Search NASA⌕ Search

SEARCH · Search NASA

Results for “coordinated scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

The Serendip II design

Serendip II is an automated system designed to perform a real time search for narrow band radio signals in the spectra of sources in a regularly scheduled, non-Seti, astronomical observing program. Because Serendip II is expected to run continuously without requiring dedicated observing time, it is hoped that a large portion of the sky will be surveyed at high sensitivity and low cost. Serendip II will compute the power spectrum using a 65,536 channel fast Fourier transform processor with a real time bandwidth of 128 KHz and 2 Hz per channel resolution. After searching for peaks in a 100 KHz portion of the radio telescope's IF band, Serendip II will move to the next 100 KHz portion using a programmable frequency synthesizer; when the whole IF band has been scanned, the process will start again. Unidentified peaks in the power spectra are candidates for further study and their celestial coordinates will be recorded along with the time and power, IF and RF frequency, and bandwidth of the peak.

Werthimer, D.↗

NASA’s Simulation Activities for Evaluating UAM Concept of Operations

NASA’s vision for Advanced Air Mobility (AAM) is to help emerging aviation markets to safely develop an air transportation system that moves people and cargo between places previously not served or underserved by aviation using revolutionary new aircraft types. Urban Air Mobility (UAM), the concept of expanding transportation networks by serving short flights to transport people and goods around metropolitan areas, is part of a larger paradigm shift toward AAM, in which new technologies and business models are enabling transformational applications of aviation. In NASA’s Concept of Operations for UAM, Providers of Services for UAM (PSU) play a key role to enable safe and efficient UAM operations by sharing operational data among UAM operators. PSUs provide a pre-departure strategic conflict management service that establishes operational plans for new flights and coordinates them with all relevant operations in shared airspace. The strategic conflict management aims to minimize the need for tactical separation provision, while considering anticipated traffic demand, vertiport capacity and availability, forecasted weather, and airspace restrictions. NASA is currently preparing a new lab evaluation activity with aviation industry partners, called the X4 simulation, to demonstrate their airspace services and capabilities and test new information exchange requirements for UAM operations. This simulation activity will support NASA’s National Campaign (NC) flight tests which are planned over the next several years to guide the collective community and stakeholders through a series of scenario-based test activities that involve vehicles and airspace management services operating in a live test environment. This presentation will provide an overview of the X4 simulation, including objectives, scenarios, assumptions, system architecture, and test schedule. The X4 simulation will evaluate the interconnectivity and operational intent sharing between PSUs for multiple operators, as well as the performance of strategic conflict management.

Urban Air Mobility, Simulation, Advanced Air Mobil↗

Final Report for the Advanced Outage Control Center Dashboard with Predictive Tools

The “Advanced Outage Control Center” (AOCC) pilot project was part of the Light Water Reactor Sustainability (LWRS) program and was a multi-year effort targeted at NPP outage improvement. The primary purpose of this pilot project was to improve management of NPP outages through the development of AOCC features and facilities designed specifically to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. Later stages of the project focused more on tools that utilize technology to improve the outage manager’s understanding of the true outage status. The primary tool that resulted from this research was an innovative outage information dashboard with built-in data analysis and predictive capabilities. In its present form, the dashboard specifically takes advantage of visualization techniques that allow users to view and understand the status of the outage at a glance, without the need to drill down to find detail information. The dashboard also incorporates historical performance data to help evaluate current performance. The key innovation in this dashboard concept is not only its ability to avoid the complexity of raw data presentation, but also to predict the completion of the current outage using data analysis of the current schedule and historical performance of the plant. Through the LWRS program, a relationship between Idaho National Laboratory and Arizona Public Service (APS) was established to investigate the application of specialized techniques to analyze and visualize complex outage information. APS has supported efforts to implement advanced methods to improve the management of outages at the three units of the Palo Verde Nuclear Generating Station (PVNGS). The project has produced the basic principles and methodology for the development of sophisticated outage information analysis and presentation tools.

