Search NASA⌕ Search

SEARCH · Search NASA

Results for “Crew Module”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Estimated Probability of a Cervical Spine Injury During an ISS Mission

Introduction: The Integrated Medical Model (IMM) utilizes historical data, cohort data, and external simulations as input factors to provide estimates of crew health, resource utilization and mission outcomes. The Cervical Spine Injury Module (CSIM) is an external simulation designed to provide the IMM with parameter estimates for 1) a probability distribution function (PDF) of the incidence rate, 2) the mean incidence rate, and 3) the standard deviation associated with the mean resulting from injury/trauma of the neck. Methods: An injury mechanism based on an idealized low-velocity blunt impact to the superior posterior thorax of an ISS crewmember was used as the simulated mission environment. As a result of this impact, the cervical spine is inertially loaded from the mass of the head producing an extension-flexion motion deforming the soft tissues of the neck. A multibody biomechanical model was developed to estimate the kinematic and dynamic response of the head-neck system from a prescribed acceleration profile. Logistic regression was performed on a dataset containing AIS1 soft tissue neck injuries from rear-end automobile collisions with published Neck Injury Criterion values producing an injury transfer function (ITF). An injury event scenario (IES) was constructed such that crew 1 is moving through a primary or standard translation path transferring large volume equipment impacting stationary crew 2. The incidence rate for this IES was estimated from in-flight data and used to calculate the probability of occurrence. The uncertainty in the model input factors were estimated from representative datasets and expressed in terms of probability distributions. A Monte Carlo Method utilizing simple random sampling was employed to propagate both aleatory and epistemic uncertain factors. Scatterplots and partial correlation coefficients (PCC) were generated to determine input factor sensitivity. CSIM was developed in the SimMechanics/Simulink environment with a Monte Carlo wrapper (MATLAB) used to integrate the components of the module. Results: The probability of generating an AIS1 soft tissue neck injury from the extension/flexion motion induced by a low-velocity blunt impact to the superior posterior thorax was fitted with a lognormal PDF with mean 0.26409, standard deviation 0.11353, standard error of mean 0.00114, and 95% confidence interval [0.26186, 0.26631]. Combining the probability of an AIS1 injury with the probability of IES occurrence was fitted with a Johnson SI PDF with mean 0.02772, standard deviation 0.02012, standard error of mean 0.00020, and 95% confidence interval [0.02733, 0.02812]. The input factor sensitivity analysis in descending order was IES incidence rate, ITF regression coefficient 1, impactor initial velocity, ITF regression coefficient 2, and all others (equipment mass, crew 1 body mass, crew 2 body mass) insignificant. Verification and Validation (V&V): The IMM V&V, based upon NASA STD 7009, was implemented which included an assessment of the data sets used to build CSIM. The documentation maintained includes source code comments and a technical report. The software code and documentation is under Subversion configuration management. Kinematic validation was performed by comparing the biomechanical model output to established corridors.

Brooker, John E.↗

XHAB 2012 Final Report Habitat Demonstration Unit Lite

The University of Maryland Space Systems Laboratory (SSL) was awarded a NASA X-Hab 2012 grant for the design and construction of a new Earth analogue habitat for habitability research. This work builds on the past ECLIPSE and X-Hab projects at the SSL, by combining these elements with a new habitat module in order to create a single research platform for habitability studies. The “Crew Habitat Evaluator for Long-duration Orbital, Near-earth, and Interplanetary Applications” (CHELONIA) will deliver a much more flexible architecture than the previously developed mock-ups, allowing facilitating faster modification of the interior layouts and available total volume. This will enable the investigators to evaluate crew assessments and task performance as a function of the interior layout, functional area allocation and total available volume. This paper documents the design of this new infrastructure, and includes the details of the manufacturing of a new habitat mock-up module and modifications to the existing elements. The paper also includes a brief discussion of possible future research goals. Initial layouts are implemented using foam-core volumetric mock-ups for internal equipment and outfitting. These low fidelity mock-ups constitute a “library” that will allow a very rapid evaluation of a multitude of layouts. CHELONIA is also suitable for higher fidelity functional mock-ups, as well as short to medium-duration mission simulations. This new facility will enable the examination of habitat layouts for both partial gravity and microgravity environments. While partial gravity systems will be easily evaluated with the habitat currently in development, microgravity subsystems will be studied by utilizing low fidelity volumetric neutral buoyancy mock-ups in order to determine if commonality in the design for these two environments is appropriate. Finally, this new facility is being integrated into the SSL Moonyard planetary surface simulation center. The Moonyard simulates a planetary surface by means of a large sandbox, and is used primarily for rover field trials and suit systems evaluation. This new facility will be a prime element in future Earth analog simulations at the University of Maryland in support of NASA exploration objectives.

