Search NASA⌕ Search

SEARCH · Search NASA

Results for “program administration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

NASA’s Laser Communications Relay Demonstration (LCRD) Experiment Program: Characterization And Initial Operations

The National Aeronautics and Space Administration’s (NASA) Laser Communications Relay Demonstration (LCRD) completed the first 18 months of its Experiment Program in December 2023. The LCRD geosynchronous payload includes two laser communications terminals interconnected via an onboard electronic switch. The payload can relay information between any two of a set of three ground stations. Two optical ground stations are located in California and Hawaii, and an RF ground station is located in New Mexico. Experiments to date have included demonstration of optimetrics, demonstrations of Delay/Disruption Tolerant Networking (DTN), and measurements of the effects of the atmosphere (turbulence, weather) on the performance and availability of lasercom (pointing, tracking, communications, and adaptive optics). Furthermore, future operational scenarios including robotic and exploration missions with various network service configurations have been emulated. This paper provides an overview and highlights of the first 18 months of LCRD experiments, and a preview of the upcoming experiments, including relaying data to and from the Integrated LCRD Low-Earth Orbit (LEO) User Modem and Amplifier Terminal (ILLUMA-T) on the International Space Station. LCRD is a joint project involving NASA Goddard Space Flight Center (GSFC), the California Institute of Technology Jet Propulsion Laboratory (JPL), and Massachusetts Institute of Technology Lincoln Laboratory (MIT LL).

David J. Israel↗

Creating a Comprehensive, Efficient, and Sustainable Nuclear Regulatory Structure: A Process Report from the U.S. Department of Energy's Material Protection, Control and Accounting Program

With the congressionally mandated January 1, 2013 deadline for the U.S. Department of Energy’s (DOE) Nuclear Material Protection, Control and Accounting (MPC&A) program to complete its transition of MPC&A responsibility to the Russian Federation, National Nuclear Security Administration (NNSA) management directed its MPC&A program managers and team leaders to demonstrate that work in ongoing programs would lead to successful and timely achievement of these milestones. In the spirit of planning for successful project completion, the NNSA review of the Russian regulatory development process confirmed the critical importance of an effective regulatory system to a sustainable nuclear protection regime and called for an analysis of the existing Russian regulatory structure and the identification of a plan to ensure a complete MPC&A regulatory foundation. This paper describes the systematic process used by DOE’s MPC&A Regulatory Development Project (RDP) to develop an effective and sustainable MPC&A regulatory structure in the Russian Federation. This nuclear regulatory system will address all non-military Category I and II nuclear materials at State Corporation for Atomic Energy “Rosatom,” the Federal Service for Ecological, Technological, and Nuclear Oversight (Rostechnadzor), the Federal Agency for Marine and River Transport (FAMRT, within the Ministry of Transportation), and the Ministry of Industry and Trade (Minpromtorg). The approach to ensuring a complete and comprehensive nuclear regulatory structure includes five sequential steps. The approach was adopted from DOE’s project management guidelines and was adapted to the regulatory development task by the RDP. The five steps in the Regulatory Development Process are: 1) Define MPC&A Structural Elements; 2) Analyze the existing regulatory documents using the identified Structural Elements; 3) Validate the analysis with Russian colleagues and define the list of documents to be developed; 4) Prioritize and schedule the development of documents; 5) Identify and develop processes to measure effectiveness of regulations. Utilizing this process is resulting in an effective regulatory process that is understood and is being adopted by the four RF organizations. It is anticipated that the current regulatory development process will continue after U.S. support ends. Utilization of the systematic methodology will ensure regulatory development is based on required MPC&A structural elements and will support the continued maintenance and development of an effective regulatory base.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Analyses of Kennedy Space Center Tropospheric Doppler Radar Wind Profiler Data for Space Launch System Program Certification

This paper documents the methodology and results of analyses used to certify the Kennedy Space Center (KSC) Tropospheric Doppler Radar Wind Profiler (TDRWP) as input to launch commit evaluations for the National Aeronautics and Space Administration’s (NASA) Space Launch System Program (SLSP). These analyses, and the requirements that they address, were designed by the Marshall Space Flight Center Natural Environments Branch (MSFC NE) to certify that the TDRWP provides data of sufficient accuracy and resolution for SLSP, and that the instrument provides enough reliability to support Day-of- Launch Initialization Loads Update (DOLILU) operations. On day-of-launch (DOL), space launch vehicle operators have used data from wind profilers to reverse a previous GO call in prelaunch loads and trajectory assessments due to the profiler’s capability to quickly identify changes in the wind profile within a rapidly changing wind environment. Certification of the TDRWP would allow SLSP to use DOL wind data generated by the TDRWP to design the vehicle trajectory and to verify trajectory and load constraints during the countdown for launch commit decision.

