Search NASA⌕ Search

SEARCH · Search NASA

Results for “amount”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Fueling strategy for controlled-autoignition engines

Methods and systems for controlling combustion performance of an engine during recompression HCCI combustion are provided. The method includes regulating a valve actuation timing and a fuel injection timing to cause a combustion phasing of at least one cylinder of the engine to approach a target combustion phasing, and estimating current combustion state information based on the combustion phasing. The current combustion state information includes at least one of a temperature, a pressure, and a pre-combustion charge composition associated with the at least one cylinder. The method further includes determining a target fuel injection amount, and determining whether the target fuel injection amount would require actuator settings that violate predetermined constraints in order to cause the combustion phasing to approach the target combustion phasing. A fuel injection amount is adjusted when the target fuel injection amount would require actuator settings that violate the predetermined constraints.

42 ENGINEERING↗

Is it Worth Relaxing Fault Tolerance to Speed Up Decommission in Distributed Storage Systems?

Efficient resource utilization is a major concern for large-scale computer platforms. One method used to lower energy consumption and operational cost is to reduce the amount of idle resources. This can be achieved by using malleability, namely, the possibility for resource managers to dynamically increase or decrease the amount of resources of jobs while they are running. Decommissioning (i.e., removing from the cluster) the idle nodes as soon as possible allows the resource manager to quickly reallocate those nodes to other jobs. Challenges appear when such nodes host part of a distributed storage system. Such storage systems may need to transfer large amounts of data before releasing the nodes, in order to ensure data availability and a certain level of fault tolerance. In this paper, we model and evaluate the performance of the decommission operation when relaxing the level of fault tolerance (i.e., the number of replicas) during this operation. Intuitively, this is expected to reduce the amount of data transfers needed before nodes are released, and thus allow nodes to be returned to the resource manager faster. We quantify theoretically how much time and resources are saved by such a fast decommission strategy compared with a standard decommission that does not temporarily reduce the fault-tolerance level. We establish lower bounds for the duration of the different phases of a fast decommission. We use the lower bounds to estimate when fast decommission would be useful to reduce the usage of core-hours and when not. We implement a prototype for fast decommission and experimentally validate the lower bounds on the duration of the operation and confirm in practice our theoretical findings.

Decommission↗

Command and Control of Utilities Systems

The utilities systems that encompass the Y-12 National Security Complex are an integral part of the entire campus, and are essential to maintaining critical mission focus for the site. Although the utilities systems each differ in function, the central production and distribution model creates a common thread on which each system is run. Several incidents in FY 2018 and FY 2019 documented a lack of overall systems control and highlighted the need to create a better command system that could maintain system availability and decrease possible impacts to the surrounding environment. An initial system was started in September of 2019 to better control mechanical utility distribution systems. The measurement of the system can be modeled against a standard command and control related incident. The corresponding work hours from a typical control-related incident were used as key component to this system model. System effectiveness is modeled against utility’s incidents that demonstrate a loss of command and control. The increased simulations of the model also document control can only be effectively contained within the stated time (3-5 years) by yielding more engineers to complete alignments, or drastically reducing the amount of time for alignments. The total control points of the model document a clear correlation between alignments, control points, and the amount of man-hours per incident. Current data shows that actual incident man-hours (1.88 manhours/ incident since initial system implementation) are near expected incident man-hours (1.81 manhours/ incident) with command and control for October 2021, which documents a 33.3% reduction in man-hours/incident since initial system implementation. A conclusion can be drawn that focus on increasing the amount of controlled points in the system can reduce incidents and the decrease the amount of non-value added work to employee’s day-to-day lives, while also achieving a culture that enhances and sustains utilities reliability.

99 GENERAL AND MISCELLANEOUS↗

A Universal Refrigerant Charge Fault Detection and Diagnostics Method Based on Pump Down Operation

The performance of the heat pump system varies greatly depending on the refrigerant charge amount. Improving the refrigerant charge fault detection and diagnostics (FDD) method of vapor compression systems have the potential for increasing energy efficiency and reducing service cost. Previous studies to predict refrigerant charge amount are mostly empirical methods which require significant amount of experimental data for high accuracy. The primary goal of this research is to develop a universal charge fault detection method which requires only a few experimental data with high prediction accuracy.Currently, pump down operations are typical practices by HVAC technicians when they need to open the refrigerant circuit to make a repairment. In addition, compressors have a built-in low-pressure cut-off protection function, and the compressor performance maps are commonly available from manufacturers. The proposed method innovatively utilizes the typical pump down operation, the compressor low-pressure cut-off protection, and the compressor performance map. It does not require any geometry information of heat exchangers, refrigerant lines, or charge buffers.The new charge prediction method is firstly formulated through theoretical analysis, then verified and calibrated by a quasi-steady-state simulation of the pump down process for a residential heat pump system. The quasi steady-state simulation uses an HVAC system simulation framework driven by DOE/ORNL Heat Pump Design Model (HPDM). Preliminary experiment validations with heat pump refrigerant leakage tests demonstrate the deviation of the proposed charge prediction method compared with measurement is within 8%. This technology makes refrigerant charge amount available at the technician’s fingertips and leads to shorter maintenance time and fewer site visits.

