Search NASA⌕ Search

SEARCH · Search NASA

Results for “Loading”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Crack Identification and Characterization in Deformed Nb3Sn Rutherford Cable Stacks Using Machine Learning

An investigation of instance segmentation of cracks in Nb3Sn 4-stack 40-strand Rutherford cables using machine learning is presented. Three samples were uniaxially and biaxially loaded before metallographic inspections were performed. The Mask R-CNN model was used in the Detectron2 framework with pre-trained weights but fine-tuned to detect and segment cracks. The model detected cracks with bounding box and mask average precisions (AP) of 42.8 and 27.9, respectively, and was used for instance segmentation of all cracks in the three samples. More cracks were found in the sample pre-loaded along the z-axis (i.e., along the cable length). Pre-loading along the x-axis (i.e., on the cables edges) reduced the number of cracks and changed the crack orientation distribution, away from being highly aligned with the y-axis (i.e., normal to the cables broad faces), i.e., the direction with the highest applied load. Fine-tuning of the Segment Anything Model (SAM) was also studied but performed poorly without human-provided prompts. However, the zero-shot capability of SAM showed high promises to accelerate the image annotation process for applications beyond this study.

Croteau, Jean-Francois↗

Design, Modeling, and Control of a Hardware-in-the-Loop Testbed for Off-Road Vehicles

This paper presents the design, modeling, and control of a hardware-in-the-loop (HIL) testbed for off-road vehicles. The proposed HIL testbed employs a transient hydrostatic dynamometer to load a diesel engine to emulate any loading cycles of a wheel loader, which is a representative off-road vehicle. A fully validated wheel loader model is used to calculate the engine load, including both the drive and work functions. Besides, iterative learning control (ILC) has been designed for the loading torque tracking of the hydrostatic dynamometer to ensure accurate emulation of real-world operation scenarios. The developed HIL testbed is used to demonstrate more than 26% energy benefits of automated wheel loaders through systematic optimization compared with human-operated wheel loaders. As a result, this HIL testbed serves as a robust platform for advancing research and development across various off-road vehicles, including excavators, tractors, and harvesters.

33 ADVANCED PROPULSION SYSTEMS↗

How Does Vertical Wind Shear Influence Updraft Characteristics and Hydrometeor Distributions in Supercell Thunderstorms?

Abstract Vertical wind shear is known to affect supercell thunderstorms by displacing updraft hydrometeor mass downshear, thereby facilitating the storms’ longevity. Shear also impacts the size of supercell updrafts, with stronger shear leading to wider, less dilute, and stronger updrafts with likely greater hydrometeor production. To more clearly define the role of shear across different vertical layers on hydrometeor concentrations and displacements relative to supercell updrafts, a suite of idealized numerical model simulations of supercells was conducted. Shear magnitudes were systematically varied across the 0–1, 1–6, and 6–12 km AGL layers, while the thermodynamic environment was held fixed. Simulations show that as shear magnitude increases, especially from 1 to 6 km, updrafts become wider and less dilute with an increase in hydrometeor loading, along with an increase in the low-level precipitation area/rate and total precipitation accumulation. Even with greater updraft hydrometeor loading amid stronger shear, updrafts are more intense in stronger shear simulations due to larger thermal buoyancy owing to wider, less dilute updraft cores. Furthermore, downshear hydrometeor displacements are larger in environments with stronger 1–6-km shear. In contrast, there is relatively less sensitivity of hydrometeor concentrations and displacements to variations in either 0–1- or 6–12-km shear. Results are consistent across free tropospheric relative humidity sensitivity simulations, which show an increase in updraft size and hydrometeor mass with increasing free tropospheric relative humidity owing to a reduction in entrainment-driven dilution for wider updrafts in moister environments. Significance Statement Rotating thunderstorms, known as supercells, are able to persist for multiple hours. One common explanation is that large changes in wind speed and/or direction with height, or shear, transport rain/hail away from supercell updrafts, supporting their maintenance. The strong shear within supercell environments, however, may also lead to greater rail/hail amounts, thereby leading to weaker storms due to this extra mass of water/ice within updrafts. Furthermore, the impact of shear across different height layers on supercell rain/hail characteristics has not been thoroughly investigated. In this study, computer simulations of supercells were conducted to determine that shear occurring between 1 and 6 km above ground level has a large impact on rain/hail distribution in supercells and that stronger shear in this layer leads to wider/stronger supercells with greater rain/hail accumulations at the surface. Additionally, some of the extra mass of water/ice is transported farther away from updrafts due to the stronger environmental storm-relative winds.

