Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Execution Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Report Series: Evaluation, Finding Of Effect, And Mitigation Documentation For Building 23-113, Mercury, Area 23, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE) National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to demolish Building 23-113 in Mercury (Nevada State Historic Preservation Office [SHPO] Resource No. B15236), which is on the Nevada National Security Site (NNSS) in Nye County, Nevada. Demolition of Building 23-113 is part of the long-term project to modernize the town of Mercury on the NNSS for future mission needs. The project is considered an undertaking subject to review under Title 54 of United States Code (USC) § 306108, commonly known as Section 106 of the National Historic Preservation Act, Title 54 USC § 300101, et seq., and its implementing regulations, Title 36 of the Code of Federal Regulations (36 CFR) Part 800. In 2018, Desert Research Institute (DRI) completed an architectural survey of the town of Mercury. This effort resulted in the identification, recordation, and evaluation of the Mercury Historic District (MHD, SHPO Resource No. D230), including the identification of its contributing elements (Reno et al. 2018). The MHD was recommended eligible for listing in the National Register of Historic Places (NRHP, National Register) under the Secretary of the Interior’s (SOI) Significance Criteria A and C, as defined in 36 CFR Part 60.4, as a significant concentration of buildings and structures with a direct and important association with Cold War-era nuclear testing from 1951 through 1992. It has not been evaluated under Criteria B and D to date. As part of a larger modernization program for Mercury, the NNSA/NFO and the SHPO executed the 2018 Programmatic Agreement between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada (the Mercury PA). The Mercury PA includes streamlined Section 106 procedures for undertakings in the MHD based on contributing element categories. Building 23-113 is identified in Appendix C of the Mercury PA as a Category I contributing element, indicating that it might be individually eligible for the NRHP. It is a historic property for the purposes of Section 106 compliance and subject to the stipulations of the Mercury PA. Per Stipulation VI of the Mercury PA, when the Area of Potential Effect (APE) for an undertaking includes Category I elements, the NNSA/NFO must evaluate the Category I elements for individual NRHP eligibility under all of the SOI Significance Criteria prior to initiating any activity that may affect the elements. Therefore, the purpose of this report is to evaluate Building 23-113 as a potential individually eligible historic property in fulfillment of Stipulation VI of the Mercury PA. The evaluation detailed herein concludes that although Building 23-113 is significant at the local level for its important role as a recreational facility on the NNSS, the building lacks sufficient integrity to convey its significance. It is not individually eligible for listing in the NRHP at any level. The building remains eligible as a contributing element to the MHD.

54 ENVIRONMENTAL SCIENCES↗

Human Factors Principles in Information Dashboard Design - 278

Refueling outages remain one of the largest opportunities for improving capacity factor and reducing costs available to commercial nuclear power plants. Although the nuclear industry has made steady improvement in outage optimization, each day of a refueling outage still represents an opportunity to save millions of dollars and each day an outage extends past its planned end date represents millions of dollars that may have been spent unnecessarily. Reducing planned outage duration or preventing outage extensions requires careful management of the outage schedule as well as constant oversight and monitoring of work completion during the outage execution. During a typical outage, there are typically more than 10,000 activities on the schedule that, if not managed efficiently, may cause expensive outage delays. Management of outages currently relies largely on paper-based resources and general-purpose office software. A typical method currently used to monitor work performance is a burn-down curve, where total remaining activities are plotted against the baseline schedule to track bulk work completion progress. While methods like this are useful, there is still considerable uncertainty during a typical outage whether bulk work progress is adequate and therefore a lot of management time is spent analyzing the situation on a daily basis. This paper is a case study of how new technology, in combination with established human-factors and user-centered design knowledge, can be used to support Outage Control Center (OCC) personnel decision making. In particular, we describe recent advances made in developing a framework for the design of visual outage information presentation, as well as an overview of the human factors principles that informed the development of the visualizations. To test the utility of advanced visual outage information presentation, an outage management dashboard software application was created as part of the Department of Energy's Advanced Outage Control Center project (AOCC). This dashboard is intended to present all the critical information an outage manager would need to understand the current status of a refueling outage. The dashboard presents the critical path, bulk work performance, key performance indicators, outage milestones and metrics relating current performance to historical performance. Additionally, the dashboard includes data analysis tools to allow outage managers to drill down into the underlying data to understand the drivers of the indicators. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Standardizing Interfaces for External Access to Data and Processing for the NASA Ozone Product Evaluation and Test Element (PEATE)