Li, Zhenning↗

Concrete Waste Recycling Process for High Quality Aggregate

Large amount of concrete waste generates during nuclear power plant (NPP) dismantling. Non-contaminated concrete waste is assumed to be disposed in a landfill site, but that will not be the solution especially in the future, because of decreasing tendency of the site availability and natural resources. Concerning concrete recycling, demand for roadbeds and backfill tends to be less than the amount of dismantled concrete generated in a single rural site, and conventional recycled aggregate is limited of its use to non-structural concrete, because of its inferior quality to ordinary natural aggregate. Therefore, it is vital to develop high quality recycled aggregate for general uses of dismantled concrete. If recycled aggregate is available for high structural concrete, the dismantling concrete is recyclable as aggregate for industry including nuclear field. Authors developed techniques on high quality aggregate reclamation for large amount of concrete generated during NPP decommissioning. Concrete of NPP buildings has good features for recycling aggregate; large quantity of high quality aggregate from same origin, record keeping of the aggregate origin, and little impurities in dismantled concrete such as wood and plastics. The target of recycled aggregate in this development is to meet the quality criteria for NPP concrete as prescribed in JASS 5N 'Specification for Nuclear Power Facility Reinforced Concrete' and JASS 5 'Specification for Reinforced Concrete Work'. The target of recycled aggregate concrete is to be comparable performance with ordinary aggregate concrete. The high quality recycled aggregate production techniques are assumed to apply for recycling for large amount of non-contaminated concrete. These techniques can also be applied for slightly contaminated concrete dismantled from radiological control area (RCA), together with free release survey. In conclusion: a technology on dismantled concrete recycling for high quality aggregate was developed. Various tests and evaluation confirmed that the high quality recycled aggregate concrete is almost equal strength and durability to ordinary aggregate concrete. The developed techniques of high quality recycled aggregate production have been applied to several new reinforced concrete buildings in industry since 2002. A practical recycling process for slightly contaminated concrete that consists of high quality recycled aggregate production and radiological survey was proposed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low Temperature Aluminum Dissolution Of Sludge Waste

High Level Waste (HLW) at the Savannah River Site (SRS) is currently stored in aging underground storage tanks. This waste is a complex mixture of insoluble solids, referred to as sludge, and soluble salts. Continued long-term storage of these radioactive wastes poses an environmental risk. The sludge is currently being stabilized in the Defense Waste Processing Facility (DWPF) through a vitrification process immobilizing the waste in a borosilicate glass matrix for long-term storage in a federal repository. Without additional treatment, the existing volume of sludge would produce nearly 8000 canisters of vitrified waste. Aluminum compounds, along with other non-radioactive components, represent a significant portion of the sludge mass currently planned for vitrification processing in DWPF. Removing the aluminum from the waste stream reduces the volume of sludge requiring vitrification and improves production rates. Treating the sludge with a concentrated sodium hydroxide (caustic) solution at elevated temperatures (>90 deg. C) to remove aluminum is part of an overall sludge mass reduction effort to reduce the number of vitrified canisters, shorten the life cycle for the HLW system, and reduce the risk associated with the long term storage of radioactive wastes at SRS. A projected reduction of nearly 900 canisters will be achieved by performing aluminum dissolution on six targeted sludge batches; however, a project to develop and install equipment will not be ready for operation until 2013. The associated upgrades necessary to implement a high temperature process in existing facilities are costly and present many technical challenges. Efforts to better understand the characteristics of the sludge mass and dissolution kinetics are warranted to overcome these challenges. Opportunities to further reduce the amount of vitrified waste and increase production rates should also be pursued. Sludge staged in Tank 51 as the next sludge batch for feed to DWPF consisted primarily of radioactive wastes containing a very high aluminum concentration. Based on initial laboratory testing and previous sludge characterization, aluminum in this sludge could be dissolved at low temperature (no more than 65 deg. C) in a concentrated caustic solution. The amount of aluminum predicted to dissolve under these conditions ranged from 25% to 80%. An opportunity existed to remove a significant amount of aluminum prior to vitrification in DWPF and increase the level of understanding of the effects of caustic dissolution of aluminum at lower temperatures. This paper presents the results of a real waste laboratory demonstration and full-scale implementation of a low temperature aluminum dissolution process which should be considered as a viable means to reduce radioactive sludge mass and reduce the amount of waste to be vitrified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-Situ Chemical Precipitation of Radioactive Liquid Waste - 12492

