Search NASA⌕ Search

SEARCH · Search NASA

Results for “Adaptive Scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Automating CapCom Using Mobile Agents and Robotic Assistants

We have developed and tested an advanced EVA communications and computing system to increase astronaut self-reliance and safety, reducing dependence on continuous monitoring and advising from mission control on Earth. This system, called Mobile Agents (MA), is voice controlled and provides information verbally to the astronauts through programs called personal agents. The system partly automates the role of CapCom in Apollo-including monitoring and managing EVA navigation, scheduling, equipment deployment, telemetry, health tracking, and scientific data collection. EVA data are stored automatically in a shared database in the habitat/vehicle and mirrored to a site accessible by a remote science team. The program has been developed iteratively in the context of use, including six years of ethnographic observation of field geology. Our approach is to develop automation that supports the human work practices, allowing people to do what they do well, and to work in ways they are most familiar. Field experiments in Utah have enabled empirically discovering requirements and testing alternative technologies and protocols. This paper reports on the 2004 system configuration, experiments, and results, in which an EVA robotic assistant (ERA) followed geologists approximately 150 m through a winding, narrow canyon. On voice command, the ERA took photographs and panoramas and was directed to move and wait in various locations to serve as a relay on the wireless network. The MA system is applicable to many space work situations that involve creating and navigating from maps (including configuring equipment for local topology), interacting with piloted and unpiloted rovers, adapting to environmental conditions, and remote team collaboration involving people and robots.

Clancey, William J.↗

Water for Two Worlds: Designing Terrestrial Applications for Exploration-class Sanitation Systems

At the United Nations Millennium Summit in September of 2000, the world leaders agreed on an ambitious agenda for reducing poverty and improving lives: the Millennium Development Goals (MDGs), a list of issues they consider highly pernicious, threatening to human welfare and, thereby, to global security and prosperity. Among the eight goals are included fundamental human needs such as the eradication of extreme poverty and hunger, the promotion of gender equality, the reduction of child mortality and improvement of maternal health, and ensuring the sustainability of our shared environment. In order to help focus the efforts to meet these goals, the United Nations (UN) has established a set of eighteen concrete targets, each with an associated schedule. Among these is Target 10: "By 2015, reduce by half the proportion of people without access to safe drinking water." A closely related target of equal dignity was agreed at the World Summit on Sustainable Development (Johannesburg, September 2002): "By 2015, reduce by half the proportion of people without access to basic sanitation." One of the greatest successes in the development of Exploration-class technologies for closed-loop, sustainable support of long-duration human space missions has been the work both ESA and NASA have done in bioregenerative water reclamation (WRS), and secondarily, in solid-waste management. Solid-waste and WRS systems tend to be combined in the commercial world into the field of sanitation, although as we will see, the most essential principles of sustainable terrestrial sanitation actually insist upon the separation of solid and liquid excreta. Seeing the potential synergy between the space program ALS technologies developed for Mars and the urgent needs of hundreds of millions of people for secure access to clean water here on Earth, we set out to organize the adaptation of these technologies to help the United Nations Development Programme (UNDP) meet Target 10. In this paper, we will summarize the issues and results of the first "Water for Two Worlds" summit held in January of this year, describe,the status of the sustainable sanitation systems that are on the table for adaptation to widespread terrestrial use, and present fundamental strategies for forward work.

