Search NASA⌕ Search

SEARCH · Search NASA

Results for “LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Operations analysis (study 2.1). Program SEPSIM (solar electric propulsion stage simulation)

Program SEPSIM is a FORTRAN program which performs deployment, servicing, and retrieval missions to synchronous equatorial orbit using a space tug with a continuous low thrust upper stage known as a solar electric propulsion stage (SEPS). The SEPS ferries payloads back and forth between an intermediate orbit and synchronous orbit, and performs the necessary servicing maneuvers in synchronous orbit. The tug carries payloads between the orbiter and the intermediate orbit, deploys fully fueled SEPS vehicles, and retrieves exhausted SEPS vehicles when, and if, required. The program is presently contained in subroutine form in the Logistical On-orbit VEhicle Servicing (LOVES) Program, but can also be run independently with the addition of a simple driver program.

Lang, T. J.↗

Smithsonian Astrophysical Observatory's minicomputer vs. the laser

Review of some of the problems encountered in replacing a CDC 6400, that was used for supplying a network of laser tracking stations with predictions, by an 8K Data General 1200 minicomputer with a teletype for I/O. Before the replacement, the predictions were expensive to compute and to transmit, and were clumsy logistically. The achieved improvements are described, along with every step it took to accomplish them, and the incurred costs.

Cherniack, J. R.↗

Development of large earth orbital space station

This paper outlines the major aspects of the development of large earth orbital space stations. At the outset, the uses of the space station are surveyed and the major systems and configurational drivers enumerated. A representative 12-man space station, studied by the Space Division of North American Rockwell Corporation under NASA contract is described. The subsequent discussion centers around earth-to-orbit logistics and possible future missions with emphasis on the establishment of a branch station geosynchronous orbit. In dealing with the associated transportation between low and high orbits, the concept of a geospace shuttle station oscillating between near-earth and synchronous orbit is compared with conventional shuttle vehicles with chemical and nuclear propulsion. In the final part, the evolution of the 12-man space station to a larger space base is described.

Ehricke, K. A.↗

Skylab Experiment M516 - Crew Activities/Maintenance Study

Skylab required daily movement about the interior of a 340 cu m vehicle and the handling and transfer of numerous loose items. Planned and unplanned maintenance tasks were also included in the daily routine of activity. Experiment M516, Crew Activities/Maintenance Study, involved an investigation of crew activity during routine daily operations. The overall objective was to secure in-flight data relevant to the performance of tasks in the weightless environment. This paper will present an evaluation of man's ability to handle and transport items of various sizes and masses (logistics management) and to make equipment repairs (maintenance). Results and conclusions are based on subjective crew comments, motion-picture film, and television transmissions.

Bond, R. L.↗

An evaluation of SAO sites for laser operations

Operational criteria are provided for the selection of laser tracking sites for the Earth and Ocean Physics Applications Program. A compilation of data is given concerning the effect of weather conditions on laser and Baker-Nunn camera operations. These data have been gathered from the Smithsonian astrophysical observing station sites occupied since the inception of the satellite tracking program. Also given is a brief description of each site, including its characteristic weather conditions, comments on communications and logistics, and a summary of the terms of agreement under which the station is or was operated.

Thorp, J. M.↗

Conduct overall test operations and evaluate two Doppler systems to detect, track and measure velocities in aircraft wake vortices

A program plan for system evaluation of the two-dimensional Scanning Laser Doppler System (SLDS) is presented. In order to meet system evaluation and optimization objectives the following tests were conducted: (1) noise tests; (2) wind tests; (3) blower flowfield tests; (4) single unit (1-D) flyby tests; and (5) dual unit (2-D) flyby tests. Test results are reported. The final phase of the program included logistics preparation, equipment interface checkouts, and data processing. It is concluded that the SLDS is capable of accurately tracking aircraft wake vortices from small or large aircraft, and in any type of weather.

Wilson, D. J.↗

Earth Observatory Satellite system definition study. Report no. 6: Space shuttle interfaces/utilization

The impacts of achieving compatibility of the Earth Observatory Satellite (EOS) with the space shuttle and the potential benefits of space shuttle utilization are discussed. Mission requirements and mission suitability, including the effects of multiple spacecraft missions, are addressed for the full spectrum of the missions. Design impact is assessed primarily against Mission B, but unique requirements reflected by Mission A, B, and C are addressed. The preliminary results indicated that the resupply mission had the most pronounced impact on spacecraft design and cost. Program costs are developed for the design changes necessary to achieve EOS-B compatibility with Space Shuttle operations. Non-recurring and recurring unit costs are determined, including development, test, ground support and logistics, and integration efforts. Mission suitability is addressed in terms of performance, volume, and center of gravity compatibility with both space shuttle and conventional launch vehicle capabilities.

Source record↗

EPA requirements and programs

The proposed ERTS-DCS system is designed to allow EPA the capability to evaluate, through demonstrable hardware, the effectiveness of automated data collection techniques. The total effectiveness of any system is dependent upon many factors which include equipment cost, installation, maintainability, logistic support, growth potential, flexibility and failure rate. This can best be accomplished by installing the system at an operational environmental control agency (CAMP station) to insure that valid data is being obtained and processed. Consequently, it is imperative that the equipment interface must not compromise the validity of the sensor data nor should the experimental system effect the present operations of the CAMP station. Since both the system which is presently in use and the automatic system would be in operation in parallel, conformation and comparison are readily obtained.

