Heat Pipe Thermal Conditioning Panel

The development, fabrication, and evaluation of heat pipe thermal conditioning panels are discussed. The panels were designed and fabricated to be compatible with several planned NASA space vehicles, in terms of panel size, capacity, temperature gradients, and integration with various heat exchangers and electronic components. It was satisfactorily demonstrated that the heat pipe thermal conditioning panel meets the thermal efficiency and heat transport requirements.

Saaski, E. W.↗

The 4.5 inch diameter IPV Ni-H2 cell development program

Interest in larger capacity Ni-H2 battery cells for space applications has resulted in the initiation of a development/qualification/production program. Cell component design was completed and component hardware fabricated and/or delivered. Finished cell design projections demonstrate favorable specific energies in the range of 70 to 75 Whr/Kg (32 to 34 Whr/Lb) for capacities of 100 to 250 Ah. It is further planned during this effort to evaluate the advanced cell design technology which has evolved from the work conducted at the NASA/Lewis Research Center.

Miller, L.↗

Design of a Commercial Scale Accelerator Driven Subcritical Aqueous Assembly

SHINE Medical Technologies is working towards producing a reliable, domestic supply of medical isotopes, including molybdenum-99 (Mo-99), xenon-133, and iodine 131, without using highly enriched uranium. Approximately 88% of Mo-99 decays to technetium-99m, which is the most widely used medical isotope in the world, accounting for approximately 80% of all nuclear medicine procedures. A novel aqueous, subcritical nuclear assembly has been designed by SHINE Medical Technologies. The assembly can produce medical radioisotopes in significant quantities for U.S. and foreign needs. The assembly produces isotopes without using a reactor, instead using a fusion-based neutron source coupled to a fission-based aqueous assembly. The subcritical nature of the aqueous assembly has safety and licensing benefits, including the elimination of the reactor control system and elimination of high level waste. SHINE plans to construct eight subcritical assemblies with a plant capacity of greater than 3000 6-day Curies, which is more than one-quarter of the world's Mo-99 requirements. From a nuclear design standpoint, the aqueous subcritical assembly needs to be able to generate sufficient fission power to meet the production capacity requirements while remaining subcritical at all times with an acceptable margin. To address these conflicting design goals, a simple nuclear design and reactivity control philosophy has been developed that allows for high power operation with a high degree of safety. A fusion-driven subcritical fission assembly has been designed by SHINE Medical Technologies to provide a reliable, domestic supply of medical isotopes. Nuclear models have been created and show that the assembly can be started up, operated, and shutdown in a safe manner without active reactivity control systems. A unique reactivity control strategy allows SHINE to operate the aqueous subcritical assembly at much higher power levels than would otherwise be practical, while still retaining the benefits of subcritical operation and avoiding the need for complex subcritical measurement techniques. Based on the current design, the subcritical target is capable of generating significant fission power (on the order of 100 kW) when being driven by a simple, low-cost deuterium-tritium accelerator, enabling the SHINE facility to supply over one-fourth of the worldwide demand of Mo- 99. SHINE has recently been issued a construction permit by the U.S. Nuclear Regulatory Commission to build the commercial facility in Janesville, WI, with eight subcritical assemblies and the associated production equipment. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Calista Energy Management Assistance Initiative

