Results for “COST ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Lake Charles CCS Project (Final Technical Report, Phase 2)

In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture and Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO 2 ) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO 2 generated in a large industrial gasification process and sequester the CO 2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials, construction labor, engineering, and other costs. The CCS Project Final Technical Report is based on a Front End Engineering and Design (FEED) study prepared by SK E&C, completed in [June] 2014. Subsequently, Fluor Enterprises completed a FEED validation study in mid-September 2014. The design analyses indicated that the FEED package was sufficient and as expected. However, Fluor considered the construction risk based on a stick-build approach to be unacceptable, but construction risk would be substantially mitigated through utilization of modular construction where site labor and schedule uncertainty is minimized. Fluor’s estimate of the overall EPC project cost utilizing the revised construction plan was comparable to SKE&C’s value after reflecting Fluor’s assessment of project scope and risk characteristic. Development was halted upon conclusion of Phase 2A FEED and the project was not constructed.Transport and Sequestration – The overall objective of the pipeline project was to construct a pipeline to transport captured CO 2 from the Lake Charles Clean Energy project to the existing Denbury Green Line and then to the Hastings Field in Southeast Texas to demonstrate effective geologic sequestration of captured CO 2 through commercial EOR operations. The overall objective of the MVA portion of the project was to demonstrate effective geologic sequestration of captured CO 2 through commercial Enhanced Oil Recovery (EOR) operations in order to evaluate costs, operational processes and technical performance. The DOE target for the project was to capture and implement a research MVA program to demonstrate the sequestration through EOR of approximately one million tons of CO 2 per year as an integral component of commercial operations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A techno-economic assessment of membrane distillation for treatment of Marcellus shale produced water

Membrane distillation (MD) is a promising desalination technology for treatment of high salinity shale gas produced water. Techno-economic assessment (TEA) is necessary for evaluating the economic feasibility of MD for produced water treatment as compared to other shale gas produced water management strategies. A detailed TEA for a hypothetical 0.5 million gallons per day (MGD) direct contact MD (DCMD) that concentrates produced water from 10% (100,000 mg/L) Total Dissolved Solids (TDS) to 30% salinity is presented in this study. The model is developed based on a combination of experimental results, ASPEN Plus process model, best available engineering knowledge, and cost estimates. Analysis reveals that thermal energy cost for MD operation contributes the most to total cost of treating produced water in an MD plant. Additionally, the results of sensitivity analysis reveal that feed TDS level and thermal energy price have a significant impact on total cost of treating produced water. We also explore the implications of utilizing waste heat on the economics of the MD technology for produced water treatment. Here the results reveal that the total cost of treating produced water using MD is $\$$5.70/m 3 feed which decreases significantly to $\$$0.74/m 3 feed when MD is integrated with a source of waste heat.

42 ENGINEERING↗

Conductive Adhesives for Metallization of Interdigitated Back Contact Solar Cells

The metallization and interconnection of Si solar cells to form a module is usually a multi-step process: cells are metallized individually, soldered into strings, and subsequently assembled into a module. Furthermore, the metallization process for individual cells must be compatible with the doped surfaces being contacted, which creates additional challenges when moving from diffused junctions to heterojunctions and/or passivated contact structures. To mitigate these problems and streamline module manufacturing for the case of interdigitated back contact (IBC) cell modules, we developed an approach wherein unmetallized IBC cells are bonded directly to a circuitized backsheet using a conductive adhesive (CA) that only conducts out-of-plane. The metal/CA/silicon stack is bonded by hot-pressing at 100-200 degrees C.For a CA consisting of ethylene vinyl acetate (EVA) filled with Ag-coated spheres or indium powder we find that contact resistivities in the range of 1-10 Wcm 2 are obtained, regardless of which conductive filler and which hot pressing parameters are used. XPS revealed that about 1-2 nm EVA residue bonds to the Si in these samples, suggesting the formation of an insulating barrier that is responsible for the high contact resistance. Using indium powder alone, improved contact resistivities <0.6 Wcm 2 , high shunt resistances, and an implied open-circuit voltage loss below 10 mV were obtained. Furthermore, a cost estimate is presented, indicating that substantial cost savings of up to $10/m 2 , or about $0.05/W DC , are possible through CA-based IBC module manufacturing.