This paper presented in-situ chemical precipitation for radioactive liquid waste by using chemical agents. Results are reported on large-scale implementation on the removal of {sup 137}Cs, {sup 134}Cs and {sup 60}Co from liquid radioactive waste generating from Nuclear Research and Training Centre. Total amount of liquid radioactive waste was 35 m{sup 3} and main radionuclides were Cs-137, Cs- 134 and Co-60. Initial radioactivity concentration of the liquid waste was 2264, 17 and 9 Bq/liter for Cs-137, Cs-134 and Co-60 respectively. Potassium ferro cyanide was selected as chemical agent at high pH levels 8-10 according to laboratory tests. After the process, radioactive sludge precipitated at the bottom of the tank and decontaminated clean liquid was evaluated depending on discharge limits. By this precipitation method decontamination factors were determined as 60, 9 and 17 for Cs-137, Cs-134 and Co-60 respectively. At the bottom of the tank radioactive sludge amount was 0.98 m{sup 3}. It was transferred by sludge pumps to cementation unit for solidification. By in situ chemical processing 97% of volume reduction was achieved. Using the optimal concentration of 0.75 M potassium ferro cyanide about 98% of the {sup 137}Cs can be removed at pH 8. The Potassium ferro cyanide precipitation method could be used successfully in large scale applications with nickel and ferrum agents for removal of Cs-137, Cs-134 and Co- 60. Although DF values of laboratory test were much higher than in-situ implementation, liquid radioactive waste was decontaminated successfully by using potassium ferro cyanide. Majority of liquid waste were discharged as clean liquid. %97.2 volumetric amount of liquid waste was cleaned and discharged at the original site. Reduced amount of sludge transportation in drums is more economical and safer method than liquid transportation. Although DF values could be different for each of applications related to main specifications of original liquid waste, this study shows that in-situ treatment of liquid waste by using potassium ferro cyanide is not only a cost effective method but also reduce radiological risks as well. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative Process for Comprehensive Treatment of Liquid Radioactive Waste - 12551