Meteorology & Atmospheric Sciences↗

ML-based Micro-CT SOFC Microstructure Models (from Kent 2026 Microstructural Augmentation paper)

Overview -------------------------- This repository contains datasets from the manuscript **"Enhanced Generalizability to Deep-Learning Quantification of 3D Microstructural Characteristics through Microstructurally Aware Augmentation of Scarce Data"** (*William F. Kent, Rochan Bajpai, Rachel C. Kurchin, William K. Epting, Harry W. Abernathy, Paul A. Salvador. Submitted 2026*). The methods are also described in the dissertation **Data Intensive Analysis of Solid Oxide Cell Microstructures** (*Doctoral dissertation, Carnegie Mellon University, 2025*). The datasets here are trained convolutional neural network (CNN) models for predicting key microstructural properties of solid oxide cell (SOC) electrodes from low-res, 2-channel 3D images, as well as some helpful code. The parameters for input images are provided in the paper. Sample data is provided in the file `Combined_anode_aug_dual_1k_examples` - that particular data was used to train `anode_all_aug.pth` and will work most accurately with that model. Please familiarize yourself with all caveats on accuracy and applicability, as detailed in the associated paper. Usage -------------------------- The basic usage is as follows, assuming `model_fn` is the path to the .pth file, and `X` is 2-channel input image(s) of the proper dimensions (either one image of shape `[2,12,24,24]`, or a batch of N input images of shape `[N,2,12,24,24]`): from CNN_inferencer import load_model_for_inference model = load_model_for_inference(model_fn) y_predicted = model(X) The model object automatically handles input scaling and output de-scaling based on the way the models were trained - in other words, pass in a 2-channel micro-CT image, and it will output microstructural property values in real units. ## Other model object attributes Note that model has useful attributes other than its forward pass model(X). * `model.output_descaler` - returns the output descaler object. Model does the de-scaling when generating inferences, but you may want to re-use this de-scaler on other values to e.g. compare predictions to ground truth from already-scaled training data. * `model.prop_names` - Gives the property names of the predicted y values, in order. Only exists if there's an output scaler as part of the model object, which there will be in the models provided here. ## Usage with sample data Here is a short script to use with the included sample data. from CNN_inferencer import display_predictions, load_model_for_inference, calculate_mape, parity_plot import h5py import numpy as np model_fn = 'anode_all_aug.pth' data_fn = 'Combined_anode_aug_dual_1k_examples.h5' N_samples = 200 figure_outdir = '.' model = load_model_for_inference(model_fn) with h5py.File(data_fn,'r') as f: XX = f['X'] #These are the 2-channel 3D images yy = f['y'] #These are the ground-truth microstructural properties, but they have been scaled for training - need to de-scale below N = XX.shape[0] #How many images total in the input data file #Run inferences on N_samples random samples from XX. #Run in a batch, much more efficient than one at a time. ii = np.random.choice(N,N_samples,replace=False) ii.sort() y_pred = model(XX[ii]) #Get the original/true (but normalized/scaled) values from the training dataset... #Because they were normalized, they are not in real units yet. So let's also de-scale them using model.output_scaler. y_true = model.output_scaler.transform(yy[ii]) #Let's display actual values for just 5 random ones for i in np.random.choice(N_samples,5,replace=False): display_predictions(y_true[i], y_pred[i], model.prop_names) #Make parity plots for each property (ground truth vs predicted values) #Also label each plot with the mean abs. percent error (MAPE) of the predicted values for i,key in enumerate(model.prop_names): mape = calculate_mape(y_true[:,i], y_pred[:,i]) parity_plot(y_true[:,i], y_pred[:,i], figure_outdir, key, extra_title=f' ({mape:.2f}% MAPE)')

