Search NASA⌕ Search

SEARCH · Search NASA

Results for “testing facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Integrated Energy System with Beneficial Carbon Dioxide (CO2) Use - Final Scientific/Technical Report

This report presents an integrated energy system that combines the production of substitute natural gas through coal hydrogasification with an algae process for beneficial carbon dioxide (CO2) use and biofuel production (funded under Department of Energy (DOE) contract DE-FE0001099). The project planned to develop, test, operate and evaluate a 2 ton-per-day coal hydrogasification plant and 25-acre algae farm at the Arizona Public Service (APS) 1000 Megawatt (MW) Cholla coal-fired power plant in Joseph City, Arizona. Conceptual design of the integrated system was undertaken with APS partners Air Liquide (AL) and Parsons. The process engineering was separated into five major areas: flue gas preparation and CO2 delivery, algae farming, water management, hydrogasification, and biofuel production. The process flow diagrams, energy and material balances, and preliminary major equipment needs for each major area were prepared to reflect integrated process considerations and site infrastructure design basis. The total project also included research and development on a bench-scale hydrogasifier, one-dimensional (1-D) kinetic-model simulation, extensive algae stressing, oil extraction, lipid analysis and a half-acre algae farm demonstration at APS?s Redhawk testing facility. During the project, a two-acre algae testing facility with a half-acre algae cultivation area was built at the APS Redhawk 1000 MW natural gas combined cycle power plant located 55 miles west of Phoenix. The test site integrated flue gas delivery, CO2 capture and distribution, algae cultivation, algae nursery, algae harvesting, dewatering and onsite storage as well as water treatment. The site environmental, engineering, and biological parameters for the cultivators were monitored remotely. Direct biodiesel production from biomass through an acid-catalyzed transesterification reaction and a supercritical methanol transesterification reaction were evaluated. The highest oil-to-biodiesel conversion of 79.9% was achieved with a stressed algae sample containing 40% algae oil. The effort concluded that producing biodiesel directly from the algae biomass could be an efficient, cost-effective and readily scalable way to produce biodiesel by eliminating the oil extraction process.

09 BIOMASS FUELS↗

DESIGN AND TESTING OF A DIGITAL REGULATOR FOR FERMILAB MAGNET POWER SYSTEMS

In this thesis, the design of a digitally controlled DC power system for testing conventional and superconducting magnets is proposed. The designed PID controller performances have been tested by the 30kA test stand for superconducting magnets, Vertical Magnet Test Facility (VMTF), which is hosted at the Fermilab Magnet Test Facility (MTF). The system is implemented on a National Instruments CompactRIO and both real-time and FPGA targets are programmed. A full 24-bit PID algorithm is coded and successfully tested by a manual tuning approach. An automated tuning algorithm is then introduced. As it will be shown by simulation and experimental results, the proposed system meets all design specifications. The current loop stability is up to 14 times better than the existing regulator and a control accuracy less than 4 ppm is achieved. Shorted-bus tests of the PID regulator have been successfully performed on the VMTF power system. In order to test the generalization capability of the designed system towards different types of magnets, the system has been easily adapted to and tested on the 10kA conventional magnet test stand (Stand C at Fermilab). As shown by experimental results, the designed PID controller features really high performancesin terms of steady-state accuracy and effectiveness of the tuning algorithm.