This paper presents the results of research activities aimed at creation of a principally new LRW distilling treatment method. The new process is based on the instantaneous evaporation method widely used in distillation units. The main difference of the proposed process is that the vapor condensation is conducted without using heat exchangers in practically ideal mode by way of direct contacting in a vapor-liquid system. This process is conducted in a specially designed ejector unit in supersonic mode. Further recuperation of excess heat of vaporization is carried out in a standard heat exchanger. Such an arrangement of the process, together with use of the barometric height principle, allows to carry out LRW evaporation under low temperatures, which enables to use excess heat from NPS for heating initial LRW. Thermal calculations and model experiments have revealed that, in this case, the expenditure of energy for LRW treatment by distilling will not exceed 3 kilowatt-hour/m{sup 3}, which is comparable with the reverse-osmosis desalination method. Besides, the proposed devices are 4 to 5 times less metal-intensive than standard evaporation units. These devices are also characterized by versatility. Experiments have revealed that the new method can be used for evaporation of practically any types of LRW, including those containing a considerable amount of oil products. Owing to arrangement of the evaporation process at low temperatures, the new devices are not sensitive to 'scale formation'. This is why, they can be used for concentrating brines of up to 500-600 g/l. New types of such evaporating devices can be required both for LRW treatment processes at nuclear-power plants under design and for treating 'non-standard' LRW with complex physicochemical and radionuclide composition resulting from the disaster at the Fukushima I Nuclear Power Plant.) As a result of accidents at nuclear energy objects, as it has recently happened at NPP 'Fukushima-1', personnel faces the necessity to take emergency measures and to use marine water for cooling of reactor zone in contravention of the technological regulations. In these cases significant amount of liquid radioactive wastes of complex physicochemical composition is being generated, the purification of which by traditional methods is close to impossible. According to the practice of elimination of the accident after-effects at NPP 'Fukushima' there are still no technical means for the efficient purification of liquid radioactive wastes of complex composition like marine water from radionuclides. Therefore development of state-of-the-art highly efficient facilities capable of fast and safe purification of big amounts of liquid radioactive wastes of complex physicochemical composition from radionuclides turns to be utterly topical problem. Cesium radionuclides, being extremely dangerous for the environment, present over 90% of total radioactivity contained in liquid radioactive wastes left as a result of accidents at nuclear power objects. For the purpose of radiation accidents aftereffects liquidation VNIIHT proposes to create a plant for LRW reprocessing, consisting of 4 major technological modules: Module of LRW pretreatment to remove mechanical and organic impurities including oil products; Module of sorption purification of LWR by means of selective inorganic sorbents; Module of reverse osmotic purification and desalination; Module of deep evaporation of LRW concentrates. The first free modules are based on completed technological and designing concepts implemented by VNIIHT in the framework of LLRW Project in the period of 2000-2001 in Russia for comprehensive treatment of LWR of atomic fleet. These industrial plants proved to be highly efficient and secure during their long operation life. Module of deep evaporation is a new technological development. It will ensure conduction of evaporation and purification of LRW of different physicochemical composition, including those containing hardness salts, resulted in generation of LRW concentrate 300-600 g/l. The method is based on utilization of supersonic ejector for intensification of thermal physic processes and performance of evaporation in brine recycling mode. All proposed technological solutions are totally based on patented Russian developments. Proposed work will allow to construct modular plants, which will be totally prepared for efficient purification of any types of liquid radioactive wastes from radionuclides in case of force majeure. According to proposed scheme concentration level of cesium radionuclides in safe-for-storage form will make up not less than 5000. With respect to purification from cesium radionuclides of liquid radioactive wastes stored at NPP 'Fukushima' about 10 t of inorganic sorbents, loaded in 160 protective filter-containers, will be required for solving this problem. The amount of secondary wastes will be reduced approximately in 5 times in comparison with traditional schemes, applied in purification of secondary LRW of Fukushima-1 by Areva (France) and Kurion (USA) companies. All units of modular plants will be constructed and manufactured as totally automated, providing their twenty-four-hour safe operation. Modular design will ensure efficiency and let optimize the costs of secondary LRW treatment. In order to ensure off-line operation in emergency conditions the plant should be equipped with auxiliary modules: energy and ventilation ones. Under normal conditions these modules can be stored in 'mothballed' condition at special warehouses under the authority of federal bodies. It will be reasonable to choose required transport facilities, the most suitable for transportation of modules to target destination beforehand, using vessel classification list.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tritium Content in and Release from Pressurized-Water-Reactor Fuel Cladding

It is expected that tritium pretreatment will be required in future reprocessing plants to prevent the release of tritium to the environment (except for long-cooled fuels; >30 yrs). To design and operate future reprocessing plants in a safe and environmentally compliant manner, the amount and form of tritium in the used nuclear fuel (UNF) must be understood and quantified. Tritium in light water reactor (LWR) fuel is dispersed between the fuel matrix and the fuel cladding, and some tritium may be in the plenum, probably as tritiated water (THO or T{sub 2}O). In a standard processing flowsheet, tritium management would be accomplished by treatment of liquid streams within the plant. Pretreating the fuel prior to dissolution to release the tritium into a single off-gas stream could simplify tritium management, so the removal of tritium in the liquid streams throughout the plant may not be required. The fraction of tritium remaining in the cladding may be reduced as a result of tritium pretreatment. Since Zircaloy'R cladding makes up roughly 25% by mass of UNF in the United States, processes are being considered to reduce the volume of reprocessing waste attributed to Zircaloy'R clad fuel by recovering the zirconium from the cladding for reuse. Treatment options for Zircaloy cladding include recycling to recover the significant value of the zirconium and eliminate costs associated with the disposal of transuranic-contaminated Zircaloy. If LWR fuel is reprocessed and the fuel is dissolved without tritium pretreatment, the tritium in the cladding will remain bound to the cladding. If tritium pretreatment is included in the flow sheet, some portion of the tritium in the cladding may be released along with the tritium from the fuel matrix. To design and operate reprocessing plants in a safe and environmentally compliant manner, the amount and form of tritium in the UNF must be understood and quantified. For Zircaloy-clad fuels from light water reactors, the tritium produced from ternary fission and other sources is expected to be divided between the fuel, where it is generated, and the cladding. It has been previously documented that a fraction of the tritium produced in uranium oxide fuel from LWRs can migrate and become trapped in the cladding. Estimates of the percentage of tritium in the cladding typically range from 0-96%. There is relatively limited data on how the tritium content of the cladding varies with burnup and fuel history (temperature, power, etc.) and how pretreatment impacts its release. The present study was undertaken to understand how tritium pretreatment at standard tritium pretreatment conditions (oxidation in air at 480 to 600 deg. C) affects the tritium content in the Zircaloy cladding and the extent to which the tritium content could be reduced with modest increases in the tritium pretreatment temperature. The data indicate that <20% of the tritium in PWR cladding will be removed by pretreatment at 500-700 deg. C for 24 h. Essentially 100% of the tritium will likely be released if the heating time at 700 deg. C is extended to 96 h. Small amounts of tritium are expected to be released if the cladding is heated at ≤ 600 deg. C for up to 96 h. The results of this study indicate that the amount of tritium released from tritium pretreatment systems will be dependent on both the operating temperature and length of time in the pretreatment system. Under certain conditions, a significant fraction of the tritium could remain bound in the cladding and would need to be considered in any subsequent processing of the cladding to recover/recycle the zirconium. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Tritium Distribution and Capture Requirements for UNF Reprocessing