3D microstructure↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Safety Basis Compliant Flexible Operations [Capstone Project]

Compliant nuclear operations must be weighed against the radiological risk to the worker, public, and the environment. This project set out to look at one facility at Los Alamos National Laboratory (LANL or the Laboratory) and compare the risk with the operational restrictions associated with the Technical Safety Requirements (TSRs). The hope was to identify controls that could be reduced or simplified while maintaining compliance with 10 CFR 830, Nuclear Safety Management. This would result in increasing facility operational flexibility and efficiency. Controls were identified to be simplified or eliminated based on risk. This identification was initially envisioned from the perspective of reanalysis of the accident and hazard analysis consequences. Additionally, it was envisioned that fire testing could show that the consequences of a fire are not as dramatic as analyzed. Specific facility controls were identified that cause operational inefficiencies. Based on data collection, two controls were identified for further evaluation. The first control was combustible loading within the waste storage buildings, and the second control is related to the seismic power cutoff switch. In evaluating the combustible loading control, the thought is that the fire suppression system (FSS) provides adequate protection and the combustible loading controls do not need elevation to a TSR control. The FSS, along with the Fire Protection Program, would provide protection to prevent a fire from impacting large amounts of stored waste material. The seismic switch was more of a challenge. When reviewing the facility operation, it was determined that the facility does not operate anywhere near the established material-at-risk (MAR – radioactive material) limits. By adjusting these limits, a reduced consequence could be achieved and hence, a significant risk reduction achieved. A new operating mode would be used to achieve this reduction. A reduced MAR limit was successfully used as a test case for snow removal during this project. This project expands on that trial case as related to combustible loading and the seismic power cutoff switch TSRs. This will increase the efficiency of operations with reduced TSR controls while reducing overall facility risk. This is a win-win situation for Triad National Security, LLC (Triad) and the U.S. Department of Energy (DOE). Due to schedule and budgetary constraints, not all envisioned work scope was accomplished. However, it is maintained in this report for future efforts.

61 RADIATION PROTECTION AND DOSIMETRY↗

Reviewing Flexibility in Industrial Electrification: U.S. Green Ammonia and Steel Industries [Slides]

The renewable energy transition in the power sector involves a paradigm shift for flexibility. Supply flexibility faces new constraints due to the increased share of variable renewable resources. Increased demand flexibility can allow less use of peaking power plants and delay need for additional capacity and transmission. Industrial customers are larger on average than residential and commercial consumers and have typically provided the largest share of demand response in the United States. We consider industrial demand, studying characteristics of flexible industrial loads. We examine the dynamics of change occurring around industrial load flexibility by focusing on two case studies: green ammonia and steel production via electric arc furnaces. Electric arc furnace steel production is an important component of current demand response programs, whereas green ammonia and green fuels offer new paradigms for flexibility. We analyze the structure and functions of the technological innovation systems of load flexibility in those two industries via interviews with twenty-two stakeholders. We conclude that the technological innovation systems are not well-functioning for flexibility in EAF based steelmaking, but are in the green ammonia space. Explicit connections between scope two greenhouse gas emissions reporting and flexibility are lacking, and industry stakeholders do not appear to make a connection between decarbonization and load flexibility.

25 ENERGY STORAGE↗

Exploring Grid-Interactive Efficient Building Strategies for Laboratories Through Energy Modeling

