Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

ASK Magazine

Academy of Program and Project Leadership (APPL) and ASK Magazine helps NASA managers and project teams accomplish today's missions and meet tomorrow's challenges by providing performance enhancement services and tools, supporting career development programs, sponsoring knowledge sharing events and publications, and creating opportunities for project management collaboration with universities, professional associations, industry partners, and other government agencies. ASK Magazine grew out of APPL's Knowledge Sharing Initiative. The stories that appear in ASK are written by the best of the best project managers, primarily from NASA, but also from other government agencies and industry. These stories contain genuine nuggets of knowledge and wisdom that are transferable across projects. Who better than a project manager to help another project manager address a critical issue on a project? Big projects, small projects - they're all here in ASK. Please direct all inquiries about ASK Magazine editorial policy to Todd Post, EduTech Ltd., 8455 Colesville Rd., Suite 930, Silver Spring, MD 20910, (301) 585-1030; or email to tpost@edutechltd.com.

Laufer, Alexander↗

Tripal, a community update after 10 years of supporting open source, standards-based genetic, genomic and breeding databases

Abstract Online, open access databases for biological knowledge serve as central repositories for research communities to store, find and analyze integrated, multi-disciplinary datasets. With increasing volumes, complexity and the need to integrate genomic, transcriptomic, metabolomic, proteomic, phenomic and environmental data, community databases face tremendous challenges in ongoing maintenance, expansion and upgrades. A common infrastructure framework using community standards shared by many databases can reduce development burden, provide interoperability, ensure use of common standards and support long-term sustainability. Tripal is a mature, open source platform built to meet this need. With ongoing improvement since its first release in 2009, Tripal provides full functionality for searching, browsing, loading and curating numerous types of data and is a primary technology powering at least 31 publicly available databases spanning plants, animals and human data, primarily storing genomics, genetics and breeding data. Tripal software development is managed by a shared, inclusive governance structure including both project management and advisory teams. Here, we report on the most important and innovative aspects of Tripal after 11 years development, including integration of diverse types of biological data, successful collaborative projects across member databases, and support for implementing FAIR principles.

59 BASIC BIOLOGICAL SCIENCES↗

NASA Crew and Cargo Launch Vehicle Development Approach Builds on Lessons from Past and Present Missions

The United States (US) Vision for Space Exploration, announced in January 2004, outlines the National Aeronautics and Space Administration's (NASA) strategic goals and objectives, including retiring the Space Shuttle and replacing it with new space transportation systems for missions to the Moon, Mars, and beyond. The Crew Exploration Vehicle (CEV) that the new human-rated Crew Launch Vehicle (CLV) lofts into space early next decade will initially ferry astronauts to the International Space Station (ISS) Toward the end of the next decade, a heavy-lift Cargo Launch Vehicle (CaLV) will deliver the Earth Departure Stage (EDS) carrying the Lunar Surface Access Module (LSAM) to low-Earth orbit (LEO), where it will rendezvous with the CEV launched on the CLV and return astronauts to the Moon for the first time in over 30 years. This paper outlines how NASA is building these new space transportation systems on a foundation of legacy technical and management knowledge, using extensive experience gained from past and ongoing launch vehicle programs to maximize its design and development approach, with the objective of reducing total life cycle costs through operational efficiencies such as hardware commonality. For example, the CLV in-line configuration is composed of a 5-segment Reusable Solid Rocket Booster (RSRB), which is an upgrade of the current Space Shuttle 4- segment RSRB, and a new upper stage powered by the liquid oxygen/liquid hydrogen (LOX/LH2) J-2X engine, which is an evolution of the J-2 engine that powered the Apollo Program s Saturn V second and third stages in the 1960s and 1970s. The CaLV configuration consists of a propulsion system composed of two 5-segment RSRBs and a 33- foot core stage that will provide the LOX/LED needed for five commercially available RS-68 main engines. The J-2X also will power the EDS. The Exploration Launch Projects, managed by the Exploration Launch Office located at NASA's Marshall Space Flight Center, is leading the design, development, testing, and operations planning for these new space transportation systems. Utilizing a foundation of heritage hardware and management lessons learned mitigates both technical and programmatic risk. Project engineers and managers work closely with the Space Shuttle Program to transition hardware, infrastructure, and workforce assets to the new launch systems, leveraging a wealth of knowledge from Shuffle operations. In addition, NASA and its industry partners have tapped into valuable Apollo databases and are applying corporate wisdom conveyed firsthand by Apollo-era veterans of America s original Moon missions. Learning from its successes and failures, NASA employs rigorous systems engineering and systems management processes and principles in a disciplined, integrated fashion to further improve the probability of mission success.