Koutsandreas, J. D.↗

Preliminary design polymeric materials experiment

A typical Advanced Technology Laboratory mission flight plan was developed and used as a guideline for the identification of a number of experiment considerations. The experiment logistics beginning with sample preparation and ending with sample analysis are then overlaid on the mission in order to have a complete picture of the design requirements. The results of this preliminary design study fall into two categories. First specific preliminary designs of experiment hardware which is adaptable to a variety of mission requirements. Second, identification of those mission considerations which affect hardware design and will require further definition prior to final design. Finally, a program plan is presented which will provide the necessary experiment hardware in a realistic time period to match the planned shuttle flights. A bibliography of all material reviewed and consulted but not specifically referenced is provided.

Mattingly, S. G.↗

Tug fleet and ground operations schedules and controls. Volume 1: Executive summary

This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.

Source record↗

Operations analysis (study 2.1). Volume 1: Executive summary

Subjects related to future STS operations concepts were investigated. The majority of effort was directed at assessing the benefits of automated space servicing concepts as related to improvements in payload procurement and shuttle utilization. Another subject was directed at understanding shuttle upper stage software development and recurring costs relative to total program projections. Space serving of automated payloads is addressed by examining the broad spectrum of payload applications with the belief that shared logistic operations will be a major contributor to reduction of future program costs. However, there are certain requirements for support of payload operations, such as availability of the payload, that may place demands upon the shuttle fleet. Because future projections of the NASA Mission Model are only representative of the payload traffic, it is important to recognize that it is the general character of operations that is significant rather than service to any single payload program.

Wolfe, R. R.↗

Manned systems utilization analysis (study 2.1). Volume 3: LOVES computer simulations, results, and analyses

The LOVES computer program was employed to analyze the geosynchronous portion of the NASA's 1973 automated satellite mission model from 1980 to 1990. The objectives of the analyses were: (1) to demonstrate the capability of the LOVES code to provide the depth and accuracy of data required to support the analyses; and (2) to tradeoff the concept of space servicing automated satellites composed of replaceable modules against the concept of replacing expendable satellites upon failure. The computer code proved to be an invaluable tool in analyzing the logistic requirements of the various test cases required in the tradeoff. It is indicated that the concept of space servicing offers the potential for substantial savings in the cost of operating automated satellite systems.

Stricker, L. T.↗

Manned systems utilization analysis (study 2.1). Volume 5: Program listing for the LOVES computer code

The LOVES computer code developed to investigate the concept of space servicing operational satellites as an alternative to replacing expendable satellites or returning satellites to earth for ground refurbishment is presented. In addition to having the capability to simulate the expendable satellite operation and the ground refurbished satellite operation, the program is designed to simulate the logistics of space servicing satellites using an upper stage vehicle and/or the earth to orbit shuttle. The program not only provides for the initial deployment of the satellite but also simulates the random failure and subsequent replacement of various equipment modules comprising the satellite. The program has been used primarily to conduct trade studies and/or parametric studies of various space program operational philosophies.

Wray, S. T., Jr.↗

Management: A continuing literature survey with indexes, March 1976

Management is a compilation of references to selected reports, journal articles, and other documents on the subject of management. This publication lists 368 documents originally announced in the 1975 issues of Scientific and Technical Aerospace Reports (STAR) or International Aerospace Abstracts (IAA). It includes references on the management of research and development, contracts, production, logistics, personnel, safety, reliability and quality control. It also includes references on: program, project and systems management; management policy, philosophy, tools, and techniques; decisionmaking processes for managers; technology assessment; management of urban problems; and information for managers on Federal resources, expenditures, financing, and budgeting.

Source record↗

Mission payloads subsystem description, revision 2

The Mission Payloads Subsystem (MPLS) which utilizes a simplified trajectory model to generate a list of missions for the Scheduling Algorithm for Mission Planning and Logistics Evaluation (SAMPLE) program is described. The MPLS is the mechanism that forms the basis of input for the other subsystems of SAMPLE and various post processors.

Williams, J. M.↗

Large Space Telescope - Orbital crew EV maintenance operations

The paper shows that orbital EV maintenance by the crew has a tremendous impact on several areas of the program, including operations, Shuttle interfaces, support equipment rendezvous and berthing, checkout and verification, levels of servicing achievable, logistics and spares and scientific instruments in order to permit changeout and possible future refurbishment. To achieve on-orbit EV maintenance, such challenges as designing for suited-astronaut access to all subsystem equipment elements, minimization for contamination, handling of extremely sensitive instruments, development of translation techniques, and use of existing GFE and hardware must be faced early in the preliminary design and operations analysis phases. All studies to date indicate that on-orbit EV manned maintenance of the LST (Large Space Telescope) is not only feasible but can be designed to be readily within the capability of the EV functioning astronaut. Both 1-g and neutral buoyancy man-in-the-loop simulations further support this point.

Fisher, H. T.↗