99 GENERAL AND MISCELLANEOUS↗

System-Oriented Runway Management Concept of Operations

This document describes a concept for runway management that maximizes the overall efficiency of arrival and departure operations at an airport or group of airports. Specifically, by planning airport runway configurations/usage, it focuses on the efficiency with which arrival flights reach their parking gates from their arrival fixes and departure flights exit the terminal airspace from their parking gates. In the future, the concept could be expanded to include the management of other limited airport resources. While most easily described in the context of a single airport, the concept applies equally well to a group of airports that comprise a metroplex (i.e., airports in close proximity that share resources such that operations at the airports are at least partially dependent) by including the coordination of runway usage decisions between the airports. In fact, the potential benefit of the concept is expected to be larger in future metroplex environments due to the increasing need to coordinate the operations at proximate airports to more efficiently share limited airspace resources. This concept, called System-Oriented Runway Management (SORM), is further broken down into a set of airport traffic management functions that share the principle that operational performance must be measured over the complete surface and airborne trajectories of the airport's arrivals and departures. The "system-oriented" term derives from the belief that the traffic management objective must consider the efficiency of operations over a wide range of aircraft movements and National Airspace System (NAS) dynamics. The SORM concept is comprised of three primary elements: strategic airport capacity planning, airport configuration management, and combined arrival/departure runway planning. Some aspects of the SORM concept, such as using airport configuration management1 as a mechanism for improving aircraft efficiency, are novel. Other elements (e.g., runway scheduling, which is a part of combined arrival/departure runway scheduling) have been well studied, but are included in the concept for completeness and to allow the concept to define the necessary relationship among the elements. The goal of this document is to describe the overall SORM concept and how it would apply both within the NAS and potential future Next Generation Air Traffic System (NextGen) environments, including research conducted to date. Note that the concept is based on the belief that runways are the primary constraint and the decision point for controlling efficiency, but the efficiency of runway management must be measured over a wide range of space and time. Implementation of the SORM concept is envisioned through a collection of complementary, necessary capabilities collectively focused on ensuring efficient arrival and departure traffic management, where that efficiency is measured not only in terms of runway efficiency but in terms of the overall trajectories between parking gates and transition fixes. For the more original elements of the concept-airport configuration management-this document proposes specific air traffic management (ATM) decision-support automation for realizing the concept.

Lohr, Gary W.↗

U.S. Spacesuit Knowledge Capture – Chronicling Spacesuit Design for the Future

With less than 4 years until the United States is scheduled to land the first woman and next man on the Moon, NASA is leveraging 60 years of experience to build a spacesuit to assist in the success of this and future human space exploration missions. This experience comes from the achievements of retired and employed spacesuit experts, innovations that were conceived from existing ideas and inventions, and a plethora of archived knowledge. The U.S. Spacesuit Knowledge Capture (SKC) Program’s primary function is to capture, archive, and share current and legacy spacesuit-related knowledge with scientists, engineers, and technicians. To capture valuable spacesuit-related knowledge, the program uses various methods that have included hosting and recording classroom and online courses, workshops, and vignettes, and preserving thousands of legacy spacesuit-related files. In 2019, the SKC Program added to its role when it began coordinating the electronic recording of the new spacesuits’ buildup. This new, next-generation spacesuit is named the Exploration Extravehicular Mobility Unit (xEMU) and is a compilation of many components. As each component is tested and assembled into the suit, the SKC Program is chronicling this buildup using high-speed video production and photography that includes time-lapsed images. To complement the recording of the components, the SKC Program plans to record and photograph the design verification testing. In 2020, the SKC Program was given the initiative to research and identify the custodianship of historical spacesuit equipment that resides within the Crew and Thermal Systems Division. These archives will be added to the SKC Program’s expansive archived collection of spacesuit-related knowledge that represents over 5 decades of spacesuit legacy from the Apollo era to the pursuit of Mars and beyond. This paper describes the electronic documentation of the xEMU’s buildup and identifies the SKC Program’s 2020 accomplishments.