NASA's traditional science data processing systems have focused on specific missions, and providing data access, processing and services to the funded science teams of those specific missions. Recently NASA has been modifying this stance, changing the focus from Missions to Measurements. Where a specific Mission has a discrete beginning and end, the Measurement considers long term data continuity across multiple missions. Total Column Ozone, a critical measurement of atmospheric composition, has been monitored for'decades on a series of Total Ozone Mapping Spectrometer (TOMS) instruments. Some important European missions also monitor ozone, including the Global Ozone Monitoring Experiment (GOME) and SCIAMACHY. With the U.S.IEuropean cooperative launch of the Dutch Ozone Monitoring Instrument (OMI) on NASA Aura satellite, and the GOME-2 instrumental on MetOp, the ozone monitoring record has been further extended. In conjunction with the U.S. Department of Defense (DoD) and the National Oceanic and Atmospheric Administration (NOAA), NASA is now preparing to evaluate data and algorithms for the next generation Ozone Mapping and Profiler Suite (OMPS) which will launch on the National Polar-orbiting Operational Environmental Satellite System (NPOESS) Preparatory Project (NPP) in 2010. NASA is constructing the Science Data Segment (SDS) which is comprised of several elements to evaluate the various NPP data products and algorithms. The NPP SDS Ozone Product Evaluation and Test Element (PEATE) will build on the heritage of the TOMS and OM1 mission based processing systems. The overall measurement based system that will encompass these efforts is the Atmospheric Composition Processing System (ACPS). We have extended the system to include access to publically available data sets from other instruments where feasible, including non-NASA missions as appropriate. The heritage system was largely monolithic providing a very controlled processing flow from data.ingest of satellite data to the ultimate archive of specific operational data products. The ACPS allows more open access with standard protocols including HTTP, SOAPIXML, RSS and various REST incarnations. External entities can be granted access to various modules within the system, including an extended data archive, metadata searching, production planning and processing. Data access is provided with very fine grained access control. It is possible to easily designate certain datasets as being available to the public, or restricted to groups of researchers, or limited strictly to the originator. This can be used, for example, to release one's best validated data to the public, but restrict the "new version" of data processed with a new, unproven algorithm until it is ready. Similarly, the system can provide access to algorithms, both as modifiable source code (where possible) and fully integrated executable Algorithm Plugin Packages (APPs). This enables researchers to download publically released versions of the processing algorithms and easily reproduce the processing remotely, while interacting with the ACPS. The algorithms can be modified allowing better experimentation and rapid improvement. The modified algorithms can be easily integrated back into the production system for large scale bulk processing to evaluate improvements. The system includes complete provenance tracking of algorithms, data and the entire processing environment. The origin of any data or algorithms is recorded and the entire history of the processing chains are stored such that a researcher can understand the entire data flow. Provenance is captured in a form suitable for the system to guarantee scientific reproducability of any data product it distributes even in cases where the physical data products themselves have been deleted due to space constraints. We are currently working on Semantic Web ontologies for representing the various provenance information. A new web site focusing on consolidating informaon about the measurement, processing system, and data access has been established to encourage interaction with the overall scientific community. We will describe the system, its data processing capabilities, and the methods the community can use to interact with the standard interfaces of the system.

Tilmes, Curt A.↗

Phase 1 research program overview

The Phase 1 research program was unprecedented in its scope and ambitious in its objectives. The National Aeronautics and Space Administration committed to conducting a multidisciplinary long-duration research program on a platform whose capabilities were not well known, not to mention belonging to another country. For the United States, it provided the first opportunity to conduct research in a long-duration space flight environment since the Skylab program in the 1970's. Multiple technical as well as cultural challenges were successfully overcome through the dedicated efforts of a relatively small cadre of individuals. The program developed processes to successfully plan, train for and execute research in a long-duration environment, with significant differences identified from short-duration space flight science operations. Between August 1994 and June 1998, thousands of kilograms of research hardware was prepared and launched to Mir, and thousands of kilograms of hardware and data products were returned to Earth. More than 150 Principal Investigators from eight countries were involved in the program in seven major research disciplines: Advanced Technology; Earth Sciences; Fundamental Biology; Human Life Sciences; International Space Station Risk Mitigation; Microgravity; and Space Sciences. Approximately 75 long-duration investigations were completed on Mir, with additional investigations performed on the Shuttle flights that docked with Mir. The flight phase included the participation of seven US astronauts and 20 Russian cosmonauts. The successful completion of the Phase 1 research program not only resulted in high quality science return but also in numerous lessons learned to make the ISS experience more productive. The cooperation developed during the program was instrumental in its success. c2001 AIAA. Published by Elsevier Science Ltd.

short duration↗

50-Year Window to Establish a Space Faring Civilization

Humankind may only have a short window of 50 years to become a space-faring civilization, after which time the opportunity to do so may become too difficult or impractical to pursue. Current policies for space exploration and infrastructure development implicitly assume a gradualistic approach to technology, budgets, and mission execution -- the common thought has been that there will be plenty of time in humankind's future to become a space-based species, and whatever we are unable to accomplish will be borne by the generations that follow. However, considering natural events, available energy, and human tendencies, the timing to make the most effective effort to achieve multi-planet status might be now, before momentum is lost and we become distracted by Peak Oil and changing energy economies -- restarting a space program after such turmoil may be more difficult than would be practical without cheap, storable, high-energy density petroleum. "Space-faring civilization" is defined as an economically profitable space-based economy that demands the presence of humans off-world in order to sustain a high level of prosperity. An initial foothold for a space-based economy that would fit within the 50-year window might include Earth dependence on rare-earth elements or other hard-to-obtain minerals mined from moons or asteroids, or a permanent settlement on another planet. Using published sources, notional mass and energy requirements for a minimal self-sustaining Mars settlement is calculated, and the number of launch vehicles discussed. Setting the launch schedule to match that of current NASA projections, it could take more than 26 years of semi-annual launches to build up such a self-sustaining human settlement -- a cost and commitment that has not been acknowledged nor planned for. Considering the time required to establish a multi-planet species, this paper frames the required window of decision that, if not taken, could condemn the species to Earth subject to whatever natural or human-made calamities that endanger single-planet civilizations.

human exploration↗

Targeting 100! Advanced Energy Efficient Building Technologies for High Performance Hospitals: Executive Summary.