43 PARTICLE ACCELERATORS↗

Sodium Freezing and Remelting Tests in FY 2018

In FY 2017 and FY 2018, a total of thirteen tests were successfully performed in the Sodium Freezing and Remelting test facility. Each new test was carefully designed based upon the results and findings of the previous test to investigate the effects of different factors on the sodium freezing phenomena, including dissolved Ar cover gas versus vacuum, test section cooling rate during freezing, different freezing patterns (e.g., from the free surfaces inward toward the center versus from the center toward the free surfaces), and Ar cover gas pressure. The freezing results were found to depend upon a combination of phenomena. As more tests were conducted and lessons learned, the conduct of the tests improved. In particular, the last three experiments, Tests 11 through 13, may be singled out as providing representative data under well controlled conditions. The maximum stresses arising from sodium freezing are measured to be quite mild. In the tests, a maximum strain change of 60 radial micro strains was measured, equivalent to a stress/negative pressure of 77 psi. This mild maximum stress is thought to reflect the low yield stress of solid sodium near the freezing temperature. Evidence for yielding of solid sodium is provided by the visual observation of a depression in the frozen sodium free surface inside of the sodium reservoir in one test. It is thought that contraction of sodium in the test section during freezing pulled downward on the frozen sodium at the free surface creating the depression. The authors are not aware of any data for the yield stress of solid sodium or the stress versus strain behavior of solid sodium (sodium is not a structural material). It is thus not possible to directly compare with the solid sodium yield strength. However, stress versus strain data at different temperatures up to the freezing temperature are available for solid lithium which is also a alkali metal and has a low yield strength similar to the maximum stresses determined from the Sodium Freezing and Remelting tests providing support for the interpretation of the results in terms of yielding of solid sodium. This is a good result for Sodium-Cooled Fast Reactors and sodium facilities. The maximum stress due to frozen sodium pulling inward upon a structural wall wetted by sodium and to which the sodium adheres will be limited by the low sodium yield stress. Argon has a significant solubility in sodium. Cavitation due to nucleation of dissolved argon can offset the effects of sodium thermal contraction and alleviate the formation of stress/negative pressure. This is also a good result for Sodium-Cooled Fast Reactors and sodium facilities that operate with an argon cover gas. In the tests, it was found that due to the cavitation, the maximum measured strain change during sodium freezing was limited to 10 axial micro strains, or equivalently 55 psi of negative pressure.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

EVOLUTION OF SPACE REACTOR QUALIFICATION METHODS AND A PATH FORWARD FOR NEW SPACE REACTORS UNDER CONSIDERATION

These slides outline the evolution of space reactor system qualifications and provide a potential framework for qualification of current space reactor concepts. Qualification approaches for SNAP 10A, SP-100, TOPAZ II, and Prometheus reactor systems will be discussed. Several qualification approaches from past reactors will be reviewed including: a component qualification approach demonstrated in the SNAP reactor program, a system level approach in the SP-100 program, adding additional features to an existing design in the TOPAZ program, and a combination of a computational and basic testing approach for the Prometheus reactor. Past and present test facilities will also be discussed and the impact of test facility availability (or existence) is discussed. A suggested approach that complies with the updated Presidential Directive (NSPM-20, August 2019) that is derived from previous program approaches will be discussed for qualification of future space reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The SNS Moderator Demonstration Facility

We describe a moderator demonstration facility at the Spallation Neutron Source (SNS). We will use the Beam Test Facility (BTF) at SNS to provide a moderator neutronics test stand with which we will verify the performance gains expected from the innovative moderator concepts central to the SNS Second Target Station. These concepts include large-volume para-hydrogen moderators and high-brightness moderators, as well as new moderator materials. The BTF provides a test facility for the new Radio-Frequency Quadrupole accelerator (RFQ) to be installed at SNS and produce a pulsed H− beam of 2.5 MeV energy. We will add to the BTF a beam chopper similar to that already used in the SNS at the RFQ exit, various beam transport components, a neutron-producing target, a cryogenic moderator test stand, a reflector-shielding assembly, and a performance assessment neutron beamline.

Iverson, Erik B.↗

JLab New Injector Cryomodule Design, Fabrication and Testing

A new Injector Cryomodule (INJ CM) aimed to replace the existing Quarter Cryomodule in the CEBAF tunnel has been developed at Jefferson Lab (JLab). It is scheduled to be first tested in the Cryomodule Test Facility (CMTF) for module performance then the Upgraded Injector Test Facility (UITF) with electron beam. This new cryomodule, hosting a 2-cell and 7-cell cavity, is designed to boost the electron energy from 200 keV to 5 MeV and permit 380 ?A ? 1.0 mA of beam current. The 2-cell cavity is a new design whereas the 7-cell cavity is refurbished from a low loss cavity from the retired JLab Renascence Cryomodule. The INJ CM adopts quite a few designs from the JLab 12 GeV Upgrade Cryomodule (C100). Examples of this include having the cold mass hung from a spaceframe structure by use of axial and transverse Nitronic rods, cavities to be tuned by scissor-jack style tuners and the end cans are actually modified from C100 style end cans. However, this new INJ CM is not a quarter of the C100 Cryomodule. This paper focuses on the major design features, fabrication and alignment process and testing of the module and its components.