Cinda Chullen↗

U.S. Spacesuit Knowledge Capture – Chronicling Spacesuit Design for the Future

With less than 4 years until the United States is scheduled to land the first woman and next man on the Moon, NASA is leveraging 60 years of experience to build a spacesuit to assist in the success of this and future human space exploration missions. This experience comes from the achievements of retired and employed spacesuit experts, innovations that were conceived from existing ideas and inventions, and a plethora of archived knowledge. The U.S. Spacesuit Knowledge Capture (SKC) Program’s primary function is to capture, archive, and share current and legacy spacesuit-related knowledge with scientists, engineers, and technicians. To capture valuable spacesuit-related knowledge, the program uses various methods that have included hosting and recording classroom and online courses, workshops, and vignettes, and preserving thousands of legacy spacesuit-related files. In 2019, the SKC Program added to its role when it began coordinating the electronic recording of the new spacesuits’ buildup. This new, next-generation spacesuit is named the Exploration Extravehicular Mobility Unit (xEMU) and is a compilation of many components. As each component is tested and assembled into the suit, the SKC Program is chronicling this buildup using high-speed video production and photography that includes time-lapsed images. To complement the recording of the components, the SKC Program plans to record and photograph the design verification testing. In 2020, the SKC Program was given the initiative to research and identify the custodianship of historical spacesuit equipment that resides within the Crew and Thermal Systems Division. These archives will be added to the SKC Program’s expansive archived collection of spacesuit-related knowledge that represents over 5 decades of spacesuit legacy from the Apollo era to the pursuit of Mars and beyond. This paper describes the electronic documentation of the xEMU’s buildup and identifies the SKC Program’s 2020 accomplishments.

Cinda Chullen↗

Successful Completion of the JWST OGSE2 Cryogenic Test at JSC Chamber-A While Managing Numerous Challenges

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) assembly is the largest optically stable infrared-optimized telescope currently being manufactured and assembled, and scheduled for launch in 2018. The JWST OTE, including the primary mirrors, secondary mirror, and the Aft Optics Subsystems (AOS) are designed to be passively cooled and operate at near 45 degrees Kelvin. Due to the size of its large sunshield in relation to existing test facilities, JWST cannot be optically or thermally tested as a complete observatory-level system at flight temperatures. As a result, the telescope portion along with its instrument complement will be tested as a single unit very late in the program, and on the program schedule critical path. To mitigate schedule risks, a set of 'pathfinder' cryogenic tests will be performed to reduce program risks by demonstrating the optical testing capabilities of the facility, characterizing telescope thermal performance, and allowing project personnel to learn valuable testing lessons off-line. This paper describes the 'pathfinder' cryogenic test program, focusing on the recently completed second test in the series called the Optical Ground Support Equipment 2 (OGSE2) test. The JWST OGSE2 was successfully completed within the allocated project schedule while faced with numerous conflicting thermal requirements during cool-down to the final cryogenic operational temperatures, and during warm-up after the cryo-stable optical tests. The challenges include developing a pre-test cool-down and warm-up profiles without a reliable method to predict the thermal behaviors in a rarified helium environment, and managing the test article hardware safety driven by the project Limits and Constraints (L&C's). Furthermore, OGSE2 test included the time critical Aft Optics Subsystem (AOS), a part of the flight Optical Telescope Element that would need to be placed back in the overall telescope assembly integrations. The OGSE2 test requirements included the strict adherence of the project contamination controls due to the presence of the contamination sensitive flight optical elements. The test operations required close coordination of numerous personnel while they being exposed and trained for the 'final' combined OTE and instrument cryo-test in 2017. This paper will also encompass the OGSE2 thermal data look-back review.

JWST OGSE2 Cryogenic Test↗

A Feasible Approach for an Early Manned Lunar Landing. Part II: Detailed Report of Ad Hoc Task Group

This report, in two parts, presents a program development plan for attempting a first manned lunar landing in 1967. The two parts consist of a Summary Report and a Detailed Report representing the coordinated output of the Ad Hoc Task Group assigned to the study. The study was started in response to the request for such a study by the Associate Administrator in his memorandum of May 2, 1961 establishing the Ad Hoc Task Group. The purpose of the study was to take a first cut at the tasks associated with the design, development and construction of the equipment and facilities as well as the development of the crews, and to show the time phasing 6f these tasks. Included are the space sciences, life science and advanced technology tasks whose data and results are needed for designing and developing the systems required in carrying out the mission. The plan presented in the two reports does not presume to be a firm plan. Its basic purpose is, by choosing one feasible method, to size up the scope, schedule and cost of the job, discover the main problems, pacing items and major decisions and provide a threshold from which a firm and detailed project development plan can be jointly formulated by the various elements of NASA.

