Search NASA⌕ Search

SEARCH · Search NASA

Results for “grid interconnection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Leading Energy Analysis: Data-Driven Insights That Power Our Energy Future

Energy analysts at the National Renewable Energy Laboratory (NREL) use a broad set of expertise and cutting-edge tools to capture the complexities of our interconnected energy system. Decision-makers rely on these insights to drive cost savings, enhance grid reliability, support long-term innovation, and bolster America's energy workforce and global competitiveness. This fact sheet highlights some of NREL's high-impact analyses, data, and tools, largely focusing on power grid analysis.

data↗

Decision Tree Based Anomaly Detection for Remedial Action Scheme in Smart Grid using PMU Data

The advanced and persistent cyber threats facing the critical infrastructure such as the smart grid are exponentially rising which require sophisticated defense strategy. Remedial Action Scheme (RAS), also known as Special Protection Scheme (SPS), relies on the interconnected cyber physical system for automated protection which is exposed to the multitude of vulnerabilities. In this paper, we propose an innovative approach to develop an Intelligent Remedial Action Scheme (IRAS) which can detect and distinguish cyber attacks from the physical disturbances in smart grid and later take smart corrective actions as required to minimize the impact on system reliability and economy. Specifically, we have proposed the decision tree based anomaly detection methodology which can distinguish between the normal tripping during power line faults and malicious tripping attack on the physical relays in the context of RAS. The classification model is developed using differential features of voltage and current phasors. Next, as a proof of concept, we have implemented and validated the proposed methodology in cyber physical environment at Iowa State's PowerCyber testbed. Finally, the proposed methodology is tested on modified IEEE 39 bus system in offline and real-time mode. Our experimental results show that the proposed method is efficient in detecting attacks and performing corrective actions within an acceptable time frame.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Final Scientific/Technical Report for Building Transmission Capacity in the Western Interconnection to Support a Low Carbon Future

The Building Transmission Capacity grant activities focused on educating both policy makers (primarily at Public Utility Commissions) and utilities across the West. Western Grid Group (WGG), the grant recipient, chose three methods to reach these audiences - direct outreach, a website that contains information on policies and strategies to integrate more variable generation resources, and a report - The Best of the West, Policies and Practices to Support Transition to a Lower-Carbon Electric Sector in the Western Interconnection and that highlights what is working in the West. While all avenues for education are effective the Best of the West report is the first west-wide assessment of its kind. The report details incremental changes that are working to integrate variable generation but it also expounds on what fundamental or transformative changes are needed to get to the 20% wind penetration and beyond.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Hierarchical Multi-Agent Based Anomaly Detection for Wide-Area Protection in Smart Grid

Future smart grid capabilities provide assurance to expand the advanced information and communication technologies to evolve into densely interconnected cyber physical system. Remedial Action Scheme (RAS), widely used for wide-area protection, relies on the interconnected networks and data sharing devices, which are exposed to the multitude of vulnerabilities. This paper presents our proposed approach to developing multi-agent based RAS scheme against the system-aware stealthy cyber-attacks. Specifically, we propose the two-level hierarchical architecture which consists of distributed local RAS controllers (RAScs) as local agents, operating at different zones/ areas, which are constantly monitored by an overseer, the central agent. The local controllers receive local and randomly changing outside zonal measurements and cyclically forwards to the overseer. The overseer identifies the corrupted controller using the anomaly detection algorithm which processes the measurements coming from the local controllers, compute measurement errors using local and outside zonal measurements, perform validation checks, and finally detect anomalies based on the two-step verification. Next, as a proof of concept, we have implemented and validated the proposed methodology in cyber physical environment at Iowa State’s PowerCyber testbed. We have also implemented the coordinated attack vectors which involve corrupting the local controller and later performing stealthy attacks on the system’s generator. We have evaluated its performance during the online testing in terms of detection rate and Iatency. The experimental results show that it is efficient in detecting different classes of attacks, including ramp and pulse attacks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Geothermal Power and Interconnection: The Economics of Getting to Market