Cheng, Guangfeng↗

RELAP5-3D Simulation of PG-27 Test at the HTTF Facility

The High Temperature Test Facility (HTTF) at Oregon State University (OSU) is a quarter scaled integral-effect test facility designed to examine the transient phenomena occurring in a Modular Hight Temperature Gas-cooled Reactor (MHTGR). It is specifically designed to handle the pressurized and depressurized conduction cooldown (PCC and DCC) events. The PCC event is an accident scenario in which there is a loss of forced convection of the coolant through the system. However, the pressure boundary remains intact. This study focuses on the Reactor Excursions and Leak Analysis Program (RELAP)5-3D simulation of the PG-27 test (PCC phenomena) and the sensitivity of those simulations from the material properties and primary helium mass flow rate standpoint. The aim is to capture a reasonable one-dimensional picture of a three dimensional phenomena. The simulation will help in the code assessment and in understanding the various unknown parameters involved. The presented results will demonstrate the code is able to capture the detailed one-dimensional physics accurately. However, input parameters to the code (i.e., the primary mass flow rate, refractory material thermal conductivity, and heat capacity at elevated temperatures) impact the fuel temperature the most. This work will discuss the sensitivity of simulations to the identified input parameters.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

TX-100 manufacturing final project report.

This report details the work completed under the TX-100 blade manufacturing portion of the Carbon-Hybrid Blade Developments: Standard and Twist-Coupled Prototype project. The TX-100 blade is a 9 meter prototype blade designed with bend-twist coupling to augment the mitigation of peak loads during normal turbine operation. This structural coupling was achieved by locating off axis carbon fiber in the outboard portion of the blade skins. The report will present the tooling selection, blade production, blade instrumentation, blade shipping and adapter plate design and fabrication. The baseline blade used for this project was the ERS-100 (Revision D) wind turbine blade. The molds used for the production of the TX-100 were originally built for the production of the CX-100 blade. The same high pressure and low pressure skin molds were used to manufacture the TX-100 skins. In order to compensate for the difference in skin thickness between the CX-100 and the TX-100, however, a new TX-100 shear web plug and mold were required. Both the blade assembly fixture and the root stud insertion fixture used for the CX-100 blades could be utilized for the TX-100 blades. A production run of seven TX-100 prototype blades was undertaken at TPI Composites during the month of October, 2004. Of those seven blades, four were instrumented with strain gauges before final assembly. After production at the TPI Composites facility in Rhode Island, the blades were shipped to various test sites: two blades to the National Wind Technology Center at the National Renewable Energy Laboratory in Boulder, Colorado, two blades to Sandia National Laboratory in Albuquerque, New Mexico and three blades to the United States Department of Agriculture turbine field test facility in Bushland, Texas. An adapter plate was designed to allow the TX-100 blades to be installed on existing Micon 65/13M turbines at the USDA site. The conclusion of this program is the kick-off of the TX-100 blade testing at the three testing facilities.

