Search NASA⌕ Search

SEARCH · Search NASA

Results for “work”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Report on the NGS3 Working Group on Safeguards by Design For Aqueous Reprocessing Plants

The objective of the Working Group on SBD for Aqueous Reprocessing Facilities was to provide recommendations, for facility operators and designers, which would aid in the coordination and integration of nuclear material accountancy and the safeguards requirements of all concerned parties - operators, state/regional authorities, and the IAEA. The recommendations, which are to be provided to the IAEA, are intended to assist in optimizing facility design and operating parameters to ensure the safeguardability of the facility while minimizing impact on the operations. The one day Working Group session addressed a wide range of design and operating topics.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Summary of the Optics, IR, Injection, Operations, Reliability and Instrumentation Working Group

The facilities reported on are all in a fairly mature state of operation, as evidenced by the very detailed studies and correction schemes that all groups are working on. First- and higher-order aberrations are diagnosed and planned to be corrected. Very detailed beam measurements are done to get a global picture of the beam dynamics. More than other facilities the high-luminosity colliders are struggling with experimental background issues, mitigation of which is a permanent challenge. The working group dealt with a very wide rage of practical issues which limit performance of the machines and compared their techniques of operations and their performance. We anticipate this to be a first attempt. In a future workshop in this series, we propose to attempt more fundamental comparisons of each machine, including design parameters. For example, DAΦNE and KEKB employ a finite crossing angle. The minimum value of β* y attainable at KEKB seems to relate to this scheme. Effectiveness of compensation solenoids and turn-by-turn BPMs etc. should be examined in more detail. In the near future, CESR-C and VEPP-2000 will start their operation. We expect to hear important new experiences from these machines; in particular VEPP-2000 will be the first machine to have adopted round beams. At SLAC and KEK, next generation B Factories are being considered. It will be worthwhile to discuss the design issues of these machines based on the experiences of the existing factory machines.

43 PARTICLE ACCELERATORS↗

Recovery Act: Waste Energy Project at AK Steel Corp. Middletown Works

In 2008, Air Products and Chemicals, Inc. (“Air Products”) began development of a project to beneficially utilize waste blast furnace “topgas” generated in the course of the iron-making process at AK Steel Corporation’s Middletown, Ohio works. In early 2010, Air Products was awarded DOE Assistance Agreement DE-EE002736 to further develop and build the combined-cycle power generation facility. In June 2012, Air Products and AK Steel Corporation terminated work when it was determined that the project would not be economically viable at that time nor in the foreseeable future. The project would have achieved the FOA-0000044 Statement of Project Objectives by demonstrating, at a commercial scale, the technology to capture, treat, and convert blast furnace topgas into electric power and thermal energy.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Methodology for Safety Conscious Work Environment Self-Assessment at Los Alamos National Laboratory

As part of a DOE complex-wide requirement, Los Alamos National Laboratory must conduct a self-assessment of safety conscious work environment (SCWE) by the end of fiscal year 2013 (FY2013). This report describes the methodology used to randomly select employees and managers for focus groups and individual interviews as part of this assessment. One of the first tasks is to identify the metrics that are used to measure the LANL safety conscious work environment. DOE’s guidance document 450.4-1C provides a listing of attributes that are present in institutions with excellent SCWE. Questions used in the self-assessment surveys and interviews are designed to elicit employee feedback with respect to these attributes.

99 GENERAL AND MISCELLANEOUS↗

Fairview (NJ) Department of Public Works Building and Site Improvements

The purpose of the project was to upgrade the Borough’s Public Works Yard that was over 60 years old by replacing the non-insulated building and utilizing renewable energy sources as part of a replacement building. The outcomes of the project is a more energy efficient Public Works Department that saves funds on energy costs by using renewable sources.

99 GENERAL AND MISCELLANEOUS↗

Clean Energy Works Oregon (Final Technical Report)

In April 2010, the City of Portland received a $20 million award from the U.S. Department of Energy, as part of the Energy Efficiency and Conservation Block Grant program. This award was appropriated under the American Recovery and Reinvestment Act (ARRA), passed by President Obama in 2009. DOE’s program became known as the Better Buildings Neighborhood Program (BBNP). The BBNP grant objectives directed the City of Portland Bureau of Planning and Sustainability (BPS) as the primary grantee to expand the BPS-led pilot program, Clean Energy Works Portland, into Clean Energy Works Oregon (CEWO), with the mission to deliver thousands of home energy retrofits, create jobs, save energy and reduce carbon dioxide emissions.The Final Technical Report explores the successes and lessons learned from the first 3 years of program implementation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Report of the eRHIC Ring-Ring Working Group

This report evaluates the ring-ring option for eRHIC as a lower risk alternative to the linac-ring option. The reduced risk goes along with a reduced initial luminosity performance. However, a luminosity upgrade path is kept open. This upgrade path consists of two branches, with the ultimate upgrade being either a ring-ring or a linac-ring scheme. The linac-ring upgrade could be almost identical to the proposed linac-ring scheme, which is based on an ERL in the RHIC tunnel. This linac-ring version has been studied in great detail over the past ten years, and its significant risks are known. On the other hand, no detailed work on an ultimate performance ring-ring scenario has been performed yet, other than the development of a consistent parameter set. Pursuing the ring-ring upgrade path introduces high risks and requires significant design work that is beyond the scope of this report.