This report provides a baseline description of the transmission issues affecting geothermal technologies. The report begins with a comprehensive overview of the grid, how it is planned, how it is used, and how it is paid for. The report then overlays onto this 'big picture' three types of geothermal technologies: conventional hydrothermal systems; emerging technologies such as enhanced engineeredgeothermal systems (EGS) and geopressured geothermal; and geothermal co-production with existing oil and gas wells. Each category of geothermal technology has its own set of interconnection issues, and these are examined separately for each. The report draws conclusions about each technology's market affinities as defined by factors related to transmission and distribution infrastructure. Itfinishes with an assessment of selected markets with known geothermal potential, identifying those that offer the best prospects for near-term commercial development and for demonstration projects.

15 GEOTHERMAL ENERGY↗

Automatic Data Distribution for CFD Applications on Structured Grids

Data distribution is an important step in implementation of any parallel algorithm. The data distribution determines data traffic, utilization of the interconnection network and affects the overall code efficiency. In recent years a number data distribution methods have been developed and used in real programs for improving data traffic. We use some of the methods for translating data dependence and affinity relations into data distribution directives. We describe an automatic data alignment and placement tool (ADAPT) which implements these methods and show it results for some CFD codes (NPB and ARC3D). Algorithms for program analysis and derivation of data distribution implemented in ADAPT are efficient three pass algorithms. Most algorithms have linear complexity with the exception of some graph algorithms having complexity O(n(sup 4)) in the worst case.

Frumkin, Michael↗

Automatic Data Distribution for CFD Applications on Structured Grids

Data distribution is an important step in implementation of any parallel algorithm. The data distribution determines data traffic, utilization of the interconnection network and affects the overall code efficiency. In recent years a number data distribution methods have been developed and used in real programs for improving data traffic. We use some of the methods for translating data dependence and affinity relations into data distribution directives. We describe an automatic data alignment and placement tool (ADAFT) which implements these methods and show it results for some CFD codes (NPB and ARC3D). Algorithms for program analysis and derivation of data distribution implemented in ADAFT are efficient three pass algorithms. Most algorithms have linear complexity with the exception of some graph algorithms having complexity O(n(sup 4)) in the worst case.

Frumkin, Michael↗

The Feasibility of Moving PMU Data in the Future Power Grid

The power grid is a complex network connecting electricity providers with their consumers. With an increasing consumer base requiring more resources and the requirement to integrate significant renewable sources, maintaining the network requires new and innovative management solutions. To manage this complexity and provide precise, real-time views of the grid, Phasor Measurement Units (PMUs) are undergoing widespread deployment. These units provide measurements as often as 60 times per second, with an accurate time identifier attached to each reading, enabling real-time monitoring of the network. However, this new capability generates much more data than the current infrastructure is designed to handle. With the expectation that there will eventually be tens of thousands of PMUs monitoring the transmission lines, the power community is looking towards accumulating multiple terabytes of data per day - several orders of magnitude beyond current data acquisition rates. This has led to questions being raised in the power community about whether or not a significant research effort is required to effectively transfer the volume of information generated by these new data streams. This paper answers that question by comparing a worst-case data generation scenario with several alternative networking protocols and historical trends in protocol advancement. Based on this analysis we are able to conclude that transferring the information between the PMUs and the resulting data repositories is feasible. We recognize that there are issues beyond transferring the data that need to be addressed such as effective access to historical data, data transfer latency, cyber security, and data analysis. There is also an extensive engineering trade-off that the power companies will need to make to decide the best mix of networking protocols for their particular PMU deployments, since that requires significant assumptions about proprietary information including deployment cost, deployment schedules, PMU locations, and available resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Geothermal Power and Interconnection: The Economics of Getting to Market

This report provides a baseline description of the transmission issues affecting geothermal technologies. The report begins with a comprehensive overview of the grid, how it is planned, how it is used, and how it is paid for. The report then overlays onto this 'big picture' three types of geothermal technologies: conventional hydrothermal systems; emerging technologies such as enhanced engineered geothermal systems (EGS) and geopressured geothermal; and geothermal co-production with existing oil and gas wells. Each category of geothermal technology has its own set of interconnection issues, and these are examined separately for each. The report draws conclusions about each technology's market affinities as defined by factors related to transmission and distribution infrastructure. It finishes with an assessment of selected markets with known geothermal potential, identifying those that offer the best prospects for near-term commercial development and for demonstration projects.