14 SOLAR ENERGY↗

OECD MCCI Project: Category 2 Coolability Engineering Enhancement Tests (Final Report)

Ex-vessel debris coolability is an important light water reactor (LWR) safety issue. For existing plants, resolution of this issue will confirm the technical basis for severe accident management guidelines (SAMGs). For new reactors, understanding this issue will help confirm the effectiveness of the design and implementation of new accident mitigation features and severe accident management design alternatives (SAMDAs). The first OECD-MCCI program conducted reactor material experiments focused on achieving the following technical objectives: i) provide confirmatory evidence and data for various cooling mechanisms through separate effect tests for severe accident model development, and ii) provide long-term 2-D coreconcrete interaction data for code assessment and improvement. On the basis of deliberations that spanned several Project Review Group (PRG) meetings, the MB subsequently approved the conduct of one large scale water-cooled basemat integral effect test to provide data on the cold-crucible method for melt stabilization, and two separate effect tests that utilized the SSWICS test facility to provide data on the melt fragmentation method for melt stabilization. This final report summarizes the test facilities, operating procedures, and key test results obtained from these three experiments. Additional details can be found in the test plans and follow-on data reports for the experiments.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Authorized Limits for the Release of a 25 Ton Locomotive, Serial Number 21547, at the Area 25 Engine Maintenance, Assembly, and Disassembly Facility, Nevada Test Site, Nevada

This document contains process knowledge and radiological data and analysis to support approval for release of the 25-ton locomotive, Serial Number 21547, at the Area 25 Engine Maintenance, Assembly, and Disassembly (EMAD) Facility, located on the Nevada Test Site (NTS). The 25-ton locomotive is a small, one-of-a-kind locomotive used to move railcars in support of the Nuclear Engine for Rocket Vehicle Application project. This locomotive was identified as having significant historical value by the Nevada State Railroad Museum in Boulder City, Nevada, where it will be used as a display piece. A substantial effort to characterize the radiological conditions of the locomotive was undertaken by the NTS Management and Operations Contractor, National Security Technologies, LLC (NSTec). During this characterization process, seven small areas on the locomotive had contamination levels that exceeded the NTS release criteria (limits consistent with U.S. Department of Energy [DOE] Order DOE O 5400.5, “Radiation Protection of the Public and the Environment”). The decision was made to perform radiological decontamination of these known accessible impacted areas to further the release process. On February 9, 2010, NSTec personnel completed decontamination of these seven areas to within the NTS release criteria. Although all accessible areas of the locomotive had been successfully decontaminated to within NTS release criteria, it was plausible that inaccessible areas of the locomotive (i.e., those areas on the locomotive where it was not possible to perform radiological surveys) could potentially have contamination above unrestricted release limits. To access the majority of these inaccessible areas, the locomotive would have to be disassembled. A complete disassembly for a full radiological survey could have permanently destroyed parts and would have ruined the historical value of the locomotive. Complete disassembly would also add an unreasonable financial burden for the contractor. A decision was reached between the NTS regulator and NSTec, opting for alternative authorized limits from DOE Headquarters. In doing so, NSTec personnel performed a dose model using the DOE-approved modeling code RESRAD-BUILD v3.5 to evaluate scenarios. The parameters used in the dose model were conservative. NSTec’s Radiological Engineering Calculation, REC-2010-001, “Public Dose Estimate from the EMAD 25 Ton Locomotive,” concluded that the four scenarios evaluated were below the 25-millirem per year limit, the “likely” dose scenarios met the “few millirem in a year” criteria, and that the EMAD 25-ton locomotive met the radiological requirements to be released with residual radioactivity to the public.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY2023 NSTTF Annual Report

