Search NASA⌕ Search

SEARCH · Search NASA

Results for “Checkout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Development of satellite position location system for aircraft and boat distress beacons

An international satellite system for the detection and location of distress beacons carried on aircraft and vessels is in its technical checkout phase. User demonstration and evaluation (D&E) will start in early 1983 and continue for two years. The D&E phase and a subsequent transition period will form the basis for improved search and rescue operations for the 1980's and beyond. The system, called COSPAS/SARSAT, has international participation involving the U.S., Canada, and France as SARSAT members and joint participation with the Soviet Union's COSPAS Project. Norway and the U.K. have recently joined as investigators. Average position location error of the satellite aided processing is expected to be from 10-20KM for the existing 121.5/243 MHz distress beacons and from 2-5KM for experimental beacons transmitting in the 406 MHz band.

Kahle, D. R.↗

Initial research program for the National Transonic Facility

The construction and checkout of the National Transonic Facility (NTF) have been completed, and detailed calibration is now in progress. The initial NTF research program covers a wide range of study areas falling into three major elements: (1) the assessment of Reynolds number sensitivities for a broad range of configurations and flow phenomena; (2) validation of the ability of NTF to simulate full-scale aerodynamics; and (3) the development of test techniques for improved test simulations in existing wind tunnels. This paper, therefore, is a status report on these various elements of the initial NTF research program.

Gloss, B. B.↗

Measurement of reach envelopes with a four-camera Selective Spot Recognition (SELSPOT) system

The basic Selective Spot Recognition (SELSPOT) system is essentially a system which uses infrared LEDs and a 'camera' with an infrared-sensitive photodetector, a focusing lens, and some A/D electronics to produce a digital output representing an X and Y coordinate for each LED for each camera. When the data are synthesized across all cameras with appropriate calibrations, an XYZ set of coordinates is obtained for each LED at a given point in time. Attention is given to the operating modes, a system checkout, and reach envelopes and software. The Video Recording Adapter (VRA) represents the main addition to the basic SELSPOT system. The VRA contains a microprocessor and other electronics which permit user selection of several options and some interaction with the system.

Stramler, J. H., Jr.↗

Shuttle avionics software trials, tribulations and success

The early problems and the solutions developed to provide the required quality software needed to support the space shuttle engine development program are described. The decision to use a programmable digital control system on the space shuttle engine was primarily based upon the need for a flexible control system capable of supporting the total engine mission on a large complex pump fed engine. The mission definition included all control phases from ground checkout through post shutdown propellant dumping. The flexibility of the controller through reprogrammable software allowed the system to respond to the technical challenges and innovation required to develop both the engine and controller hardware. This same flexibility, however, placed a severe strain on the capability of the software development and verification organization. The overall development program required that the software facility accommodate significant growth in both the software requirements and the number of software packages delivered. This challenge was met by reorganization and evolution in the process of developing and verifying software.

Henderson, O. L.↗

Shuttle avionics software development trials: Tribulations and successes, the backup flight system

The development and verification of the Backup Flight System software (BFS) is discussed. The approach taken for the BFS was to develop a very simple and straightforward software program and then test it in every conceivable manner. The result was a program that contained approximately 12,000 full words including ground checkout and the built in test program for the computer. To perform verification, a series of tests was defined using the actual flight type hardware and simulated flight conditions. Then simulated flights were flown and detailed performance analysis was conducted. The intent of most BFS tests was to demonstrate that a stable flightpath could be obtained after engagement from an anomalous initial condition. The extention of the BFS to meet the requirements of the orbital flight test phase is also described.

Chevers, E. S.↗

Launch processing system concept to reality

The Launch Processing System represents Kennedy Space Center's role in providing a major integrated hardware and software system for the test, checkout and launch of a new space vehicle. Past programs considered the active flight vehicle to ground interfaces as part of the flight systems and therefore the related ground system was provided by the Development Center. The major steps taken to transform the Launch Processing System from a concept to reality with the successful launches of the Shuttle Programs Space Transportation System are addressed.