Fleming, William A.↗

Using Open Standards and NASA Open Source Simulation Tools to Model Artemis Base Camp Mission Timelines

The United States’ National Aeronautics and Space Administration (NASA) has announced that the Artemis Program will return humans to the Moon, establishing a persistent presence with the Artemis Base Camp (ABC), and extend human exploration to Mars. The NASA Exploration Systems Simulations (NExSyS) team at NASA’s Johnson Space Center is using internationally developed simulation interoperability standards and NASA open source simulation tools to support Artemis concept, analysis, designs, development, training, and ultimately operations. The NExSyS team has been tasked to support early ABC architecture and mission analysis using mission time lines developed by the crew operations mission planning team. The NExSyS team is developing a distributed simulation framework with initial Artemis element implementations to model the ABC mission timelines using the international simulation interoperability standard High Level Architecture (HLA), the Simulation Interoperability Standards Organization’s Space Reference Federation Object Model (SpaceFOM), the NASA open source Trick Simulation Environment, and another NASA open source interface package called TrickHLA. The ABC architecture is composed of a number of key surface elements and resources. Some examples of modeled elements (also known as entities) are landers, habitats, rovers, logistics carriers, and astronauts. Some examples of modeled transferable and consumable resources are power, water, oxygen, nitrogen, scientific samples, and food. These entities and resources are modeled in a collection of individual simulations called Federates. A coordinated collection of interoperable federates is called a Federation and when these federates are tied together in a coordinated simulation run, it is referred to as a Federation Execution. The federates communicate through HLA using data exchange formats defined by a collection of machine readable files called Federation Object Models (FOMs). These FOM files are based on extensions to the SpaceFOM. This enables the instantiation and sharing of objects and interactions between federates in the federation. These provide for entity and resource tracking, object transfer, and data collection. Federate interactions are used to trigger events and notify federates of entity or resource transfers. For the initial implementation, the constituent federates are Trick-based simulations that use TrickHLA to provide the required HLA-base interoperability. These Trick-based simulations provide the required modeling for the individual Artemis elements along with the associated element resources. These federates provide a means to explore traverses between surface elements and exploration sites as scheduled in a mission timeline and explore the affects traverse times have on the overall mission timeline. The mission time lines are modeled using a Trick input file event handling capabilities. Each timeline operation is handled as individual simulation events, and triggered based on previous event status, time of operation, and simulated task completions. In addition, the ABC Federation can be used to perform Monte Carlo analysis. The Monte Carlo tool can vary the inputs, timings, and malfunctions to show how various contingencies in the mission can affect the mission timeline.

Keaton Craig Dodd↗

Identifying Young, Nearby Stars

Young stars have certain characteristics, e.g., high atmospheric abundance of lithium and chromospheric activity, fast rotation, distinctive space motion and strong X-ray flux compared to that of older main sequence stars. We have selected a list of candidate young (<100Myr) and nearby (<60pc) stars based on their space motion and/or strong X-ray flux. To determine space motion of a star, one needs to know its coordinates (RA, DEC), proper motion, distance, and radial velocity. The Hipparcos and Tycho catalogues provide all this information except radial velocities. We anticipate eventually searching approx. 1000 nearby stars for signs of extreme youth. Future studies of the young stars so identified will help clarify the formation of planetary systems for times between 10 and 100 million years. Certainly, the final output of this study will be a very useful resource, especially for adaptive optics and space based searches for Jupiter-mass planets and dusty proto-planetary disks. We have begun spectroscopic observations in January, 2001 with the 2.3 m telescope at Siding Spring Observatory (SSO) in New South Wales, Australia. These spectra will be used to determine radial velocities and other youth indicators such as Li 6708A absorption strength and Hydrogen Balmer line intensity. Additional observations of southern hemisphere stars from SSO are scheduled in April and northern hemisphere observations will take place in May and July at the Lick Observatory of the University of California. AT SSO, to date, we have observed about 100 stars with a high resolution spectrometer (echelle) and about 50 stars with a medium spectral resolution spectrometer (the "DBS"). About 20% of these stars turn out to be young stars. Among these, two especially noteworthy stars appear to be the closest T-Tauri stars ever identified. Interestingly, these stars share the same space motions as that of a very famous star with a dusty circumstellar disk--beta Pictoris. This new finding better constrains the age of beta Pictoris to be approx. 10 Myr.