Kevin Davis↗

STS-102 Crew Activity Report/Flight Day 9 Highlights

On this ninth day of the STS-102 mission, three crews are on the International Space Station: (1) STS-102 (Commander James Wetherbee, Pilot James Kelly, and Mission Specialists Andrew Thomas and Paul Richards); (1) Expedition 1 (William Shepherd, Yuri Gidzenko, and Sergei Krikalev); and (3) Expedition 2 (James Voss, Susan Helms, and Yuriy Usachev). Mission Specialist Thomas, Commander Shepherd, and Commander Usachev are seen in the Leonardo Module stowing items for the trip home on Discovery. Then the three crews are seen together answering questions about the mission during an in-flight interview.

Source record↗

Shutter Interaction Study

The deployment, transport, and exchange procedures for the SOC logistics module and for logistics modules/cradles envisioned to support both the flight support facilities operation and the space construction operation were developed. The use of a holding and positioning aid device was determined to be the most desirable arrangement for the parking/holding of the modules during this exchange operation. The capability/feasibility of transporting eight crew members in the orbiter to and from the SOC was analyzed. Two arrangements were defined for this operation: (1) with the airlock in the orbiter cabin, and (2) with no airlock in the cabin.

Source record↗

Early surface habitation elements for planetary exploration missions

Rigid pressure vessel concepts appropriate for initial, crew-supporting exploration activities on planetary surfaces are discussed and compared. The problem of early exploration crew support is first bounded and outlined. The studied trade-space spans five crew sizes from 4 to 12, and three diameters of module structure from 4.4 to 10 m. Other considerations of gravity, orientation, structure and topology are also used as parameters. The paper illustrates application of a technique which uses interpolation across a field of point-designs to yield trade results. Methods to reduce the option set from 1480 to 30 are presented. Reproducible evaluation criteria are explained and applied, to enable selecting the most promising candidates. A final concept is synthesized for further study use, and presented via configuration drawings and weight statements. It is a 7.6 m diameter module, with two floors running lengthwise and a cross-sectioning pressure bulkhead. Versions for four, six and perhaps eight people can be landed fully integrated on the moon.

Sherwood, Brent↗

STS-88 Mission Highlights Resources Tape

The STS-88 flight crew, Commander Robert D. Cabana, Pilot Frederick W. Sturckow, and Mission Specialists Nancy J. Currie, James H. Newman, Jerry L. Ross, and Sergei Krikalev present a video overview of their space flight. This is the first of three videos which show the highlights of the Endeavour mission. Important visual images include pre-launch activities such as the eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also included are various panoramic views of the shuttle on the pad. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. Once on-orbit crew members are seen delivering and connecting the UNITY Connecting Module to the ZARYA Control Module.

Source record↗

STS-96 Mission Highlights

In this second part of a three-part video mission-highlights set, on-orbit spacecrew activities performed on the STS-96 Space Shuttle Orbiter Discovery and the International Space Station are reviewed. The flight crew consists of Kent V. Rominger, Commander; Rick D. Husband, Pilot; and Mission Specialists Ellen Ochoa, Tamara E. Jernigan, Daniel T. Barry, Julie Payette (Canadian), and Valery Ivanovich Tokarev (Russian). The primary goals of this mission were to work on logistics and resupply the International Space Station. This second part in the mission series features video from Flight Day 4-7 (FD 4-7). FD 4 of STS-96 presents astronauts Tammy Jernigan and Dan Barry completing the second longest space walk in shuttle history. Footage includes Jernigan and Barry transferring and installing two cranes from the shuttle's payload bay to locations on the outside of the station. The astronauts enter the International Space Station delivering supplies and prepare the outpost to receive its first resident crew, scheduled to arrive in early 2000 on FD 5. The video also captures the crew involved in logistics transfer activities within the Discovery/ISS orbiting complex. FD 6 includes footage of Valery Tokarev and Canadian astronaut Julie Payette charging out the final six battery recharge controller units for two of Zarya's power-producing batteries and all crew members' involvement in logistics transfer activities from the SPACEHAB module to designated locations in the International Space Station. With the transfer work of FD 6 all but complete, the astronauts conduct some additional work, installing parts of a wireless strain gauge system that will help engineers track the effects of adding modules to the station throughout its assembly. Moving the few remaining items from Discovery to the ISS, then closing a series of hatches within the station's modules leading back to the shuttle are the primary activities contained in FD 7. Final coverage features Discovery's astronauts finishing their work inside the International Space Station, closing all of the hatches and readying the shuttle's small thrusters to be fired to raise the entire complex's orbit in preparation for the undocking and departure set for FD 8.

