Optimizing Segmentation for Quantitative Studies of Materials
An increasing amount of image data is being produced. Currently, most of the anlysis is done manually. There is a growing need to automate image interpretation.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
An increasing amount of image data is being produced. Currently, most of the anlysis is done manually. There is a growing need to automate image interpretation.
This thesis presents a search for the standard model and fermiophobic Higgs bosons produced in association with a vector boson using like-sign dilepton events collected by Collider Detector at Fermilab (CDF II). This analysis uses the data corresponding to an integrated luminosity of 9.4 fb -1 . The search is characterized by minimally biased cuts which maximize the acceptance of the Higgs bosons. The numbers of expected signal events passing requirements for like-sign dilepton are 5.6 for the fermiophobic Higgs on the mass of 110 GeV/c 2 assuming the standard model production cross section, and 1.7 for the standard model on the mass of 160 GeV/c 2 . The expectation of background events are 696.1, while the number of observed events are 624. To discriminate signal events from backgrounds, the search employs a multivariate analysis based on boosted decision trees. There are no significant disagreements in the BDT outputs, then, upper limits at a 95% confidence level are set on σ(p$\bar{p}$→V h) × B(h→WW ) for both Higgs bosons scenarios. The expected and observed limits are 5.9 and 9.2, respectively, relative to the standard model expectation for the standard model Higgs boson mass of 160 GeV/c 2 . For the fermiophobic Higgs boson corresponding to the mass of 110 GeV/c 2 , the expected and observed limits are 2.6 and 4.4, respectively.
The residential solar photovoltaic (PV) market in the United States is growing, despite frequent customer cancellations. Contract cancellations result in lost time and costs that must be borne by installers, often in the form of higher "soft costs" (i.e., non-equipment costs). These costs are often passed on to customers who successfully install PV systems. To date, few studies have attempted to estimate national cancellation rates or model the impacts on installed system costs. In this report, we utilize an installer-provided dataset of 199,665 residential PV-only projects representing about 10% of U.S. installs each year from 2017-2019. With this data, we evaluate cancellation rates and trends from contract signing to install. Next, by leveraging NREL's soft cost model for residential solar, we estimate installer spending through each phase of the pre-install process. Applying our findings on cancellation timelines and rates, we then estimate the potential cost impacts to successful installs from contract cancellations. Our work suggests that the rates and impacts of contract cancellations have been previously underestimated. Namely, we find that cancellations/unsuccessful project are; more common than previous estimates suggest; occur earlier in project timelines, though a significant number happen even after permit/ATB approvals; and contribute significantly to customer acquisition and other soft costs. We also find that cancellation do not appear to be driven by review delays in permitting and interconnection applications.
The transition toward a cleaner and more weather-dependent power system brings with it unprecedented challenges and opportunities for maintaining resource adequacy—namely, a future that includes rapid load growth, plant retirements, and a shift toward variable and energy-limited resources. Resource adequacy analyses, capacity accreditation, and the resource adequacy planning criteria are becoming increasingly important for power system planning and investment decisions. While previous ESIG reports evaluated the changing resource adequacy risks and planning practices created by the energy transition, none specifically examined potential changes to the resource adequacy criterion used for planning. The resource adequacy criterion sets the level of supply- and demand-side resources that are required for a given power system to meet reliability objectives. It is a pivotal standard that influences billions of dollars of investment decisions.
The goal of this project was to compare and contrast utility scale power plant characteristics used in data sets that support energy market models. Characteristics include both technology cost and technology performance projections to the year 2050. Cost parameters include installed capital costs and operation and maintenance (O&M) costs. Performance parameters include plant size, heat rate,capacity factor or availability factor, and plant lifetime. Conventional, renewable, and emerging electricity generating technologies were considered. Six data sets, each associated with a different model, were selected. Two of the data sets represent modeled results, not direct model inputs. These two data sets include cost and performance improvements that result from increased deployment aswell as resulting capacity factors estimated from particular model runs; other data sets represent model input data. For the technologies contained in each data set, the levelized cost of energy (LCOE) was also evaluated, according to published cost, performance, and fuel assumptions.
This document is comprised of a collection of consolidated parameters for the key parts of the muon collider. These consolidated parameters follow on from the October 2024 Preliminary Parameters Report. Attention has been given to a high-level consistent set of baseline parameters throughout all systems of the complex, following a 10 TeV center-of-mass design. Additional details of the designs contributing to this baseline design are featured in the appendix. Likewise, explorative variations from this baseline set can be found in the appendix. The data is collected from a collaborative spreadsheet and transferred to overleaf.
Cutoff-type high gain amplifier coupled by a diode prevents overdriving of operational amplifier. An amplified feedback signal offsets the excess input signal that tends to cause the amplifier to exceed its preset limit. The output is, therfore, held to the set clamp level.
Video remodulation unit enhances facsimile transmission using an amplitude-modulated 2400 Hz carrier. The unit demodulates the signal and then remodulates it, using the same carrier. By using the unit controls, modulation can be set to levels that compensate for picture in-transit degradation.
Noise data were taken for variations to a large scale model of an externally blown flap lift augmentation system. The variations included two different mixer nozzles (7 and 8 lobes), two different wing models (2 and 3 flaps), and different lateral distances between the wing chord line and the nozzle centerline. When the seven lobe was used with the trailing flap in the 60 deg position, increasing the wing to nozzle distance had no effect on the sound level. When the eight lobe nozzle was used there was a decrease in sound level. With the 20 deg flap setting the noise level decreased when the distance was increased using either nozzle.