This research, Targeting 100!, provides a conceptual framework and decision-making structure at a schematic design level of precision for hospital owners, architects and engineers to radically reduce energy use in hospitals. Following the goals of Architecture 2030 and The 2030 Challenge, it offers access to design strategies and the cost implications of those strategies for new hospitals to utilize 60% less energy. The name, Targeting 100!, comes from the 2030 Challenge energy reduction goal for hospitals; a 60% energy use reduction from typical acute care hospital targets approximately 100 KBtu/SF Year, thus the name “Targeting 100!”. Targeting 100! was developed through funding partnerships with the US Department of Energy and the Northwest Energy Efficiency’s BetterBricks Initiative. The technical team was led by the University of Washington Integrated Design Lab supported by deep collaboration with Solarc Architecture and Engineering, TBD Cost Consultants, and NBBJ Architecture. Through extensive research and design development, Targeting 100! provides a framework for developing high performance healthcare projects today and into the future. An online tool houses a Targeting 100! knowlegebase and roadmap. It can be accessed at: www.idlseattle.com/t100. The webtool is structured from high-level overview materials to detailed library with modeling inputs and outputs, providing a comprehensive report of the background, data, and outcomes from the project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Verification of the CENTRM Module for Adaptation of the SCALE Code to NGNP Prismatic and PBR Core Designs

The generation of multigroup cross sections lies at the heart of the very high temperature reactor (VHTR) core design, whether the prismatic (block) or pebble-bed type. The design process, generally performed in three steps, is quite involved and its execution is crucial to proper reactor physics analyses. The primary purpose of this project is to develop the CENTRM cross-section processing module of the SCALE code package for application to prismatic or pebble-bed core designs. The team will include a detailed outline of the entire processing procedure for application of CENTRM in a final report complete with demonstration. In addition, they will conduct a thorough verification of the CENTRM code, which has yet to be performed. The tasks for this project are to: Thoroughly test the panel algorithm for neutron slowing down; Develop the panel algorithm for multi-materials; Establish a multigroup convergence 1D transport acceleration algorithm in the panel formalism; Verify CENTRM in 1D plane geometry; Create and test the corresponding transport/panel algorithm in spherical and cylindrical geometries; and, Apply the verified CENTRM code to current VHTR core design configurations for an infinite lattice, including assessing effectiveness of Dancoff corrections to simulate TRISO particle heterogeneity.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Ultra Efficient Light Duty Powertrain with Gasoline Low Temperature Combustion (Final Report)

This document details the work completed during Project DE-EE0006839 ‘Ultra Efficient Light Duty Powertrain with Gasoline Low Temperature Combustion’. All tasks from the project’s Statement of Project Objectives are discussed. Final demonstration data is also presented and discussed. Further project details can be found in the Quarterly Technicial Reports that were submitted during the course of the project and are stored on the EERE Project Management Center Website. The goal of this project was to develop, implement and demonstrate a low temperature combustion approach called Gasoline Direct Injection Compression Ignition (GDCI) that provides high thermal efficiency with low NOx and PM emissions. The project target was to demonstrate a 35% fuel economy improvement over the baseline vehicle while meeting Tier 3 emissions levels. At the start of this project, GDCI was a moderately mature combustion technology, due in large part to advances made during a Delphi Technologies program funded through an earlier Department of Energy Advanced Technology Powertrains (ATP) opportunity; under that earlier contract, DE-EE0003258, Delphi Technologies assembled a team with complementary industrial and academic experience, and led this team to advance the technology from the original fundamental work to the state of art embodied by a first-generation (Gen 1) multi-cylinder GDCI engine. Key activities during that project centered on engine and combustion chamber design, and development of fuel injection equipment, valvetrain and advanced controls. Performance results with the Gen 1 engine in a development vehicle demonstrated that GDCI had the capability to operate using Low Temperature Combustion (LTC) over a broad speed-load range. Based on benchmarking work, efficiency for the Gen 1 GDCI engine compared favorably overall to production light-duty diesel engines. The second DOE funded project, DE-EE0006839, focused on a number of technical risks and issues that were left to be resolved for GDCI to become a production-viable technology. These risks were:GDCI combustion system refinement to achieve near-ideal air/fuel mixture preparation for high efficiency and low HC and CO emissions; Transient control development for low temperature combustion with high EGR levels during real-world transient driving maneuvers and over a broader range of ambient conditions; Aftertreatment system design that is effective in dealing with the low-temperature challenges of a highly efficient engine. The project was executed in two phases. Phase 1 leveraged the development vehicle from the Advanced Technologies Powertrain 1 (ATP1) project, DE-EE0003258. That vehicle was used as an initial test bed in the development of a high performance low temperature exhaust aftertreatment system. The vehicle was also used to develop calibration refinements for improved exhaust emissions and fuel efficiency. Samples of a new GDCI development level engine, called Gen2 GDCI (and developed outside of the first DOE funded project), were also used during Phase 1 to develop refined controller hardware and control algorithms, as well as improved sensors and actuators. The Gen2 engine was then retrofitted into the development vehicle from the ATP1 project and used for controls refinement and calibration of GDCI to achieve improved cold start, drivability and robustness to real world environments and fuel variations. During Phase 2 of the project, Gen3 versions of the GDCI engine were designed and built specifically for this project based on experience from the earlier engines. These engines were designed to be production-like in construction and, when combined with refined control systems and project specific low temperature exhaust aftertreatment, were intended to support the goal of meeting Tier 3 emissions levels at a vehicle level. Though great progress had been made advancing the GDCI combustion process, and despite extensive presentations of our work on the technology at various conferences and in direct meetings with automotive companies, none of the US domestic automotive OEMs had shown an interest in adopting this combustion process as part of their technology planning as the project approached the Go/No-Go point at the end of Budget Period 3. As a result of this low-level of interest both the US Department of Energy and Delphi Technologies received in this technology from domestic auto manufactures, Delphi Technologies elected a ‘No-Go’ status for the gate between Budget Period 3 and Budget Period 4 which terminated the project without spending any Budget Period 4 funds. The project team concluded that the dynamometer mapping of the most recent level of hardware, combined with the vehicle level simulation by Argonne National Laboratory, was sufficient to document the capabilities and potential of the combustion process without spending the time and money to do the controls development and full calibration necessary for a demonstration vehicle.