Webb, Rich↗

A lock-free priority queue design based on multi-dimensional linked lists

The throughput of concurrent priority queues is pivotal to multiprocessor applications such as discrete event simulation, best-first search and task scheduling. Existing lock-free priority queues are mostly based on skiplists, which probabilistically create shortcuts in an ordered list for fast insertion of elements. The use of skiplists eliminates the need of global rebalancing in balanced search trees and ensures logarithmic sequential search time on average, but the worst-case performance is linear with respect to the input size. In this paper, we propose a quiescently consistent lock-free priority queue based on a multi-dimensional list that guarantees worst-case search time of O(logN) for key universe of size N. The novel multi-dimensional list (MDList) is composed of nodes that contain multiple links to child nodes arranged by their dimensionality. The insertion operation works by first injectively mapping the scalar key to a high-dimensional vector, then uniquely locating the target position by using the vector as coordinates. Nodes in MDList are ordered by their coordinate prefixes and the ordering property of the data structure is readily maintained during insertion without rebalancing nor randomization. Furthermore, in our experimental evaluation using a micro-benchmark, our priority queue achieves an average of 50% speedup over the state of the art approaches under high concurrency.

97 MATHEMATICS AND COMPUTING↗

An approach to multivariable control of manipulators

The paper presents simple schemes for multivariable control of multiple-joint robot manipulators in joint and Cartesian coordinates. The joint control scheme consists of two independent multivariable feedforward and feedback controllers. The feedforward controller is the minimal inverse of the linearized model of robot dynamics and contains only proportional-double-derivative (PD2) terms - implying feedforward from the desired position, velocity and acceleration. This controller ensures that the manipulator joint angles track any reference trajectories. The feedback controller is of proportional-integral-derivative (PID) type and is designed to achieve pole placement. This controller reduces any initial tracking error to zero as desired and also ensures that robust steady-state tracking of step-plus-exponential trajectories is achieved by the joint angles. Simple and explicit expressions of computation of the feedforward and feedback gains are obtained based on the linearized model of robot dynamics. This leads to computationally efficient schemes for either on-line gain computation or off-line gain scheduling to account for variations in the linearized robot model due to changes in the operating point. The joint control scheme is extended to direct control of the end-effector motion in Cartesian space. Simulation results are given for illustration.

Seraji, H.↗

Innovation in Contracting Strategy for a Master Services Agreement for Remediation of Low Level Radioactive Waste - 18381

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from several locations, including the Port Hope Harbour, a closed municipal landfill and approximately 800 residential properties. This complex project requires contracting the services of qualified, skilled and experienced environmental remediation contractors to meet the diverse needs of the myriad tasks that comprise the remediation and restoration of all properties. This paper will highlight how the CNL contracting services team developed an innovative approach to a contracting strategy designed to deliver the safe execution of work and keep the project on time and within budget. The approach addresses the complexities of a scope of work that consists of multiple work packages to be executed both concurrently and in tandem, and that require highly specialized trades/skills, as well as high-level project management expertise to ensure seamless coordination among the various contractors. The author will discuss CNL's strategy to engage the market with a Request for Expression of Interest to identify potential qualified suppliers and gauge their level of interest, issue a Request for Prequalification (RFPQ) to determine eligible contractors and, ultimately, issue a Request for Proposal for a Master Services Agreement (MSA) that would competitively evaluate each contractor's direct experience, technical expertise, quality management programs, safety systems compliance and track record. Using CNL's experience as a case study, the paper will highlight how an innovative approach can positively affect project timelines by describing how CNL addressed the challenge associated with the limited time available to implement procurement processes and deliver a series of executed agreements while ensuring that work would begin on time and key project milestones would be met. The author will summarize how CNL's strategy put the project back on schedule, without compromising the process guideline/requirements, and ensured that a qualified and experienced set of contractors, committed to a strong safety culture, will be available to perform the work required when the cleanup in the Port Hope community begins in 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydropower Role in a Power Grid with a High Proportion of Variable Renewables