Adams, Constance↗

Automated and Adaptive Mission Planning for Orbital Express

The Orbital Express space mission was a Defense Advanced Research Projects Agency (DARPA) lead demonstration of on-orbit satellite servicing scenarios, autonomous rendezvous, fluid transfers of hydrazine propellant, and robotic arm transfers of Orbital Replacement Unit (ORU) components. Boeing's Autonomous Space Transport Robotic Operations (ASTRO) vehicle provided the servicing to the Ball Aerospace's Next Generation Serviceable Satellite (NextSat) client. For communication opportunities, operations used the high-bandwidth ground-based Air Force Satellite Control Network (AFSCN) along with the relatively low-bandwidth GEO-Synchronous space-borne Tracking and Data Relay Satellite System (TDRSS) network. Mission operations were conducted out of the RDT&E Support Complex (RSC) at the Kirtland Air Force Base in New Mexico. All mission objectives were met successfully: The first of several autonomous rendezvous was demonstrated on May 5, 2007; autonomous free-flyer capture was demonstrated on June 22, 2007; the fluid and ORU transfers throughout the mission were successful. Planning operations for the mission were conducted by a team of personnel including Flight Directors, who were responsible for verifying the steps and contacts within the procedures, the Rendezvous Planners who would compute the locations and visibilities of the spacecraft, the Scenario Resource Planners (SRPs), who were concerned with assignment of communications windows, monitoring of resources, and sending commands to the ASTRO spacecraft, and the Mission planners who would interface with the real-time operations environment, process planning products and coordinate activities with the SRP. The SRP position was staffed by JPL personnel who used the Automated Scheduling and Planning ENvironment (ASPEN) to model and enforce mission and satellite constraints. The lifecycle of a plan began three weeks outside its execution on-board. During the planning timeframe, many aspects could change the plan, causing the need for re-planning. These variable factors, ranging from shifting contact times to ground-station closures and required maintenance times, are discussed along with the flexibility of the ASPEN tool to accommodate changes to procedures and the daily or long-range plan, which contributed to the success of the mission. This paper will present an introduction to ASPEN, a more in-depth discussion on its use on the Orbital Express mission, and other relative work. A description of ground operations after the SRP deliveries were made is included, and we briefly discuss lessons learned from the planning perspective and future work.

scheduling↗

Constellation Training Facility Support

The National Aeronautics and Space Administration is developing the next set of vehicles that will take men back to the moon under the Constellation Program. The Constellation Training Facility (CxTF) is a project in development that will be used to train astronauts, instructors, and flight controllers on the operation of Constellation Program vehicles. It will also be used for procedure verification and validation of flight software and console tools. The CxTF will have simulations for the Crew Exploration Vehicle (CEV), Crew Module (CM), CEV Service Module (SM), Launch Abort System (LAS), Spacecraft Adapter (SA), Crew Launch Vehicle (CLV), Pressurized Cargo Variant CM, Pressurized Cargo Variant SM, Cargo Launch Vehicle, Earth Departure Stage (EDS), and the Lunar Surface Access Module (LSAM). The Facility will consist of part-task and full-task trainers, each with a specific set of mission training capabilities. Part task trainers will be used for focused training on a single vehicle system or set of related systems. Full task trainers will be used for training on complete vehicles and all of its subsystems. Support was provided in both software development and project planning areas of the CxTF project. Simulation software was developed for the hydraulic system of the Thrust Vector Control (TVC) of the ARES I launch vehicle. The TVC system is in charge of the actuation of the nozzle gimbals for navigation control of the upper stage of the ARES I rocket. Also, software was developed using C standards to send and receive data to and from hand controllers to be used in CxTF cockpit simulations. The hand controllers provided movement in all six rotational and translational axes. Under Project Planning & Control, support was provided to the development and maintenance of integrated schedules for both the Constellation Training Facility and Missions Operations Facilities Division. These schedules maintain communication between projects in different levels. The CxTF support provided is one that requires continuous maintenance since the project is still on initial development phases.

Flores, Jose M.↗

BioSentinel: To the Moon or Beyond?

BioSentinel, an Artemis-1 secondary spacecraft, will carry a biology experiment into deep space for the first time in 50 years. A 6U CubeSat form factor was utilized for the spacecraft and included technologies newly developed or adapted for operations beyond Earth orbit. This is the maiden deep-space voyage for the radio, propulsion system, electrical power system, and BioSensor payload. The spacecraft carries onboard budding yeast, Saccharomyces cerevisiae, as an analog to human cells to test the biological response to deep space radiation. Flying a secondary payload beyond LEO comes with unique challenges with respect to trajectory uncertainty and mission operations planning. BioSentinel does not carry propulsion for trajectory maneuvers, so plans for Comms and Power need to be developed for all trajectories. The nominal plan is a lunar flyby followed by an insertion into Heliocentric orbit. However, some possible scenarios include lunar eclipses that could severely impact the power budget during that phase of the mission, while others could result in a “Retrograde” hyperbola at swingby resulting in the spacecraft traveling inward toward Earth or even towards a collision with the lunar surface. BioSentinel’s final trajectory will not be known until after launch and deployment so possible scenarios need to be planned for ahead of time. This paper discusses the operational scenarios that were planned for as well as the actual execution of the mission operations including: command pass scheduling with the Deep Space Network, selecting bandwidth limits, medium gain antenna versus low gain antenna usage, and conserving power prior to a lunar eclipse. Note: Artemis-1 is planned to launch in the Spring of 2022