33 ADVANCED PROPULSION SYSTEMS↗

Sustainable Transactions - The Fine Art of the Forever Deal - 19569

The U.S. Department of Energy Office of Legacy Management (LM) has various real property interests at the 92 sites within its current portfolio. Because of its unique mission, LM does not own most of the sites for which it has responsibility for long-term surveillance and maintenance (LTS and M). In addition to the sites it does own, LM works with various federal, state, local, and private entities to execute its obligations. Each site has its own narrative with respect to the real property assets: how they were acquired, how they are sustained, and how they were or will be dispositioned. Since the regulatory time frame for LTS and M activities at some sites can be in perpetuity, durable and effective instruments and documentation are necessary to support LM's mission as a federal land manager and steward. In addition, more than half of the sites currently in LM's inventory do not allow unrestricted use because of residual contamination from historical activities, and institutional controls are required to limit human and environmental exposures to residual contamination by controlling land use, restricting access to potential hazards, and making the public aware of potential dangers from the residual contamination. Thus, the overall real property interests and transactions associated with these sites not only have to address the environmental concerns associated with protection of human health and the environment but also how best to position LM's real property assets to support the mission for future generations. These types of transactions are often complex, requiring the negotiation of numerous documents to achieve and sustain protection of human health and the environment while allowing for future use. Such planning needs to be flexible enough to envision that the original transaction will likely change over time due to changing regulations, communities, stakeholders, and site conditions as operation and maintenance activities are performed. Planning for the integration of these requirements with the needs of the end users, stakeholders, and communities is paramount to a successful project, and various transactional considerations impact how best to achieve this goal. As such, these transactions have to be sustainable. Real property interests change over time, with new owners, operators, regulators, and stakeholders. Determining the sustainability of these real property interests, therefore, calculates the sustainability of each asset's physical attributes and also the sustainability of the various legal instruments and arrangements that are put in place at each site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dynamic Mode Decomposition of Unsteady Pressure-Sensitive Paint Measurements for the NASA Unitary Plan Wind Tunnel Tests

This paper discusses the Dynamic Mode Decomposition (DMD) of the Unsteady Pressure-Sensitive Paint (uPSP) measurements, which were collected with four Phantom high-speed cameras at a constant sample frequency in the Ascent Transient Aerodynamics Test (ATAT) of the Space Launch System (SLS) Block 1 cargo vehicle with the Unitary Plan Wind Tunnel (UPWT) 11-by-11-foot Transonic Wind Tunnel in September 2019 at NASA Ames Research Center. The conventional DMD algorithm is based on the Singular Value Decomposition (SVD). For the data with zero mean, the DMD is equivalent to the Discrete Fourier Transform (DFT). Since the uPSP is mainly used to determine the unsteady property of the aerodynamic flow, the DMD of the uPSP measurements is implemented in two steps: (1) subtract the mean value from the uPSP measurement; (2) apply the Fast Fourier Transform (FFT) on the resulting data with zero mean. The DMD of the uPSP measurements with FFT has two advantages: (1) the FFT algorithm is well known for its computational efficiency, therefore, compared to the SVD-based DMD algorithm, the DMD with FFT reduces the computation time; (2) the DMD with FFT can be easily implemented in parallel processing. The DMD outputs were generated with the execution in parallel of a code in C, with libraries of FFTW for FFT and MPI/OpenMP for parallel processing, on the NASA Pleiades supercomputer. In this paper, the results of DMD of the uPSP measurements in the tests of Mach sweep runs of the SLS ATAT are presented, and the effectiveness of the DMD of the uPSP measurements in the diagnosis of the unsteady, aerodynamic phenomena is demonstrated. The work described in this paper is a part of NASA’s development of a new state-of-the-art uPSP capability in production wind tunnels. Funding for this research was provided by the NASA Aeroscience Evaluation and Test Capabilities Project.

