Search NASA⌕ Search

SEARCH · Search NASA

Results for “ABSTRACT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

(abstract) Follow-on Missions for the Pluto Spacecraft

The Pluto Fast Flyby mission development baseline consists of 2 identical spacecraft (120 - 165 kg) to be launched to Pluto/Charon in the late 1990s. These spacecraft are intended to fly by Pluto and Charon in order to perform various remote-sensing scientific investigations and have a mission development cost less than $400M (FY92$) through launch plus 30 days. The long-life (6 - 10 years) mission duration and lightweight design make the Pluto spacecraft a good candidate for a number of other flyby missions to objects in the outer Solar System, and some of these were investigated by JPL in cooperation with NASA Code SL's (Solar System Exploration) Outer Planets Science Working Group (OPSWG) in 1993. The JPL team looked at what it would mean to fly one of these missions (if a third spacecraft were available) in terms of flight time, spacecraft modifications, and science payload resources; the OPSWG recommended science investigation modifications for the different targets based on the available resources. The missions could, in many cases, utilize less capable launch vehicles, thereby reducing life-cycle cost of the mission. Examples of the sort of targets which were investigated and looked attractive in terms of flight time are: Uranus, Neptune, Uranus/Neptune dual-mission, Trojan asteroids (624 Hektor, 617 Patroclus, others), 5145 Pholus (the reddest object known in the solar system), and Kuiper Belt objects (i.e., 1992 QB1) . This paper will present the results of this investigation in terms of potential science return, performance, and the potential for life-cycle cost reductions through inheritance from Pluto Fast Flyby .

Pluto Charon flyby follow-on missions↗

(abstract) Student Involvement in the Pluto Mission

The Pluto Fast Flyby mission development baseline consists of 2 identical spacecraft (120 - 165 kg) to be launched to Pluto/ Charon in the late 1990s. These spacecraft are intended to fly by Pluto and Charon in order to perform various remote-sensing scientific investigations and have a mission development cost less than $400M (FY92$) through launch plus 30 days. The Pluto team is committed to involving students in all areas of mission development and operations. In November 1992, the Pluto team sent a request for information to industry and universities looking for ways to lower the mass and cost of the mission. A number of universities responded with creative and promising technological developments. In addition to contracts with industry and other federal labs, contracts were signed with schools which allowed students to apply their research, enabling the Pluto team to use valuable resources on a variety of advanced technology endeavors. Perhaps the most exciting aspect of these investigations was that the deliverables that the students produced were not just final reports, but actual prototype hardware complete with write-ups on lessons learned in machining, programming, and design. Another exciting development was a prototype adapter competition in which 7 universities competed to design, build, and test their idea of a lightweight spacecraft-propulsion stack adapter. Georgia Tech won with an innovative dodecahedron composite lattice cone. Other students from other universities were involved as well. All in all, over 40 students from 20 different colleges made significant contributions to the Pluto Fast Flyby mission development through their efforts. This paper will give an overview of Pluto student involvement, the technologies which they examined, and useful results for the mission.

Pluto student involvement design universities tech↗

(abstract) MEASURE-Jupiter: Low Cost Missions to Explore Jupiter in the Post-Galileo Era

MEASURE-Jupiter is a new mission concept for the exploration of giant planets, with initial application to Jupiter. By flying sets of lightweight spacecraft with highly focused measurement objectives, it is designed to break the apparent impass in giant planet exploration beyond Cassini. The MEASURE-Jupiter concept is characterized by: 1) intensive exploration of a giant planet system, 2) multiple small missions flown in focused waves using spacecraft costing $100M to $200M, and 3) mission sets launched every 2 to 3 years. Why Jupiter? Jupiter is the most complex planetary system in the Solar System with many scientifically intriguing bodies and phenomena to explore. The Galileo mission will scratch the surface of the exploration of Jupiter, posing many questions for the MEASURE-Jupiter missions to address. Jupiter is also the easiest planet in the Outer Solar System to reach, making possible flight times of 2 years and total mission durations of 3 years or less. Concept design studies have uncovered a number of scientifically rewarding, simple, low-cost mission options. These options have the additional attraction of being able to launch on 2-year trajectories to Jupiter with low-cost Delta II expendable launch vehicles. A partial list of mission concepts studied to date include: Io Very Close Flyby, Jupiter Close Polar Pass, Mini-Orbiters, and Galilean Satellite Penetrators. Key to the realization of the MEASURE-Jupiter missions is the judicious use of the new low power consuming advanced technology and applicable systems from the Pluto Fast Flyby mission spacecraft design. Foremost of the new technologies planned for inclusion are the elements of hybrid solar array/battery power systems which make it possible to perform the identified missions without the need for Radioactive Thermoelectric Generators (RTGs). This relieves the mission design of the attendant programmatic complexities, cost, and constraints attendant with the use of RTGs.