Laboratories are often overlooked in demand flexibility research due to constraints on their operations as mission critical facilities, despite the major role they play in an organization's emissions. Laboratories consume 3-4 times more energy than a typical office building and are commonly the largest energy users on any campus. Consequently, most laboratories in the United States are significant contributors to their organization's carbon footprint if their energy needs are met through the combustion of fossil fuels. As part of the initiative to decarbonize laboratories, this report documents an analysis on specifically grid-interactive efficient building (GEB) opportunities for reducing energy costs and emissions associated with laboratory operations. The goal of this initiative was to provide a case study and guidance on how to use OpenStudio and REopt as modeling tools for GEB technologies and strategies in laboratory environments across different climate zones in the United States. The analysis found that efficiency-based GEB strategies had the most significant impact on laboratory operations, while load-shedding and load-shifting GEB strategies produced smaller results. The culmination of these approaches applied across all five climate zones generated on average: 1) 28% energy cost savings and 30% greenhouse gas (GHG) emissions reductions, and 2) 4% enhanced energy cost savings under a time-of-use (TOU) pricing schedule compared to traditional pricing schemes. Grid-interactive efficiency building measures were found to produce the greatest energy savings in both electricity and natural gas, particularly in regions with high electrical loads, such as warm climates for cooling. Laboratories that had high levels of natural gas consumption, meanwhile, experienced the greatest emission reductions. The report concludes with an analysis on the opportunities for flexible loads in lab spaces and how small-scale measures in addition to opaque pricing structures for peak demand could become barriers to demand flexibility planning. The report also explores how electrifying laboratory buildings with heat pumps could reduce energy costs and GHG emissions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating Iodine Immobilization Technologies: Cermets, Polycermets, and Polyhalmets

The work in this report documents the efforts conducted to assess the feasibility of some of the ideas documented in Pacific Northwest National Laboratory invention disclosure reports (IDRs) including: 1) Iodine capture in polyacrylonitrile (PAN)-containing composite sorbents (32451-E). In this work, the composites evaluated included Ag0, Bi0, Cu0, Bi2S3, and Cu2S embedded in PAN. 2) Metal iodide removal from these sorbents through dissolution in dimethyl sulfoxide (DMSO) (32729-E). In this work, PAN dissolution was evaluated for multiple types of sorbents including Ag-Pan, Bi-PAN, Cu-PAN, Bi2S3-PAN, and Cu2S-PAN. 3) Using metal-sulfide sorbents for iodine capture (32647-E). In this work, the composites evaluated under this IDR included Ag2S, Bi2S3, and Cu2S embedded in PAN. 4) Using low-melting metals to immobilize (encapsulate) iodine-loaded and polymer-containing sorbents into polymer-ceramic-metal (called polycermet) or polymer-halide-metal (called polyhalmet) composite waste forms (32625-E). In this work, the iodine-loaded PAN composites included AgI-PAN, BiI-PAN, and CuI-PAN. 5) Ceramic-metal composite waste form synthesis of polymer-containing materials using low-melting metals like bismuth, tin, or bismuth-tin alloys (32537-E). In this work, the metals evaluated included Bi, 58Bi-42Sn eutectic. 6) Cermets for immobilizing commercial sorbents loaded with radioiodine (32806-E). In this work, AgIX (iodine-loaded silver faujasite zeolite) was evaluated in cermet form.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

The Maintainable Fusion Pilot Plant

The US fusion community has coalesced around the goal of building an FPP as described by the National Academies of Science, Engineering, and Medicine (NASEM). In addition to demonstrating the viability of the technologies necessary to operate such a plant, including demonstration of net energy and electricity production, NASEM found that a “fusion pilot plant will need to demonstrate the ability to efficiently perform remote maintenance and replacement in support of the design of a power plant, taking into account details of the consequences of the fusion environment, such as material activation and tritium retention in components.” Current designs of fusion demonstration reactors do usually foresee a regular exchange of their first wall modules, including the tritium breeding blankets. In the European Power Plant Conceptual Studies, it is assumed that a fusion reactor will need to change its divertor every 2 years and its first wall blanket module every 5 to 6 years to reach acceptable availability. Underlying this capability are remote-handling technologies to keep the outage for the exchange of these components short. There are many uncertainties in the remote-handling schemes, and most schemes are at a preconceptual level at best. In addition, the exchange of these components would either produce an enormous rad-waste stream or would require an enormous refurbishment activity with huge cost-prohibitive hot-cells. Past Fusion Nuclear Science Facility (FNSF) preconceptual studies have led to hot cell dimensions of an unbelievable size, likely costing tens of billions of dollars. Already at The Way (previously International Thermonuclear Experimental Reactor, ITER), hot-cells have become cost-prohibitive, demanding redesigns of the ITER first wall to reduce the toxic rad-waste/inventory. In this in-situ PFC repair project, a concept for a long-life, maintainable first wall module concept is developed and tested. This first wall concept relies on innovative remote handling to repair the first wall modules in-situ, avoiding costly refurbishments outside of the tokamak vessel. This approach was highlighted in the Fusion Energy Sciences Advisory Committee (FESAC) report on Transformative Enabling Capabilities for Efficient Advance Toward Fusion Energy. In general, the damage of the first wall armor is due to particle and radiation exposures. Load conditions vary from one fusion reactor design to another. In tokamaks, first wall Plasma Facing Components (PFCs) are exposed to far-Scrape-Off-Layer plasma fluxes, electromagnetic radiation, energetic CX neutrals, and potentially runaway electron beams. Protecting the first wall to the worst-case load conditions would require the design of a very thick first wall armor. Transient heat and particle fluxes due to disruptions or edge localized modes can lead to excessive heat loads resulting potentially in melting PFCs down to the cooling channel. Catastrophic events like these need to be avoided by appropriate disruption mitigation systems. However, failure of these systems will still put a first wall at an unacceptable risk. Hence, a first wall design needs to accommodate the occasional transient heat loads by introducing sacrificial limiters, which will absorb these transients.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Addressing the Split Incentive Challenge for Enhanced Solar Adoption in Multifamily Rental Properties [Abstract]