Source record↗

Oxygen Generation Assembly Technology Development

Hamilton Standard Space Systems International (HSSI) is under contract to NASA Marshall Space Flight Center (MSFC) to develop an Oxygen Generation Assembly (OGA) for the International Space Station (ISS). The International Space Station Oxygen Generation Assembly (OGA) electrolyzes potable water from the Water Recovery System (WRS) to provide gaseous oxygen to the Space Station module atmosphere. The OGA produces oxygen for metabolic consumption by crew and biological specimens. The OGA also replenishes oxygen lost by experiment ingestion, airlock depressurization, CO2 venting, and leakage. As a byproduct, gaseous hydrogen is generated. The hydrogen will be supplied at a specified pressure range above ambient to support future utilization. Initially, the hydrogen will be vented overboard to space vacuum. This paper describes the OGA integration into the ISS Node 3. It details the development history supporting the design and describes the OGA System characteristics and its physical layout.

Bagdigian, Robert↗

Apollo 11 Launch

This NASA Kennedy Space Center video release presents the countdown and liftoff of Apollo 11, the first manned journey to the Moon which began at Pad A, Launch Complex 39, Kennedy Space Center, Florida at 9:32 a.m. EDT on July 16, 1969. The crew of Apollo 11 included Commander Neil A. Armstrong, Command Module pilot Michael Collins, and Lunar Module pilot Edwin E. Aldrin, Jr. Several different camera viewpoints of the spacecraft as well as over-head shots of the Kennedy launch control center are presented prior to liftoff. Other footage includes shots of President Lyndon B. Johnson and his wife among the Florida audience viewing liftoff. During the countdown several audio updates from Kennedy launch control are presented as to the status of pre-launch testing and system readiness. Captivating footage from liftoff to the spacecraft nearing the outer Earth atmosphere is shown as the video ends with Neil Armstrong's confirmation of engine skirt separation and launch escape tower separation from the spacecraft.

Source record↗

Space Station Biological Research Project

To meet NASA's objective of using the unique aspects of the space environment to expand fundamental knowledge in the biological sciences, the Space Station Biological Research Project at Ames Research Center is developing, or providing oversight, for two major suites of hardware which will be installed on the International Space Station (ISS). The first, the Gravitational Biology Facility, consists of Habitats to support plants, rodents, cells, aquatic specimens, avian and reptilian eggs, and insects and the Habitat Holding Rack in which to house them at microgravity; the second, the Centrifuge Facility, consists of a 2.5 m diameter centrifuge that will provide acceleration levels between 0.01 g and 2.0 g and a Life Sciences Glovebox. These two facilities will support the conduct of experiments to: 1) investigate the effect of microgravity on living systems; 2) what level of gravity is required to maintain normal form and function, and 3) study the use of artificial gravity as a countermeasure to the deleterious effects of microgravity observed in the crew. Upon completion, the ISS will have three complementary laboratory modules provided by NASA, the European Space Agency and the Japanese space agency, NASDA. Use of all facilities in each of the modules will be available to investigators from participating space agencies. With the advent of the ISS, space-based gravitational biology research will transition from 10-16 day short-duration Space Shuttle flights to 90-day-or-longer ISS increments.

NASA Discipline General Space Life Sciences↗

Moving Towards a Common Ground and Flight Data Systems Architecture for NASA's Exploration Missions

The National Aeronautics and Space Administration has embarked on an ambitious effort to return man to the moon and then on to Mars. The Exploration Vision requires development of major new space and ground assets and poses challenges well beyond those faced by many of NASA's recent programs. New crewed vehicles must be developed. Compatible supply vehicles, surface mobility modules and robotic exploration capabilities will supplement the manned exploration vehicle. New launch systems will be developed as well as a new ground communications and control infrastructure. The development must take place in a cost-constrained environment and must advance along an aggressive schedule. Common solutions and system interoperability and will be critical to the successful development of the Exploration data systems for this wide variety of flight and ground elements. To this end, NASA has assembled a team of engineers from across the agency to identify the key challenges for Exploration data systems and to establish the most beneficial strategic approach to be followed. Key challenges and the planned NASA approach for flight and ground systems will be discussed in the paper. The described approaches will capitalize on new technologies, and will result in cross-program interoperability between spacecraft and ground systems, from multiple suppliers and agencies.