Four radionuclides have been identified as being sufficiently volatile in reprocessing of nuclear fuel that their gaseous release needs to be controlled to meet U.S. regulatory requirements. These radionuclides are {sup 3}H, {sup 14}C, {sup 85}Kr, and {sup 129}I. Previous studies have discussed the need for treating off-gas streams to control {sup 3}H, {sup 14}C, {sup 85}Kr, and {sup 129}I from the reprocessing of used nuclear fuel (UNF) and the regulations that set the limits for releases from such a facility. These regulations ultimately prescribe the decontamination factor (DF) that must be met in the facility. Jubin et al. examined the role of off-gas pathways since the gaseous radionuclides can partition to different reprocessing off-gas streams. Based on this report and subsequent analysis, the required DF for {sup 129}I could be 1000 to 3000. The required DF for {sup 3}H could be as high as 200, depending on the age of the fuel processed. The DF for {sup 85}Kr could be up to ∼35, also depending on fuel age. The required DF for {sup 14}C is 1 in many cases (no treatment required) but could be higher in specific cases. While iodine has been the focus of a number of studies due to the high DF requirements on multiple escape pathways, it is clear from the studies noted above that the control of tritium will also be a significant issue for future reprocessing plants, especially if processing relatively short-cooled fuels (<10 yr post reactor discharge). Tritium contained in a UNF matrix will be released into the liquid and off-gas streams during fuel reprocessing. The amount released into the process streams is a function of the type and burnup of the fuel processed, and the chemical processes employed within the reprocessing plant. Previous studies have examined the tritium capture requirements for the reprocessing facility assuming that all of the tritium is volatilized in the head-end operations, i.e., tritium pretreatment is employed and tritium is completely released from the cladding. This is clearly a worst case scenario from the standpoint of the amount of tritium that could be released, but the scenario tends to limit the release pathway to the head-end off-gas stream. In this analysis, the volume of HTO and the HTO to H{sub 2}O ratio for each of the three plant-wide tritium DFs were determined. The overall amount of HTO that had to be captured from the off-gas streams was virtually the same for the three DF cases evaluated; 98%, 99% and 99.5% of the tritium in the fuel entering the plant needed to be recovered for overall plant DFs of 50, 100 and 200, respectively. The use of the 'tritium barrier' to limit the spread of HTO from the head-end systems to the balance of the plant results in an increase in tritiated waste concentration in the head-end recycle acid systems which results in a decrease in the total amount of HTO + H{sub 2}O that must recovered from the gaseous effluent from the plant. The use of the 'tritium barrier' decreases the waste volume due to the higher HTO:H{sub 2}O ratio in the treated off-gas stream. The results also show that increasing the acid recycle percentage increases the concentration of HTO within the UNF reprocessing plant. This is then manifested in less HTO + H{sub 2}O that must be recovered from the gaseous effluents. Finally, the application of tritium recovery on the recycle acid reduces the HTO concentration in the recycle acid stream and generates a separate HTO + H{sub 2}O stream that must be managed. However, the resulting volume of tritium-containing waste generated plant-wide is a function of the selectivity of the tritium recovery system and the ability of the tritium recovery system to limit the accumulation of HTO in the recycle acid such that the HTO + H{sub 2}O recovered from gaseous effluents does not contribute significantly to the overall tritium waste volume. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of Chlorination Process for Cladding Hull Waste and its Combination with Pyroprocessing