Pressure-Sensitive Paint↗

Validation Data Acquisition in HTTF during PCC Events

A validation experimental campaign was conducted in an Integral Effect Test (IET) facility of High Temperature Gas Reactors (HTGR), the High-Temperature Test Facility (HTTF) at Oregon State University (OSU). The HTTF simulates Depressurized and Pressurized Conduction Cooldowns (DCC and PCC). This campaign required the development of a new laser spectroscopic diagnostic to measure velocity in the challenging conditions of the HTTF: low speed (~1 m/s) gas flows at HTGR prototypical temperature and 1/10th pressure. This was a collaborative effort between co-PIs at The George Washington University (GW), Oregon State University (OSU), and NASA Langley Research Center. The main accomplishments of this project include the record for dynamic range for velocimetry, highest accuracy obtained with this technique, successful deployment in an IET leading to new validation matrix for CFD. These are detailed below and in manuscript appended to this executive summary. For this project, we introduced a new class of laser spectroscopic diagnostics to Thermal-Hydraulics to measure velocity of gases; furthermore, the diagnostic was demonstrated in-situ in an IET during DCC events. In such scenarios, particles used in mainstream techniques, like Particle Image Velocimetry (PIV) are not appropriate as they settle down too rapidly and also contaminate the experimental facility. Molecular tracers stay mixed within the working gas and can seed the flow in a technique called Molecular Tagging Velocimetry (MTV). In MTV a molecular tracer is photo-dissociated by a first (write) laser into radicals or molecules. The pattern created by the write laser is then interrogated with planar laser-induced fluorescence (PLIF), the read pulse(s), which are recorded with a camera. The pattern is probed and matched at two times (interval or probe time, dt), resulting in a time-of-flight velocimetry technique. This project demonstrated a new application range for MTV in gases. MTV has been extensively used for high-speed gas dynamics: molecules do not suffer from inertia associated with particles in regions of high accelerations (such as shock waves). For high-speed flows, the probe time is on the order of 0.1-10 µs. In time-of-flight techniques, the velocity is reconstructed from the recorded displacement, dx, between time interval dt: U = dx/dt. To first order, the resolution of the pattern matching is typically a (fixed) fraction of a pixel; therefore the resolution of the velocity measurement increases with dx and, for a given flow velocity, dt. For the low-speed flows of interest here, this requires long probe time, and therefore finding tracers that are stable for a long time. After an extensive literature survey we identified 6 tracers that would be suitable. We also worked with Spectra Physics to design a custom laser system that is flexible enough to probe these various tracers. The final instrument is made of 4 lasers that are integrated into a compact and movable cart to facilitate the deployment of the instrument off-site. One unique aspect of the laser system is the tunable dye laser (needed to do PLIF of the radicals). By being pumped by two Nd:YAG lasers, this laser is able to provide two pulses with any probe time (dt) for wavelengths between 200 and 900 nm with a linewidth of 3 pm. Accommodating the dual-pulse capability required customizing the pump lasers and the dye laser, making this system unique. Additionally, a custom UV-intensified CCD camera capable of frame-straddling and exposure time as short as 10 ns was acquired. More than two-third of the instrument cost (~$200k) was covered by a cost sharing from the PI’s startup funds. Of the 6 potential tracers identified, two were tested extensively (H2O and N2O) at high-temperature and elevated pressure at GW prior to conducting the tests at OSU. For both tracers, an Ar-F laser (193 nm, 10 ns, 10 mJ/pulse) photo-dissociates trace amounts (0.1 – 5% molar fraction) of the gases into OH and NO. OH is probed at 281.905 nm and NO at 226.186 nm (4-30mJ, 10 ns pulse). NO is very stable in inert environment and we could reconstruct velocities precisely with probe delay times as long at 40 ms, compared to 2 ms for OH, resulting in increased precision. Therefore, for the tests in the HTTF, N2O was selected as the final tracer and its optimal concentration was determined to be 0.5% molar. In the GW laboratory, we obtained a velocity measurement precision of 4 mm/s at conditions mimicking the HTTF tests. We also demonstrated the benefit of molecular tracers over particles and the flexibility of our instrument by continuously measuring velocity from 1000 to 0.1 m/s in a blow down test. This represents a dynamic range on velocity of 80 dB, which is unprecedented for velocimetry! Once the diagnostic was optimized, two two-week campaigns were conducted in the HTTF. This experimental campaign required numerous practical solutions to successfully and rapidly deploy this very sensitive table-top diagnostic in-situ. This was accomplished thanks to very extensive planning from all parties involved in the project. Due to constraints on availability of the HTTF, only adiabatic DCC tests were conducted. Specifically, the velocity was measured at the exit of the hot leg into the Reactor Cavity Simulation Tank (RCST). We were able to record the gas velocity associated with the air ingress for long times (up to one hour). Depending on the initial conditions (density of the gases in the Reactor Pressure Vessel and the RCST) the lock exchange lasted 30-60 s past the valve openings. Large vortices were identified within the shear layer at the interface of the cross flow. These vortices are an indication of shear-driven instability between the counter streams of different density. After the lock-exchange, a small residual flow was still present and its strength decayed exponentially. It finds its source in a buoyancy difference between the gases in both vessels due to the mixing and diffusion of the gases in the cross-over duct and the RPV lower plenum. We did not expect to capture this part of the transient, which would have been less significant (if not negligible) in the presence of a heated core; the precision of our measurement in the HTTF was 6 mm/s, which exceeded our expectations for such a complex test! Using commercial software (Fluent) we simulated the experiment with Computational Fluid Dynamic (CFD) using Reynolds Averaged Navier-Stokes (RANS) turbulence models. We were not able to accurately reproduce the shear layer instability, mixing, and diffusion captured in our experimental data, even with large 3D meshes (>10 M points). We attributed this to the inadequacy of the RANS models for the flow of interest: our experimental Reynolds number was too low and was outside the applicability range of the RANS models. Instead, we should have employed CFD with less modeling, such as Large Eddy (LES) or even Direct Numerical (DNS) simulations. Unfortunately, we did not have the computational resources to do so. Finally, it should be noted that this experimental technique holds great promises for measuring velocity in thermalhydraulics. MTV has an application domain (highlighted in the narrative) that is complimentary to more established (and simpler) techniques, such as PIV. It has attracted the attention of several thermalhydraulics researchers and sponsors to measure velocity in harsh environments. The spectroscopic nature of this technique also enables to expand it to measure temperature and concentration simultaneously to velocity. In lieu of a narrative, 4 detailed journal publications are appended to this executive summary to describe the various development and accomplishments during this project. They include 2 published manuscripts (Experiments in Fluids and Measurement Science and Technology), and two invited contributions following the NURETH-17 conference (Nuclear Science and Technology). Our current Nuclear Engineering and Design draft is not included at this time.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Distributed Solar Quality and Safety in India: Key Challenges and Potential Solutions

The quality and safety of solar systems and their installation has become a concern for investors, regulators, consumers, and Discoms in India. The push for low prices and lack of quality standards are driving project developers to install low quality products, with poor system design and execution on-site. Existing literature and stakeholder interviews point to the rampant use of low quality, sub-standard solar products in India. These products deliver less energy than expected, or have high detrition rates, or have lower product life–all of which are serious issues for developers whose return on investment depend on the amount of power generation from these solar systems for the expected life of the project. Equipment which does not conform to the minimum quality standards also creates safety risks for the distribution network. Performance and safety concerns lower investor and consumer confidence in solar products with the potential to threaten market development. This report formulates a set of recommendations to concerned authorities in India to improve the quality and safety of rooftop solar systems. Primary and secondary sources are employed to understand the current solar quality and safety scenario in India to provide the basis for future recommendations. An overview of international experiences and lessons learned on solar quality and safety issues is also conducted to understand potential solutions for India.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Quarterly Technical Progress Report Piperazine Advanced Stripper (PZAS™) Front End Engineering Design