Bailey, W. W.↗

Mathematical models for space shuttle ground systems

Math models are a series of algorithms, comprised of algebraic equations and Boolean Logic. At Kennedy Space Center, math models for the Space Shuttle Systems are performed utilizing the Honeywell 66/80 digital computers, Modcomp II/45 Minicomputers and special purpose hardware simulators (MicroComputers). The Shuttle Ground Operations Simulator operating system provides the language formats, subroutines, queueing schemes, execution modes and support software to write, maintain and execute the models. The ground systems presented consist primarily of the Liquid Oxygen and Liquid Hydrogen Cryogenic Propellant Systems, as well as liquid oxygen External Tank Gaseous Oxygen Vent Hood/Arm and the Vehicle Assembly Building (VAB) High Bay Cells. The purpose of math modeling is to simulate the ground hardware systems and to provide an environment for testing in a benign mode. This capability allows the engineers to check out application software for loading and launching the vehicle, and to verify the Checkout, Control, & Monitor Subsystem within the Launch Processing System. It is also used to train operators and to predict system response and status in various configurations (normal operations, emergency and contingent operations), including untried configurations or those too dangerous to try under real conditions, i.e., failure modes.

Tory, E. G.↗

Space shuttle main engine: Interactive design challenges

The operating requirements established by NASA for the SSME were considerably more demanding than those for earlier rocket engines used in the military launch vehicles or Apollo program. The SSME, in order to achieve the high performance, low weight, long life, reusable objectives, embodied technical demands far in excess of its predecessor rocket engines. The requirements dictated the use of high combustion pressure and the staged combustion cycle which maximizes performance through total use of all propellants in the main combustion process. This approach presented a myriad of technical challenges for maximization of performance within attainable state of the art capabilities for operating pressures, operating temperatures and rotating machinery efficiencies. Controlling uniformity of the high pressure turbomachinery turbine temperature environment was a key challenge for thrust level and life capability demanding innovative engineering. New approaches in the design of the components were necessary to accommodate the multiple use, minimum maintenance objectives. Included were the use of line replaceable units to facilitate field maintenance automatic checkout and internal inspection capabilities.

Mccarty, J. P.↗

Impact of lunar and planetary missions on the space station: Preliminary STS logistics report

Space station requirements for lunar and planetary missions are discussed. Specific reference is made to projected Ceres and Kopff missions; Titan probes; Saturn and Mercury orbiters; and a Mars sample return mission. Such requirements as base design; station function; program definition; mission scenarios; uncertainties impact; launch manifest and mission schedule; and shuttle loads are considered. It is concluded that: (1) the impact of the planetary missions on the space station is not large when compared to the lunar base; (2) a quarantine module may be desirable for sample returns; (3) the Ceres and Kopff missions require the ability to stack and checkout two-stage OTVs; and (4) two to seven manweeks of on-orbit work are required of the station crew to launch a mission and, with the exception of the quarantine module, dedicated crew will not be required.

Source record↗

Replaceable blade turbine and stationary specimen corrosion testing facility

A facility was constructed to provide relatively low cost testing of hot section turbine blade and vane materials under hot corrosion conditions more akin to service environments. The facility consists of a small combustor whose pressurized gas flow can be directed to either a test section consisting of three small cascaded specimens or to a partial admittance single-stage axial flow turbine. The turbine rotor contains 28 replaceable turbine blades. The combustion gases resulting from the burning of Jet A-l fuel can be seeded with measured amounts of alkali salts. This facility is described here along with preliminary corrosion test results obtained during the final checkout of the facility.

Santoro, G. J.↗

Natural environment design criteria for the Space Station definition and preliminary design

The natural environment design criteria for the Space Station Program (SSP) definition and preliminary design are presented. Information on the atmospheric, dynamic and thermodynamic environments, meteoroids, radiation, magnetic fields, physical constants, etc. is provided with the intension of enabling all groups involved in the definition and preliminary design studies to proceed with a common and consistent set of natural environment criteria requirements. The space station program elements (SSPE) shall be designed with no operational sensitivity to natural environment conditions during assembly, checkout, stowage, launch, and orbital operations to the maximum degree practical.

Vaughan, W. W.↗

Definition of ground test for Large Space Structure (LSS) control verification

An overview for the definition of a ground test for the verification of Large Space Structure (LSS) control is given. The definition contains information on the description of the LSS ground verification experiment, the project management scheme, the design, development, fabrication and checkout of the subsystems, the systems engineering and integration, the hardware subsystems, the software, and a summary which includes future LSS ground test plans. Upon completion of these items, NASA/Marshall Space Flight Center will have an LSS ground test facility which will provide sufficient data on dynamics and control verification of LSS so that LSS flight system operations can be reasonably ensured.