14 SOLAR ENERGY↗

Hydrogen and Battery Storage Technologies for Low-Cost Energy Decarbonization in Distribution Networks

Deep energy decarbonization cannot be achieved without high penetration of renewables. At higher renewable energy penetrations, the variability and intermittent nature of solar photovoltaic (PV) electricity can cause ramping issues with existing fossil fuel generation, requiring longer term energy storage to increase the reliability of grid operation. Here, a proton exchange membrane electrolyzer can produce H 2 and serves as a utility controllable load. The produced H 2 can then be stored and converted back into electricity, or mixed with natural gas, or used as transportation fuel, or chemical feedstock. This paper considers the perspective of the distribution system operator that operates the distributed energy resources on a standard IEEE 33-node distribution network considering the technical and physical constraints with the goal of minimizing total investment and operation cost. Different case studies, at very high PV penetrations are considered to show the challenges and path to net-zero emission energy production using H 2 energy. Sensitivity of utility PV costs and electrolyzer capital costs on producing H 2 at $\$1$ /kg are presented showing that the distribution network could produce 100% renewable electricity and H 2 could be produced at a cost of $\$1$ /kg by 2050 with conservative cost estimates and by 2030 with accelerated cost declines.

25 ENERGY STORAGE↗

FECM/NETL Offshore CO2 Saline Storage Cost Model

The FECM/NETL Offshore CO2 Saline Storage Cost Model (CO2_S_COM_Offshore) estimates costs for a CO2 storage project in an offshore saline formation or reservoir. It is applicable for storage projects located on the Outer Continental Shelf of the Gulf of America. The purpose is to model the costs associated with a project, using simplified geo-engineering equations to calculate reservoir values needed to determine costs (such as CO2 plume area and number of injection wells). To use the model, change any of the inputs, which are always in orange cells, to the values you desire. Although there are numerous values that can be changed, the values expected to be of most interest have input cells on the 'Key_Inputs' sheet. Last update: 5/2/2025; Version 1.1 corrects bug in reservoir thickness calculations.

Carbon storage↗

Transformational Solid Oxide Fuel Cell (SOFC) Technology

This project was conducted under the Co-operative Agreement No. DE-FE0027584 with the US Department Energy to developed advanced Solid Oxide Fuel Cell (SOFC) Technologies. The overall objective of this project was to advance SOFC technology at the cell and stack level to enhance cell robustness and durability, increase performance, and reduce balance-of-plant (BOP) requirements. By reducing system complexity combined with the increases in power density and efficiency, the ultimate goal of the project was to increased reliability and to reduce capital and operating costs of installed systems. The project was focused on pathways that will reduce the cost of the SOFC cell and stack, including the following areas: Robust, redox tolerant cell technology Lower cost cell manufacturing through advances in cell design, which will reduce the amount of material, energy and time used in the fabrication of SOFCs High performance, low temperature electrolyte based on improvement of established materials Innovative SOFC stack architecture which truly integrates Balance of Plant functionality into the stack level design Thermal management of the fuel cell stack for increased durability and expanded window of operation Novel stack design amenable for use in sub-MW to multi-MW-scale power plants and having low replacement cost The incorporation of balance-of-plant (BOP) equipment into the stack platform increased the economic viability of smaller scale systems. The project objectives were met by a multi-prong approach, including new cell design complemented with modifications to existing cell technology, as well as a new stack design incorporating components typically included in the BOP, such as heat exchangers, oxidizer, fuel reformers, and recycle systems. The project culminated with demonstration of a stack test validating the viability of the cell and stack improvements. A cost model was also developed to estimate costs for the advanced stack technology at high volume manufacturing levels. The net outcome of the project is SOFC cell and stack technology with costs significantly below current DOE targets without compromising and, in some cases, improving on the performance and degradation rate demonstrated with the current state-of-the-art stack design. The results of this project advanced the reliability, robustness, and endurance of low-cost SOFC technology that ultimately are ready to be deployed in coal power systems with greater than 60 percent efficiency (based on higher heating value of fuel) and the capability for ≥97% CO 2 capture at a cost-of-electricity that is approximately 40 percent below presently available Integrated Gasification Combined Cycle systems.