03 NATURAL GAS↗

Spectral Clustering-Based Partitioning of Large-Scale Power Electronics-Based Power Systems for Small-Signal Stability Analysis

The nodal admittance matrix (NAM)-based approach is well-suited for small-signal stability analysis of large-scale power electronics-based power systems (PEPSs), as it preserves the system structure through its admittance matrix. Previous studies have explored partitioning such systems into subareas and interconnections to reduce computational burden; however, they lacked a formal algorithmic procedure for determining feasible partitions. While several grid partitioning methods, such as those based on graph theory or machine learning, exist in the literature, they cannot be directly applied to NAM-based analysis due to differing objectives and constraints. Here, this paper addresses this gap by presenting a systematic, step-by-step procedure for applying a spectral partitioning algorithm that yields a division of the system into subareas suitable for NAM-based analysis. The computational complexity of the proposed method is also derived to demonstrate its efficiency and justify the practicality of the resulting subarea decomposition. The performance of the partitioning method is evaluated by applying the spectral clustering-derived subareas and interconnections to the NAM-based partitioning approach on a 140-bus system. Computational times for the full-system and partitioned NAM analyses are compared using MATLAB. Additionally, PSCAD simulations of the complete system and partitioned subareas are carried out to verify the effectiveness of the proposed method.

Nupur [Univ. of Tennessee, Knoxville, TN (United S↗

Transforming the U.S. Market with a New Application of Ternary-Type Pumped-Storage Hydropower Technology: Preprint

As the deployment of wind and solar technologies increases at an unprecedented rate across the United States and in many world markets, the variability of power output from these technologies expands the need for increased power system flexibility. Energy storage can play an important role in the transition to a more flexible power system that can accommodate high penetrations of variable renewable technologies. This project focuses on how ternary pumped storage hydropower (T-PSH) coupled with dynamic transmission can help this transition by defining the system-wide benefits of deploying this technology in specific U.S. markets. T-PSH technology is the fastest responding pumped hydro technology equipment available today for grid services. T-PSH efficiencies are competitive with lithium-ion (Li-ion) batteries, and T-PSH can provide increased storage capacity with minimal degradation during a 50-year lifetime. This project evaluates T-PSH for grid services ranging from fast frequency response (FFR) for power system contingency events and enhanced power system stability to longer time periods for power system flexibility to accommodate ramping from wind and solar variability and energy arbitrage. In summary, this project: Compares power grid services and costs, including ancillary services and essential reliability services, for T-PSH and conventional pumped storage hydropower (PSH) - Evaluates the dynamic response of T-PSH and PSH technologies and their contribution to essential reliability services for grid stability by developing new power system model representations for T-PSH and performing simulations in the Western Interconnection - Evaluates production costs, operational impacts, and energy storage revenue streams for future power system scenarios with T-PSH focusing on time frames of 5 minutes and more - Assesses the electricity market-transforming capabilities of T-PSH technology coupled with transmission monitoring and dynamic control. This paper presents an overview of the methodology and initial, first-year preliminary findings of a 2-year in-depth study into how advanced PSH and dynamic transmission contribute to the transformation and modernization of the U.S. electric grid. This project is part of the HydroNEXT Initiative funded by the U.S. Department of Energy (DOE) that is focused on the development of innovative technologies to advance nonpowered dams and PSH. The project team consists of the National Renewable Energy Laboratory (project lead), Absaroka Energy, LLC (Montana-based PSH project developer), GE Renewable Energy (PSH pump/turbine equipment supplier), Grid Dynamics, and Auburn University (lead for NREL/Auburn dynamic modeling team).