The importance of hydropower increases as the power grid evolves with the higher variable renewable contribution. As conventional thermal power plants are retired, the importance of hydropower contribution increases to balance the variability of solar and wind generation. However, reservoir water resources are constrained by multiple constraints, and variability of water inflow to the reservoirs creates limitations to dam water releases for power grid needs. Coordination of multiple tools, including water resources modeling, ecological modeling, and technical and economic power grid modeling, informs dam water releases. Better representation of ecological constraints and other water use details in the suit of power grid models are required to identify the hydropower flexibility to provide multiple power grid services. Impacts of water planning and hydropower operation changes to a power grid are better understood by production cost model simulations with technical and economic data, including unserved energy, reserve failures, transmission congestion to serve load, and local marginal price increases. Similarly, PCM simulation of current and future projected power grid information, including LMP, and carbon emission rates, informs short-term water release plans and long-term investments for power plant upgrades for technical and ecological needs. Hydropower operations of several case studies are simulated to understand operation patterns, revenue, water release decisions in multiple time scales (month, day, minutes), hydropower contracts scheduling, and water variability impacts.

environmental↗

Powernet in Farms Project

Coordinating behind-the-meter (BTM) distributed energy resources (DERs) is critical to ensuring efficiency and reliability for consumers facing an increasingly variable grid supply. Outside of very controlled environments, however, such coordination of heterogeneous resources at scale has remained a challenge due to harsh field conditions, the lack of adequate communication infrastructure, and the difficulty of modeling the system. The intent of this research was to refine the Powernet system deployed in a California dairy farm to achieve the following objectives: a) validate the results of the previous deployment and b) validate new hypothesis about system performance based on the simulation of the new system. The new system design would reduce the overall system cost, and achieve a payback period of less than 3 years, demonstrating the feasibility of such system and its relevance for a segment not well known for technology advancements in power systems. The new proposed system was significantly cheaper than the original design, which would enable the solution to be cost effective and likely economically viable. However, due to significant delays in project start date which affected funding availability, overlap with prior scheduled mandatory military leave from key members of the project team, and customer drop-out, due to the significant delays, which could not be replaced in time, caused the project to be ended prior to completion.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Flight Avionics Hardware Roadmap

The Avionics Technology Roadmap takes an 80% approach to technology investment in spacecraft avionics. It delineates a suite of technologies covering foundational, component, and subsystem-levels, which directly support 80% of future NASA space mission needs. The roadmap eschews high cost, limited utility technologies in favor of lower cost, and broadly applicable technologies with high return on investment. The roadmap is also phased to support future NASA mission needs and desires, with a view towards creating an optimized investment portfolio that matures specific, high impact technologies on a schedule that matches optimum insertion points of these technologies into NASA missions. The roadmap looks out over 15+ years and covers some 114 technologies, 58 of which are targeted for TRL6 within 5 years, with 23 additional technologies to be at TRL6 by 2020. Of that number, only a few are recommended for near term investment: 1. Rad Hard High Performance Computing 2. Extreme temperature capable electronics and packaging 3. RFID/SAW-based spacecraft sensors and instruments 4. Lightweight, low power 2D displays suitable for crewed missions 5. Radiation tolerant Graphics Processing Unit to drive crew displays 6. Distributed/reconfigurable, extreme temperature and radiation tolerant, spacecraft sensor controller and sensor modules 7. Spacecraft to spacecraft, long link data communication protocols 8. High performance and extreme temperature capable C&DH subsystem In addition, the roadmap team recommends several other activities that it believes are necessary to advance avionics technology across NASA: center dot Engage the OCT roadmap teams to coordinate avionics technology advances and infusion into these roadmaps and their mission set center dot Charter a team to develop a set of use cases for future avionics capabilities in order to decouple this roadmap from specific missions center dot Partner with the Software Steering Committee to coordinate computing hardware and software technology roadmaps and investment recommendations center dot Continue monitoring foundational technologies upon which future avionics technologies will be dependent, e.g., RHBD and COTS semiconductor technologies

