transactions per joule. The second testbed demonstrates key hardware: a prototype low-loss, high-port count optical “selector switch”. This switch was fabricated, racked, and tested. Measured switch characteristics include loss, bandwidth, crosstalk, switch time, system-level switch time (including the transceivers), and bit error rate. The third testbed demonstrates a fully working and manufactured pinwheel design which dramatically lowers the cost of design, while delivering high switch radix and low reconfiguration times. The LEED project has tied these three novel photonic switch prototypes together with production servers and software through the development of a novel FPGA-based NIC platform called Corundum. Corundum ensures that the packet-switched protocols supported by commodity operating systems and devices can interface with the Rotor switch design. The LEED group has used this combined hardware and software prototype to characterize applications running at a commercially relevant scale. The project has used a combination of enhanced optical modulation amplitude (OMA) modulators, broadband multiplexers and demultiplexers, avalanche photodiodes, and a novel burst-mode receivers to enable the insertion of LEED-developed optical switches without the need for expensive optical amplification. Our modeling has shown that measured LEED-developed device characteristics can achieve link characteristics of 2 pJ/bit including both transceivers and the Rotor switch. In summary, the LEED program has demonstrated a credible and practical path, through novel hardware and software, to realize the program objectives of ENLITENED. The net result will ensure that the United States maintains its strength in the crucial sector of Information Technology, which is vital to both our economic security and our national security.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Implementation Guide of Customer-Focused Key Performance Indicators for Electric Vehicle Charging

This report describes how individual and unique messages that are sent over in OCPP sessions and/or transactions are used to calculate the interim set of key performance indicators (KPI) established by ChargeX Consortium’s Working Group 1: Defining the Charging Experience in the report entitles “Customer-Focused Key Performance Indicators for Electric Vehicle Charging.

33 - ADVANCED PROPULSION SYSTEMS↗

Energy Cost Estimate Tool v2.0: Methodology and Usage

Information about home energy costs is essential for appraisers, lenders, and buyers, but reliable data are often unavailable in real estate transactions. To fill this gap, the National Laboratory of the Rockies developed the Energy Cost Estimate (ECE) tool. The tool provides flexible, data-driven estimates of annual household energy use and costs across the contiguous United States, using only a small number of inputs typically found in mortgage appraisals. This report presents the methodology behind version 2.0 of the ECE tool, demonstrates how users can generate estimates through its interface, and discusses its applications and limitations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Database Performance Monitoring for DUNE

This project improves Checkmk monitoring for DUNE Rucio PostgreSQL database services by adding clearer dashboard visibility for connection and lock behavior. The work began with a request to monitor database performance metrics such as connection usage, configured limits, lock activity, wait behavior, query performance, storage trends, and saturation alerts. Existing Checkmk PostgreSQL checks were reviewed, and gaps were identified in how connection states and lock modes were displayed. To address these gaps, two DSG-specific local checks were added for dune_rucio_prod: one for connection-state monitoring and one for lock-state monitoring. These checks report active, idle, idle-in-transaction, total, usage-percent, lock-mode, waiting-lock, and wait-age metrics. The added metrics supplement built-in Checkmk monitoring and provide DUNE application developers with clearer service states, history graphs, dashboard widgets, and alerts.

Bowers, Elliot [Cabrillo Coll.]↗

How Argonne's Intense Pulsed Neutron Source came to life and gained its niche : the view from an ecosystem perspective.