Belt-type moving ground equipment, used for ground-effect simulation in STOL and VTOL tests, can be inconvenient and costly, especially in larger tunnels. In most cases such difficulties may be avoided by employing tangential blowing at the ground surface, from a single slot. The paper reviews several powered model tests using both moving ground and tangential blowing and describes the slot configuration, and the test techniques which were developed. Ground skin friction is monitored to set blowing levels and no model-dependent calculations are needed. It is also shown that application to center-tunnel testing can delay tunnel flow breakdown very considerably.
Performability modeling and evaluation techniques are applied to the SIFT computer as it might operate in the computational evironment of an air transport mission. User-visible performance of the total system (SIFT plus its environment) is modeled as a random variable taking values in a set of levels of accomplishment. These levels are defined in terms of four attributes of total system behavior: safety, no change in mission profile, no operational penalties, and no economic process whose states describe the internal structure of SIFT as well as relavant conditions of the environment. Base model state trajectories are related to accomplishment levels via a capability function which is formulated in terms of a 3-level model hierarchy. Performability evaluation algorithms are then applied to determine the performability of the total system for various choices of computer and environment parameter values. Numerical results of those evaluations are presented and, in conclusion, some implications of this effort are discussed.
A summary of synoptic weather conditions existing over the western United States is given for the time of shuttle descent into Edwards Air Force Base, California. The techniques and methods used to furnish synoptic atmospheric data at the surface and aloft for flight verification of the STS-1 orbiter during its descent into Edwards Air Force Base are specified. Examples of the upper level data set are given.
Synoptic weather conditions existing over the western United States for the time of Shuttle descent are presented. The techniques and methods used to furnish synoptic atmospheric data at the surface and aloft for flight verification of the STS 3 orbiter during its descent are specified. Examples of the upper level data set are given.
A detailed view of the Space Research and Technology program work breakdown structure is provided down to the specific objective level. Goals or objectives at each of these levels are set forth. The specific objective narratives are structured into several parts. First, a short paragraph statement of the specific objective is given. This is followed by a list of subobjectives. A list of targets is then provided for those areas of the specific objective that are amenable to a quantitative description of technical accomplishment and schedule. Fluid and thermal physics, materials and structures, computer science and electronics, space energy conversion, multidisciplinary research, controls and human factors, chemical propulsion, spacecraft systems, transportation systems, platform systems, and spacecraft systems technology comprise the principal research programs.
A summary of synoptic weather conditions existing over the western United States is given for the time of Shuttle descent into Edwards Air Force Base, California. The techniques and methods used to furnish synoptic atmospheric data at the surface and aloft for flight verification of the STS-4 Orbiter during its descent into Edwards Air Force Base are specified. Examples of the upper level data set are given.
The Aeronautics Research and Technology program is broken down into two program areas (research and technology base, and systems technology programs) which are further broken down into succeedingly more detailed activities to form a work breakdown structure for the aeronautics program: program area, program/discipline objective, specific objective, and research and technology objective and plan (RTOP). A detailed view of this work breakdown structure down to the specific objective level is provided, and goals or objectives at each of these levels are set forth. What is to be accomplished and why are addressed, but not how. The letter falls within the domain of the RTOP.
The impact of various flight-related tasks on the workload imposed by the requirement to compute new headings, course changes, and reciprocal headings was investigated. Eight pilots were presented with a series of heading-change tasks in a laboratory setting. Two levels of difficulty of each of three tasks were presented verbally and spatially. Performance was measured by evaluating the speed and accuracy of the responses. The subjective responses and objective measures of performance reflected a strong association between subjective experience and objective behavior. The reciprocal calculations were performed quickly and accurately throughout and were considered to be minimally loading. Subjective workload, percent correct and response times for the two course-change tasks varied significantly as a function of level of difficulty and display format, with no discernable speed/accuracy trade off.
The major research objectives are to diagnose the physical processes responsible for the maintenance of the South Pacific Convergence Zone (SPCZ) and to examine the role of the SPCZ in the large-scale circulation patterns of the Southern Hemisphere. To accomplish these objectives researchers used several data sources which include: a modified set of Level III-b upper air analyses, originally produced by ECMWF (Vincent, 1982); subjectively analyzed surface analyses for the South Pacific based on island station reports (Vincent, 1985); outgoing longwave radiation values supplied to us by NOAA/NESDIS; and equivalent black body temperatures and precipitation rates derived by Robertson. In the past year researchers found that wave number four plays an inportant role in the Southern Hemisphere tropics during the 15-day period when the sPCZ was a dominant feature, particularly with regard to the baroclinic conversion of potential to kinetic energy (Huang and Vincent, 1985). The convectively-active SPCZ area was found to make a significant contribution to this conversion process; thus, it appears that baroclinic effects and latent heating are important in maintaining the SPCZ. Recently efforts concentrated on two research tasks, an examination of cyclone activity within the SPCZ (Kann, 1985; Vincent, 1985; Vincent and Kann, 1985) and a study of the heat and moisture budgets in the South Pacific (Miller, et al., 1985). It was found that cyclonic disturbances occurred with regularity in the Zone from 10 to 17 January.