43 PARTICLE ACCELERATORS↗

Chair Report Consultancy Meeting on Nuclear Security Assessment Methodologies (NUSAM) Transport Case Study Working Group

The purpose of the consultancy assignment was to (i) apply the NUSAM assessment methods to hypothetical transport security table top exercise (TTX) analyses and (ii) document its results to working materials of NUSAM case study on transport. A number of working group observations, using the results of TTX methodologies, are noted in the report.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Regulatory Technology Development Plan - Sodium Fast Reactor. Mechanistic Source Term - Trial Calculation. Work Plan

The overall objective of the SFR Regulatory Technology Development Plan (RTDP) effort is to identify and address potential impediments to the SFR regulatory licensing process. In FY14, an analysis by Argonne identified the development of an SFR-specific MST methodology as an existing licensing gap with high regulatory importance and a potentially long lead-time to closure. This work was followed by an initial examination of the current state-of-knowledge regarding SFR source term development (ANLART-3), which reported several potential gaps. Among these were the potential inadequacies of current computational tools to properly model and assess the transport and retention of radionuclides during a metal fuel pool-type SFR core damage incident. The objective of the current work is to determine the adequacy of existing computational tools, and the associated knowledge database, for the calculation of an SFR MST. To accomplish this task, a trial MST calculation will be performed using available computational tools to establish their limitations with regard to relevant radionuclide release/retention/transport phenomena. The application of existing modeling tools will provide a definitive test to assess their suitability for an SFR MST calculation, while also identifying potential gaps in the current knowledge base and providing insight into open issues regarding regulatory criteria/requirements. The findings of this analysis will assist in determining future research and development needs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

LLNL Center of Excellence Work Items for Q9-Q10 period

This work plan encompasses a slice of effort going on within the ASC program, and for projects utilizing COE vendor resources, describes work that will be performed by both LLNL staff and COE vendor staff collaboratively.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Working Group Report: Quantum Chromodynamics

This is the summary report of the energy frontier QCD working group prepared for Snowmass 2013. We review the status of tools, both theoretical and experimental, for understanding the strong interactions at colliders. We attempt to prioritize important directions that future developments should take. Most of the efforts of the QCD working group concentrate on proton-proton colliders, at 14 TeV as planned for the next run of the LHC, and for 33 and 100 TeV, possible energies of the colliders that will be necessary to carry on the physics program started at 14 TeV. We also examine QCD predictions and measurements at lepton-lepton and lepton-hadron colliders, and in particular their ability to improve our knowledge of strong coupling constant and parton distribution functions.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Integrated Work Management: Preparer, Course 31883

The preparer (also called the “planner”) plays a key role in the integrated work management (IWM) process at Los Alamos National Laboratory (LANL). This course, Integrated Work Management: Preparer (COURSE 31883), describes the IWM roles and responsibilities of the preparer. This course also discusses IWM requirements that must be met by the preparer.

99 GENERAL AND MISCELLANEOUS↗

HEP Software Foundation Community White Paper Working Group - Data Analysis and Interpretation

At the heart of experimental high energy physics (HEP) is the development of facilities and instrumentation that provide sensitivity to new phenomena. Our understanding of nature at its most fundamental level is advanced through the analysis and interpretation of data from sophisticated detectors in HEP experiments. The goal of data analysis systems is to realize the maximum possible scientific potential of the data within the constraints of computing and human resources in the least time. To achieve this goal, future analysis systems should empower physicists to access the data with a high level of interactivity, reproducibility and throughput capability. As part of the HEP Software Foundation Community White Paper process, a working group on Data Analysis and Interpretation was formed to assess the challenges and opportunities in HEP data analysis and develop a roadmap for activities in this area over the next decade. In this report, the key findings and recommendations of the Data Analysis and Interpretation Working Group are presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The Giants of the Nuclear Testing Era: A series of notebooks from the pioneers: The Works of Willis Whitfield

Whitfield's laboratory notebook covers work from late 1960 into 1974. He used the notebook to capture ideas and to summarize what he was working on—including writing papers and traveling— as well as his research. It does not offer a detailed exploration of his thinking leading up to technical advances and it only rarely explicates experimental set-ups. It also has long gaps between some entries. It is nonetheless revealing of his approach, his focus, and his results.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

FY 18 Summary Report on the Technology Transfer Work Package for the Northstar Mo99 Production Project

In order for LANL to assist Northstar in achieving their production goal, the main work package for LANL in FY18 was termed Technology Transfer. This has evolved beyond transferring knowledge and information to assisting in the new plant design. Progress was significantly delayed because Northstar did not provide a point-of-contact until mid-year, at which point James McCarter was hired. This year end report will detail the work done in support of the Northstar facility.

43 PARTICLE ACCELERATORS↗