EXECUTIVE SUMMARY This document summarizes the status of Cooperative Agreement DE-FE0031844, “Piperazine Advanced Stripper (PZAS™) Front-End Engineering Design,” during the reporting period of January 1 through March 31, 2020. The objective of this project is to develop accurate installed costs by conducting a Front-End Engineering Design (FEED) of PZAS™ at Golden Spread Electric Cooperative’s (GSEC) Mustang Station located in Denver City, TX. Complementary benefits include positioning the technology for a commercial project with the 45Q tax credits, qualifying PZAS™ for use on a Natural Gas Combined Cycle (NGCC) Cogen facility, and to provide cost detail to optimize PZAS™ and help guide R&D of second-generation solvent CO2 capture technologies. Results from the FEED will be used to evaluate the economic feasibility of the process at Mustang Station. This project is funded by the U.S. DOE National Energy Technology Laboratory under the aforementioned Cooperative Agreement. Exxon, Total, Chevron, UOP-Honeywell, and the University of Texas (UT) are project co-funders. AECOM and Trimeric are project team members; UT is the prime contractor. Summary of Progress Cooperative Agreement DE-FE0031844 was established in October 2019. The current reporting period, January 1 through March 31, 2020, is the second technical progress reporting period for the project. Several milestones were accomplished during this reporting period, including: • Kickoff Meeting with DOE on February 3, 2020. • Kickoff Meeting with GSEC on March 30, 2020. (Note: Due to Covid-19 travel restrictions and shelter-in-place guidelines, the kickoff meeting was conducted remotely via videoconferencing. See attached notes from that telecon.) • Updated Project Management Plan March 2020, submitted with this quarterly report Other activities during the quarter included progress on contracting and other legal agreements (e.g., non-disclosure agreements), internal kickoff meetings at both AECOM and Trimeric, and development of a Technical Implementation Plan (TIP). The TIP will help the team to make critical, early process decisions and, ultimately, to develop a project and process design basis. Note that all agreements between project team participants are complete as of this submittal, except the vendor agreement with Kiewit (steam cycle modeling). Plans for Next Reporting Period Activities during the next reporting period (April 1, 2020 through June 30, 2020) include: the completion of the Project Design Basis and progress towards the Process Design Basis/Process Design Package (PDP). The Project Design Basis is due as a deliverable and milestone during the next reporting period.

Rochelle, Gary T.↗

Refueling Behavior of Flexible Fuel Vehicle Drivers in the Federal Fleet

Federal fleets are a frequent subject of legislative and executive efforts to lead a national transition to alternative fuels and advanced vehicle technologies. Section 701 of the Energy Policy Act of 2005 requires that all dual-fueled alternative fuel vehicles in the federal fleet be operated on alternative fuel 100% of the time when they have access to it. However, in Fiscal Year (FY) 2012, drivers of federal flex fuel vehicles (FFV) leased through the General Services Administration refueled with E85 24% of the time when it was available--falling well short of the mandate. The U.S. Department of Energy's National Renewable Energy Laboratory completed a 2-year Laboratory Directed Research and Development project to identify the factors that influence the refueling behavior of federal FFV drivers. The project began with two primary hypotheses. First, information scarcity increases the tendency to miss opportunities to purchase E85. Second, even with perfect information, there are limits to how far drivers will go out of their way to purchase E85. This paper discusses the results of the project, which included a June 2012 survey of federal fleet drivers and an empirical analysis of actual refueling behavior from FY 2009 to 2012. This research will aid in the design and implementation of intervention programs aimed at increasing alternative fuel use and reducing petroleum consumption.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Continuation Report: Creep-fatigue Behavior and Damage Accumulation of a Candidate Structural Material for Concentrating Solar Thermal Receiver

At the start of this phase, six alloys were determined to be candidate materials for the concentrating solar power (CSP) thermal receiver: Alloys 617, 625, 740H, 230, 282 and Alloy X. From these, Alloys 740H and 282 were determined to be the most suitable, with both alloys exhibiting similar high temperature strength properties. Alloy 740H was selected due to its ease to work with (simpler heat treatments and welding procedures) and a larger database of existing data. Fatigue testing was started in this phase, with four fatigue tests having been completed, with additional fatigue testing planned, as well as tensile, creep and creep-fatigue tests starting in the next phase. Two fatigue tests performed at 850 °C and were completed in significantly fewer cycles than the two tests performed at 750 °C. Metallography was performed on the fatigued specimens to examine crack path and surrounding microstructure. These preliminary results suggest a significant drop in strength at elevated temperatures above 750 °C, however, more test results will be needed prior to setting design limits. Several potential model high temperature design methods were evaluated that could form the basis of our final recommended creep-fatigue design method for Alloy 740H. To do this we expanded on the receiver finite element model to develop a model representative of a potential Gen 3 design using KCl-MgCl2 salt coolant and operating with a salt inlet temperature of 550°C and salt outlet temperature of 720°C. Using the temperature fields from the model thermohydraulic analysis we determined the design life of the reference receiver assuming it was constructed from 740H seamless tubing and assuming high temperature design properties for 740H from literature data and, where required, naïve extrapolation. As experimental data is generated, these tentative design parameters will be updated to match the actual performance of 740H in elevated temperature service. The results of this design study are a rank ordering of potential design methods for two criteria: ease of use and design margin. The end goal of this project is to develop a creep-fatigue design method with adequate, but not over conservative, design margin that is straightforward to execute. Our receiver model is based on the preliminary design provided to DOE by Solar Reserve. Our analysis indicates a peak metal temperature of around 840° C for this design (comparable to Solar Reserve’s analysis, which shows a peak metal temperature of around 830° C). The Solar Reserve tube thickness is too thin to sustain creep-fatigue loading at this temperature. This means that the current trial design is not well-suited for evaluating different design methodologies, as we predict it will have a very short design life. We suggest that we modify our reference design with input from DOE in order to lower the maximum metal temperature to less than 800° C. We can then repeat these analyses and give a more meaningful comparison of different design methods before making a final selection.