The Calista Energy Management Assistance Initiative (CEMAI) provided technical assistance and capacity building for 56 Tribal communities in the Calista Region of Alaska as an effort to reduce costs, improve operational efficiency, enhance human capacity, and job opportunities. CEMAI catalyzed and guided numerous efforts into a consolidated and effective initiative that brought rural energy best practices, economies of scale, operational efficiencies, human capacity, and economic development to the forefront. Calista Corporation (Calista) is one of thirteen Alaska Native Regional Corporations created under the Alaska Native Claims Settlement Act of 1971 (ANCSA) in the settlement of aboriginal land claims. Calista was incorporated in Alaska on June 12, 1972. The Calista Region covers Alaska’s Bethel and Kusilvak (formerly Wade Hampton) Census areas and includes 56 communities. Calista partnered with Nuvista Light and Electric Cooperative (Nuvista) on the Department of Energy, Office of Indian Energy (DOE-OIE), CEMAI project. Nuvista is a non-profit that seeks to reduce energy costs and provide renewable sources of energy to the people of western Alaska. It is founded and led by a non-profit, Tribe, Native Corporations (including Calista), energy organizations, and Alaska Native stakeholders in the Yukon-Kuskokwim Delta (YK-D) Region; covering the same service boundaries and communities served by Calista. This partnership allowed Calista to direct the project work with local energy experts to respond to community needs. In this arrangement, Calista added credibility and regional accountability while Nuvista added energy-specific expertise and skill set in project management. The delivery of the CEMAI Workplan included short-term or on-demand responses to specific technical assistance requests from communities in addition to longer-term strategically directed activities such as workshops, coordinated training, and capacity development efforts across the region. CEMAI’s Workplan aimed to enhance communities’ readiness for establishing renewable energy projects and implementing energy efficiency initiatives. The CEMAI objectives included: (1) Identifying common operational needs and improvement opportunities for entities with an energy interest or responsibility. (2) Providing access to multi-level expertise to address existing challenges. (3) Developing specialized training programs to build local capacity and community readiness. (4) Nurturing the creation of regional support networks. (5) Increasing access to regional, state, and federal energy initiatives, funding, and expertise. (6) Improving technical skills, provide livable wages, and job opportunities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Optimal Control of Distributed Energy Resources and Demand Response under Uncertainty

We take the perspective of a microgrid that has installed distribution energy resources (DER) in the form of distributed generation with combined heat and power applications. Given uncertain electricity and fuel prices, the microgrid minimizes its expected annual energy bill for various capacity sizes. In almost all cases, there is an economic and environmental advantage to using DER in conjunction with demand response (DR): the expected annualized energy bill is reduced by 9percent while CO2 emissions decline by 25percent. Furthermore, the microgrid's risk is diminished as DER may be deployed depending on prevailing market conditions and local demand. In order to test a policy measure that would place a weight on CO2 emissions, we use a multi-criteria objective function that minimizes a weighted average of expected costs and emissions. We find that greater emphasis on CO2 emissions has a beneficial environmental impact only if DR is available and enough reserve generation capacity exists. Finally, greater uncertainty results in higher expected costs and risk exposure, the effects of which may be mitigated by selecting a larger capacity.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Developing State and National Evaluation Infrastructures- Guidance for the Challenges and Opportunities of EM&V

Evaluating the impacts and effectiveness of energy efficiency programs is likely to become increasingly important for state policymakers and program administrators given legislative mandates and regulatory goals and increasing reliance on energy efficiency as a resource. In this paper, we summarize three activities that the authors have conducted that highlight the expanded role of evaluation, measurement and verification (EM&V): a study that identified and analyzed challenges in improving and scaling up EM&V activities; a scoping study that identified issues involved in developing a national efficiency EM&V standard; and lessons learned from providing technical assistance on EM&V issues to states that are ramping up energy efficiency programs. The lessons learned are summarized in 13 EM&V issues that policy makers should address in each jurisdiction and which are listed and briefly described. The paper also discusses how improving the effectiveness and reliability of EM&V will require additional capacity building, better access to existing EM&V resources, new methods to address emerging issues and technologies, and perhaps foundational documents and approaches to improving the credibility and cross jurisdictional comparability of efficiency investments. Two of the potential foundational documents discussed are a national EM&V standard or resource guide and regional deemed savings and algorithm databases.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Roles and Impacts of PV-Battery Hybrids in a Decarbonized U.S. Electricity Supply