BioSentinel↗

Online Monitoring of Medium Voltage Cable Systems with Spread Spectrum Time Domain and Frequency Domain Reflectometry

In-service failures of wave energy convertor (WEC) cable systems can have a significant cost and power availability impact. Close parallel research 2019 data showed > 1B£ and 9 Terra-Watt-Hours associated with global off-shore wind (OSW) cable failures (Strang-Moran 2020). OSW is a closely related technology but currently is significantly cheaper than WEC technology. For wave energy to compete, the problem of reliable cable transmission must be mitigated. This project develops isolation technology to allow online high frequency reflectometry testing of medium voltage cables (1 to 10 kV and higher) without arcing or damage to the test instrument. Online spread spectrum time domain reflectometry (SSTDR) testing has been established for low voltage cable systems in the aircraft and rail industry and the ability to detect and locate cable flaws of interest is well understood. Extending reflectometry testing to medium voltage systems could enable detection of cable damage before failures occur thereby allowing repair and replacement of damaged cable segments to be scheduled and managed. The seedling project succeeded to pass and receive high frequency SSTDR signals onto a cable up to 1 kV using a parallel trace isolation circuit board that can be connected onto the test cable. The approach used a novel circuit design for which an invention disclosure has been filed. A proposed sapling project would extend the technology toward the higher operating voltages used by WEC systems, thereby enabling online SSTDR cable monitoring. The goal of the seedling project was to extend the capability of the ARENA cable/motor test bed to address medium voltages and to develop a high pass filter isolation architecture to protect the reflectometry instrument from the low frequency (DC – 60 Hz) line voltage while allowing the high frequency diagnostic signal to pass to and from the test instrument to the live line. Initial efforts focused on passive LCR filter circuits to reduce 60 Hz levels below 10 volts from a 10 kV line while allowing the MHz high frequency chirps to pass onto the cables and for mV signals to be detected. We discovered that the parasitic loss behavior of real high voltage components precluded this approach from working. An alternate approach was adapted for the electric field to couple between two parallel traces on a printed circuit board much like a radio-frequency coupler. The challenge here was and is to have the parallel traces close enough to each other to effectively pass the high frequency chirp onto the live line and receive any reflected signal from any encountered impedance change along the cable. This reflected signal will be in the mV range. The traces however must be far enough apart to not allow arcing on the board. A design with 3 mm spacing was determined to allow the high frequency signal to pass onto the live line and receive the mV signal back into the instrument while reducing the 60 Hz voltage amplitude by >80 dB (more than a factor of 10,000) without allowing arcing from across the parallel traces. This was confirmed by simulation and test.

16 TIDAL AND WAVE POWER↗

WetLab-2: Tools for Conducting On-Orbit Quantitative Real-Time Gene Expression Analysis on ISS

The objective of NASA Ames Research Centers WetLab-2 Project is to place on the ISS a research platform capable of conducting gene expression analysis via quantitative real-time PCR (qRT-PCR) of biological specimens sampled or cultured on orbit. The project has selected a Commercial-Off-The-Shelf (COTS) qRT-PCR system, the Cepheid SmartCycler and will fly it in its COTS configuration. The SmartCycler has a number of advantages including modular design (16 independent PCR modules), low power consumption, rapid ramp times and the ability to detect up to four separate fluorescent channels at one time enabling multiplex assays that can be used for normalization and to study multiple genes of interest in each module. The team is currently working with Cepheid to enable the downlink of data from the ISS to the ground and provide uplink capabilities for programming, commanding, monitoring, and instrument maintenance. The project has adapted commercial technology to design a module that can lyse cells and extract RNA of sufficient quality and quantity for use in qRT-PCR reactions while using a housekeeping gene to normalize RNA concentration and integrity. The WetLab-2 system is capable of processing multiple sample types ranging from microbial cultures to animal tissues dissected on-orbit. The ability to conduct qRT-PCR on-orbit eliminates the confounding effects on gene expression of reentry stresses and shock acting on live cells and organisms or the concern of RNA degradation of fixed samples. The system can be used to validate terrestrial analyses of samples returned from ISS by providing on-orbit gene expression benchmarking prior to sample return. The ability to get on orbit data will provide investigators with the opportunity to adjust experiment parameters for subsequent trials based on the real-time data analysis without need for sample return and re-flight. Researchers will also be able to sample multigenerational changes in organisms. Finally, the system can be used for analysis of air, surface, water, and clinical samples to monitor environmental contaminants and crew health. The verification flight of the instrument is scheduled to launch on SpaceX-7 in June 2015.