14 SOLAR ENERGY↗

Effectiveness of State-Level Policies on Solar Market Development in Different State Contexts

In response to public interest in customer-sited distributed solar photovoltaics (PV), state and local policymakers have implemented policy initiatives with the goal of encouraging private investment and building a robust PV market. Policymakers face challenges, including limited budgets and incomplete information about the effectiveness of the various policy options in their specific situation, in crafting and executing policy that supports market development goals. Recent work investigated the effect of the order in which policies are implemented (referred to as 'policy stacking') and the presence of low-cost enabling policies, such as interconnection standards and net metering, can have on the success of states in promoting PV markets. Findings indicate that implementation of interconnection standards and policy related to the valuation of excess electricity (e.g., net metering), along with indicators of long term government support for a solar PV market (e.g., RPS) and a non-policy determinant (population), explain about 70% of the variation among states in new PV capacity. This paper builds on that research to determine the most effective policy strategies for different types of states, as determined by their physical, demographic and macroeconomic context. A number of researchers have investigated the effectiveness of state-level policy using various statistical methods to determine relationships between installed solar PV projects and policy initiatives. In this study, the grouping of states by non-policy factors adds dimension to these analyses by identifying how policies function in different non-policy environments.

14 SOLAR ENERGY↗

Automated and Adaptive Mission Planning for Orbital Express

The Orbital Express space mission was a Defense Advanced Research Projects Agency (DARPA) lead demonstration of on-orbit satellite servicing scenarios, autonomous rendezvous, fluid transfers of hydrazine propellant, and robotic arm transfers of Orbital Replacement Unit (ORU) components. Boeing's Autonomous Space Transport Robotic Operations (ASTRO) vehicle provided the servicing to the Ball Aerospace's Next Generation Serviceable Satellite (NextSat) client. For communication opportunities, operations used the high-bandwidth ground-based Air Force Satellite Control Network (AFSCN) along with the relatively low-bandwidth GEO-Synchronous space-borne Tracking and Data Relay Satellite System (TDRSS) network. Mission operations were conducted out of the RDT&E Support Complex (RSC) at the Kirtland Air Force Base in New Mexico. All mission objectives were met successfully: The first of several autonomous rendezvous was demonstrated on May 5, 2007; autonomous free-flyer capture was demonstrated on June 22, 2007; the fluid and ORU transfers throughout the mission were successful. Planning operations for the mission were conducted by a team of personnel including Flight Directors, who were responsible for verifying the steps and contacts within the procedures, the Rendezvous Planners who would compute the locations and visibilities of the spacecraft, the Scenario Resource Planners (SRPs), who were concerned with assignment of communications windows, monitoring of resources, and sending commands to the ASTRO spacecraft, and the Mission planners who would interface with the real-time operations environment, process planning products and coordinate activities with the SRP. The SRP position was staffed by JPL personnel who used the Automated Scheduling and Planning ENvironment (ASPEN) to model and enforce mission and satellite constraints. The lifecycle of a plan began three weeks outside its execution on-board. During the planning timeframe, many aspects could change the plan, causing the need for re-planning. These variable factors, ranging from shifting contact times to ground-station closures and required maintenance times, are discussed along with the flexibility of the ASPEN tool to accommodate changes to procedures and the daily or long-range plan, which contributed to the success of the mission. This paper will present an introduction to ASPEN, a more in-depth discussion on its use on the Orbital Express mission, and other relative work. A description of ground operations after the SRP deliveries were made is included, and we briefly discuss lessons learned from the planning perspective and future work.

scheduling↗

Small Scale Field Test Demonstrating CO 2 Sequestration In Arbuckle Saline Aquifer And By CO 2 -Eor At Wellington Field, Sumner County, Kansas