In this paper, we explore the potential impacts of growing industry interest in hybrid systems comprising PV and battery technologies on the results and findings of the Solar Futures Study (DOE 2021). We employ similar scenario definitions in the same ReEDS capacity expansion model, but we perform two versions of each scenario: one in which PV and battery technologies must be deployed separately (No Hybrids), and one in which the model has the option of deploying them together as PVB hybrids (With Hybrids). By comparing the No Hybrids and With Hybrids versions of each scenario, we isolate the impacts of hybridization on the outcomes and findings of the Solar Futures Study. We find that PVB hybrid configurations capture a sizable share of PV deployment, and the highest-net-value PVB hybrid configuration depends strongly on policy conditions. A power sector decarbonization policy generally increases the value proposition of a more forward-looking PVB hybrid configuration that involves significant oversizing of the PV arrays, a larger battery (which facilitates greater recovery and utilization of otherwise clipped energy), and a higher capacity factor. The growing deployment of PVB hybrid configurations primarily displaces standalone PV capacity, such that total installed PV capacity is largely unaffected by the availability of PVB hybrid configurations. However, the higher capacity factors associated with PVB hybrid configurations drive a modest (1-2 percentage point) increase in PV's share of U.S. electricity supply in 2050. Finally, introducing the PVB hybrid configurations influences the future role and makeup of battery storage technologies, and it reduces the required transmission expansion, particularly under scenarios that involve a power sector decarbonization policy.

14 SOLAR ENERGY↗

Analyzing the Deployment of Large Amounts of Offshore Wind to Design an Offshore Transmission Grid in the United States: Preprint

This paper revisits the results from the U.S. Department of Energy's '20% Wind Energy By 2030' study, which envisioned that 54 GW of offshore wind would be installed by said year. The analysis is conducted using the Regional Energy Deployment System (ReEDS), a capacity expansion model developed by the National Renewable Energy Laboratory. The model is used to optimize the deployment of the 54 GW of wind capacity along the coasts and lakes of the United States. The graphical representation of the results through maps will be used to provide a qualitative description for planning and designing an offshore grid. ReEDS takes into account many factors in the process of siting offshore wind capacity, such as the quality of the resource, capital and O&M costs, interconnection costs, or variability metrics (wind capacity value, forecast error, expected curtailment). The effect of these metrics in the deployment of offshore wind will be analyzed through examples in the results.

17 WIND ENERGY↗

FY-09 Summary Report to the Office of Petroleum Reserves on the Western Energy Corridor Initiative Activities and Accomplishments

To meet its programmatic obligations under the Energy Policy Act of 2005, the Office of Naval Petroleum and Shale Oil Reserves (NPSOR) has initiated the Western Energy Corridor Initiative (WECI). The WECI will implement the Unconventional Strategic Fuels Task Force recommendations for accelerating and promoting the development of domestic unconventional fuels to help meet the nations’ energy needs. The mission of the WECI is to bolster America’s future fuel security by facilitating socially and environmentally responsible development of unconventional fuels resources in the Western Energy Corridor, using sound engineering principles and science-based methods to define and assess benefits, impacts, uncertainties, and mitigation options and to resolve impediments. The Task Force proposed a three-year program in its commercialization plan. The work described herein represents work performed by Idaho National Laboratory (INL) in support of the DOE’s WECI. This effort represents an interim phase of work, designed to initiate only select portions of the initiative, limited by available funding resources within NPOSR. Specifically, the work presented here addresses what was accomplished in FY-09 with the remaining carryover (~$420K) from NPOSR FY-08 funds. It was the intent of the NPOSR program to seek additional funding for full implementation of the full scope of work; however, the original tasks were reduced in scope, terminated, or eliminated (as noted below). An effort is ongoing to obtain funding to continue the tasks initiated under this project. This study will focus on the integrated development of multiple energy resources in a carbon-neutral and environmentally acceptable manner. Emphasis will be placed on analyses of the interrelationships of various energy-resource development plans and the infrastructure, employment, training, fiscal, and economic demands placed on the region as a result of various development scenarios. The interactions at build-out during the design, permitting, and construction of individual and multiple energy developments are not fully considered at the local, state, regional, or national levels. The net impacts to the Western Energy Corridor cannot be understood and the design optimized under the current approach. A regional development plan is needed to model cumulative impacts, determine the carrying capacity of the basin, and provide valuable technically based information to both skeptics and advocates. The INL scope of work for FY-09 involved six tasks: 1. Evaluation of the ASPEN Code as a dynamic systems model for application and use under the WECI and communications with Alberta Oil Sands Research Institutions as an “analog” resource development in the Western Energy Corridor 2. Application of the Aspen Plus computer model to several oil shale processes to consider energy balances and inputs and outputs (e.g. water consumption, CO2 production, etc.) 3. Development of a regulatory roadmap for oil shale developments 4. Defining of the physiographic extent of the natural resource reserves that comprise the Western Energy Corridor 5. A review of the Unconventional Fuels Task Force Report to Congress for ideas, concepts and recommendations that crosscutting plans 6. Program development with stakeholders, including industry, academics, state and federal agencies, and non government organizations. This task also includes project management, strategic development and reporting.