Waites, H. B.↗

Utilization of Space Station by the Large Deployment Reflector

The Large Deployable Reflector (LDR), a NASA concept of a very large, orbiting, far infrared submillimeter telescope is described. To be launched in the 1990s, LDR has a projected life of 10 years and is to be serviced every 2 to 3 years. A System Concept and Technology Definition Study of LDR for NASA Ames is currently being conducted. Study results indicate that launch of a 20 m LDR, operating in a 700 to 800 km orbit, requires two shuttle loads. The components of LDR are assembled in a lower parking orbit, and the system is checked out and then transferred to the operational orbit. Furthermore, for servicing, LDR may have to be retrieved to the same lower orbit (and later returned to operational altitude) by an orbit transfer vehicle. These requirements bring up the question of a suitable assembly, checkout, and servicing platform. The deployment process is time consuming and may require special equipment not necessarily available from the orbiter itself. The SS is an attractive choice for that platform.

Bandermann, L. W.↗

National transonic facility shakedown test results and calibration plans

The results of the shakedown tests and the calibration plan of the National Transonic Facility (NTF) are presented. The facility is designed to operate in both air and nitrogen modes, cover Mach numbers from 0.2 to 1.2, pressures up to 8.8 atm and temperatures between 77 and 339 K. The facility data system is built around four 16-bit minicomputers with a total memory of three megabytes. A portable cryogenic chamber is available. The tunnel systems were operated in a series of tests in Mach number range of 0.2 to 1.17, pressures up to 8.5 atm, and temperatures down to 100 K. The calibration plan includes steady-state and dynamic calibration, as well as wall interference studies. The facility underwent the checkout of the model attitude, plenum isolation, and model access systems, followed by aerodynamic calibration in 1984. Schematic drawings and diagrams are included.

Bruce, W. E., Jr.↗

The IRM fluxgate magnetometer

This report describes the three-axis fluxgate magnetometer instrument on board the AMPTE IRM spacecraft. Important features of the instrument are its wide dynamic range (0.1-60,000 nT), a high resolution (16-bit analog to digital conversion) and the capability to operate automatically or via telecommand in two gain states. In addition, the wave activity is monitored in all three components up to 50 Hz. Inflight checkout proved the nominal functioning of the instrument in all modes.

Luehr, H.↗

The design, development, and flight testing of a modern-control-designed autoland system

This paper discusses the design, development, and flight test results of a full-state feedback modern-controls-designed autoland system - the Digital Integrated Automatic Landing System (DIALS). The lateral and longitudinal control laws were designed by formulating a linear quadratic regulator with disturbances problem. Although the designs were independent of each other, in implementation cross-coupling of the lateral and longitudinal variables does occur. A brief discussion of the control modes - localizer capture, localizer track, decrab, glideslope capture, glideslope track, and flare - and the modifications made to the basic design during the simulation phase to achieve desired performance is given. Some of the efforts required to implement the system in the flight computers and some problems encountered in the ground hardware simulation checkout are discussed. Finally, flight test data is presented for this system which performed 10 'hands off' automatic landings. The flight test data includes the performance of the aircraft in mild, gust, and wind shear conditions.

Hueschen, R. M.↗

Simulation of PCM Data

Program for communications and control computer simulates pulse-codemodulated data. Software for simulation pulse-code-modulated (PCM) data from Space Shuttle during launch preparations developed for use with checkout, control, and monitor subsystem (CCMS). Facilitates testing of CCMS with data expected from main engines, external fuel tanks, operational instrumentation, general-purpose computer, backup flight system, and payload. Simulator program executes in standard CCMS hardware, requiring no new hardware.

Bernstrom, G. G.↗

Research and technology

As the NASA Center responsible for assembly, checkout, servicing, launch, recovery, and operational support of Space Transportation System elements and payloads, Kennedy Space Center is placing increasing emphasis on the Center's research and technology program. In addition to strengthening those areas of engineering and operations technology that contribute to safe, more efficient, and more economical execution of our current mission, we are developing the technological tools needed to execute the Center's mission relative to Space Station and other future programs. The Engineering Development Directorate encompasses most of the laboratories and other Center resources that are key elements of research and technology program implementation and is responsible for implementation of the majority of the projects in this Kennedy Space Center 1985 Annual Report. The report contains brief descriptions of research and technology projects in major areas of Kennedy Space Center's disciplinary expertise.

Source record↗