Rader. Steve↗

International Space Station Powered Bolt Nut Anomaly and Failure Analysis Summary

A key mechanism used in the on-orbit assembly of the International Space Station (ISS) pressurized elements is the Common Berthing Mechanism (CBM). The mechanism that effects the structural connection of the CBM halves is the Powered Bolt Assembly. There are sixteen Powered Bolt Assemblies per CBM. The CBM has a bolt which engages a self aligning Powered Bolt Nut (PBN) on the mating interface; see Figure 1. The Powered Bolt Assemblies are preloaded to approximately 19 kilo pounds (KIPs) prior to pressurization of the CBM. The PBNs mentioned below, manufactured in 2009, will be used on ISS future missions. An on orbit functional failure of this hardware would be unacceptable and in some instances catastrophic due to the failure of modules to mate and seal the atmosphere, risking loss of crew and ISS functions. The manufacturing processes which create the PBNs need to be strictly controlled. Functional (torque vs. tension) acceptance test failures will be the result of processes not being strictly followed. Without the proper knowledge of thread tolerances, fabrication techniques, and dry film lubricant application processes, PBNs will be, and have been manufactured improperly. The knowledge gained from acceptance test failures and the resolution of those failures, thread fabrication techniques and thread dry film lubrication processes can be applied to many aerospace mechanisms to enhance their performance. Test data and manufactured PBN thread geometry will be discussed for both failed and successfully accepted PBNs.

Sievers, Daniel E.↗

International Space Station Powered Bolt Nut Anomaly and Failure Analysis Summary

A key mechanism used in the on-orbit assembly of the International Space Station (ISS) pressurized elements is the Common Berthing Mechanism. The mechanism that effects the structural connection of the Common Berthing Mechanism halves is the Powered Bolt Assembly. There are sixteen Powered Bolt Assemblies per Common Berthing Mechanism. The Common Berthing Mechanism has a bolt which engages a self aligning Powered Bolt Nut (PBN) on the mating interface (Figure 1). The Powered Bolt Assemblies are preloaded to approximately 84.5 kN (19000 lb) prior to pressurization of the CBM. The PBNs mentioned below, manufactured in 2009, will be used on ISS future missions. An on orbit functional failure of this hardware would be unacceptable and in some instances catastrophic due to the failure of modules to mate and seal the atmosphere, risking loss of crew and ISS functions. The manufacturing processes that create the PBNs need to be strictly controlled. Functional (torque vs. tension) acceptance test failures will be the result of processes not being strictly followed. Without the proper knowledge of thread tolerances, fabrication techniques, and dry film lubricant application processes, PBNs will be, and have been manufactured improperly. The knowledge gained from acceptance test failures and the resolution of those failures, thread fabrication techniques and thread dry film lubrication processes can be applied to many aerospace mechanisms to enhance their performance. Test data and manufactured PBN thread geometry will be discussed for both failed and successfully accepted PBNs.

Sievers, Daniel E.↗

Issues and Design Drivers for Deep Space Habitats

A cross-disciplinary team of scientists and engineers applied expertise gained in Lunar Lander development to the conceptual design of a long-duration, deep space habitat for Near Earth Asteroid (NEA) missions. The design reference mission involved two launches to assemble 5-modules for a 380-day round trip mission carrying 4 crew members. The conceptual design process yielded a number of interesting debates, some of which could be significant design drivers in a detailed Deep Space Habitat (DSH) design. These issues included: Design to minimize crew radiation exposure, launch loads, communications challenges, docking system and hatch commonality, pointing and visibility, consumables, and design for contingency operations.

Rucker, Michelle A.↗

Development of an Inflatable Airlock for Deep Space Exploration

An airlock is a required component of a crewed spacecraft to allow for maintenance, repair and exploration outside of a habitable vehicle. Airlock designs in use today are rigid pressure vessels with complex hatches and seals. Inflatable structures technology utilizes high strength fabric materials and internal pressure to create a stiffened pressure vessel that can replace traditional rigid primary structure in a habitable spacecraft. The flexibility of fabric structures allows them to be compactly stowed for launch and expanded in space. Recent developments towards the design of an inflatable airlock structure show feasibility and a significant launch volume savings over a traditional metallic design. This paper provides a detailed summary of historical and current work in inflatable airlock development and provides guidance for the design of a soft goods airlock system. Accommodations for withstanding crew-induced loads, provisions for human interfaces, the design and development of an internal substructure to provide translation aids and restraints, the thermal considerations of a fabric shell, micrometeoroid protection in deep space, and packaging and deployment of an inflatable airlock are all discussed.