04 OIL SHALES AND TAR SANDS↗

Hualapai Tribal Utility Development Project

The first phase of the Hualapai Tribal Utility Development Project (Project) studied the feasibility of establishing a tribally operated utility to provide electric service to tribal customers at Grand Canyon West (see objective 1 below). The project was successful in completing the analysis of the energy production from the solar power systems at Grand Canyon West and developing a financial model, based on rates to be charged to Grand Canyon West customers connected to the solar systems, that would provide sufficient revenue for a Tribal Utility Authority to operate and maintain those systems. The objective to establish a central power grid over which the TUA would have authority and responsibility had to be modified because the construction schedule of GCW facilities, specifically the new air terminal, did not match up with the construction schedule for the solar power system. Therefore, two distributed systems were constructed instead of one central system with a high voltage distribution network. The Hualapai Tribal Council has not taken the action necessary to establish the Tribal Utility Authority that could be responsible for the electric service at GCW. The creation of a Tribal Utility Authority (TUA) was the subject of the second objective of the project. The second phase of the project examined the feasibility and strategy for establishing a tribal utility to serve the remainder of the Hualapai Reservation and the feasibility of including wind energy from a tribal wind generator in the energy resource portfolio of the tribal utility (see objective 2 below). It is currently unknown when the Tribal Council will consider the implementation of the results of the study. Objective 1 - Develop the basic organizational structure and operational strategy for a tribally controlled utility to operate at the Tribe’s tourism enterprise district, Grand Canyon West. Coordinate the development of the Tribal Utility structure with the development of the Grand Canyon West Power Project construction of the power infrastructure at Grand Canyon West. Develop the maintenance and operations capacity necessary to support utility operations. Develop rates for customers on the Grand Canyon West “mini-grid” sufficient for the tribal utility to be self-sustaining. Establish an implementation strategy for tribal utility service at Grand Canyon West Objective 2 - Develop a strategy for tribal utility takeover of electric service on the Reservation. Perform a cost analysis of Reservation electrical service. Develop an implementation strategy for tribal takeover of Reservation electrical service. Examine options and costs associated with integration of the Tribe’s wind resources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ESTIMATING RISK TO CALIFORNIA ENERGY INFRASTRUCTURE FROM PROJECTED CLIMATE CHANGE

This report outlines the results of a study of the impact of climate change on the energy infrastructure of California and the San Francisco Bay region, including impacts on power plant generation; transmission line and substation capacity during heat spells; wildfires near transmission lines; sea level encroachment upon power plants, substations, and natural gas facilities; and peak electrical demand. Some end-of-century impacts were projected:Expected warming will decrease gas-fired generator efficiency. The maximum statewide coincident loss is projected at 10.3 gigawatts (with current power plant infrastructure and population), an increase of 6.2 percent over current temperature-induced losses. By the end of the century, electricity demand for almost all summer days is expected to exceed the current ninetieth percentile per-capita peak load. As much as 21 percent growth is expected in ninetieth percentile peak demand (per-capita, exclusive of population growth). When generator losses are included in the demand, the ninetieth percentile peaks may increase up to 25 percent. As the climate warms, California's peak supply capacity will need to grow faster than the population.Substation capacity is projected to decrease an average of 2.7 percent. A 5C (9F) air temperature increase (the average increase predicted for hot days in August) will diminish the capacity of a fully-loaded transmission line by an average of 7.5 percent.The potential exposure of transmission lines to wildfire is expected to increase with time. We have identified some lines whose probability of exposure to fire are expected to increase by as much as 40 percent. Up to 25 coastal power plants and 86 substations are at risk of flooding (or partial flooding) due to sea level rise.