The split incentive problem is particularly pronounced in rental markets, where landlords prioritize investments that directly increase property value or rental income. Since energy savings from solar photovoltaic (PV) systems primarily benefit tenants, landlords may perceive little return on investment unless mechanisms exist to recapture some of the financial gains. The primary objective of this project is to develop a publicly available, web-based tool to analyze the U.S. Department of Energy’s ResStock database, which models the U.S. residential building stock. The tool allows users to filter buildings by location, type, HVAC system, square footage, and other characteristics, and outputs typical electric load profiles. By leveraging location-specific electric load data, Fram Energy aims to advance business strategies that address the split incentive barrier and promote the adoption of solar PV installations in rental properties. In addition, a machine learning model will be developed to weigh the marginal contribution of building features across the dataset in predicting electricity demand, supporting guided decision making in forecasting electric load profiles. Lastly, based on each building’s location, load profile, and utility’s electricity rate, an optimized solar photovoltaic array and battery energy storage system will be sized to provide energy arbitrage opportunities.

14 SOLAR ENERGY↗

Field Validation of Dynamic Mechanical Torque Measurements for Geared Wind Turbines

Accurate knowledge of the mechanical loads of wind turbine gearboxes has become essential in modern, highly loaded gearbox designs, as maintaining or even improving gearbox reliability with increasing torque density demands is proving to be challenging. Unfortunately, the traditional method of measuring dynamic mechanical torque using strain gauges placed on the outer surface of a rotating shaft and transmitting the resulting signal is unsuitable for serial deployment due to technical and economic constraints. An alternative method based on fiber-optic strain sensors placed on the stationary outer surface of the gearbox ring gear has been proposed. Like shaft torsion, the radial deformation of the ring gear is proportionate to the rotor torque. Placing the sensors on a stationary component is a cost-effective alternative for serial implementation because the need for complex and expensive data transfer via wireless transmission or a slip ring is eliminated. In this paper, we present the results of an extensive field experiment conducted to evaluate the torque measurement accuracy of this novel sensing solution installed on the gearbox of a Gamesa G97 2-MW wind turbine at the National Renewable Energy Laboratory's Flatirons Campus. Torque measurements derived from fiber-optic strain sensors placed on the ring gear of the planetary stage are compared to conventional torque measurements from strain gauges placed on the main shaft. Two different torque estimation data processing methods were evaluated, with the method based on operational deflection shapes providing the most accurate results with an average normalized root mean square error below 0.7% for a load revolution distribution analysis. The effect of operating conditions on the torque estimate was also investigated, and the third planet-passing operational deflection shape was found to be the least sensitive to nontorque load-related effects. The fiber-optic strain sensors' successful operation during the complete test campaign has demonstrated a robust and accurate solution for fleet-wide enhanced gearbox remaining useful life estimation.

