Search NASA⌕ Search

SEARCH · Search NASA

Results for “scheduling software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Performance Analysis of the NAS Y-MP Workload

This paper describes the performance characteristics of the computational workloads on the NAS Cray Y-MP machines, a Y-MP 832 and later a Y-MP 8128. Hardware measurements indicated that the Y-MP workload performance matured over time, ultimately sustaining an average throughput of 0.8 GFLOPS and a vector operation fraction of 87%. The measurements also revealed an operation rate exceeding 1 per clock period, a well-balanced architecture featuring a strong utilization of vector functional units, and an efficient memory organization. Introduction of the larger memory 8128 increased throughput by allowing a more efficient utilization of CPUs. Throughput also depended on the metering of the batch queues; low-idle Saturday workloads required a buffer of small jobs to prevent memory starvation of the CPU. UNICOS required about 7% of total CPU time to service the 832 workloads; this overhead decreased to 5% for the 8128 workloads. While most of the system time went to service I/O requests, efficient scheduling prevented excessive idle due to I/O wait. System measurements disclosed no obvious bottlenecks in the response of the machine and UNICOS to the workloads. In most cases, Cray-provided software tools were- quite sufficient for measuring the performance of both the machine and operating, system.

Bergeron, Robert J.↗

Project Management Using Modern Guidance, Navigation and Control Theory

The idea of control theory and its application to project management is not new, however literature on the topic and real-world applications is not as readily available and comprehensive in how all the principals of Guidance, Navigation and Control (GN&C) apply. This paper will address how the fundamental principals of modern GN&C Theory have been applied to NASA's Constellation Space Suit project and the results in the ability to manage the project within cost, schedule and budget. A s with physical systems, projects can be modeled and managed with the same guiding principles of GN&C as if it were a complex vehicle, system or software with time-varying processes, at times non-linear responses, multiple data inputs of varying accuracy and a range of operating points. With such systems the classic approach could be applied to small and well-defined projects; however with larger, multi-year projects involving multiple organizational structures, external influences and a multitude of diverse resources, then modern control theory is required to model and control the project. The fundamental principals of G N&C stated that a system is comprised of these basic core concepts: State, Behavior, Control system, Navigation system, Guidance and Planning Logic, Feedback systems. The state of a system is a definition of the aspects of the dynamics of the system that can change, such as position, velocity, acceleration, coordinate-based attitude, temperature, etc. The behavior of the system is more of what changes are possible rather than what can change, which is captured in the state of the system. The behavior of a system is captured in the system modeling and if properly done, will aid in accurate system performance prediction in the future. The Control system understands the state and behavior of the system and feedback systems to adjust the control inputs into the system. The Navigation system takes the multiple data inputs and based upon a priori knowledge of the input, will develop a statistical-based weighting of the input to determine where the system currently is located. Guidance and Planning logic of the system with the understanding of where it is (provided by the navigation system) will in turn determine where it needs to be and how to get there. Lastly, the system Feedback system is the right arm of the control system to allow it to affect change in the overall system and therefore it is critical to not only correctly identify the system feedback inputs but also the system response to the feedback inputs. And with any systems project it is critical that the objective of the system be clearly defined for not only planning but to be used to measure performance and to aid in the guidance of the system or project.

Hill, Terry↗

Concurrent development of fault management hardware and software in the SSM/PMAD

Space Station issues in fault management are discussed. The system background is described with attention given to design guidelines and power hardware. A contractually developed fault management system, FRAMES, is integrated with the energy management functions, the control switchgear, and the scheduling and operations management functions. The constraints that shaped the FRAMES system and its implementation are considered.

Freeman, Kenneth A.↗

Test/score/report: Simulation techniques for automating the test process

A Test/Score/Report capability is currently being developed for the Transportable Payload Operations Control Center (TPOCC) Advanced Spacecraft Simulator (TASS) system which will automate testing of the Goddard Space Flight Center (GSFC) Payload Operations Control Center (POCC) and Mission Operations Center (MOC) software in three areas: telemetry decommutation, spacecraft command processing, and spacecraft memory load and dump processing. Automated computer control of the acceptance test process is one of the primary goals of a test team. With the proper simulation tools and user interface, the task of acceptance testing, regression testing, and repeatability of specific test procedures of a ground data system can be a simpler task. Ideally, the goal for complete automation would be to plug the operational deliverable into the simulator, press the start button, execute the test procedure, accumulate and analyze the data, score the results, and report the results to the test team along with a go/no recommendation to the test team. In practice, this may not be possible because of inadequate test tools, pressures of schedules, limited resources, etc. Most tests are accomplished using a certain degree of automation and test procedures that are labor intensive. This paper discusses some simulation techniques that can improve the automation of the test process. The TASS system tests the POCC/MOC software and provides a score based on the test results. The TASS system displays statistics on the success of the POCC/MOC system processing in each of the three areas as well as event messages pertaining to the Test/Score/Report processing. The TASS system also provides formatted reports documenting each step performed during the tests and the results of each step. A prototype of the Test/Score/Report capability is available and currently being used to test some POCC/MOC software deliveries. When this capability is fully operational it should greatly reduce the time necessary to test a POCC/MOC software delivery, as well as improve the quality of the test process.