quantitative PCR↗

Applying an improved rapid impact assessment matrix method to strategic environmental assessment of urban planning in China

Strategic environmental assessment (SEA) has become an increasingly important decision-support tool for providing information on the environmental implications of a policy, plan, or program. The goal is to safeguard the environment and promote sustainable development at the strategic level. Despite major progress in implementing SEA practices internationally, developing countries, such as China, often lag behind in applying SEA methodology. Lack of available data and time constraints arising from tight schedules create problems. The rapid impact assessment matrix (RIAM) is a potential resource for breaking through such difficulties. Our analysis of RIAM applications suggested that it could become a tool for evaluating strategic alternatives because of its applicability in interdisciplinary settings, its transparency, and its short implementation timeframe. To make it more suitable for the SEA context, we have developed two major improvements to the conventional RIAM process: assignment of weights to assessment indicators and the development of an integrated environmental assessment score (IES). The improved RIAM process was employed in an SEA of the development plan for the Nansha District in Guangzhou, the capital city of Guangdong Province in China. It was used to assess five alternatives for development in Wanqingsha (WQS), a subunit of Nansha, where important ecological resources are located and where industrial development could impact the air quality in the neighboring Hong Kong Special Administrative Region (HKSAR). The evaluation identified WQS-A04 as the preferred alternative. This alternative involved a minimal amount of industrial development – 10% compared with the most intense development alternative – and included important wetland preservation plans. The assessment results have been incorporated into the officially approved development plan for Nansha. The improved RIAM methodology is well adapted to the technical aims of SEA and decision-making structures in China. It offers the potential for delivering timely and quality results to decision-making processes. To achieve the desired efficiency, it is recommended that an SEA procedure take into account findings acquired from an improved RIAM application at an early stage, then, at a later stage, results from more comprehensive assessments conducted using more sophisticated methods should be added, if time and data are available. - Highlights: • RIAM is a potential SEA tool due to its multidisciplinary setting and rapid process. • Weighting index and computing IES are raised for improving RIAM when applied to SEAs. • The improved RIAM boosts SEA effectiveness by timely responding to decision-making. • The improved RIAM is more suitable to an SEA bothered by tight time or data shortage. • The improved RIAM adapts to the technical aims of SEA and decision features in China.

54 ENVIRONMENTAL SCIENCES↗

Life sciences recruitment objectives

The goals of the Life Sciences Division of the Office of Space Sciences and Application are to ensure the health, well being and productivity of humans in space and to acquire fundamental scientific knowledge in space life sciences. With these goals in mind Space Station Freedom represents substantial opportunities and significant challenges to the Life Sciences Division. For the first time it will be possible to replicate experimental data from a variety of simultaneously exposed species with appropriate controls and real-time analytical capabilities over extended periods of time. At the same time, a system for monitoring and ameliorating the physiological adaptations that occur in humans subjected to extended space flight must be evolved to provide the continuing operational support to the SSF crew. To meet its goals, and take advantage of the opportunities and overcome the challenges presented by Space Station Freedom, the Life Sciences Division is developing a suite of discipline-focused sequence. The research phase of the Life Sciences Space Station Freedom Program will commence with the utilization flights following the deployment of the U.S. laboratory module and achievement of Man Tended Capability. Investigators that want the Life Sciences Division to sponsor their experiment on SSF can do so in one of three ways: submitting a proposal in response to a NASA Research Announcement (NRA), submitting a proposal in response to an Announcement of Opportunity (AO), or submitting an unsolicited proposal. The scientific merit of all proposals will be evaluated by peer review panels. Proposals will also be evaluated based on relevance to NASA's missions and on the results of an Engineering and Cost Analyses. The Life Sciences Division expects that the majority of its funding opportunities will be announced through NRA's. It is anticipated that the first NRA will be released approximately three years before first element launch (currently scheduled for late 1995). Subsequent NRA's will be released on a rotating two year cycle.