Barbre, Robert E., Jr.↗

Phase 1 research program overview

The Phase 1 research program was unprecedented in its scope and ambitious in its objectives. The National Aeronautics and Space Administration committed to conducting a multidisciplinary long-duration research program on a platform whose capabilities were not well known, not to mention belonging to another country. For the United States, it provided the first opportunity to conduct research in a long-duration space flight environment since the Skylab program in the 1970's. Multiple technical as well as cultural challenges were successfully overcome through the dedicated efforts of a relatively small cadre of individuals. The program developed processes to successfully plan, train for and execute research in a long-duration environment, with significant differences identified from short-duration space flight science operations. Between August 1994 and June 1998, thousands of kilograms of research hardware was prepared and launched to Mir, and thousands of kilograms of hardware and data products were returned to Earth. More than 150 Principal Investigators from eight countries were involved in the program in seven major research disciplines: Advanced Technology; Earth Sciences; Fundamental Biology; Human Life Sciences; International Space Station Risk Mitigation; Microgravity; and Space Sciences. Approximately 75 long-duration investigations were completed on Mir, with additional investigations performed on the Shuttle flights that docked with Mir. The flight phase included the participation of seven US astronauts and 20 Russian cosmonauts. The successful completion of the Phase 1 research program not only resulted in high quality science return but also in numerous lessons learned to make the ISS experience more productive. The cooperation developed during the program was instrumental in its success. c2001 AIAA. Published by Elsevier Science Ltd.

short duration↗

Modular space station Phase B extension NASA administrator's review

The preliminary design, reference program, costs, and sortie and program options for the modular space station are outlined. The Phase B has a barbell configuration baseline with a manipulator. The baseline includes two capability plateaus, a 6-man station followed after five years by growth to a 12-man station. It is concluded that a common development approach is the most cost effective and flexible system. The system includes a module to support automated payload servicing, a set of sortie labs, and the cargo modules, RAMs, and space station modules. These would be developed and operated in conjunction with the space shuttle.

Source record↗

National Aeronautics and Space Administration plans for space communication technology

A program plan is presented for a space communications application utilizing the 30/20 GHz frequency bands (30 GHz uplink and 20 GHz downlink). Results of market demand studies and spacecraft systems studies which significantly affect the supporting research and technology program are also presented, along with the scheduled activities of the program plan.

Alexovich, R. E.↗

National Aeronautics and Space Administration plans for space communication technology

A program plan is presented for a space communications application utilizing the 30/20 GHz frequency bands (30 GHz uplink and 20 GHz downlink). Results of market demand studies and spacecraft systems studies which significantly affect the supporting research and technology program are also presented, along with the scheduled activities of the program plan.

Alexovich, R. E.↗

Use of the Advanced Communications Technology Satellite to Promote International Distance Education Programs for Georgetown University

Georgetown's distance education program is designed to demonstrate to faculty and administrators the feasibility and desirability of using two-way video transmission for international education. These programs will extend the reach of Georgetown's educational offerings; enrich the curriculum and content of Georgetown's offerings by interaction with institutions in other nations; enhance the world view of the School of Business Administration; enable Georgetown to share its resources with other institutions outside of the United States; and promote Commerce within the Americas. The primary reason for this pilot program is to evaluate the effectiveness and economic viability of offering academic courses and Small Business Development training.

Bradley, Harold↗

Nutrition and renal stone disease in space

There is a growing body of evidence from the National Aeronautics and Space Administration and the Russian space program showing that humans exposed to the microgravity environment of space have a greater risk for developing renal stones. Increased bone resorption and the attendant hypercalciuria and hyperphosphaturia contribute significantly to raising the urinary state of saturation with respect to the calcium salts, namely calcium oxalate and calcium phosphate. In addition, other environmental and dietary factors may adversely affect urine composition and increase stone formation risk during space flight. For example, reductions in urinary volume, pH, and citrate contribute to raising stone formation risk. In addition to raising the risk for calcium stone formation, this metabolic profile is conducive to the formation of uric acid stones. Although observations to date have suggested that there may actually be a reduced food intake during the early phase of flight, crew members on longer-duration flights may increase food intake and be at increased risk for stone formation. Taken together, these findings support the use of nutritional recommendations for crew members that would serve to reduce the stone-forming propensity of the urinary environment. Pharmacologic intervention should be directed at raising urinary volumes, diminishing bone losses, and preventing reductions in urinary pH and citrate. Success in reducing the risk for stone formation in astronauts would also be of potential major benefit to the estimated 20 million Americans with nephrolithiasis.