At first glance the story of the Intense Pulsed Neutron Source (IPNS) at Argonne National Laboratory (ANL) appears to have followed a puzzling course. When researchers first proposed their ideas for an accelerator-driven neutron source for exploring the structure of materials through neutron scattering, the project seemed so promising that both Argonne managers and officials at the laboratory's funding agency, the Department of Energy (DOE), suggested that it be made larger and more expensive. But then, even though prototype building, testing, and initial construction went well a group of prominent DOE reviewers recommended in fall 1980 that it be killed, just months before it had been slated to begin operation, and DOE promptly accepted the recommendation. In response, Argonne's leadership declared the project was the laboratory's top priority and rallied to save it. In late 1982, thanks to another review panel led by the same scientist who had chaired the panel that had delivered the death sentence, the project was granted a reprieve. However, by the late 1980s, the IPNS was no longer top priority within the international materials science community, at Argonne, or within the DOE budget because prospects for another, larger materials science accelerator emerged. At just this point, the facility started to produce exciting scientific results. For the next two decades, the IPNS, its research, and its experts became valued resources at Argonne, within the U.S. national laboratory system, and within the international materials science community. Why did this Argonne project prosper and then almost suffer premature death, even though it promised (and later delivered) good science? How was it saved and how did it go on to have a long, prosperous life for more than a quarter of a century? In particular, what did an expert assessment of the quality of IPNS science have to do with its fate? Getting answers to such questions is important. The U.S. government spends a lot of money to produce science and technology at multipurpose laboratories like Argonne. For example, in the mid-1990s, about the time the IPNS's fortunes were secured, DOE spent more than $6 billion a year to fund nine such facilities, with Argonne's share totaling $500 million. And an important justification for funding these expensive laboratories is that they operate expensive but powerful scientific tools like the IPNS, generally considered too large to be built and managed by universities. Clearly, 'life and death' decision making has a lot to tell us about how the considerable U.S. federal investment in science and technology at national laboratories is actually transacted and, indeed, how a path is cleared or blocked for good science to be produced. Because forces within Argonne, DOE, and the materials science community obviously dictated the changing fortunes of the IPNS, it makes sense to probe the interactions binding these three environments for an understanding of how the IPNS was threatened and how it survived. In other words, sorting out what happened requires analyzing the system that includes all three environments. In an attempt to find a better way to understand its twists and turns, I will view the life-and-death IPNS story through the lens of an ecological metaphor. Employing the ideas and terms that ecologists use to describe what happens in a system of shared resources, that is, an ecosystem, I will describe the IPNS as an organism that vied with competitors for resources to find a niche in the interrelated environments of Argonne, DOE, and the materials science community. I will start with an explanation of the Argonne 'ecosystem' before the advent of the IPNS and then describe how the project struggled to emerge in the 1970s, how it scratched its way to a fragile niche in the early 1980s, and how it adapted and matured through the turn of the 21st century. The paper will conclude with a summary of what the ecosystem perspective shows about the life and death struggle of the IPNS and reflect on what that perspective reveals about how research is produced in the laboratory.

43 PARTICLE ACCELERATORS↗

Lawrence Livermore National Security CFO Processes Functional Management Assessment

The scope of the Functional Management Assessment of the CFO included a review of the CFO Organizational Structure, including deployed financial services and the division of responsibilities and internal controls between CFO and other organizations that perform financial functions across the Laboratory. In addition, the assessment team solicited input from end users and reviewers. Three issues discussed are: ISSUE 1: Financial activities and cash transactions are occurring outside the CFO organization. Approximately $200M of non-purchase order spending occurs in seven areas outside CFO control (travel, relocation, special disbursements, IPO, legal, risk management, and freight). NIF financial services have not been integrated into the CFO organization and operate outside CFO control. Business risks--There is no single point of financial accountably; Currently within the CFO and Business and Operations organizations there is a lack of clarity of roles and responsibilities for financial activities; Financial talent within the laboratory is fragmented; and Inefficiencies exist based on the current structure; An example of the above business risks associated with organizational structure can be observed in the process for reimbursement of relocation costs to employees. Currently, Human Resources and Travel both administer portions of an employee's relocation. Costs are reviewed for compliance with FAR travel guidelines and for compliance with the offer letter but there is no financial review for allowability of costs nor is there a single point where the total relocation costs are reviewed. Through the e-pay system the check is processed by the CFO organization but there is no review by that organization. ISSUE 2: Impact of involuntary separation on current and future activities. 3 risks are: (1) Loss of internal controls--with the upcoming involuntary reductions there will be a loss of personnel with institutional knowledge which will increase the risk of losing internal control on some processes. The organization needs to be cognizant of this risk and take measures to minimize financial risk and ensure on-going A-123 compliance. (2) Project Costing Implementation (PCI) delay--the implementation of PCI is key to achieving integration and reporting of financial data. Presently, business analysts spend half of their time collecting and compiling data and 94% of the labs financial management reports are created using spreadsheets. Currently, the PCI project is on schedule but the involuntary reductions may result in loss of support in this area. (3) Financial Performance Milestones not met--for FY-08 there are fixed, base and stretch financial performance milestones for the laboratory. With reductions in staff the risk of missing key milestones increases. ISSUE 3: Strategically growing the Work for Others (WFO) Portfolio. A key objective of the laboratory is to increase WFO. Greater reliance on WFO will result in additional funding sources and increase the number of control points and financial activities to be monitored thus increasing the level of financial complexity at the lab. The CFO organization should work now to improve controls and processes to accommodate these changes. In particular the following areas should be focused on: (1) Cost reporting needs to be streamlined; (2) Cost Transfer controls need to be increased; and (3) Timely monitoring and close out of contracts needs occur.