Keefe, J. Richard↗

Predicting Airport Runway Configurations for Decision-Support Using Supervised Learning

One of the most challenging tasks for air traffic controllers is runway configuration management (RCM). It deals with the optimal selection of runways to operate on (for arrivals and departures) based on traffic, surface wind speed, wind direction, other environmental variables, noise constraints, and several other airport-specific factors. It affects the efficiency of the National Airspace System (NAS) and both surface and airspace operations can benefit from better understanding future runway configurations. In this paper, we present a comprehensive implementation of predictive models for runway configuration estimation from large volumes of historical data. Specifically, operational data from two full years (2018 and 2019) is collected, analyzed, and fused together to build the data product used in this work. The data set differs from prior work in the field in terms of its scope, resolution, and variety of factors collected and considered. Meteorological data is collected from two different sources – current weather conditions from METAR (Meteorological Terminal Aviation Routine Weather Report) and forecast weather conditions from Localized Aviation MOS Program (LAMP). Operational data from the Federal Aviation Administration (FAA) Aviation System Performance Metrics (ASPM) related to scheduled and actual number of arrivals and departures, average taxi times, etc. are collected. NASA’s Sherlock Data Warehouse is used to identify critical information such as go-arounds, and other events that might impact RCM decision-making. All data is collected and aggregated over 15-minute intervals throughout the two years. This provides a resolution like the timescales that might be necessary for runway configuration management decision-making. A variety of supervised learning algorithms are tested including Support Vector Machine, Random Forest, Gradient Boosting, etc. including tuning of the model hyperparameters. The modeling process is applied and presented on two representative U.S. airports – Charlotte Douglas International Airport (KCLT) and Denver International Airport (KDEN). The two airports present different levels of complexity in terms of the total number of configurations used and provide a balanced perspective on the generalizability of the developed approach to other airports in the NAS. Initial results are promising (F1 score of 0.91 at KCLT and 0.83 at KDEN) for data in the test set. The final paper will contain a comprehensive comparison between different models and model building strategies as well as further refined results. Most important predictors for each airport will be identified along with a discussion and recommendations on adapting the framework to other scenarios.

Tejas G Puranik↗

Artificial Gravity Research Project

Protecting the health, safety, and performance of exploration-class mission crews against the physiological deconditioning resulting from long-term weightlessness during transit and long-term hypogravity during surface operations will require effective, multi-system countermeasures. Artificial gravity (AG), which would replace terrestrial gravity with inertial forces generated by rotating the transit vehicle or by a human centrifuge device within the transit vehicle or surface habitat, has long been considered a potential solution. However, despite its attractiveness as an efficient, multi-system countermeasure and its potential for improving the environment and simplifying operational activities (e.g., WCS, galley, etc.), much still needs to be learned regarding the human response to rotating environments before AG can be successfully implemented. This paper will describe our approach for developing and implementing a rigorous AG Research Project to address the key biomedical research questions that must be answered before developing effective AG countermeasure implementation strategies for exploration-class missions. The AG Research Project will be performed at JSC, ARC, extramural academic and government research venues, and international partner facilities maintained by DLR and IMBP. The Project includes three major ground-based human research subprojects that will lead to flight testing of intermittent short-radius AG in ISS crewmembers after 201 0, continuous long-radius AG in CEV crews transiting to and from the Moon, and intermittent short-radius AG plus exercise in lunar habitats. These human ground-based subprojects include: 1) a directed, managed international short-radius project to investigate the multi-system effectiveness of intermittent AG in human subjects deconditioned by bed rest, 2) a directed, managed long-radius project to investigate the capacity of humans to live and work for extended periods in rotating environments, and 3) a focused, investigator-initiated project to investigate system-specific adaptation to and from rotating environments. The AG Research Project also includes two major animal research subprojects: 1) a directed, managed ground-based subproject using rodents and, possibly, sub-human primates, to address mechanistic issues that cannot be studied in humans, to rapidly develop higher sample numbers than can be achieved in the human subprojects, and to establish feasible parameter operating bands to reduce the breadth of the human subprojects, and 2) a flight subproject using rodents to estimate the physiological effects of long term exposure to hypogravity and to investigate the effects of contamination by terrestrial gravity in estimating AG effectiveness. The animal flight subproject would be performed aboard ISS using the CAM module in approximately the 2008-201 1 timeframe. The paper will first present an overview of the key biomedical research questions to be answered. It will then describe the overall approaches to be utilized in developing and implementing the AG Research Project, including definition of the intended scientific research, management and development approaches, identification of roles and responsibilities, risk management, and definition of project deliverables. The primary focus of the paper will be on the first of the three ground-based human research subprojects, since it is the only one currently in development and is scheduled to start active subject investigations in April of 2005.