MEASURE-Jupiter Jupiter Pluto Fast Flyby low cost ↗

(abstract) A Low-Cost Mission to 2060 Chiron Based on the Pluto Fast Flyby

The Pluto Fast Flyby-based mission to Chiron described in this paper is a low cost, scientifically rewarding, focused mission in the outer solar system. The proposed mission will make a flyby of 2060 Chiron, an active 'comet' with over 10(sup 4) times the mass of Halley, and an eccentric, Saturn-crossing orbit which ranges from 8.5 to 19 AU. This mission concept achieves the flyby 4.2 years after launch on a direct trajectory from Earth, is independent of Jupiter launch windows, and fits within Discovery cost guidelines. This mission offers the scientific opportunity to examine a class of object left unsampled by the trail-blazing Mariners, Pioneers, Voyagers, and missions to Halley. Spacecraft reconnaissance of Chiron addresses unique objectives relating to cometary science, other small bodies, the structure of quasi-bound atmospheres on modest-sized bodies, and the origin of primitive bodies and the giant planets. Owing to Chiron's large size (180<D<370 km), unique nature, and unusual orbit, this mission is likely to draw significant public interest. As described by COMPLEX, the SSEC, and later the SSES, flybys are the appropriate scale missions for initial reconnaissance missions. Carrying three sophisticated instruments, the proposed flyby will return critical data about Chiron's size, shape, polar obliquity, atmosphere, surface morphology, surface composition, internal structure, surface activity (including the nature of Chiron's outbursts), and origin. Engineering analysis indicates that the spacecraft is capable of navigating to and encountering Chiron at close approach distances of less than 5 000 km, well inside the 50 000 to 150 000 km coma, and perhaps within the collisional chemistry zone of the coma. The low cost of the proposed Chiron mission is based on the opportunity to use the planned Pluto Flyby spare spacecraft and a Proton Expendable Launch Vehicle (ELV) (the pluto spacecraft is being designed to be compatible with a Proton launch). Backup launch opportunities on Delta II and Atlas ELVs are available. The Pluto Fast Flyby mission plans to develop a low cost ($150M), lightweight (<150 kg) outer planet spacecraft which is well suited to flyby reconnaissance in the outer solar system. This Chiron flyby mission is designed to leverage SSED's Pluto spacecraft investment into a scientifically valuable successor mission within the Discovery cost cap. Taking advantage of the spare spacecraft, we estimate the Discovery Chiron intercept mission can be launched for less than $100 M. We believe this makes a highly attractive proposal, which maintains US presence and leadership in the study of the outer solar system, and enables the first-time exploration of a wholly new class of planetary target, an outer solar system planetesimal.