13 HYDRO ENERGY↗

Maturity Model for Advancing Smart Grid Interoperability

Abstract—Interoperability is about the properties of devices and systems to connect and work properly. Advancing interoperability eases integration and maintenance of the resulting interconnection. This leads to faster integration, lower labor and component costs, predictability of projects and the resulting performance, and evolutionary paths for upgrade. When specifications are shared and standardized, competition and novel solutions can bring new value streams to the community of stakeholders involved. Advancing interoperability involves reaching agreement for how things join at their interfaces. The quality of the agreements and the alignment of parties involved in the agreement present challenges that are best met with process improvement techniques. The GridWise® Architecture Council (GWAC) sponsored by the United States Department of Energy is supporting an effort to use concepts from capability maturity models used in the software industry to advance interoperability of smart grid technology. An interoperability maturity model has been drafted and experience is being gained through trials on various types of projects and community efforts. This paper describes the value and objectives of maturity models, the nature of the interoperability maturity model and how it compares with other maturity models, and experiences gained with its use.

IEEE↗

Supervised Learning for Distribution Secondary Systems Modeling: Improving Solar Interconnection Processes

The current interconnection process and hosting capacity analysis for distributed energy resources (DERs), such as photovoltaics (PV) and battery energy storage systems, are based on analyzing grid network constraints (voltage and thermal) using only medium-voltage distribution network models. This is because most utilities do not have secondary low-voltage system models that connect service transformers and residential customers. This is important because in many cases the main impact of interconnecting DERs could occur on the low-voltage distribution systems. This paper proposes a supervised learning method to approximate local secondary models to improve the interconnection process. The proposed supervised learning method includes a decision tree model that predicts the secondary topology and a logistic regression model that predicts conductor types. The case studies demonstrate the benefits of including secondary low-voltage circuits in the interconnection process. We report the proposed modeling methodology is readily scalable and thus can reduce the cost and effort of PV interconnection for the industry and stakeholders.

14 SOLAR ENERGY↗

Scalable domain decomposition solvers for stochastic PDEs in high performance computing

Stochastic spectral finite element models of practical engineering systems may involve solutions of linear systems or linearized systems for non-linear problems with billions of unknowns. For stochastic modeling, it is therefore essential to design robust, parallel and scalable algorithms that can efficiently utilize high-performance computing to tackle such large-scale systems. Domain decomposition based iterative solvers can handle such systems. And though these algorithms exhibit excellent scalabilities, significant algorithmic and implementational challenges exist to extend them to solve extreme-scale stochastic systems using emerging computing platforms. Intrusive polynomial chaos expansion based domain decomposition algorithms are extended here to concurrently handle high resolution in both spatial and stochastic domains using an in-house implementation. Sparse iterative solvers with efficient preconditioners are employed to solve the resulting global and subdomain level local systems through multi-level iterative solvers. We also use parallel sparse matrix–vector operations to reduce the floating-point operations and memory requirements. Numerical and parallel scalabilities of these algorithms are presented for the diffusion equation having spatially varying diffusion coefficient modeled by a non-Gaussian stochastic process. Scalability of the solvers with respect to the number of random variables is also investigated.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Momentary Cessation: Improving Dynamic Performance and Modeling of Utility-Scale Inverter Based Resources During Grid Disturbances

Sandia National Laboratories worked with NERC staff to provide stakeholder guidance in responding to a May 2018 NERC alert regarding dynamic performance and modeling issues for utility-scale inverter-based resources. The NERC alert resulted from event analyses for grid disturbances that occurred in southern California in August 2016 and October 2017. Those disturbances revealed the use of momentary cessation of transmission connected inverter-based generation- a short time period when they ceased to inject current into the grid, counter to desired transmission operation. The event analyses concluded that, in many cases, the Western Interconnection system models used to determine planning and operating criteria do not reflect the actual behavior of solar plants, resulting in overly optimistic planning assessments and substandard operational responses. This technical report summarizes the gaps between the models and actual performance that were observed at those times, and the guidance that Sandia and NERC provided to owners of solar PV power plants, transmission planners, transmission operators and planning/reliability coordinators to modify existing models to reflect that actual performance

