Search NASA⌕ Search

SEARCH · Search NASA

Results for “Command”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

FPGA-based hardware/software co-design instrument command-and-control solutions

Traditional design methodology dictates that an instrument electronics platform should consist of a printed circuit board (PCB)—often multiple boards—populated with many components and support electronics. More specifically, each subsystem is composed of numerous integrated circuits (ICs) spread across the board(s), connected with innumerable traces and wires. Additionally, it is often the case that the hardware and software design teams are quite separated—the hardware team designs a board and hands it to a software team, who must then deal with any hardware quirkiness and may need to rewrite software due to inadequately defined interfaces...

Allen, Mark A.↗

On-demand Command and Control of ASTERIA with Cloud-based Ground Station Services

ASTERIA (Arcsecond Space Telescope Enabling Research in Astrophysics) was a 6-unit CubeSat technology demonstration mission that deployed from the International Space Station on November 20th, 2017. After successfully completing its 90-day primary mission that demonstrated arcsecond-level line-of-sight pointing and focal plane thermal stability for exoplanet detection, it entered an extended mission performing onboard software demonstrations to mature technology both in space and on the ground. One of the technologies was a completely cloud-based ground system leveraging Amazon Web Services (AWS) Ground Station service.Announced in December 2018 and launched in May 2019, AWS Ground Station is a fully managed ground station service that aims to reduce the overhead associated with developing and maintaining ground system infrastructure throughout the mission lifecycle. AWS Ground Station makes available the suite of features required for any ground system in support of low-Earth orbit (LEO) and medium-Earth Orbit (MEO) satellite operations on-demand and without setting up or maintaining long-term contracts. Charges are incurred on a per-minute basis for antenna usage during scheduled tracks. Support is available for S-band uplink and downlink, along with X-band narrowband and wideband downlink. Missions that use the service may reserve tracks with any licensed AWS Ground Station antennas located across each service region and have direct access to any AWS services in support of mission operations.The cloud-based architecture built around the AWS Ground Station service greatly enhanced ASTERIA mission operations by enabling end-to-end pass automation, on-demand contact scheduling and contingency planning, along with more efficient data downlink through station availability and station-to-station handovers. It incorporated open-source software, particularly NASA's AMMOS Instrument Toolkit (AIT) and Open Mission Control Technologies (OpenMCT), along with the AWS application programming interfaces (API) to the Ground Station, Elastic Compute Cloud (EC2) and Simple Storage Service (S3) services. After showcasing operability in August 2019, the team continued using and improving this novel ground system architecture until the end of mission in December 2019. This paper describes the cloud-based ground system, how it was designed, tested, and evaluated with an in-orbit spacecraft, the operational capabilities that it enabled, along with lessons learned and recommendations for future missions.

Fesq, Lorraine↗

Commanding Curiosity from the Couch: MSL Remote Operations, Challenges, and Path Ahead

This paper describes how the Mars ScienceLaboratory (MSL) project prepared for and successfully beganCuriosity rover Mars operations from their homes in responseto the COVID-19 work-from-home orders. In a very shortperiod, the team developed procedures and executed a remoteoperations readiness test in parallel with the team's support fornominal operations. Continuing regular rover operations withan entirely remote team had not previously been consideredfeasible due to a variety of factors. These included both thehuman factors, such as multiple concurrent person-to-personinteractions of the uplink planning team, as well as technicalfactors, such as reliance on powerful workstations dedicated tographically intensive software tools used for planning. The testwas conducted on March 12th, with both the downlink anduplink teams successfully simulating a near full planning day.The JPL administration announced the transition to mandatorytelework on Monday, March 16th. MSL stood down the uplinkplanning originally scheduled for the next day while downlinkcontinued monitoring the rover. Full operations then resumedper schedule with nearly the entire operations team teleworkingon Friday, March 20th, during which the team planned roveractivities for three Martian days (sols). These activities includedthe successful drilling of the "Edinburgh" rock target, a highlycomplex contact science activity.As of October 1st, 2020, the Mars Science Laboratory missionoperations team has conducted 88 remote tactical uplink shiftsfor a total of 190 sols of planned rover activity, which accountsfor more than 6% of the mission to date. In this period the roverhas completed four drilling campaigns and driven over 1150meters towards its next major science target – a sulfate bearinggeologic unit at the foot of Mount Sharp. Success has not beenwithout its challenges. Many of these have been addressed whileothers will remain in some form until the team can safely returnto JPL, which in turn is the largest challenge for the future.

Stroupe, Ashley↗