The objectives of this project are to understand the processes that occur when a maximum of 70,000 metric tonnes of CO 2 are injected into two different formations to evaluate the response in different lithofacies and depositional environments. The evaluation will be accomplished through the use of both in situ and indirect MVA (monitoring, verification, and accounting) technologies. The project will optimize for carbon storage accounting for 99% of the CO 2 using lab and field testing and comprehensive characterization and modeling techniques. Site characterization and CO 2 injection should demonstrate state-of-the-art MVA tools and techniques to monitor and visualize the injected CO 2 plume and to refine geomodels developed using nearly continuous core, exhaustive wireline logs, and well tests and a multi-component 3-D seismic survey. Reservoir simulation studies will map the injected CO 2 plume and estimate tonnage of CO 2 stored in solution, as residual gas, and by mineralization and integrate MVA results and reservoir models shall be used to evaluate CO 2 leakage. A rapid-response mitigation plan was developed to minimize CO 2 leakage and provide a comprehensive risk management strategy. The CO 2 was intended to be supplied from a reliable facility and have an adequate delivery and quality of CO 2 . However, several unforeseen circumstances complicated this plan: (1) the initially negotiated CO 2 supply facility went offline and contracts associated with CO 2 supply had to be renegotiated, (2) a UIC Class VI permit proved to be difficult to obtain due to the experimental nature of the project. Both subjects are detailed in separate deliverables attached to this report. The CO 2 enhanced oil recovery (EOR) and geologic storage in Mississippian carbonate reservoir was sucessully deployed. Approximately 20,000 metric tons of CO 2 was injected in the upper part of the Mississippian reservoir to verify CO 2 EOR viability in carbonate reservoirs and evaluate a potential of transitioning to geologic CO 2 storage through EOR. A total of 1,101 truckloads, 19,803 metric tons—an average of 120 tonnes per day—were delivered over the course of injection that lasted from January 9 to June 21, 2016. After cessation of CO 2 injection, the KGS 2-32 well was converted to water injector and continues to operate. CO 2 EOR progression in the field was monitored weekly with fluid level, temperature, and production recording and formation fluid composition sampling. It is important to note that normally, CO 2 EOR pilots are less efficient than commercial operations due to lack of directional and precise well control, lack of surface facilities for CO 2 recycling, and other factors. As a result of this pilot CO 2 injection, the observed incremental average oil production increase was ~68% with only ~18% of injected CO 2 produced back. Decline curve analysis forecasts of additional cumulative oil produced were 32.44M STB to the end of 2027. Wellington Mississippian pilot efficiency by the end of forecast calculations is 11 MCF per barrel of produced oil. Using 32M STB oil production and $1,964,063 cost of CO 2 , CO 2 EOR cost per barrel of oil production is ~$60. Simple but robust monitoring technologies proved to be very efficient in detecting and locating CO 2 . High CO 2 reservoir retentions with low yields within an actively producing field could help to estimate real-world risks of CO 2 geological storage for future projects. The Wellington Field CO 2 EOR was executed in a controlled environment with high efficiency. This case study proves that CO 2 EOR could be successfully applied in Kansas carbonate reservoirs if CO 2 sources and associated infrastructure are available. Recent developments in unconventional resources development in Mid-Continent USA and associated large volume disposal of backflow water and the resulting seismic activity have brought more focus and attention to the Arbuckle Group in southern Kansas. Despite the commercial interest, limited essential information about reservoir properties and structural elements has impeded the management and regulation of disposal, an issue brought to the forefront by recent seismicity in and near areas of large volumes and rates of brine disposal. The Kansas Geological Survey (KGS) collected, compiled, and analyzed available data, including well logs, core data, step rate tests, drill stem tests, 2-D and 3-D seismic data, water level measurements, and others types of data. Several exploratory wells were drilled and core was collected and modern suites of logs were analyzed. Reservoir properties were populated into several site-specific geological models. The geological models illustrate the highly heterogeneous nature of the Arbuckle Group. Vertical and horizontal variability results in several distinct hydro-stratigraphic units that are the result of both depositional and diagenetic processes. During the course of this project, it has been demonstrated that advanced seismic interpretation methods can be used successfully for characterization of the Mississippian reservoir and Arbuckle saline aquifer. Analysis of post-stack 3-D seismic data at the Mississippian reservoir showed the response of a gradational velocity transition. Pre-stack gather analysis showed that porosity zones of the Mississippian and Arbuckle reservoirs exhibit characteristic amplitude versus offset (AVO) response. Simultaneous AVO inversion estimated P- and S-impedances. The 3-D survey gather azimuthal anisotropy analysis (AVAZ) provided information about the fault and fracture network and showed good agreement to the regional stress field and well data. Mississippian reservoir porosity and fracture predictions agreed well with the observed mobility of injected CO 2 in KGS well 2-32. Fluid substitution modeling predicted acoustic impedance reduction in the Mississippian carbonate reservoir introduced by the presence of CO 2 . Seismicity in the United States midcontinent has increased by orders of magnitude over the past decade. Spatiotemporal correlations of seismicity to wastewater injection operations have suggested that injection-related pore fluid pressure increases are inducing the earthquakes. In this investigation, we examine earthquake occurrence in southern Kansas and northern Oklahoma and its relation to the change in pore pressure. The main source of data comes from the Wellington Array in the Wellington oil field, in Sumner County, Kansas, which has monitored for earthquakes in central Sumner County, Kansas, since early 2015. The seismometer array was established to monitor CO 2 injection operations at Wellington Field. Although no seismicity was detected in association with the spring 2016 Mississippian CO 2 injection, the array has recorded more than 2,500 earthquakes in the region and is providing valuable understanding to induced seismicity. A catalog of earthquakes was built from this data and was analyzed for spatial and temporal changes, stress information, and anisotropy information. The region of seismic concern has been shown to be expanding through use of the Wellington earthquake catalog, which has revealed a northward progression of earthquake activity reaching the metropolitan area of Wichita. The stress orientation was also calculated from this earthquake catalog through focal mechanism inversion. The calculated stress orientation was confirmed through comparison to other stress measurements from well data and previous earthquake studies in the region. With this knowledge of the stress orientation, the anisotropy in the basement could be understood. This allowed for the anisotropy measurements to be correlated to pore pressure increases. The increase in pore pressure was monitored through time-lapse shear-wave anisotropy analysis. Since the onset of the observation period in 2010, the orientation of the fast shear wave has rotated 90°, indicating a change associated with critical pore pressure build up. The time delay between fast and slow shear wave arrivals has increased, indicating a corresponding increase in anisotropy induced by pore pressure rise. In-situ near-basement fluid pressure measurements corroborate the continuous pore pressure increase revealed by the shear-wave anisotropy analysis over the earthquake monitoring period. This research is the first to identify a change in pore fluid pressure in the basement using seismological data and it was recently published in the AAAS journal Science Advances (Nolte et al., 2017). The shear-wave splitting analysis is a novel application of the technique, which can be used in other regions to identify an increase in pore pressure. This increasing pore fluid pressure has become more regionally extensive as earthquakes are occurring in southern Kansas, where they previously were absent. These monitoring techniques and analyses provide new insight into mitigating induced seismicity’s impact on society.

02 PETROLEUM↗