03 NATURAL GAS↗

Parallel computing for power system climate resiliency: Solving a large-scale stochastic capacity expansion problem with mpi-sppy

Here we propose a nodal stochastic generation and transmission expansion planning model that incorporates the output from high-resolution global climate models through load and generation availability scenarios. We implement our model in Pyomo and perform computational studies on a realistically-sized test case of the California electric grid in a high performance computing environment. We propose model reformulations and algorithm tuning to efficiently solve this large problem using a variant of the Progressive Hedging Algorithm. We utilize the parallelization capabilities and overall versatility of mpi-sppy, exploiting its hub-and-spoke architecture to concurrently obtain inner and outer bounds on an optimal expansion plan. Initial results show that instances with 360 representative days on a system with over 8,000 buses can be solved to within 5% of optimality in under 4 h of wall clock time, a first step towards solving a large-scale power system expansion planning problem across a wide range of climate-informed operational scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Review of wind generation within adequacy calculations and capacity markets for different power systems

The integration of renewable energy sources, including wind power, in the adequacy assessment of electricity generation capacity becomes increasingly important as renewable energy generation increases in volume and replaces conventional power plants. The contribution of wind power to cover the electricity demand is less certain than conventional power sources; therefore, the capacity value of wind power is smaller than that of conventional plants. This article presents an overview of the adequacy challenge, how wind power is handled in the regulation of capacity adequacy, and how wind power is treated in a selection of jurisdictions. The jurisdictions included in the overview are Sweden, Great Britain, France, Ireland, United States (PJM and ERCOT), Finland, Portugal, Spain, Norway, Denmark, Belgium, Germany, Italy and the Netherlands.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Final report: Task 4a.2 20% wind scenario assessment of electric grid operational features

Wind integration modeling in electricity generation capacity expansion models is important in that these models are often used to inform political or managerial decisions. Poor representation of wind technology leads to under-estimation of wind's contribution to future energy scenarios which may hamper growth of the industry. The NREL's Wind Energy Deployment System (WinDS) model provides the most detailed representation of geographically disperse renewable resources and the optimization of transmission expansion to access these resources. Because WinDS was selected as the primary modeling tool for the 20% Wind Energy by 2030 study, it is the ideal tool for supplemental studies of the transmission expansion results. However, as the wind industry grows and knowledge related to the wind resource and integration of wind energy into the electric system develops, the WinDS model must be continually improved through additional data and innovative algorithms to capture the primary effects of variable wind generation. The detailed representation of wind technology in the WinDS model can be used to provide improvements to the simplified representation of wind technology in other capacity expansion models. This task did not employ the WinDS model, but builds from it and its results. Task 4a.2 provides an assessment of the electric grid operational features of the 20% Wind scenario and was conducted using power flow models accepted by the utility industry. Tasks 2 provides information regarding the physical flow of electricity on the electric grid which is a critical aspect of infrastructure expansion scenarios. Expanding transmission infrastructure to access remote wind resource in a physically realizable way is essential to achieving 20% wind energy by 2030.

17 WIND ENERGY↗

Coordinated microgrid investment and planning process considering the system operator

Nowadays, a significant number of distribution systems are facing problems to accommodate more photovoltaic (PV) capacity, namely due to the overvoltages during the daylight periods. This has an impact on the private investments in distributed energy resources (DER), since it occurs exactly when the PV prices are becoming attractive, and the opportunity to an energy transition based on solar technologies is being wasted. In particular, this limitation of the networks is a barrier for larger consumers, such as commercial and public buildings, aiming at investing in PV capacity and start operating as microgrids connected to the MV network. To address this challenge, this paper presents a coordinated approach to the microgrid investment and planning problem, where the system operator and the microgrid owner collaborate to improve the voltage control capabilities of the distribution network, increasing the PV potential. The results prove that this collaboration has the benefit of increasing the value of the microgrid investments while improving the quality of service of the system and it should be considered in the future regulatory framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Identifying and Characterizing Candidate Areas for Siting New Nuclear Capacity in the United States