Kamman, Michelle R.↗

NASA's Habitat Demonstration Unit (HDU) Pressurized Excursion Module (PEM) In-Field Demonstration at Desert RATS 2010

This paper describes the construction, assembly, subsystem integration, transportation, and field testing operations associated with the Habitat Demonstration Unit (HDU) Pressurized Excursion Module (PEM) and discusses lessons learned. In a one-year period beginning summer 2009, a tightly scheduled design-develop-build process was utilized by a small NASA "tiger team" to produce the functional HDU-PEM prototype in time to participate in the 2010 Desert Research and Technology Studies (Desert RATS) field campaign. The process required the coordination of multiple teams, subcontractors, facility management and safety staff. It also required a well-choreographed material handling and transportation process to deliver the finished product from the NASA-Johnson Space Center facilities to the remote Arizona desert locations of the field test. Significant findings of this paper include the team s greater understanding of the HDU-PEM s many integration issues and the in-field training the team acquired which will enable the implementation of the next-generation of improvements and development of high-fidelity field operations in a harsh environment. The Desert RATS analog environment is being promoted by NASA as an efficient means to design, build, and integrate multiple technologies in a mission architecture context, with the eventual goal of evolving the technologies into robust flight hardware systems. The HDU-PEM in-field demonstration at Desert RATS 2010 provided a validation process for the integration team, which has already begun to retool for the 2011 field tests that require an adapted architecture.

Tri, Terry O.↗

Design and Performance of the PALM-3000 3.5 kHz Upgrade

PALM-3000 (P3K), the second-generation adaptive optics (AO) instrument for the 5.1 meter Hale telescope atPalomar Observatory, was released as a facility class instrument in October 2011 and has since been used on-skyfor over 600 nights as a workhorse science instrument and testbed for coronagraph and detector development.In late 2019 P3K underwent a significant upgrade to its wavefront sensor (WFS) arm and real-time control(RTC) system to reinforce its position as a state-of-the-art AO facility and extend its faint-end capability forhigh-resolution imaging and precision radial velocity follow-up of Kepler and TESS targets. The main featuresof this upgrade include an EM-CCD WFS camera capable of 3.5 kHz framerates, and an advanced Digital SignalProcessor (DSP) based RTC system to replace the aging GPU based system. Similar to the pre-upgrade system,the Shack-Hartmann wavefront sensor supports multiple pupil sampling modes using a motorized lenslet stage.The default sampling mode with 64×64 subapertures has been re-commissioned on-sky in late 2019, witha successful return to science observations in November 2019. In 64×mode the upgraded system is alreadyachieving K-band Strehl ratios up to 85% on-sky and can lock on natural guide stars as faint as mV=16. A16×16 subaperture mode is scheduled for on-sky commissioning in Fall 2020 and will extend the system’s faintlimit even further. Here we present the design and on-sky re-commissioning results of the upgraded system,dubbed P3K-II.