Review↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton Block 1 configuration, and will then evolve to an ultimate capability of 130 metric tons. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS - Exploration Mission-1 (EM-1), an uncrewed mission to orbit the moon and return, and progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance (ULA) in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations program is transforming Kennedy Space Center into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton (t) Block 1 configuration, and will then evolve to an ultimate capability of 130 t. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS -- Exploration Mission-1 (EM-1), an un-crewed mission to orbit the moon and return. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, SLS is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress is on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance (ULA) in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the OSA and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center (MSFC) in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 t to LEO, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the EUS, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the proving ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, Space Launch System (SLS), is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations program is transforming Kennedy Space Center into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 metric tons to low Earth orbit, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the Exploration Upper Stage, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the Proving Ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

Department of Energy: Nuclear S&T workforce development programs

The U.S. Department of Energy (DOE) national laboratories use their expertise in nuclear science and technology (S&T) to support a robust national nuclear S&T enterprise from the ground up. Traditional academic programs do not provide all the elements necessary to develop this expertise, so the DOE has initiated a number of supplemental programs to develop and support the nuclear S&T workforce pipeline. This document catalogs existing workforce development programs that are supported by a number of DOE offices (such as the Offices of Nuclear Energy, Science, Energy Efficiency, and Environmental Management), and by the National Nuclear Security Administration (NNSA) and the Naval Reactor Program. Workforce development programs in nuclear S&T administered through the Department of Homeland Security, the Nuclear Regulatory Commission, and the Department of Defense are also included. The information about these programs, which is cataloged below, is drawn from the program websites. Some programs, such as the Minority Serving Institutes Partnership Programs (MSIPPs) are available through more than one DOE office, so they appear in more than one section of this document.

99 GENERAL AND MISCELLANEOUS↗

Current Progress of the Final Design of a Subcritical Assembly at the Oak Ridge National Laboratory

During the past decade, the US Department of Energy (DOE)/National Nuclear Security Administration (NNSA) Nuclear Criticality Safety Program (NCSP) has been coordinating nuclear criticality safety (NCS) courses to provide training and qualification to new staff, supervisors, managers, regulators, and other professionals involved with NCS. To address the growing need for more NCS training possibilities, a subcritical assembly was designed at Oak Ridge National Laboratory (ORNL). The Oak Ridge Subcritical Assembly (ORSA), operated at ORNL, could be used in a new course for fissile material handlers/operators or as a backup training facility for currently existing NCSP hands-on NCS training. This paper describes some of the design steps necessary for obtaining a final ORSA design, beginning with a successful feasibility study performed in 2020. Numerous parameters within each main element of the assembly were considered, such as the reflector used, the type of fuel coating or plating used, and the number of fuel plates used. The design choices related to each parametric study described in this paper are detailed and justified at the end of each subsection. An overview of the current final design characteristics of ORSA and the experiments’ possibilities is also provided. ORSA will be built with fuel plates from legacy Aerojet General Nucleonics (AGN)-201M research reactors currently stored at the Y-12 National Security Complex (Y-12). The cylindrical fuel plates comprise UO 2 particles embedded in polyethylene and have a nominal enrichment of 19.5 ± 0.5 wt % 235 U. The basis for the final design was the feasibility study from 2020. In the feasibility study, ORSA achieved k eff = 0.95, corresponding to a multiplication factor of 20, with approximately 620 g of 235 U (four 4 cm plates, three 2 cm plates, and two 1 cm plates) and an 8.5 cm thick graphite reflector radially and on top of the assembly. The bottom of the assembly has a graphite thickness of 5 cm, and the chosen graphite density was 2.3 g/cm 3 . All design calculations were performed using SCALE 6.2.4 KENO-VI and with the ENDF/B VII.1 Continuous Energy cross-section library.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NIF Operations Management Plan, August 2011