17 WIND ENERGY↗

Novel Modular Heat Engines with sCO 2 Bottoming Cycle Utilizing Advanced Oil-Free Turbomachinery

This report presents the thermal, mechanical, and electric machine design of a 27krpm rotating test rig aimed at reducing technical risks with hermetic oil-free super-critical carbon dioxide (sCO 2 ) turbomachinery. The test rig rotor system is based on a conceptual turbomachine design discussed that evaluates a sCO 2 waste heat recovery (WHR) unit for land-based gas turbines at natural gas (NG) compressor stations. The key novelty of the hermetic sCO 2 turbomachine concept is the utilization of additively manufactured CO 2 gas bearings and a CO 2 -immersed direct-drive permanent magnet (PM) electric machine. The previous effort on conceptual design identified 3 main technical risks, which included thrust bearing load capacity, rotordynamics, and thermal performance of the system. Therefore, key requirements of the test vehicle include the ability to test the rotor system in a 400psi (27.6 bar) hermetic CO 2 operating environment, apply up to 1,500 lbs (6.7 kN) of rotor thrust loads, capability to assess rotordynamics with radial gas bearings, inclusion of instrumentation to assess thrust bearing load capability, and flexibility for varying secondary cooling flows to confirm thermal model predictions. Design topics such as rotordynamics, bearing design, and electric machine design are addressed, while highlighting critical elements. In addition, additive build trials for Inconel 718 radial and thrust bearings were performed to prove the manufacturability of the bearing design concepts. The results of the design efforts yield a test rig concept with ability to operate at 27,000 rpm, apply thrust loads to 1,500 lbs, deliver CO 2 up to 800psi, and modulate cooling flows.

03 NATURAL GAS↗

Mitigating Data Center Impact on Grid Stability: A Coordinated Control Strategy Using Verrus StabiliGrid Architecture

Large data centers, which now represent a significant and growing share of the total U.S. grid load, can inadvertently destabilize the electrical grid when they disconnect simultaneously during brief voltage disturbances. The July 10, 2024, Eastern Interconnection incident, in which a sub-100-millisecond transmission fault triggered the cascading loss of approximately 1,500 MW of data center load, illustrates this vulnerability. While commercial battery energy storage systems (BESS) deployed in data centers provide device-level fault ride-through per IEEE 1547, they lack coordination with facility protection logic and uninterruptible power supplies (UPS), limiting their effectiveness as grid-stabilizing assets. This report presents the Verrus StabiliGrid architecture, a coordinated control framework that integrates BESS, UPS, and point-of-interconnection (POI) protection settings to enable data centers to ride through both undervoltage and overvoltage grid contingencies without disconnecting. The four-step strategy encompasses: (1) high-resolution power quality monitoring to detect the grid state during events such as undervoltage, overvoltage, underfrequency, and overfrequency; (2) POI protection settings that allow for extended ride-through and grid-connected operation during grid contingencies; (3) grid state-driven autonomous dispatch of assets to improve grid resilience by reducing power draw during undervoltage or absorbing more power during overvoltage events; and (4) coordinated post-recovery dispatch of data center assets to restore firm load to pre-contingency levels. Validated through controller-hardware-in-the-loop (C-HIL) simulations at the National Laboratory of the Rockies, results show grid import restoration to pre-fault levels within 100 milliseconds of voltage recovery. This work advances the ability of data centers to transition from passive, disturbance-sensitive loads to active participants in grid stability, a capability increasingly required by emerging NERC and ERCOT regulatory frameworks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Temperature-Time Modeling of Spent Fuel Cladding in Dry Storage Casks