Hageman, Barbara H.↗

JPL's Space Flight Operations Center: Development project overview

The topics are covered in view graph form and include the following: (1) major elements of deep space flight programs; (2) development schedule; (3) primary design goals; (4) Space Flight Operations Center (SFOC) data systems architecture; (5) technical guidelines; (6) SFOC data system functional architecture; (7) typical SFOC node; (8) SFOC components; (9) SFOC software categories; (10) planned subsystem core diagram for Mars observer; (11) SFOC use of public domain/3rd party software; (12) SFOC hardware; (13) SFOC target six mission configuration; and (14) SFOC development status and plans.

Ebersole, M.↗

Planning Systems for Distributed Operations

This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.

Maxwell, Theresa G.↗

A Simulation Testbed for Airborne Merging and Spacing

The key innovation in this effort is the development of a simulation testbed for airborne merging and spacing (AM&S). We focus on concepts related to airports with Super Dense Operations where new airport runway configurations (e.g. parallel runways), sequencing, merging, and spacing are some of the concepts considered. We focus on modeling and simulating a complementary airborne and ground system for AM&S to increase efficiency and capacity of these high density terminal areas. From a ground systems perspective, a scheduling decision support tool generates arrival sequences and spacing requirements that are fed to the AM&S system operating on the flight deck. We enhanced NASA's Airspace Concept Evaluation Systems (ACES) software to model and simulate AM&S concepts and algorithms.

Santos, Michel↗

Implementing Earned Value Management in the CxP EVA Systems Project Office

Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

Sorge, Les L.↗

MPST Software: MoonKommand

This software automatically processes Sally Ride Science (SRS) delivered MoonKAM camera control files (ccf) into uplink products for the GRAIL-A and GRAIL-B spacecraft as part of an education and public outreach (EPO) extension to the Grail Mission. Once properly validated and deemed safe for execution onboard the spacecraft, MoonKommand generates the command products via the Automated Sequence Processor (ASP) and generates uplink (.scmf) files for radiation to the Grail-A and/or Grail-B spacecraft. Any errors detected along the way are reported back to SRS via email. With Moon Kommand, SRS can control their EPO instrument as part of a fully automated process. Inputs are received from SRS as either image capture files (.ccficd) for new image requests, or downlink/delete files (.ccfdl) for requesting image downlink from the instrument and on-board memory management. The Moon - Kommand outputs are command and file-load (.scmf) files that will be uplinked by the Deep Space Network (DSN). Without MoonKommand software, uplink product generation for the MoonKAM instrument would be a manual process. The software is specific to the Moon - KAM instrument on the GRAIL mission. At the time of this writing, the GRAIL mission was making final preparations to begin the science phase, which was scheduled to continue until June 2012.

Kwok, John H.↗

Human Exploration Spacecraft Testbed for Integration and Advancement (HESTIA)