24 POWER TRANSMISSION AND DISTRIBUTION↗

Describing Function Analysis of Transformer Magnetizing Inductance for Direct Power Control of Back-to-Back Modular Multilevel Converters with Advanced Grid Support

This paper provides a detailed investigation into the application of describing function-based analysis for assessing transformer magnetizing inductance and its impact on system performance. The focus is on a back-to-back modular multilevel converter architecture, designed to interconnect systems operating at different frequencies. The study explores the implementation of a Direct Power Control strategy, examining its effects on transformer magnetizing inductance saturation and offering effective mitigation techniques. Furthermore, the integration of advanced grid support functionalities is highlighted, demonstrating how these enhancements bolster the converter's ability to improve grid stability and power quality, positioning it as a robust solution for modern power systems. The proposed approach is validated through extensive computer simulations based MAT LAB/Simulink domain, supported by significant case study results, confirming its practical effectiveness.

back-to-back modular multilevel converters (B2B- M↗

GPU-enabled extreme-scale turbulence simulations: Fourier pseudo-spectral algorithms at the exascale using OpenMP offloading

Fourier pseudo-spectral methods for nonlinear partial differential equations are of wide interest in many areas of advanced computational science, including direct numerical simulation of three-dimensional (3-D) turbulence governed by the Navier-Stokes equations in fluid dynamics. This paper presents a new capability for simulating turbulence at a new record resolution up to 35 trillion grid points, on the world's first exascale computer, Frontier, comprising AMD MI250x GPUs with HPE's Slingshot interconnect and operated by the US Department of Energy's Oak Ridge Leadership Computing Facility (OLCF). Key programming strategies designed to take maximum advantage of the machine architecture involve performing almost all computations on the GPU which has the same memory capacity as the CPU, performing all-to-all communication among sets of parallel processes directly on the GPU, and targeting GPUs efficiently using OpenMP offloading for intensive number-crunching including 1-D Fast Fourier Transforms (FFT) performed using AMD ROCm library calls. With 99% of computing power on Frontier being on the GPU, leaving the CPU idle leads to a net performance gain via avoiding the overhead of data movement between host and device except when needed for some I/O purposes. Memory footprint including the size of communication buffers for MPI_ALLTOALL is managed carefully to maximize the largest problem size possible for a given node count. Detailed performance data including separate contributions from different categories of operations to the elapsed wall time per step are reported for five grid resolutions, from 2048 3 on a single node to 32768 3 on 4096 or 8192 nodes out of 9408 on the system. Both 1D and 2D domain decompositions which divide a 3D periodic domain into slabs and pencils respectively are implemented. The present code suite (labeled by the acronym GESTS, GPUs for Extreme Scale Turbulence Simulations) achieves a figure of merit (in grid points per second) exceeding goals set in the Center for Accelerated Application Readiness (CAAR) program for Frontier. The performance attained is highly favorable in both weak scaling and strong scaling, with notable departures only for 2048 3 where communication is entirely intra-node, and for 32768 3 , where a challenge due to small message sizes does arise. Communication performance is addressed further using a lightweight test code that performs all-to-all communication in a manner matching the full turbulence simulation code. Performance at large problem sizes is affected by both small message size due to high node counts as well as dragonfly network topology features on the machine, but is consistent with official expectations of sustained performance on Frontier. Overall, although not perfect, the scalability achieved at the extreme problem size of 32768 3 (and up to 8192 nodes — which corresponds to hardware rated at just under 1 exaflop/sec of theoretical peak computational performance) is arguably better than the scalability observed using prior state-of-the-art algorithms on Frontier's predecessor machine (Summit) at OLCF. New science results for the study of intermittency in turbulence enabled by this code and its extensions are to be reported separately in the near future.

3D fast Fourier transform↗