The National Solar Thermal Test Facility (NSTTF) is a DOE Core Capability and Technology Deployment Center located in Albuquerque, NM. It is operated by Sandia National Laboratories (Sandia) for the U.S. Department of Energy (DOE). The NSTTF is the only multi-mission, multi-use, multi-story test facility of its type in the United States. The NSTTF was founded in 1978 and began testing with high heat flux that same year. Over the past 45 years, the NSTTF has been at the forefront of the research, design, fabrication, and testing of many of the critical Concentrating Solar Power (CSP) technologies. These technologies have allowed costs to be dramatically reduced from over $\$ $0.40 /kWh to $\$$0.12 /kWh since the conception of this renewable energy technology. The NSTTF has worked to make the Solar Energy Generating Systems (SEGS) parabolic trough plants successful, while also working with the Solar One and Solar Two facilities for successful implementation. Over the four decades since its founding, the mission of the NSTTF has grown to include new receiver technologies, like our generation 3 falling particle system (G3P3 Tower), optical metrology techniques like SOFAST, molten salt testing, thermal energy storage, solar thermal chemistry, and more. We continue to expand our capabilities in pursuit of the DOE SETO mission and the DOE SunShot 2030 goals: unsubsidized LCOE of $\$$0.05/kWh for CSP that includes 12 or more hours of thermal energy storage. To support both the DOE SETO mission and support the CSP sector as a whole, we are working to develop our operations and maintenance framework to provide a world class testing facility in support of our technological achievements. To accomplish both of these missions, the NSTTF draws on the decades of experience and expertise of our staff along with the world-class facilities at Sandia National Laboratories to further the science of concentrated solar thermal technologies in diverse applications. We remain a trusted partner for high-quality and impactful research in both fundamental and applied arenas. We are able to provide our partners with both one-of-a-kind testing platforms as well as world-class analytics.

14 SOLAR ENERGY↗

Enterprise SRS: Leveraging Ongoing Operations to Advance Nuclear Fuel Cycle Programs - 12579

The international leadership in nuclear technology development and deployment long held by the United States has eroded due to the lack of clear national strategies for advanced reactor fuel cycle concepts and for nuclear materials management, as well as to the recent policy decision that halts work on the nuclear fuel repository at Yucca Mountain. Although no national consensus on strategy has yet been reached, a number of recent high-profile reviews and workshops have clearly highlighted a national need for robust research, development and deployment (RD and D) programs in key areas of nuclear technology, especially nuclear separations science and engineering. Collectively, these reviews and workshops provide a picture of the nuclear separations mission needs for three major program offices: Department of Energy Office of-Environmental Management), DOE Office of Nuclear Energy), and the National Nuclear Security Administration (NNSA). While the individual program needs differ significantly in detail and timing, they share common needs in two critical areas of RD and D: - The need for access to and use of multi-purpose engineering-scale demonstration test facilities that can support testing with radioactive material, and - The need for collaborative research enterprises that encompass government research organizations (i.e., national laboratories), commercial industry and the academic community. Such collaborative enterprises effectively integrate theory and modeling with the actual experimental work at all scales, as well as strengthen the technical foundation for research in critical areas. The arguments for engineering-scale collaborative research facilities are compelling. Processing history has shown that test programs and demonstrations conducted with actual nuclear materials are essential to program success. It is widely recognized, however, that such facilities are expensive to build and maintain; creating an imposing, if not prohibitive, financial burden on an individual sponsoring office. Given that reality, success for the current and future nuclear separations missions is dependent on a concerted effort to develop new, creative, approaches that leverage existing facilities in a manner that supports both near- and long-term needs of national programs. As a result of this situation, the Savannah River National Laboratory (SRNL) organized the 'Nuclear Separations User Facility Strategy Session' in Washington, D.C. on July 29, 2011. This workshop brought together key stakeholders from DOE and the private sector to develop a strategy for using engineering-scale nuclear materials processing facilities to advance our nation's nuclear separations research needs. In particular, the meeting focused on recommending how these engineering-scale demonstration facilities, like the Savannah River Site H-Canyon, can be connected with smaller 'bench-scale' research activities to form a seamless approach that integrates across the continuum of RD and D of advanced separations technologies. Coming out of this workshop, a new vision has been developed for a collaborative research facility model that centers on H-Canyon. Unique to this approach is the fact that H-Canyon will continue to accomplish DOE's critical nuclear material processing missions, while simultaneously serving as an RD and D resource for the scientific and technical portions of the nuclear separations community. This paper describes the planned operations for H-Canyon in FY2012 and beyond and discusses how these operations fit within the context of a collaborative research facility model and support the ongoing fuel cycle research and development programs of the DOE. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CX-100 Manufacturing (Final Project Report)