The proposed paper will cover ongoing effort named HESTIA (Human Exploration Spacecraft Testbed for Integration and Advancement), led at the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) to promote a cross-subsystem approach to developing Mars-enabling technologies with the ultimate goal of integrated system optimization. HESTIA also aims to develop the infrastructure required to rapidly test these highly integrated systems at a low cost. The initial focus is on the common fluids architecture required to enable human exploration of mars, specifically between life support and in-situ resource utilization (ISRU) subsystems. An overview of the advancements in both integrated technologies, in infrastructure, in simulation, and in modeling capabilities will be presented, as well as the results and findings of integrated testing,. Due to the enormous mass gear-ratio required for human exploration beyond low-earth orbit, (for every 1 kg of payload landed on Mars, 226 kg will be required on Earth), minimization of surface hardware and commodities is paramount. Hardware requirements can be minimized by reduction of equipment performing similar functions though for different subsystems. If hardware could be developed which meets the requirements of both life support and ISRU it could result in the reduction of primary hardware and/or reduction in spares. Minimization of commodities to the surface of mars can be achieved through the creation of higher efficiency systems producing little to no undesired waste, such as a closed-loop life support subsystem. Where complete efficiency is impossible or impractical, makeup commodities could be manufactured via ISRU. Although, utilization of ISRU products (oxygen and water) for crew consumption holds great promise of reducing demands on life support hardware, there exist concerns as to the purity and transportation of commodities. To date, ISRU has been focused on production rates and purities for propulsion needs. The meshing of requirements between all potential users, producers, and cleaners of oxygen and water is crucial to guiding the development of technologies which will be used to perform these functions. Various new capabilities are being developed as part of HESTIA, which will enable the integrated testing of these technologies. This includes the upgrading of a 20' diameter habitat chamber to eventually support long duration (90+ day) human-in-the-loop testing of advanced life support systems. Additionally, a 20' diameter vacuum chamber is being modified to create Mars atmospheric pressures and compositions. This chamber, designated the Mars Environment Chamber (MEC), will eventually be upgraded to include a dusty environment and thermal shroud to simulate conditions on the surface of Mars. In view that individual technologies will be in geographically diverse locations across NASA facilities and elsewhere in the world, schedule and funding constraints will likely limit the frequency of physical integration. When this is the case, absent subsystems can be either digitally or physically simulated. Using the Integrated Power Avionics and Software (iPAS) environment, HESTIA is able to bring together data from various subsystems in simulated surroundings, insert faults, errors, time delays, etc., and feed data into computer models or physical systems capable of reproducing the output of the absent subsystems for the consumption of a local subsystems. Although imperfect, this capability provides opportunities to test subsystem integration and interactions at a fraction of the cost. When a subsystem technology is too immature for integrated testing, models can be produced using the General-Use Nodal Network Solver (GUNNS) capability to simulate the overall system performance. In doing so, even technologies not yet on the drawing board can be integrated and overall system performance estimated. Through the integrated development of technologies, as well as of the infrastructure to rapidly and at a low cost, model, simulate, and test subsystem technologies early in their development, HESTIA is pioneering a new way of developing the future of human space exploration.

Banker, Brian F.↗

Promoting Astronaut Autonomy in Human Spaceflight Missions

Mission operations will have to adapt for long duration, long distance human spaceflight missions. This change is driven mainly by the significantly different communication availability between Earth and space. As astronauts travel farther from Earth, the one-way communication latency increases; the amount of bandwidth will be limited; and there will be period of long and/or no communication. Currently, ground flight controllers collaborate and cooperate with astronauts in space to accomplish essential operational functions. Astronaut autonomy, i.e., the crew’s ability to work more independently from mission control, will be a key enabler in future exploration missions. Over the last several years, the NASA Ames Human-Computer Interaction (HCI) Group has investigated various ways to promote and support astronaut autonomy in human spaceflight missions. Software prototypes are researched, designed, implemented, and assessed for their ability to enable astronaut autonomy. From integrated Internet of Thing for Space, advanced procedures interfaces, comm-delayed chats, and self-scheduling tools, the HCI Group has explored different aspects of astronaut autonomy. Specifically, the self-scheduling tool Playbook has been evaluated in analog extreme environments and onboard the International Space Station, successfully paving the way for future autonomous astronauts.