The Korea Atomic Energy Research Institute (KAERI) is spending efforts to minimize the amount of radioactive wastes generated during pyro-processing. One of the major issues is management of cladding hull waste owing to its large amount (25 wt.% of fuel) and high radioactivity. Although the cladding hull waste might be classified as an intermediate-level waste according to the Korean regulation, the large amount makes it reasonable to develop a way to reduce the amount of cladding hull waste. Previously performed radioactivation analysis results revealed that selective recovery of zirconium from the cladding hull waste will produce a weak beta-decaying zirconium. As a means of selective Zr recovery, KAERI is working on a chlorination process which employs a chemical reaction between metallic zirconium and chlorine gas. The chlorination process generates zirconium tetrachloride (ZrCl{sub 4}) which sublimes at 331 deg. C leading to an easy separation from other radioactive nuclides. KAERI has started the chlorination process R and D with small quartz reactors with grams of cladding hulls, and now its work is proceeded to fundamental approaches and scale-up. In this work, the progress achieved by KAERI on the chlorination process is reviewed and a recent approach to combine the chlorination process with pyro-processing, so-called MKZP (Min Ku Zirconium Process) is introduced. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of Ultra Small Scale Mechanical Testing and Localized He Implantation for Nuclear Applications

Mechanical properties degradation of components deployed in nuclear applications has been a concern since the deployment of first generation nuclear power plants. Radiation damage along with environmental degradation, elevated temperatures, and long term deployment of nuclear structures pose a challenging environment for all materials in these applications. Traditionally, the mechanical properties are assessed by standardized macroscopic testing methods. While those are providing engineering relevant data these techniques do have limitations, especially on reactor irradiated materials, due to the large size of the samples. Limitations on the amount of radioactivity of large samples must be applied for research applications as they are conducted at universities. In addition it can be difficult to retrieve sufficiently large amounts of material from an operating reactor component. Therefore smaller sample sizes are desirable and reduce the amount of radioactive material which needs to be handled or material which needs to be retrieved. In addition, the number of tests which can be performed on materials irradiated in a test reactor program is limited due to limited space in specific dose and temperature positions. Downsizing of the mechanical test can overcome this issue and perform more tests on the same amount of irradiated materials, reducing the statistical uncertainties. In addition, smaller scale samples allow access to specific regions of interest in a material or component, be it the zone in front of a crack tip or the sampling of very small components like springs or welded areas. In addition ion beam irradiation has become an integral part of nuclear materials research to enhance the understanding of radiation damage in materials in a time and cost effective fashion. The drawback of ion beam irradiation is the small penetration depth of the ions into the material making localized microstructural characterization as well as small scale mechanical testing necessary. Another more fundamental motivation is the fact that since the beginning of electron microscopy, one has been concerned about imaging and quantifying defects in materials. Multiscale tools to image a large range of radiation induced defects have been established starting from atom probe tomography to transmission electron microscopy, up to scattering techniques. Mechanical testing, however, has always been performed on a large scale, and an attempt to match the same scale where a defect is observed with the materials' mechanical property response has not yet been realized. However, the question of separate effects testing on specific radiation induced defects remains and is an additional driving force for small scale mechanical testing. In this work we present an approach for small scale mechanical testing in irradiated materials and the variety of possible test methods developed today. We also present recent efforts of performing localized ion beam implantation to achieve a number of different doses in the same region of interest enhancing comparability and quantification of observed phenomena. It is the intention to give the reader an overview of the different microscale mechanical testing techniques possible today as well as an introduction of a novel ion beam irradiation method using a newly established capability. In this paper we can't discuss all aspects of all small scale mechanical testing of irradiated materials However, It does give an overview over the techniques enabled due to recent effort and enhanced instrument capability. While indentation or micro compression testing has been performed previously tensile testing and ion beam irradiation using the He ion beam microscope are novel approaches not attempted previously. (authors)

36 MATERIALS SCIENCE↗

Isopiestic Measurements of Water Adsorption on Uranium Bearing Solids - 1900w

The research focus was to investigate the stability of the multicomponent uranium-bearing precipitates mimicking those created in sediments as a result of alkaline ammonia gas treatment in the vadose zone. Gravimetric measurements of moisture uptake on uranium-bearing precipitates as a function of increasing relative humidity can provide reasonable estimates of the deliquescence point of solid phases or its components. Water moisture uptake by uranium-bearing precipitates as a function of increasing relative humidity was measured at 25 deg. C via the isopiestic method. The conditions for each isotherm were calculated by a division of the amount of adsorbed moisture by the amount of dry precipitate samples. This method can provide estimates of water quantity retained within precipitates conducted in the range of water activities. The desorption portion of the isotherm was obtained by progressively decreasing the water activity or relative pressure in the isopiestic chamber while monitoring the equilibrium amount of moisture sorbed at each relative pressure. The amount of water adsorbed by multicomponent precipitates at a{sub w} = 0.67 ranged between 0.63 and 0.77 g water/g precipitate. Higher water activities or relative humidity values eventually lead to the deliquescence of the solid or its components and the formation of a liquid phase. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Influence of protective actions on ingress-water mass in steam generator tube rupture of HTGR - 18479