This report uses thermal and decay heat modeling to investigate spent fuel performance and the potential for cladding to anneal in dry storage conditions. Annealing is an important feature to investigate in SNF cladding because it has a direct relationship to cladding response in storage, transportation and disposal conditions. Annealed cladding may have lower strength than unannealed cladding, however its increased ductility would provide better protection against rupture in high strain rate situations such as severe accidents. These consequences are the driver for this work however are outside of the scope of this report. The modeling focused on three representative storage systems, the TN-32B, MAGNASTOR with TSC-37 canister, and NUHOMS AHSM with a 32PTH2 canister. This covers the vertical dual-purpose, vertical ventilated and horizontal ventilated casks respectively. Decay heat modeling using high and low enrichment assemblies was used to bound the decay heat curves that might be expected in dry storage. To bound the temperature relationship, the storage casks were modeled starting at the design basis heat loads with heat decaying through time. Although the results are bounding there is not an attempt to maximize conservatism, rather the intent to form a reasonable upper limit on temperature that will be broadly applicable to the U.S. cask fleet. This will allow materials testing to focus on relevant conditions for annealing that may affect the U.S. spent fuel inventory. The results show a clear dependence on heat load pattern in time in Figure S-1 and Figure S-2. This dependence is due to the different assembly decay heat curves for different assemblies in preferentially loaded casks. It shows the need for careful decay heat modeling when examining in service fuel temperatures that are less than the cask design basis heat load. The body of the report shows percent cladding cutoffs of 300°C and 350 °C as well. These results can be used to inform testing and conclusions about cladding performance through time and the potential for cladding annealing during dry storage.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of a high fidelity CFD model for solvent evaporation and transport in porous structure during battery electrode drying

An efficient battery manufacturing process is the key to the mass production of Electric Vehicles (EV), in which drying is one of the most energy-intensive steps significantly influencing the battery cell performance. An accurate 3D CFD model for drying is essential for predicting the drying mechanism and optimizing its parameters. By optimizing the drying process, it is possible to reduce energy consumption and cost during battery manufacturing, minimize binder loading and maximize active material loading to achieve superior electrochemical performances and facilitate wider and faster public adoption of EV. This project aims to optimize the drying process during electrode manufacturing by leveraging high-fidelity, porous electrode simulations for solvent evaporation. By optimizing this process, we seek to reduce energy consumption during battery manufacturing, while minimizing binder loading and maximizing active material loading, with the overall goal of enhancing electrical vehicle performance.

Horner, Jeffrey Scott [Sandia National Laboratorie↗

Storing Affordability: Battery Storage as an Asset to Reduce Data Center Cost Shifts

This report examines how battery energy storage systems (BESS) can help utilities accommodate large load growth while protecting affordability for existing ratepayers. Rapid growth in electricity demand from artificial intelligence (AI) data centers is straining the U.S. grid. Furthermore, many new data centers are entering rural markets, which could offer economic benefits but may also pose implementation challenges for smaller utilities. At the same time, retail electricity prices are increasing faster than inflation, elevating customer affordability as a key challenge. While data centers have not been the primary driver of increases in residential prices to date, they have pushed wholesale energy and capacity prices higher in several markets. Fundamental utility cost-allocation principles show that data center growth can be rate-positive for existing customers only if new peak demand grows faster than the costs a utility must incur to serve it. Several factors, including a utility’s degree of wholesale market exposure, forecast uncertainty and stranded-asset risk, and tariff design can determine the outcome of load growth on retail rates. Energy storage can make several affordability contributions in the face of this landscape of uncertainty and market volatility, including deferral of higher-cost grid investments through improved utilization of existing assets and flexibility of new large loads, insulation from volatile wholesale prices through peak shaving, and reliability support to address grid risks stemming from the behavior of AI data center loads. Different potential BESS deployment pathways—utility-scale front-of-the-meter systems, aggregated small-scale storage installations, and data center-sited behind-the-meter storage—are compared against each other and against conventional capacity alternatives. This framework is intended as a conceptual resource to utilities, particularly smaller public utilities with rural service territories, who may be considering the role that energy storage can play in insulating existing ratepayers from data center cost shifts.

25 ENERGY STORAGE↗

Additional Data Focused on Phase 1 Geared Toward Computational Fluid Dynamics (CFD) validation

A new validation campaign was developed within the Offshore Code Comparison Collaboration, Continued, with Correlation and unCertainty (OC6) to better understand the complex interactions between components of a floating wind system (e.g., columns, pontoons, etc.) in a more generic sense, and to validate modeling approaches for a variety of floating designs. A set of cylinders based on the Offshore Code Comparison Collaboration Continuation (OC4)-DeepCwind semidesign were tested under wave loading, both individually and in different combinations (including the attachment of heave plates of different sizes). The cylinders were held rigid, and pressure sensors were used to measure the distributed loading on the structures, while load cells measured the total integrated hydrodynamic loads.

17 WIND ENERGY↗