crew autonomy↗

Flexible User Radio for Lunar Missions

NASA’s Artemis program and other lunar exploration and development programs are planning over 40 lunar missions before 2030. Lunar missions, both crewed and uncrewed, include orbiters, landers, rovers, and surface stations. All these missions require communications with Earth, either via Direct to Earth (DTE) links or through relays in lunar orbit. Multiple DTE options are available among existing and planned ground stations: Deep Space Network (DSN), European Space Agency, and others. Relay options include the planned Lunar Gateway, LunaNet compliant relays, and some lunar landers propose to launch dedicated orbiters. The dilemma for lunar system designers is to identify a communication link which meets mission requirements but does not have issues of limited access (e.g. DSN is in high demand supporting deep space missions with high priority and some with inflexible schedules), system impacts (high power Radio Frequency (RF) for DTE links), cost (dedicated relay), or operational date. To avoid this difficult decision, a Flexible Radio for Lunar Missions is proposed, which will enable system designs to proceed prior to any final decision on the communication network to be used, by enabling compatibility with any of multiple DTE or orbital relay communication systems. The Flexible Radio will support the necessary frequency, bandwidth, modulation, and power requirements to interoperate with the majority of known or planned DTE or relay systems, and can be designed into a lunar mission without prior knowledge of which link will ultimately be used. Furthermore, the link being used can be changed as needed during the mission, in near real time. The Flexible Radio design will leverage work already completed at NASA in the areas of Wideband RF, Software Defined Radio, Adaptive Coding and Modulation, and Phased Array antennas. The Flexible Radio requires sufficient bandwidth to cover the allocated frequencies for both the operation of links in cislunar space and for space-to-Earth links; the flexibility to support multiple modulations, data rates, and coding schemes; the ability to identify available relays, detect and recognize the signals of those relays, and adapt its own frequency, modulation, symbol rate, and code rate to operate with the detected relay (or DTE station); and finally, it requires appropriate software to support network configuration and interoperability with the detected network. The Flexible Radio can be designed in a sufficiently small, lightweight, and low-power package to be used in a wide variety of lunar systems. The initial implementation, as proposed, will focus on the Ka-band, supporting up to 2 GHz bandwidth around the 27 GHz frequency for return links, and 23 GHz for forward links. Other frequency bands are under consideration for future configurations. The software defined modem will support OQPSK, BPSK, and NASA-defined modulations which also support two-way ranging with data. For near-real time adaptation, the Flexible Radio will scan the sky for available relays, using a phased array antenna with Adaptive/Cognitive Communications. It will then configure for network interoperability supporting DTN and other protocol options. The Flexible Radio will support scheduled connections and on-demand use when available.

Lunar Space Communications↗

Flexible User Radio for Lunar Missions

NASA’s Artemis program and other lunar exploration and development programs are planning over 40 lunar missions before 2030. Lunar missions, both crewed and uncrewed, include orbiters, landers, rovers, and surface stations. All these missions require communications with Earth, either via Direct to Earth (DTE) links or through relays in lunar orbit. Multiple DTE options are available among existing and planned ground stations: Deep Space Network (DSN), European Space Agency, and others. Relay options include the planned Lunar Gateway, LunaNet compliant relays, and some lunar landers propose to launch dedicated orbiters. The dilemma for lunar system designers is to identify a communication link which meets mission requirements but does not have issues of limited access (e.g. DSN is in high demand supporting deep space missions with high priority and some with inflexible schedules), system impacts (high power Radio Frequency (RF) for DTE links), cost (dedicated relay), or operational date. To avoid this difficult decision, a Flexible Radio for Lunar Missions is proposed, which will enable system designs to proceed prior to any final decision on the communication network to be used, by enabling compatibility with any of multiple DTE or orbital relay communication systems. The Flexible Radio will support the necessary frequency, bandwidth, modulation, and power requirements to interoperate with the majority of known or planned DTE or relay systems, and can be designed into a lunar mission without prior knowledge of which link will ultimately be used. Furthermore, the link being used can be changed as needed during the mission, in near real time. The Flexible Radio design will leverage work already completed at NASA in the areas of Wideband RF, Software Defined Radio, Adaptive Coding and Modulation, and Phased Array antennas. The Flexible Radio requires sufficient bandwidth to cover the allocated frequencies for both the operation of links in cislunar space and for space-to-Earth links; the flexibility to support multiple modulations, data rates, and coding schemes; the ability to identify available relays, detect and recognize the signals of those relays, and adapt its own frequency, modulation, symbol rate, and code rate to operate with the detected relay (or DTE station); and finally, it requires appropriate software to support network configuration and interoperability with the detected network. The Flexible Radio can be designed in a sufficiently small, lightweight, and low-power package to be used in a wide variety of lunar systems. The initial implementation, as proposed, will focus on the Ka-band, supporting up to 2 GHz bandwidth around the 27 GHz frequency for return links, and 23 GHz for forward links. Other frequency bands are under consideration for future configurations. The software defined modem will support OQPSK, BPSK, and NASA-defined modulations which also support two-way ranging with data. For near-real time adaptation, the Flexible Radio will scan the sky for available relays, using a phased array antenna with Adaptive/Cognitive Communications. It will then configure for network interoperability supporting DTN and other protocol options. The Flexible Radio will support scheduled connections and on-demand use when available.

Lunar Space Communications↗

DSN radio science system, Mark III-78

Mark III-78, is one of eight DSN Data Systems which provide major data types and functional capabilities to flight projects. It includes the equipment, software, personnel, documentation, procedures, and resources necessary to deliver the required data to flight projects. A system definition is given along with key characteristics, functional description, system configuration, testing, implementation status, and system schedule.