Steam generator tube rupture(SGTR) accident is one characteristic accident of High Temperature Gas-Cooled Reactor (HTGR), which may cause a potential hazard to reactor system. Because the amount of water ingress into reactor core is related closely to the severity of the accident, the research on water-ingress is significant for the evaluation on inherent safety characteristics of HTGR. Both different accident scenario and the system design will have influence on the amount of the ingress-water under SGTR. In this paper, a pebble-bed high temperature gas cooled reactor is modeled by thermal-hydraulic system analysis code and the water-ingress transient under SGTR is simulated to study the influence of the protective action of emergency shutdown on the water ingress. The research indicates that the protective action has no obvious influence on the amount of the ingress-water within the current studied range. The amount of ingress-water is controlled below the design value to satisfy the demand of reactor safety. The analysis results will provide some support for the HTGR research. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Degradation Model and Testing Protocol for Metallic Waste Forms

Metallic waste forms developed to immobilize high-level radioactive wastes generated in advanced (closed) fuel cycles are being evaluated as part of the US DOE Fuel Cycle Research and Development program. The electrometallurgical reprocessing of used metallic fuels to recover U and Pu generates two waste streams: salt waste comprised of electro-refiner salt contaminated with oxidized fission products and metallic waste comprised of activated cladding and metallic fission products that were not oxidized under the processing conditions. Metallic waste forms can be made by directly melting the cladding and fuel wastes with small amounts of trim metals to form a multiphase alloy material in which radionuclides and other waste constituents are immobilized within chemically durable intermetallic and iron-based solid solution phases. Some components of the waste streams serve as important constituents of phases comprising the waste form, such as Mo and Zr, which form Fe{sub 2}Mo and Fe{sub 2}Zr intermetallic phases. Other waste constituents are accommodated as substitutional contaminants, such as Tc within the Fe{sub 2}Mo intermetallic and U/TRU within the Fe{sub 2}Zr intermetallic. Sufficient amounts of these host phases must be available to accommodate all radionuclides in the waste stream. The compositional flexibility of the host phases to incorporate waste components is being utilized to formulate metal waste forms that will accommodate variations in waste streams compositions that will occur over long-term fuel reprocessing operations. Small amounts of trim metals can be added to tailor the phase assembly to match the waste stream composition and facilitate waste form processing. For example, additional Zr may be added during waste form production to ensure all U/TRU is sequestered in a durable Fe{sub 2}Zr host phase and trim Cr, Mo, and Ni can be added to supplement the amounts provided by the steel cladding to improve the durability of a metallic waste form. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

OFFGAS GENERATION FROM THE DISPOSITION OF SCRAP PLUTONIUM BY VITRIFICATION SIMULANT TESTS

The Department of Energy Office of Environmental Management is supporting R&D for the conceptual design of the Plutonium Disposition Project at the Savannah River Site in Aiken, SC to reduce the attractiveness of plutonium scrap by fabricating a durable plutonium oxide glass form and immobilizing this form within the high-level waste glass prepared in the Defense Waste Processing Facility. A glass formulation was developed that is capable of incorporating large amounts of actinides as well as accommodating many impurities that may be associated with impure Pu feed streams. The basis for the glass formulation was derived from commercial glasses that had high lanthanide loadings. A development effort led to a Lanthanide BoroSilicate (LaBS) glass that accommodated significant quantities of actinides, tolerated impurities associated with the actinide feed streams and could be processed using established melter technologies. A Cylindrical Induction Melter (CIM) was used for vitrification of the Pu LaBS glass. Induction melting for the immobilization of americium and curium (Am/Cm) in a glass matrix was first demonstrated in 1997. The induction melting system was developed to vitrify a non-radioactive Am/Cm simulant combined with a glass frit. Most of the development of the melter itself was completed as part of that work. This same melter system used for Am/Cm was used for the current work. The CIM system used consisted of a 5 inch (12.7 cm) diameter inductively heated platinum-rhodium (Pt-Rh) containment vessel with a control system and offgas characterization. Scrap plutonium can contain numerous impurities including significant amounts of chlorides, fluorides, sodium, potassium, lead, gallium, chromium, and nickel. Smaller amounts of additional elements can also be present. The amount of chlorides present is unusually high for a melter feed. In commercial applications there is no reason to have chloride at such high concentrations. Because the melter operates at 1400-1475 C, many of the impurities present are extremely volatile. An alternative being considered is to pre-treat the impure PuO{sub 2} by water washing to remove the soluble salts, which would significantly reduce the melter emissions. The disadvantage of the washing alternative is the criticality concerns of using water with plutonium. In this paper, the testing that has been conducted at the Savannah River National Laboratory (SRNL) to demonstrate induction melting of impure plutonium simulants will be described. The work described concentrates on quantification of the gaseous and particulate emissions from the induction melter. The Pt-Rh melter vessel is a cylinder with a conical bottom and a tubular drain as shown in Figure 1. A 5-inch (12.7 cm) diameter CIM was used for all of the emissions tests. A 6-inch (15.24 cm) diameter CIM, which is the size of the full-scale melter, has since been constructed for further testing. The 5-inch CIM is heated by three induction coils: one for the 5 inch cylinder, one for the conical section, and one for the 1/4-inch (6.35 mm) drain tube. The 6-inch CIM is similar except the cylinder heater extends lower and also heats the cone. The induction heating system is manufactured by Ameritherm{trademark}. The heating system is controlled by a PC to maintain a specific heat up profile and then maintain a constant energy input that maintains a constant temperature. The CIM is operated in batch mode where the plutonium simulant and the glass-forming frit are first thoroughly mixed in an attrittor mill, then added to the melter. Hafnium oxide (HfO{sub 2}) is used as a simulant for the radioactive PuO{sub 2}. The melter is heated until the mixture begins to melt at about 1100 C, then completely melts at about 1400-1450 C. This temperature is maintained for about three hours. While the temperature is maintained at {approx} 1400 C, an air bubbler is normally used to promote mixing of the glass-forming frit and the waste simulant.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The solution combustion synthesis of nanophosphors