Lawrence Livermore National Laboratory’s (LLNL) National Ignition Facility (NIF) is a key component of the National Nuclear Security Administration’s (NNSA) Stockpile Stewardship Program, whose purpose is to maintain the safety, reliability, and effectiveness of our nation’s nuclear stockpile without underground nuclear testing. The NIF is crucial to the Stockpile Stewardship Program because it is the only facility that can create the conditions of extreme temperature and pressure—conditions that exist only in stars or in exploding nuclear weapons—that are relevant to understanding how our modern nuclear weapons operate. As such, the NIF’s primary mission is to attain fusion ignition in the laboratory. Fusion ignition not only supports Stockpile Stewardship needs, but also provides the basis for future decisions about fusion’s potential as a long-term energy source. Additionally, NIF provides scientists with access to high-energy-density regimes that can yield new insight and understanding in the areas of astrophysics, hydrodynamics, material properties, plasma physics, and radiative properties. The use of the NIF to support the Stockpile Stewardship Program and the advancement of basic high-energy-density science understanding is planned and managed through program-level execution plans and NIF directorate-level management teams. An example of a plan is the National Ignition Campaign Execution Plan. The NIF Operations Management Plan provides an overview of the NIF Operations organization and describes how the NIF is supported by the LLNL infrastructure and how it is safely and responsibly managed and operated. Detailed information on NIF management of the organization is found in a series of supporting plans, policies, and procedures. A list of related acronyms can be found in Appendix A of this document. The purpose of this document is to provide a roadmap of how the NIF Operations organization functions. It provides a guide to understanding the requirements, document flow down, organizational vision and mission, performance metrics, and interrelationship of the NIF Operations organization with other directorate and laboratory organizations. This document also provides a listing of roles and responsibilities, core processes, procedures, authority matrices, change control boards, and other information necessary for successfully functioning in the NIF Operations organization. This document, the NIF Shot Operations Plan, and the NIF Maintenance Plan together represent the primary documents satisfying our Conduct of Operations compliance requirement.

42 ENGINEERING↗

Energy Savings from GSA's National Deep Retrofit Program

Under its National Deep Energy Retrofit (NDER) program, the U.S. General Services Administration (GSA) awarded 10 ESPC projects with the objectives of using innovative technologies and renewable energy technologies, and moving buildings toward net zero energy consumption. This report analyzes data on energy savings from the 10 NDER projects, and compares them with the savings of a sample of other recently awarded Federal ESPC projects. It is shown that by emphasizing the need for deeper energy savings, and by the establishment of a central Project Management Office (PMO) to provide authoritative contracting, technical and pricing assistance, the NDER projects achieved an average level of savings more than twice that of the other Federal ESPC projects. The level of savings achieved in each project seems to be dependent more on the availability of ECMs at the site than on energy price, energy cost per square foot, pre-retrofit EUI or the length of the contract term. This suggests that GSA can achieve similar results in a wide variety of building

ESPC↗

Technical Safety Requirements for the Waste Storage Facilities May 2014

This document contains the Technical Safety Requirements (TSR) for the Radioactive and Hazardous Waste Management (RHWM) WASTE STORAGE FACILITIES, which include Area 625 (A625) and the Building 693 (B693) Yard Area of the Decontamination and Waste Treatment Facility (DWTF) at LLNL. The TSRs constitute requirements for safe operation of the WASTE STORAGE FACILITIES. These TSRs are derived from the Documented Safety Analyses for the Waste Storage Facilities (DSA) (LLNL 2011). The analysis presented therein concluded that the WASTE STORAGE FACILITIES are low-chemical hazard, Hazard Category 2 non-reactor nuclear facilities. The TSRs consist primarily of inventory limits and controls to preserve the underlying assumptions in the hazard and accident analyses. Further, appropriate commitments to safety programs are presented in the administrative controls sections of the TSRs. The WASTE STORAGE FACILITIES are used by RHWM to handle and store hazardous waste, TRANSURANIC (TRU) WASTE, LOW-LEVEL WASTE (LLW), mixed waste, California combined waste, nonhazardous industrial waste, and conditionally accepted waste generated at LLNL as well as small amounts of waste from other DOE facilities, as described in the DSA. In addition, several minor treatments (e.g., size reduction and decontamination) are carried out in these facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