Berman, A. L.↗

Computational Support for Technology- Investment Decisions

Strategic Assessment of Risk and Technology (START) is a user-friendly computer program that assists human managers in making decisions regarding research-and-development investment portfolios in the presence of uncertainties and of non-technological constraints that include budgetary and time limits, restrictions related to infrastructure, and programmatic and institutional priorities. START facilitates quantitative analysis of technologies, capabilities, missions, scenarios and programs, and thereby enables the selection and scheduling of value-optimal development efforts. START incorporates features that, variously, perform or support a unique combination of functions, most of which are not systematically performed or supported by prior decision- support software. These functions include the following: Optimal portfolio selection using an expected-utility-based assessment of capabilities and technologies; Temporal investment recommendations; Distinctions between enhancing and enabling capabilities; Analysis of partial funding for enhancing capabilities; and Sensitivity and uncertainty analysis. START can run on almost any computing hardware, within Linux and related operating systems that include Mac OS X versions 10.3 and later, and can run in Windows under the Cygwin environment. START can be distributed in binary code form. START calls, as external libraries, several open-source software packages. Output is in Excel (.xls) file format.

Adumitroaie, Virgil↗

Using Planning, Scheduling and Execution for Autonomous Mars Rover Operations

With each new rover mission to Mars, rovers are traveling significantly longer distances. This distance increase raises not only the opportunities for science data collection, but also amplifies the amount of environment and rover state uncertainty that must be handled in rover operations. This paper describes how planning, scheduling and execution techniques can be used onboard a rover to autonomously generate and execute rover activities and in particular to handle new science opportunities that have been identified dynamically. We also discuss some of the particular challenges we face in supporting autonomous rover decision-making. These include interaction with rover navigation and path-planning software and handling large amounts of uncertainty in state and resource estimations. Finally, we describe our experiences in testing this work using several Mars rover prototypes in a realistic environment.

automated rover operations↗

STK Integrated Message Production List Editor (SIMPLE) for CEO Operations

Late in fiscal year 2011, the Crew Earth Observations (CEO) team was tasked to upgrade and replace its mission planning and mission operations software systems, which were developed in the Space Shuttle era of the 1980s and 1990s. The impetuses for this change were the planned transition of all workstations to the Windows 7 64-bit operating system and the desire for more efficient and effective use of Satellite Tool Kit (STK) software required for reliable International Space Station (ISS) Earth location tracking. An additional requirement of this new system was the use of the same SQL database of CEO science sites from the SMMS, which was also being developed. STK Integrated Message Production List Editor (SIMPLE) is the essential, all-in-one tool now used by CEO staff to perform daily ISS mission planning to meet its requirement to acquire astronaut photography of specific sites on Earth. The sites are part of a managed, long-term database that has been defined and developed for scientific, educational, and public interest. SIMPLE's end product is a set of basic time and location data computed for an operator-selected set of targets that the ISS crew will be asked to photograph (photography is typically planned 12 to 36 hours out). The CEO operator uses SIMPLE to (a) specify a payload operations planning period; (b) acquire and validate the best available ephemeris data (vectors) for the ISS during the planning period; (c) ingest and display mission-specific site information from the CEO database; (d) identify and display potential current dynamic event targets as map features; (e) compute and display time and location information for each target; (f) screen and select targets based on known crew availability constraints, obliquity constraints, and real-time evaluated constraints to target visibility due to illumination (sun elevation) and atmospheric conditions (weather); and finally (g) incorporate basic, computed time and location information for each selected target into the daily CEO Target List product (message) for submission to ISS payload planning and integration teams for their review and approval prior to uplink. SIMPLE requires and uses the following resources: an ISS mission planning period Greenwich Mean Time start date/time and end date/time), the best available ISS mission ephemeris data (vectors) for that planning period, the STK software package configured for the ISS, and an ISS mission-specific subset of the CEO sites database. The primary advantages realized by the development and implementation of SIMPLE into the CEO payload operations support activity are a smooth transition to the Windows 7 operating system upon scheduled workstation refresh; streamlining of the input and verification of the current ISS ephemeris (vector data); seamless incorporation of selected contents of the SQL database of science sites; the ability to tag and display potential dynamic event opportunities on orbit track maps; simplification of the display and selection of encountered sites based on crew availability, illumination, obliquity, and weather constraints; the incorporation of high-quality mapping of the Earth with various satellite-based datasets for use in describing targets; and the ability to encapsulate and export the essential selected target elements in XML format for use by onboard Earth-location systems, such as Worldmap. SIMPLE is a carefully designed and crafted in-house software package that includes detailed help files for the user and meticulous internal documentation for future modifications. It was delivered in February 2012 for test and evaluation. Following acceptance, it was implemented for CEO mission operations support in May 2012.

Trenchard, Mike↗