03 NATURAL GAS↗

CACTUS: CO 2 Aerogel Capture Towards Utilization and Sequestration

The CACTUS project aimed to develop a novel solid sorbent and sorption module prototype for direct air capture (DAC) of carbon dioxide, by a moisture-swing adsorption (MSA) mechanism. Because MSA uses changes in humidity, not temperature to switch the sorbent from capturing CO 2 to releasing concentrated CO 2 it is > 4X more energy-efficient than the thermal swing process. The goal was to develop a sorbent with a CO 2 capture capacity of 1 mmol CO 2 /g sorbent (or 0.75 mmol CO 2 /g structured sorbent), at a projected scaled cost of < $\$$15/kg sorbent and demonstration of a path to < $\$$100/ton CO 2 . At the end of the project, we achieved 0.8 mmol CO 2 /g sorbent powders, 0.37 mmol CO 2 /g structured sorbent (50% of target), at a projected cost of $\$$29/kg sorbent and an estimated cost of $\$$160/ton CO 2 . The key innovation was SRI’s patented polymer aerogel synthesis platform, which was adapted to produce a nanoporous aerogel with a high density of CO 2 -adsorbing quaternary ammonium groups. This research discovered a new ammonium polymer sorbent and identified a chemical path for its fabrication. The new process solved the monomer immiscibility challenge encountered with the initial method (ammonium is hydrophilic and the crosslinker is hydrophobic). The team fabricated structured sorbent sheets consisting of a non-woven porous substrate impregnated with ammonium polymer and demonstrated its operation in custom made breakthrough test setup MSA DAC built at SRI, and which operates similarly to the envisioned large-scale CO 2 capture plant, to provide data for techno-economic analysis (TEA). TEA sensitivity analysis indicated that ∼$\$$100/ton CO 2 can be achieved if the target capacity of 0.75 mmol CO 2 /g structured sorbent is met. Also identified routes to decrease sorbent manufacturing cost to ∼$\$$19/kg by reducing amounts and recycling the organic solvents. More work is needed on transitioning process manufacturing from powders (which showed a capacity of up to 0.8 mmol/g sorbent) to structured sheets which showed a capacity of 0.37 mmol CO 2 /g structured sorbent (or 0.44 mmol/g sorbent if one excludes the inert porous substrate). This is likely due to different micro/nano-structure of the sorbent and material processing constraints at the laboratory scale. Sorbent cycling studies (> 100 cycles) are needed to investigate its performance stability over time.

99 GENERAL AND MISCELLANEOUS↗

Development of an Air Brayton solar receiver

Various receiver configurations and operating conditions were examined. The interface requirements between the receiver/concentrator/power module were addressed. Production cost estimates were obtained to determine the cost of the receiver during the 1980 timeframe. A conceptual design of an air Brayton solar receiver is presented based on the results. The following design goals were established: (1)peak thermal input power - 85 KWt; (2)receiver outlet air temperature - 1500 F; (3)receiver inlet air temperature - 1050 F; (4)design mass flow rate - 0.533 lb/sec; and (5)design receiver inlet pressure - 36.75 psia.

Source record↗

Economics of polysilicon processes

Techniques are being developed to provide lower cost polysilicon material for solar cells. Existing technology which normally provides semiconductor industry polysilicon material is undergoing changes and also being used to provide polysilicon material for solar cells. Economics of new and existing technologies are presented for producing polysilicon. The economics are primarily based on the preliminary process design of a plant producing 1,000 metric tons/year of silicon. The polysilicon processes include: Siemen's process (hydrogen reduction of trichlorosilane); Union Carbide process (silane decomposition); and Hemlock Semiconductor process (hydrogen reduction of dichlorosilane). The economics include cost estimates of capital investment and product cost to produce polysilicon via the technology. Sensitivity analysis results are also presented to disclose the effect of major paramentes such as utilities, labor, raw materials and capital investment.