99 GENERAL AND MISCELLANEOUS↗

Leading by Example with Smart Energy Management (Fact Sheet)

The Federal Energy Management Program facilitates the Federal Government?s implementation of sound, cost-effective energy management and investment practices to enhance the nation?s energy security and environmental stewardship. FEMP does this by focusing on the needs of its Federal customers, delivering an array of products grouped into project transaction services, applied technology services, and decision support services. This document outlines FEMP services and programs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Special Report on the "Department of Energy's Efforts to Meet Accountability and Performance Reporting Objectives of the American Recovery and Reinvestment Act"

The purpose of the American Recovery and Reinvestment Act of 2009 (Recovery Act) was to jumpstart the U.S. economy, create or save millions of jobs, spur technological advances in health and science, and invest in the Nation's energy future. The Department of Energy will receive an unprecedented $38 billion in Recovery Act funding to support a variety of science, energy, and environmental initiatives. The Recovery Act requires transparency and accountability over these funds. To this end, the Office of Management and Budget (OMB) issued guidance requiring the Department to compile and report a wide variety of funding, accounting, and performance information. The Department plans to leverage existing information systems to develop accounting and performance information that will be used by program managers and ultimately reported to Recovery.gov, the government-wide source of Recovery Act information, and to OMB. The Department's iManage iPortal, a system that aggregates information from a number of corporate systems, will serve as the main reporting gateway for accounting information. In addition, the Department plans to implement a methodology or system that will permit it to monitor information reported directly to OMB by prime funding recipients. Furthermore, performance measures or metrics that outline expected outcomes are being developed, with results ultimately to be reported in a recently developed Department-wide system. Because of the significance of funds provided and their importance to strengthening the Nation's economy, we initiated this review to determine whether the Department had taken the steps necessary to ensure that Recovery Act funds can be appropriately tracked and are transparent to the public, and whether the benefits of the expenditures can be properly measured and reported clearly, accurately, and in a timely manner. Although not yet fully mature, we found that the Department's efforts to develop, refine, and apply the control structure needed to ensure accurate, timely, and reliable reporting to be both proactive and positive. We did, however, identify certain issues relating to Recovery Act performance management, accounting and reporting accuracy, and timeliness that should be addressed and resolved. In particular, at the time of our review: (1) Program officials had not yet determined whether existing information systems will be able to process anticipated transaction increases associated with the Recovery Act; (2) System modifications made to the Department's performance management system to accommodate Recovery Act performance measures had not yet been fully tested and verified; (3) The ability of prime and sub-recipients to properly segregate and report both accounting and performance information had not been determined; (4) There was a lack of coordination between Headquarters organizations related to aspects of Recovery Act reporting. For example, we observed that the Offices of Fossil Energy and Program, Analysis and Evaluation were both involved in developing job creation estimates that could yield significantly different results; and, (5) A significant portion (91 of 142, or 64 percent) of the performance measures developed for the Recovery Act activities were not quantifiable. In some instances, Project Operating Plans had not been finalized and we were not able to verify that all needed performance measures had been developed. Furthermore, the Department had not developed specific metrics to measure federal and contractor jobs creation and retention, an essential Recovery Act objective. The Department had devoted a great deal of time and resources to identifying and mitigating Recovery Act-related risks. For example, the Department developed a risk assessment tool that is intended to assist programs in identifying risks that can prevent its Recovery Act projects from meeting their intended goals. We also found that program staff and management officials at multiple levels were actively engaged in designing Recovery Act-related control and accountability programs. These efforts ranged from updating existing information systems to developing matrices designed to ensure that all required reporting and performance elements were addressed. Each of these activities required substantial effort and was accomplished within a relatively short period. Further, we noted that the Office of the Chief Financial Officer had been instrumental in helping impacted program elements identify issues that could adversely affect the Department's ability to execute its accounting, reporting, and performance monitoring responsibilities. While much has been done, additional work is necessary if the Department is to successfully manage Recovery Act-related risks. For example, as previously noted, OMB has issued guidance establishing Recovery Act monitoring and reporting requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2008 WIND TECHNOLOGIES MARKET REPORT