Nanophosphors are defined as nano-sized (1-100mn), insulating, inorganic materials that emit light under particle or electromagnetic excitation. Their unique luminescence properties provide an excellent potential for applications in radiation detection and imaging. Herein, solution combustion synthesis (SCS) is presented as a method to prepare nanophosphor powders, while X-ray diffraction (XRD), transmission electron microscopy (TEM), photoluminescence (PL), photoluminescence excitation (PLE), and other techniques were used to characterize their structural and optical properties. The goal of this work is to synthesize bright, high-quality powders of nanophosphors, consolidate them into bulk materials and study their structural and optical properties using XRD, TEM, PL, and PLE. SCS is of interest because it is a robust, inexpensive, and facile technique, which yields a significant amount of a wide variety of oxide materials, in a short amount of time. Several practical nanophosphors were synthesized and investigated in this work, including simple oxides such as Y{sub 2}O{sub 3}:Bi, Y{sub 2}O{sub 3}:Tb, Y{sub 2}O{sub 3}:Eu and Gd{sub 2}O{sub 3}:Eu, complex oxides such as Gd{sub 2}SiO{sub 5}:Ce, Y{sub 2}SiO{sub 5}:Ce, Lu{sub 2}SiO{sub 5}:Ce, Zn{sub 2}SiO{sub 4}:Mn, and Y{sub 3}Al{sub 5}O{sub 12}:Ce. Results demonstrate that altering the processing parameters such as water content of the precursor solution, ignition temperature, fuel type and amount, and post-synthesis annealing can significantly improve light output, and that it is possible to optimize the luminescence output of oxyorthosilicates by reducing the amount of silica in the precursor mixture.

36 MATERIALS SCIENCE↗

Competitive grain boundary segregation of phosphorus and carbon governs delamination crack in a ferritic steel

Highlights: • Trace amounts of P in the steel cause delamination in case of Lt-high Temp. holding. • Anisotropic microstructure did not affect the delamination in this study. • Crack-linked GBs in Lt-high Temp. steel had higher P and lower C segregation. • Crack-interrupt GBs in St-high Temp. steel had lower P and higher C segregation. • Competitive segregation controlled by high Temp. holding time affects delamination. - Abstract: The present study aims at unveiling the influence of trace amounts of phosphorus on the macro-scale delamination in a ferritic steel. Two different steels with trace amounts of phosphorus were examined to reveal the cause: One was made by long-time high temperature holding to maximize the phosphorus segregation, and the other one was made by short-time high temperature holding to minimize the phosphorus segregation. The atom probe results at the grain boundaries ahead of the delamination-related cracks provide a strong evidence that phosphorus-enrichment and carbon-depletion for the long-time high temperature holding induces a larger degree of delamination as compared to the short-time high temperature holding. Reasons for the different segregation tendency were discussed by correlating the isothermal holding time at high temperature and the competitive segregation between phosphorus and carbon.

36 MATERIALS SCIENCE↗