Yaws, C. L.↗

How Do You Go From a Concept Idea to a NASA Selected Mission? Formulating the Psyche Discovery Mission with JPL's Concurrent Engineering Teams

JPL’s Office of Formulation provides continuity of support and access to domain subject matter experts, as Principal Investigators mature their mission concepts from “cocktail napkin” ideas to Preliminary Design Reviews [1]. Using NASA’s Psyche mission as a case study, we describe JPL’s concurrent engineering A-Team and Team X support to the Psyche competed concept study team in the areas of 1) Initial Feasibility, 2) Trade Space Exploration, 3) Spacecraft Point Design and Cost Estimate, 4) Science, Technical, Management, and Cost Review, and 5) Strategy and Communication Development. NASA’s Psyche Discovery-class mission started as a grassroots idea from Principal Investigator L.T. ElkinsTanton. Is there a compelling Discovery mission to visit the interior of a body for the first time, by sending a mission to an iron metal asteroid? In less than five years the Psyche concept was selected as a mission under NASA’s Discovery Program. While Psyche had a dedicated concept development team [2], they utilized JPL’s concurrent engineering teams, methods, analysis tools, and subject matter experts throughout their mission concept formulation lifecycle

Ziemer, John↗

How Do You Go From a Concept Idea to a NASA Selected Mission? Formulating the Psyche Discovery Mission with JPL's Concurrent Engineering Teams

JPL’s Office of Formulation provides continuity of support and access to domain subject matter experts, as Principal Investigators mature their mission concepts from “cocktail napkin” ideas to Preliminary Design Reviews [1]. Using NASA’s Psyche mission as a case study, we will describe JPL’s concurrent engineering ATeam and Team X support to the Psyche competed concept study team in the areas of 1) Science Feasibility, 2) Trade Space Exploration, 3) Spacecraft Point Design and Cost Estimate, 4) Science, Technical, Management, and Cost Review, and 5) Strategy and Communication Development. NASA’s Psyche Discovery class mission started as a grassroots idea in our A-Team facility, and in less than five years was selected as a mission under NASA’s Discovery Program. While Psyche had a dedicated concept development team [2], they utilized JPL’s concurrent engineering teams, methods, analysis tools, and experts throughout their mission concept lifecycle.

Ziemer, John↗

Systems Engineering Provides Successful High Temperature Steam Electrolysis Project

This paper describes two Systems Engineering Studies completed at the Idaho National Laboratory (INL) to support development of the High Temperature Stream Electrolysis (HTSE) process. HTSE produces hydrogen from water using nuclear power and was selected by the Department of Energy (DOE) for integration with the Next Generation Nuclear Plant (NGNP). The first study was a reliability, availability and maintainability (RAM) analysis to identify critical areas for technology development based on available information regarding expected component performance. An HTSE process baseline flowsheet at commercial scale was used as a basis. The NGNP project also established a process and capability to perform future RAM analyses. The analysis identified which components had the greatest impact on HTSE process availability and indicated that the HTSE process could achieve over 90% availability. The second study developed a series of life-cycle cost estimates for the various scale-ups required to demonstrate the HTSE process. Both studies were useful in identifying near- and long-term efforts necessary for successful HTSE process deployment. The size of demonstrations to support scale-up was refined, which is essential to estimate near- and long-term cost and schedule. The life-cycle funding profile, with high-level allocations, was identified as the program transitions from experiment scale R&D to engineering scale demonstration.

08 HYDROGEN↗

Ultra Thin Quantum Well Materials

This project has enabled Hi-Z technology Inc. (Hi-Z) to understand how to improve the thermoelectric properties of Si/SiGe Quantum Well Thermoelectric Materials. The research that was completed under this project has enabled Hi-Z Technology, Inc. (Hi-Z) to satisfy the project goal to understand how to improve thermoelectric conversion efficiency and reduce costs by fabricating ultra thin Si/SiGe quantum well (QW) materials and measuring their properties. In addition, Hi-Z gained critical new understanding on how thin film fabrication increases the silicon substrate's electrical conductivity, which is important new knowledge to develop critical material fabrication parameters. QW materials are constructed with alternate layers of an electrical conductor, SiGe and an electrical insulator, Si. Film thicknesses were varied, ranging from 2nm to 10nm where 10 nm was the original film thickness prior to this work. The optimum performance was determined at a Si and SiGe thickness of 4nm for an electrical current and heat flow parallel to the films, which was an important conclusion of this work. Essential new information was obtained on how the Si substrate electrical conductivity increases by up to an order of magnitude upon deposition of QW films. Test measurements and calculations are accurate and include both the quantum well and the substrate. The large increase in substrate electrical conductivity means that a larger portion of the electrical current passes through the substrate. The silicon substrate's increased electrical conductivity is due to inherent impurities and thermal donors which are activated during both molecular beam epitaxy and sputtering deposition of QW materials. Hi-Z's forward looking cost estimations based on future high performance QW modules, in which the best Seebeck coefficient and electrical resistivity are taken from separate samples predict that the electricity cost produced with a QW module could be achieved at < $\$$ 0.35/W. This price would open many markets for waste heat recovery applications. By installing Hi-Z's materials in applications in which electricity could be produced from waste heat sources could result in significant energy savings as well as emissions reductions. For example, if QW thermoelectric generators could be introduced commercially in 2015, and assuming they could also capture an additional 0.1%/year of the available waste heat from the aluminum, steel, and iron industries, then by 2020, their use would lead to a 2.53 trillion Btu/year reduction in energy consumption. This translates to a $\$$ 12.9 million/year energy savings, and 383.6 million lb's of CO 2 emissions reduction per year. Additionally, Hi-Z would expect that the use of QW TE devices in the automotive, manufacturing, and energy generation industries would reduce the USA's petroleum and fossil fuel dependence, and thus significantly reduce emissions from CO 2 and other polluting gasses such as NOx, SOx, and particulate matter (PM), etc.