Oak Ridge National Laboratory (ORNL) staff recently completed an internal 'Energy Assurance' study examining the key issues associated with the country's energy needs for the future focusing on generation sources, baseload options, transmission and distribution, reduction of greenhouse gases, and overall energy security issues. In examining the various generation sources including nuclear power and renewables, one principal finding was that 300 GW(e) of new nuclear electrical generating capacity would be needed by 2050. With that need, the initial, obvious question is can 300 GW(e) of nuclear capacity be sited in the United States? In an attempt to address that question as well as others, ORNL initiated a 'National Electric Generation Siting Study,' which is to be a multiphase study to address several key questions related to our national electrical energy supply. The initial phase of this study is to examine the nuclear option. This paper summarizes the approach developed for screening sites, the methodology employed that includes spatial modeling, and preliminary results using the southeast United States to demonstrate the usefulness of the overall approach as a test case.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Capabilities Development at the University of Texas at El Paso for Hydrogen Generation Research and Education

Gasification-based systems have recently received much attention due to their capability of converting wastes into useful fuels. The gasification of biomass, municipal solid waste (MSW), plastics, and other sustainable resources has shown promise in hydrogen production. When coupled to a CCU or CCS unit, these systems have the potential to achieve carbon neutrality or carbon-negative emissions. In addition, these systems have an edge over conventional incineration or landfill systems by reducing greenhouse gas emissions and recovering useful energy. However, the gasification of MSW and other wastes is still in its early stages. In particular, co-gasification of wastes with biomass has significant unknowns in optimizing the reaction kinetics, operability, design and performance improvements. Currently, Supercritical Water Gasifiers (SCWG) and Plasma Gasifiers are the major systems that are capable of producing high hydrogen amounts from Biomass and MSW, respectively. However, both systems have high capital and operating costs, adversely affecting efficiency and the hydrogen production cost. Additionally, due to lower temperatures, SCWGs are prone to tar formation and fouling in the heat exchangers. Hence, there is a need to look for alternative solutions for MSW and biomass gasifications, particularly in co-gasification. The current effort aims to develop a strategic plan to establish a sustainable gasification facility for hydrogen research at the University of Texas at El (UTEP). A major part of this effort involves an extensive literature survey to identify technological gaps and potential areas of interest. Several concepts were developed in accordance with the current demands from the literature survey. Based on the concepts, a center-wide capability assessment was conducted to measure the current capacity and feasibility of establishing hydrogen research. Afterward, a strategic research plan was developed, and a list of required resources was made for the expansion of hydrogen research at UTEP. In addition, successful partnerships with the local county and the city were developed to pursue hydrogen research. The strategic goal setting and planning of UTEP Aerospace Center resulted in securing $2.5 million in external support to expand the hydrogen research during the project performance period. In addition, during the project period, a course in Hydrogen Energy Systems was developed to expand the energy curriculum at the UTEP Aerospace and Mechanical Engineering Department. The course focused on hydrogen production, storage, supply and delivery and application. The cross-listed course was offered at both undergraduate and graduate levels during the Spring 2024 semester and had 27 enrolled students. Moreover, the students supported under this award were trained in gasification process modeling, CAD, CFD and FEA during the project period. The training enabled the students to move into new projects to support gasification design, integrated gasification combined cycle process plant analysis, gasifier structural and operational analysis, and digitally threading the systems.

08 HYDROGEN↗

Summary of GFL Inverter Capability and Performance: Malawi [Slides]

This presentation provides a comprehensive comparison of inverter-based resource (IBR) technical requirements across multiple international grid codes - including IEEE 2800, ESO, EirGrid, and Malawi's evolving regulatory framework - to support capacity building for electricity-sector institutions in Malawi. It highlights key performance expectations for grid-following (GFL) inverters across critical domains such as primary and fast frequency response, ramping behavior, frequency and voltage ride-through capabilities, reactive power and voltage control, ROCOF withstand, phase jump tolerance, system strength considerations, protection schemes, and dynamic modeling requirements. Emphasizing a "Do no harm, do something, do more" philosophy, the document synthesizes best practices and operational benchmarks to guide the integration and stability of inverter-based resources within Malawi's power system. The presentation forms part of the SABESS Center of Excellence initiative supported by the Global Energy Alliance for People and the Planet.

24 POWER TRANSMISSION AND DISTRIBUTION↗