This report details the work completed under the CX-100 blade manufacturing project. It presents the tooling design and manufacturing, blade production, blade instrumentation, blade shipping and adapter plate design and fabrication. The CX-100 blade was designed to demonstrate the efficient use of carbon fiber in the spar cap of a wind turbine blade. The baseline blade used for this project was the ERS-100 (Revision D) wind turbine blade. ERS-100 master plugs – for both the high pressure and low pressure skins – were modified to create plugs for the CX-100. Using the new CX-100 master skin plugs, high pressure and low pressure molds were fabricated. Similar modifications were also completed on the shear web plug/mold, the blade assembly fixture and the root stud insertion fixture. Once all of the tooling modifications were complete, a production run of seven CX-100 prototype blades was undertaken. Of those seven blades, four were instrumented with strain gauges before final assembly. After production at the TPI facility in Rhode Island, the blades were shipped to various test sites: two blades to the NWTC at NREL, two blades to Sandia National Laboratory and three blades to the USDA-ARS turbine field test facility located in Bushland, Texas. An adapter plate was designed to allow the CX-100 blades to be installed on existing Micron 65/13M turbines at the USDA site. The conclusion of this program is the kick-off of the blade testing at the three testing facilities.

42 ENGINEERING↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 114: Area 25 EMAD Facility Nevada Test Site, Nevada

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 114, Area 25 EMAD Facility, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 114 comprises the following corrective action site (CAS) located in Area 25 of the Nevada Test Site: • 25-41-03, EMAD Facility This plan provides the methodology for field activities needed to gather the necessary information for closing CAS 25-41-03. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 114 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for CAS 25-41-03. It is anticipated that the results of the field investigation and implementation of corrective actions will support a defensible recommendation that no further corrective action is necessary. If it is determined that complete clean closure cannot be accomplished during the SAFER, then a hold point will have been reached and the Nevada Division of Environmental Protection (NDEP) will be consulted to determine whether the remaining contamination will be closed under the alternative corrective action of closure in place. This will be presented in a closure report that will be prepared and submitted to NDEP for review and approval. The CAS will be investigated based on the data quality objectives (DQOs) developed on April 30, 2009, by representatives of NDEP and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAS 25-41-03. The following text summarizes the SAFER activities that will support the closure of CAU 114: • Perform site preparation activities (e.g., utilities clearances, radiological surveys). • Collect samples of materials to determine whether potential source material (PSM) is present that may cause the future release of a contaminant of concern to environmental media. • If no PSMs are present at the CAS, establish no further action as the corrective action. • If a PSM is present at the CAS, either: - Establish clean closure as the corrective action. The material to be remediated will be removed and disposed of as waste, or - Establish closure in place as the corrective action and implement the appropriate use restrictions. • Confirm the selected closure option is sufficient to protect human health and the environment.

54 ENVIRONMENTAL SCIENCES↗

Restart of the Transient Reactor Test (TREAT) Facility Neutron Radiography Program

The TREAT radiography system is used to perform neutron radiography of fuels, experiments, and other specimens before and after irradiation within the TREAT reactor. The TREAT neutron radiography facility performed approximately 5,000 radiographs by the spring of 1977. Originally built in 1958, the TREAT Facility was in operation until it was placed in a shutdown status in 1994. Following the Fukishima disaster and seeing a need for enhanced accident tolerant fuels, the United Stated Department of Energy decided to restart the TREAT facility and resume transient operations. In November 2017, the TREAT reactor was successfully restarted and is currently performing operational testing in preparation for initial experiment irradiations and transient testing. This paper discusses efforts to reactivate the TREAT neutron radiography facility. To characterize the neutron beam, gold foil activation measurements were made to determine an average neutron flux and flux profile. An open beam image provides the information about variations in the beam profile. In conclusion, a series of system qualification radiographs have been acquired to determine the effective image acquisition parameters, resulting image quality, and the relationships between the two.