Vasisht, Gautam↗

Materials Control for Aerospace Applications

The distant future of mankind and the ultimate survivability of the human race, as it is known today, will depend on mans' ability to break earthly bonds and establish new territorial positions throughout the universe. Man must therefore be positioned to not only travel to, but also, to readily adapt to numerous and varying environments. For this mass migration across the galaxies nothing is as import to the human race as is NASA's future missions into Low Earth Orbit (LEO), to the moon, and/or Mars. These missions will form the building blocks to eternity for mankind. From these missions, NASA will develop the foundations for these building blocks based on sound engineering and scientific principles, both known and yet to be discovered. The integrity of the program will lead to development, tracking and control of the most basic elements of hardware production: That being development and control of applications of space flight materials. Choosing the right material for design purposes involves many considerations, such as governmental regulations associated with manufacturing operations, both safety of usage and of manufacturing, general material usage requirements, material longevity and performance requirements, material interfacing compatibility and material usage environments. Material performance is subject to environmental considerations in as much as a given material may perform exceptionally well at standard temperatures and pressures while performing poorly under non-standard conditions. These concerns may be found true for materials relative to the extreme temperatures and vacuum gradients of high altitude usage. The only way to assure that flight worthy materials are used in design is through testing. However, as with all testing, it requires both time on schedule and cost to the operation. One alternative to this high cost testing approach is to rely on a materials control system established by NASA. The NASA community relies on the MAPTIS materials control system founded at MSFC and supported by the other NASA Centers. This system is a data bank of all materials used in space flight operations. These materials are rated for several characteristics that are common concerns in high altitude or deep space usage: Odor, off gassing, material fluid compatibility, toxicity, corrosion susceptibility, stress corrosion susceptibility, etc.

Ferguson, Michael↗

Circadian rhythms, sleep, and performance in space

Maintaining optimal alertness and neurobehavioral functioning during space operations is critical to enable the National Aeronautics and Space Administration's (NASA's) vision "to extend humanity's reach to the Moon, Mars and beyond" to become a reality. Field data have demonstrated that sleep times and performance of crewmembers can be compromised by extended duty days, irregular work schedules, high workload, and varying environmental factors. This paper documents evidence of significant sleep loss and disruption of circadian rhythms in astronauts and associated performance decrements during several space missions, which demonstrates the need to develop effective countermeasures. Both sleep and circadian disruptions have been identified in the Behavioral Health and Performance (BH&P) area and the Advanced Human Support Technology (AHST) area of NASA's Bioastronautics Critical Path Roadmap. Such disruptions could have serious consequences on the effectiveness, health, and safety of astronaut crews, thus reducing the safety margin and increasing the chances of an accident or incident. These decrements oftentimes can be difficult to detect and counter effectively in restrictive operational environments. NASA is focusing research on the development of optimal sleep/wake schedules and countermeasure timing and application to help mitigate the cumulative effects of sleep and circadian disruption and enhance operational performance. Investing research in humans is one of NASA's building blocks that will allow for both short- and long-duration space missions and help NASA in developing approaches to manage and overcome the human limitations of space travel. In addition to reviewing the current state of knowledge concerning sleep and circadian disruptions during space operations, this paper provides an overview of NASA's broad research goals. Also, NASA-funded research, designed to evaluate the relationships between sleep quality, circadian rhythm stability, and performance proficiency in both ground-based simulations and space mission studies, as described in the 2003 NASA Task Book, will be reviewed.

Review↗

Modeling, analysis, and optimization of complex nuclear processes and facilities via computational methods: The HALEU process case study

Improving and adapting industrial systems to timely meet changing programmatic and market demands is an important goal to achieve, including when operating and maintaining complex nuclear processes and facilities. However, changes to these complex systems are costly, particularly when they are already in place and bounded to stringent requirements and constraints such as when handling radioactive material and contaminated equipment. These conditions often exist when treating spent nuclear fuel remotely within shielded nuclear radiation chambers, commonly referred as hot cells, to condition nuclear material and/or fabricate products for utilization in other nuclear enterprises such as in the manufacture of advanced nuclear fuel. The illustrative case considered here is the production of high assay low enriched uranium (HALEU) products supporting the deployment of advanced nuclear reactors. For the HALEU program, resources invested were and are being systematically analyzed so that these investments are maximized in a facility that is nearly 60 years old. A methodology that has effectively enabled optimized and improvements in the Spent Fuel Treatment (SFT) program, and consequently the HALEU program, involves discrete event simulation as addressed in this article. Here, the quantification of multiple productivity metrics, including material processing rates, cycle times, bottlenecks, number of material transfers as well as equipment, workstation, and material handling utilization, has resulted in a myriad of diverse discoveries and data-informed decisions regarding process layout and constituent, labor levels and schedules, selection of new process units, storage needs, and other critical process configurations. This article describes such a computational capability being applied for decision-making, illustrates its application to an actual process and program, provides illustrative results, and argues how computational methods for the modeling, analysis, and optimization of complex processes and facilities does lead to informed decisions derived from data and not only from intuition.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Biomolecule Sequencer: Next-Generation DNA Sequencing Technology for In-Flight Environmental Monitoring, Research, and Beyond