2060 Chiron planetesimal flyby Pluto Fast Flyby sp↗

(abstract) Saturn Mini-Probes Mission

The original Cassini mission concept for intensive Saturn exploration included dual atmospheric probes - to Titan and Saturn. The Saturn probe was lost in Cassini Project cost reduction, but the Saturn atmospheric goals are still important to the planetary science community - especially it measurements can be acquired during synoptic coverage by the Cassini Orbiter. New advanced technology and design heritage from the Pluto Fast Flyby mission permit a low cost mission concept for launch early in the first decade of the 21st century, in time to take advantage of the Cassini spacecraft being in orbit around Saturn. This paper will describe such a concept. The mini-probe carrier can be a relatively simple design, depending on a solar array/battery power system design instead of Radioactive Thermoelectric Generators (RTGs) with their attendant programmatic complexities, costs, and constraints. The Atlas IIAS/Star 48B, Proton, and STS with upper stage are launch vehicle options which permit modest payload deliveries to Saturn with relatively short flight times (3 to 4 years) such that the mini-probes arrive in the time period when the Cassini Orbiter is operating at Saturn. The Cassini time-line with a compatible SMP mission sequence is described. An example mission concept includes a carrier spacecraft with three 10 to 20 kg mini-probes, launched in the late summer of 2001 by an Atlas IIAS/Star 48B on a 3.8 year trip to Saturn. Preliminary evaluation of the Cassini time-line suggests compatibility of the probe entries with collecting the data for Earth-return.

Saturn Cassini miniprobes cost Pluto Fast Flyby↗

(abstract) High-T(sub c) SNS Weak Links Using Oxide Normal Metals

This work examines device results for edge-geometry SNS weak links utilizing a variety of oxide normal metals. A comparison of the electrical properties of fabricated devices and the magnetic field response will be presented. Device reproducibility will also be discussed. This talk will also examine recent progress in fabrication of epitaxial SNS weak links on silicon-on-sapphire (SOS) substrates. SNS weak links fabricated recently are under investigation, and preliminary results on these devices will be discussed.

SNS weak links oxide normal metals silicon-on-sapp↗

(abstract) Absolute Flux Calibrations of Venus and Jupiter at 32 GHz

The microwave flux densities of Venus and Jupiter at 32 GHz have been measured using a calibration standard radio telescope system at the Owens Valley Radio Observatory (OVRO) during April and May of 1993. These measurements are part of a joint JPL/Caltech program to accurately calibrate a catalog of other radio sources using the two bright planets as flux standards.

microwave flux densities Venus Jupiter catalog cal↗

(abstract) Experimental Evaluation of Russian Anode Layer Thruster

This paper describes the results of a preliminary evaluation of a 1.35 kW anode layer thruster. Data on performance and plume characteristics will be presented. Data on thruster characteristics such as thrust, plume current densities, discharge voltage, discharge current, and mass flow rate along with the results of a 500-hour endurance test wear will be presented.

anode layer thrusters SPT thrusters propulsion end↗

(abstract) Evaluation and Development of Diamond Grids for Ion Optics

A research program is underway to establish the feasibility of fabricating 15 cm diameter ion engine optics from polycrystalline diamond film. Because of its high thermal conductivity, low CTE, and low sputter yield, diamond film has the potential of mitigating life limiting and performance degrading processes which have hindered flight qualification of ion thrusters to date. Results of experiments are reported.

ion engines diamond films ion optics fabrication f↗

(abstract) Maneuver Design for Galileo Asteroid Flybys

This paper will address the trajectory correction maneuvers (TCMs) which enabled the successful completion of the circuitous VEEGA trajectory while providing for the first ever encounters with main-belt asteroids.

Galileo trajectory correction maneuvers Jupiter as↗

(abstract) Ekman Pumping/Suction and Wind-Driven Ocean Circulation from ERS-1 Scatterometer Measurements Over the Arabian Sea During October 1994-October 1995

Spatial variations of the east-west and north-south components of surface wind stress are critical in studies of ocean circulation and biological-physical interactions because surface wind stress curl produces a vertical velocity in the upper ocean at the bottom of the Ekman Layer.The ERS-1 scatterometer provides reasonable coverage and direct measurements of vector of winds. Three schemes are evaluated relative to high-quality moored-bouy wind observations recorded in the central Arabian Sea, where high surface waves and high atmospheric water content during the southeast monsoon adversely affect the estimation of satellite-derived winds.

scatterometer↗

Galileo at Jupiter: Status and Overview (abstract)

The Galileo Orbiter spacecraft has been in Jupiter orbit since 7 December 1995. During its continuing orbital tour, Galileo is sending back a continuous stream of data about Jupiter, its magnetosphere and the Galilean satellites. Results to date include several major discoveries. The current status of the mission and plans for the final portion of the nominal mission and possible extended operations will be discussed.

Galileo↗