Some, Raphael↗

Assessing Relay Communications for Mars Sample Return Surface Mission Concepts

The Mars Sample Return (MSR) Campaign is a 3-mission campaign concept supported by NASA and ESA to return samples from the Mars surface. MSR will, for the firsttime ever, present a need to communicate with multiple surfaceassets that are co-located on Mars in a coordinated effort toaccomplish the unified objective of fetching, transporting, andreturning samples from Mars. Currently, Mars surface assetsrelay data to and from Earth using a number of orbiters inwhat’s known as the Mars Relay Network (MRN). This networkis characterized by a small number of surface assets distributedacross the Martian globe and a larger number of orbiters toprovide relay services. As of June 2020, there are two surfaceassets for which five orbiters are providing relay. During theMSR Campaign, there will be two rovers and a lander that allwill require relay communication from a small number of Marsorbiters to meet the aggressive MSR timeline. The inversion ofthe current MRN paradigm, a system of many surface assetsrequiring relay and few orbiters to provide relay, necessitatesthe unique challenge of optimally allocating relay passes tomaximize the operational capability of all assets. The allocationmust consider a large number of trade variables includingMars asset operational requirements and Earth ground systemconstraints, including staffing schedules, operations planningacross time zones, and more. To address these telecommunicationchallenges, the Mars Asset Relay Mission Link AllocationDesign Environment (MARMLADE) tool was developed. Itis a MATLAB-based tool to assign orbiter passes or Direct-From-Earth (DFE) links to each of the three surface assets andquantify the operational efficiency of each surface asset.MARMLADE uses a data set of simulated Mars relay orbitergeometry and telecommunication capabilities provided by JPL’sTelecom Orbit Analysis and Simulation Tool (TOAST) softwareto compute which asset should get each pass based on a seriesof heuristics and predictions of all assets’ states. WithinMARMLADE, the user can provide inputs including the optionfor time-based pass splitting, fixed FWD data rate capabilities,DFE communication capabilities, and link parameters allowingfor the assessment of complex operations and hardware tradesusing surface mission operational efficiency as a primary figureof merit. As the MSR mission concepts continue to mature,MARMLADE is being used to assess ability of all MSR elementsto meet the surface mission timeline requirements and to provide relay link allocations to each of the MSR surface assets.

Lee, Charles↗

Project Management Using Modern Guidance, Navigation and Control Theory

The idea of control theory and its application to project management is not new, however literature on the topic and real-world applications is not as readily available and comprehensive in how all the principals of Guidance, Navigation and Control (GN&C) apply. This paper will address how the fundamental principals of modern GN&C Theory have been applied to NASA's Constellation Space Suit project and the results in the ability to manage the project within cost, schedule and budget. A s with physical systems, projects can be modeled and managed with the same guiding principles of GN&C as if it were a complex vehicle, system or software with time-varying processes, at times non-linear responses, multiple data inputs of varying accuracy and a range of operating points. With such systems the classic approach could be applied to small and well-defined projects; however with larger, multi-year projects involving multiple organizational structures, external influences and a multitude of diverse resources, then modern control theory is required to model and control the project. The fundamental principals of G N&C stated that a system is comprised of these basic core concepts: State, Behavior, Control system, Navigation system, Guidance and Planning Logic, Feedback systems. The state of a system is a definition of the aspects of the dynamics of the system that can change, such as position, velocity, acceleration, coordinate-based attitude, temperature, etc. The behavior of the system is more of what changes are possible rather than what can change, which is captured in the state of the system. The behavior of a system is captured in the system modeling and if properly done, will aid in accurate system performance prediction in the future. The Control system understands the state and behavior of the system and feedback systems to adjust the control inputs into the system. The Navigation system takes the multiple data inputs and based upon a priori knowledge of the input, will develop a statistical-based weighting of the input to determine where the system currently is located. Guidance and Planning logic of the system with the understanding of where it is (provided by the navigation system) will in turn determine where it needs to be and how to get there. Lastly, the system Feedback system is the right arm of the control system to allow it to affect change in the overall system and therefore it is critical to not only correctly identify the system feedback inputs but also the system response to the feedback inputs. And with any systems project it is critical that the objective of the system be clearly defined for not only planning but to be used to measure performance and to aid in the guidance of the system or project.

Hill, Terry↗