02 PETROLEUM↗

Solar central electric power generation - A baseline design

The paper presents the conceptual technical baseline design of a solar electric power plant using the central receiver concept, and derives credible cost estimates from the baseline design. The major components of the plant - heliostats, tower, receiver, tower piping, and thermal storage - are discussed in terms of technical and cost information. The assumed peak plant output is 215 MW(e), over 4000 daylight hours. The contribution of total capital investment to energy cost is estimated to be about 55 mills per kwh in mid-1974 dollars.

Powell, J. C.↗

Quantifying Contaminant Mass for the Feasibility Study of the DuPont Chambers Works FUSRAP Site - 13510

The U.S. Army Corps of Engineers (USACE) - Philadelphia District is conducting an environmental restoration at the DuPont Chambers Works in Deepwater, New Jersey under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Discrete locations are contaminated with natural uranium, thorium-230 and radium-226. The USACE is proposing a preferred remedial alternative consisting of excavation and offsite disposal to address soil contamination followed by monitored natural attenuation to address residual groundwater contamination. Methods were developed to quantify the error associated with contaminant volume estimates and use mass balance calculations of the uranium plume to estimate the removal efficiency of the proposed alternative. During the remedial investigation, the USACE collected approximately 500 soil samples at various depths. As the first step of contaminant mass estimation, soil analytical data was segmented into several depth intervals. Second, using contouring software, analytical data for each depth interval was contoured to determine lateral extent of contamination. Six different contouring algorithms were used to generate alternative interpretations of the lateral extent of the soil contamination. Finally, geographical information system software was used to produce a three dimensional model in order to present both lateral and vertical extent of the soil contamination and to estimate the volume of impacted soil for each depth interval. The average soil volume from all six contouring methods was used to determine the estimated volume of impacted soil. This method also allowed an estimate of a standard deviation of the waste volume estimate. It was determined that the margin of error for the method was plus or minus 17% of the waste volume, which is within the acceptable construction contingency for cost estimation. USACE collected approximately 190 groundwater samples from 40 monitor wells. It is expected that excavation and disposal of contaminated soil will remove the contaminant source zone and significantly reduce contaminant concentrations in groundwater. To test this assumption, a mass balance evaluation was performed to estimate the amount of dissolved uranium that would remain in the groundwater after completion of soil excavation. As part of this evaluation, average groundwater concentrations for the pre-excavation and post-excavation aquifer plume area were calculated to determine the percentage of plume removed during excavation activities. In addition, the volume of the plume removed during excavation dewatering was estimated. The results of the evaluation show that approximately 98% of the aqueous uranium would be removed during the excavation phase. The USACE expects that residual levels of contamination will remain in groundwater after excavation of soil but at levels well suited for the selection of excavation combined with monitored natural attenuation as a preferred alternative. (authors)

54 ENVIRONMENTAL SCIENCES↗

The Opportunity in Commercial Approaches for Future NASA Deep Space Exploration Elements

This work joins two events, showing the potential for commercial, public private partnerships, modeled on programs like COTS, to reduce the cost to NASA significantly for other required deep space exploration capabilities. These other capabilities include landers, stages and more. We mature the concept of costed baseball cards, adding cost estimates to NASAs space systems baseball cards.

cost modeling estimation↗