The U.S. wind industry experienced a banner year in 2008, again surpassing even optimistic growth projections from years past. At the same time, the last year has been one of upheaval, with the global financial crisis impacting near-term growth prospects for the wind industry, and with federal policy changes enacted to push the industry towards continued aggressive expansion. This rapid pace of development has made it difficult to keep up with trends in the marketplace. Yet, the need for timely, objective information on the industry and its progress has never been greater. This report - the third of an ongoing annual series - attempts to meet this need by providing a detailed overview of developments and trends in the U.S. wind power market, with a particular focus on 2008. As with previous editions, this report begins with an overview of key wind power installation-related trends: trends in wind capacity growth in the U.S., how that growth compares to other countries and generation sources, the amount and percentage of wind in individual states and serving specific utilities, and the quantity of proposed wind capacity in various interconnection queues in the United States. Next, the report covers an array of wind industry trends, including developments in turbine manufacturer market share, manufacturing and supply-chain investments, wind turbine and wind project size, project financing developments, and trends among wind power developers, project owners, and power purchasers. The report then turns to a discussion of wind project price, cost, and performance trends. In so doing, it reviews the price of wind power in the United States, and how those prices compare to the cost of fossil-fueled generation, as represented by wholesale power prices. It also describes trends in installed wind project costs, wind turbine transaction prices, project performance, and operations and maintenance expenses. Next, the report examines other policy and market factors impacting the domestic wind power market, including federal and state policy drivers, transmission issues, and grid integration. Finally, the report concludes with a preview of possible near- to medium-term market developments. This version of the Annual Report updates data presented in the previous editions, while highlighting key trends and important new developments from 2008. New to this edition is an executive summary of the report and an expanded final section on near- to medium-term market development. The report concentrates on larger-scale wind applications, defined here as individual turbines or projects that exceed 50 kW in size. The U.S. wind power sector is multifaceted, however, and also includes smaller, customer-sited wind turbines used to power the needs of residences, farms, and businesses. Data on these applications are not the focus of this report, though a brief discussion on Distributed Wind Power is provided on page 4. Much of the data included in this report were compiled by Berkeley Lab, and come from a variety of sources, including the American Wind Energy Association (AWEA), the Energy Information Administration (EIA), and the Federal Energy Regulatory Commission (FERC). The Appendix provides a summary of the many data sources used in the report. Data on 2008 wind capacity additions in the United States are based on information provided by AWEA; some minor adjustments to those data may be expected. In other cases, the data shown here represent only a sample of actual wind projects installed in the United States; furthermore, the data vary in quality. As such, emphasis should be placed on overall trends, rather than on individual data points. Finally, each section of this document focuses on historical market information, with an emphasis on 2008; with the exception of the final section, the report does not seek to forecast future trends.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Renewable Energy Prices in State-Level Feed-in Tariffs: Federal Law Constraints and Possible Solutions

State legislatures and state utility commissions trying to attract renewable energy projects are considering feed-in tariffs, which obligate retail utilities to purchase electricity from renewable producers under standard arrangements specifying prices, terms, and conditions. The use of feed-in tariffs simplifies the purchase process, provides revenue certainty to generators, and reduces the cost of financing generating projects. However, some argue that federal law--including the Public Utility Regulatory Policies Act of 1978 (PURPA) and the Federal Power Act of 1935 (FPA)--constrain state-level feed-in tariffs. This report seeks to reduce the legal uncertainties for states contemplating feed-in tariffs by explaining the constraints imposed by federal statutes. It describes the federal constraints, identifies transaction categories that are free of those constraints, and offers ways for state and federal policymakers to interpret or modify existing law to remove or reduce these constraints. This report proposes ways to revise these federal statutes. It creates a broad working definition of a state-level feed-in tariff. Given this definition, this report concludes there are paths to non-preempted, state-level feed-in tariffs under current federal law.

24 POWER TRANSMISSION AND DISTRIBUTION↗