36 MATERIALS SCIENCE↗

SRF Test Areas Cryogenic System Controls Graphical User Interface

Fermi National Accelerator Laboratory has constructed a superconducting 1.3 GHz cavity test facility at Meson Detector Building (MDB) and a superconducting 1.3 GHz cryomodule test facility located at the New Muon Lab Building (NML). The control of these 2K cryogenic systems is accomplished by using a Synoptic graphical user interface (GUI) to interact with the underlying Fermilab Accelerator Control System. The design, testing and operational experience of employing the Synoptic client-server system for graphical representation will be discussed. Details on the Synoptic deployment to the MDB and NML cryogenic sub-systems will also be discussed. The implementation of the Synoptic as the GUI for both NML and MDB has been a success. Both facilities are currently fulfilling their individual roles in SCRF testing as a result of successful availability of the cryogenic systems. The tools available for creating Synoptic pages will continue to be developed to serve the evolving needs of users.

43 PARTICLE ACCELERATORS↗

Resumption of water capsule reactivity-initiated accident testing at TREAT

A series of integral reactivity-initiated accident (RIA) commissioning experiments were completed in a new static water capsule in the Transient Reactor Test Facility (TREAT), marking the first such tests in the U.S. in more than 40 years. The test campaign included a verification test followed by five tests in the Static Environment Rodlet Transient Test Apparatus (SERTTA) capsule. The capsule initial conditions varied from room temperature and pressure up to 200°C and 2.5 MPa, with energy depositions varying between ~500–1100 J/gUO 2 . The series of tests allowed for a number of instrumentation qualifications and demonstrations, including cladding thermometry, rodlet plenum pressure, cladding elongation, and an electro-impedance boiling detector. Post transient examinations such as gamma emission spectroscopy, profilometry, and microscopy were performed to document the end state of the fuel rods. Furthermore, the results from the experiments show that the fuel rodlets behaved very similar to historical tests under similar energy depositions. This paper documents the design of the capsule and highlights some results from the commissioning tests and post-transient examination.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fabrication and Design Aspects of High-Temperature Compact Diffusion Bonded Heat Exchangers

The Very High Temperature Reactor (VHTR) using gas-cooled reactor technology is anticipated to be the reactor type for the Next Generation Nuclear Plant (NGNP). In this reactor concept with an indirect power cycle system, a high-temperature and high integrity Intermediate Heat Exchanger (IHX) with high effectiveness is required to efficiently transfer the core thermal output to a secondary fluid for electricity generation, hydrogen production, and/or industrial process heat applications. At present, there is no proven IHX concept for VHTRs. The current Technology Readiness Level (TRL) status issued by NGNP to all components associated with the IHX for reduced nominal reactor outlet temperatures of 750–800 degrees C is 3 on a 1–10 scale, with 10 indicating omplete technological maturity. Among the various potential IHX concepts available, diffusion bonded heat exchangers (henceforth called printed circuit heat exchangers, or PCHEs) appear promising for NGNP applications. The design and fabrication of this key component of NGNP with Alloy 617, a candidate high-temperature structural material for NGNP applications, are the primary focus of this paper. In the current study, diffusion bonding of Alloy 617 has been demonstrated, although the optimum diffusion bonding process parameters to engineer a quasi interface-free joint are yet to be determined. The PCHE fabrication related processes, i.e., photochemical etching and diffusion bonding are discussed for Alloy 617 plates. In addition, the authors’ experiences with these non-conventional machining and joining techniques are discussed. Two PCHEs are fabricated using Alloy 617 plates and are being experimentally investigated for their thermal-hydraulic performance in a High-Temperature Helium Facility (HTHF). The HTHF is primarily of Alloy 800H construction and is designed to facilitate experiments at temperatures and pressures up to 800 degrees C and 3 MPa, respectively. Furthermore, some preliminary microstructural and mechanical property characterization studies of representative diffusion bonded Alloy 617 specimens are presented. The characterization studies are restricted and less severe from an NGNP perspective but provide sufficient confidence to ensure safe operation of the heat exchangers in the HTHF. The test results are used to determine the design operating conditions for the PCHEs fabricated.

99 GENERAL AND MISCELLANEOUS↗