Deep Space Exploration↗

STS-107 Mission Highlights Resource, Part 3 of 4

This video, Part 3 of 4, shows the activities of the STS-107 crew during flight days 9 through 12 of the Columbia orbiter's final flight. The crew consists of Commander Rick Husband, Pilot William McCool, Payload Commander Michael Anderson, Mission Specialists David Brown, Kalpana Chawla, and Laurel Clark, and Payload Specialist Ilan Ramon. On flight day 9 David Brown and other crew members are at work on experiments in the Spacehab research module, and imagery is shown from the Mediterranean Israeli Dust Experiment (MEIDEX) on a pass over North Africa and the Horn of Africa. Ilan Ramon narrates part of the footage from flight day 10, and intravehicular activities of the astronauts onboard Columbia are shown, as well as views of the Gulf of Aden, and Lake Chad, which is seen with the back of the orbiter in the foreground. Rick Husband narrates the footage from day 11, which includes cleaning duties and maintenance, as well as an excellent view of the Sinai Peninsula, Israel, and Jordan, as well as the Mediterranean Sea, Red Sea, and Gulf of Aqaba. The highlight of flight day 12 is a conversation between Columbia's crew and the crew of the International Space Station (ISS). A special section of Earth views at the end of the video shows: 1) Atlantic Ocean, Strait of Gibraltar, Mediterranean Sea, Iberian Peninsula, Morocco, and Algeria; 2) Baja Peninsula; 3) Cyprus and Mediterranean Sea; 4) Florida; 5) Earth limb and Pacific Ocean; 6) North Carolina Outer Banks, Cape Hatteras, and Atlantic Ocean; 7) Houston with zoom out to Texas and Louisiana; 8) Mt. Vesuvius (Italy); 9) Earth limb and Atlantic Ocean; 10) Earth limb and terminator, and Pacific Ocean; 11) Saudia Arabia, Yemen, Oman, and Arabian Sea.

Source record↗

Collaborative Host Facility for Lunar Operations

This project establishes a new collaborative simulation connectivity capability for JSC utilizing existing facilities. The principal collaborating organizations are Safety & Mission Assurance (Code NA) and Engineering Directorate (Code EA), but the capability is open for any JSC user. The core of the connectivity resides in Code ER7’s Concept Exploration Laboratory (CEL) and is part of ER7’s Systems Engineering Simulator (SES) complex. NA Subject Matter Experts (SMEs) work proactively in situ with EA and commercial crew counterparts to evaluate Safety Review Panel (SRP) protocols for landers, habitation modules, and lunar roving systems using the same tools, terrain models and data as the designers. NA software initiated under two JSC Center Innovation Fund (CIF) and Innovation Charge account (ICA) funded projects will be used to configure the CEL to function as an EA maintained facility. Collaboration via the CEL with the U.S. Space Force (USSF) provides visibility for USSF. The potential for commercial crew and vehicle suppliers will require IT security and associated security architecture to be implemented in additional CIF based proposals.

Collaborative Simulation Hosting↗

STS-112 Flight Day 10 Highlights

On Flight Day 10 of the STS-112 mission, its crew (Jeffrey Ashby, Commander; Pamela Melroy, Pilot; David Wolf, Mission Specialist; Piers Sellers, Mission Specialist; Sandra Magnus, Mission Specialist; Fyodor Yurchikhin, Mission Specialist) on the Atlantis and the Expedition 5 crew on the International Space Station (ISS) (Valery Korzun, Commander; Peggy Whitson, Flight Engineer; Sergei Treschev, Flight Engineer) are shown exchanging farewells in the ISS's Destiny Laboratory Module following the completion of a week-long period of docked operations. The Expedition 5 crew is nearing the end of five and a half continuous months aboard the space station. Following the closing of the hatches, the Atlantis Orbiter undocks from the station, and Melroy pilots the shuttle slowly away from the ISS, and engages in a radial fly-around of the station. During the fly-around cameras aboard Atlantis shows ISS from a number of angles. ISS cameras also show Atlantis. There are several shots of each craft with a variety of background settings including the Earth, its limb, and open space. The video concludes with a live interview of Ashby, Melroy and Yurchikhin, still aboard Atlantis, conducted by a reporter on the ground. Questions range from feelings on the conclusion of the mission to the experience of being in space. The primary goal of the mission was the installation of the Integrated Truss Structure S1 on the ISS.

Source record↗