On the International Space Station (ISS), technologies capable of rapid microbial identification and disease diagnostics are not currently available. NASA still relies upon sample return for comprehensive, molecular-based sample characterization. Next-generation DNA sequencing is a powerful approach for identifying microorganisms in air, water, and surfaces onboard spacecraft. The Biomolecule Sequencer payload, manifested to SpaceX-9 and scheduled on the Increment 4748 research plan (June 2016), will assess the functionality of a commercially-available next-generation DNA sequencer in the microgravity environment of ISS. The MinION device from Oxford Nanopore Technologies (Oxford, UK) measures picoamp changes in electrical current dependent on nucleotide sequences of the DNA strand migrating through nanopores in the system. The hardware is exceptionally small (9.5 x 3.2 x 1.6 cm), lightweight (120 grams), and powered only by a USB connection. For the ISS technology demonstration, the Biomolecule Sequencer will be powered by a Microsoft Surface Pro3. Ground-prepared samples containing lambda bacteriophage, Escherichia coli, and mouse genomic DNA, will be launched and stored frozen on the ISS until experiment initiation. Immediately prior to sequencing, a crew member will collect and thaw frozen DNA samples, connect the sequencer to the Surface Pro3, inject thawed samples into a MinION flow cell, and initiate sequencing. At the completion of the sequencing run, data will be downlinked for ground analysis. Identical, synchronous ground controls will be used for data comparisons to determine sequencer functionality, run-time sequence, current dynamics, and overall accuracy. We will present our latest results from the ISS flight experiment the first time DNA has ever been sequenced in space and discuss the many potential applications of the Biomolecule Sequencer for environmental monitoring, medical diagnostics, higher fidelity and more adaptable Space Biology Human Research Program investigations, and even life detection experiments for astrobiology missions.

Sequencer↗

Small Waste in a Large Package - Meeting Requirements for Packaging, Transport and Disposal - 18092

A small amount of Class C Mixed Low Level Waste (MLLW) required packaging and disposition to an off-site facility. The AREVA TN RAM cask, designed and licensed for shipping Type B waste packages, was chosen as the most appropriate shipping solution. Due to packaging, shipping and disposal requirements, the standard TN RAM cask could not be utilized without making some modifications. Unique solutions and approaches had to be developed by the AREVA design team to complete the project within the anticipated budget and schedule. The general work scope was to characterize, remove from a pool, profile, package, certify and transport four irradiated components to an approved off-site facility. The material makeup of the components (three stainless steel plates and a lead counterweight) resulted in a MLLW classification which required special packaging and disposal methods. The AREVA design team worked with the disposal facility to identify all requirements associated with disposal of Class B/C MLLW. After defining the packaging and disposal requirements, it was determined that unique spacers and void fillers would be required. The design solution consisted of a liner insert as well as axial and radial spacers filled with inert material. Remaining voids in the liner insert were filled with recycled glass beads to fulfill the requirement for maximum 10% void space in the waste package. The axial spacers also served to center the waste load in the shipping cask to comply with the AREVA TN RAM Cask NRC license. Concentration averaging and waste consolidation were used to reach the Class C MLLW determination for shipping and disposal. This disposal method for Class C waste met the requirements of macro-encapsulation. Therefore, no additional treatment action was required when disposing of Class C MLLW. AREVA's solution provides a model for meeting macro-encapsulation requirements while also meeting void space requirements. This solution provides a model for how to adapt large shipping casks and liners to smaller waste packages that would not normally be a good fit for traditional casks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