Dumbacher, Daniel L.↗

Radionuclide Migration through Sediment and Concrete: 16 Years of Investigations

The Waste Management Project provides safe, compliant, and cost-effective waste management services for the Hanford Site and the U.S. Department of Energy (DOE) complex. Part of these services includes safe disposal of low-level waste and mixed low-level waste at the Hanford Low-Level Waste Burial Grounds in accordance with the requirements of DOE Order 435.1, Radioactive Waste Management. To partially satisfy these requirements, performance assessment analyses were completed and approved. DOE Order 435.1 also requires continuing data collection to increase confidence in the critical assumptions used in these analyses to characterize the operational features of the disposal facility that are relied on to satisfy the performance objectives identified in the order. Cement-based solidification and stabilization is considered for hazardous waste disposal because it is easily done and cost-efficient. One critical assumption is that concrete will be used as a waste form or container material at the Hanford Site to control and minimize the release of radionuclide constituents in waste into the surrounding environment. Concrete encasement would contain and isolate the waste packages from the hydrologic environment and act as an intrusion barrier. Any failure of concrete encasement may result in water intrusion and consequent mobilization of radionuclides from the waste packages. The radionuclides iodine-129, selenium-75, technetium-99, and uranium-238 have been identified as long-term dose contributors (Mann et al. 2001; Wood et al. 1995). Because of their anionic nature in aqueous solutions, these constituents of potential concern may be released from the encased concrete by mass flow and/or diffusion and migrate into the surrounding subsurface environment (Serne et al. 1989; 1992; 1993a, b; 1995). Therefore, it is necessary to assess the performance of the concrete encasement structure and the ability of the surrounding soil to retard radionuclide migration. Each of the test methods performed throughout the lifetime of the project has focused on different aspects of the concrete waste form weathering process. Diffusion of different analytes [technetium-99 (Tc-99), iodine-125 (I-125), stable iodine (I), uranium (U), and rhenium (Re)] has been quantified from experiments under both saturated and unsaturated conditions. The water-saturated conditions provide a conservative estimate of the concrete’s performance in situ, and the unsaturated conditions provide a more accurate estimate of the diffusion of contaminants from the concrete.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

100-KE REACTOR CORE REMOVAL PROJECT ALTERNATIVE ANALYSIS WORKSHOP REPORT

On December 15-16, 2009, a 100-KE Reactor Core Removal Project Alternative Analysis Workshop was conducted at the Washington State University Consolidated Information Center, Room 214. Colburn Kennedy, Project Director, CH2M HILL Plateau Remediation Company (CHPRC) requested the workshop and Richard Harrington provided facilitation. The purpose of the session was to select the preferred Bio Shield Alternative, for integration with the Thermal Shield and Core Removal and develop the path forward to proceed with project delivery. Prior to this workshop, the S.A. Robotics (SAR) Obstruction Removal Alternatives Analysis (565-DLV-062) report was issued, for use prior to and throughout the session, to all the team members. The multidisciplinary team consisted ofrepresentatives from 100-KE Project Management, Engineering, Radcon, Nuclear Safety, Fire Protection, Crane/Rigging, SAR Project Engineering, the Department of Energy Richland Field Office, Environmental Protection Agency, Washington State Department of Ecology, Defense Nuclear Facility Safety Board, and Deactivation and Decommission subject matter experts from corporate CH2M HILL and Lucas. Appendix D contains the workshop agenda, guidelines and expectations, opening remarks, and attendance roster going into followed throughout the workshop. The team was successful in selecting the preferred alternative and developing an eight-point path forward action plan to proceed with conceptual design. Conventional Demolition was selected as the preferred alternative over two other alternatives: Diamond Wire with Options, and Harmonic Delamination with Conventional Demolition. The teams preferred alternative aligned with the SAR Obstruction Removal Alternative Analysis report conclusion. However, the team identified several Path Forward actions, in Appendix A, which upon completion will solidify and potentially enhance the Conventional Demolition alternative with multiple options and approaches to achieve project delivery. In brief, the Path Forward was developed to reconsider potential open air demolition areas; characterize to determine if any zircaloy exists, evaluate existing concrete data to determine additional characterization needs, size the new building to accommodate human machine interface and tooling, consider bucket thumb and use ofshape-charges in design, and finally to utilize complex-wide and industry explosive demolition lessons learned in the design approach. Appendix B documents these results from the team's use ofValue Engineering process tools entitled Weighted Analysis Alternative Matrix, Matrix Conclusions, Evaluation Criteria, and Alternative Advantages and Disadvantages. These results were further supported with the team's validation of parking-lot information sheets: memories (potential ideas to consider), issues/concerns, and assumptions, contained in Appendix C. Appendix C also includes the recorded workshop flipchart notes taken from the SAR Alternatives and Project Overview presentations. The SAR workshop presentations, including a 3-D graphic illustration demonstration video have been retained in the CHPRC project file, and were not included in this report due to size limitations. The workshop concluded with a round robin close-out where each member was engaged for any last minute items and meeting utility. In summary, the team felt the session was value added and looked forward to proceeding with the recommended actions and conceptual design.

36 MATERIALS SCIENCE↗

Space Station Information Systems

The utility of the Space Station is improved, the ability to manage and integrate its development and operation enhanced, and the cost and risk of developing the software for it is minimized by three major information systems. The Space Station Information System (SSIS) provides for the transparent collection and dissemination of operational information to all users and operators. The Technical and Management Information System (TMIS) provides all the developers with timely and consistent program information and a project management 'window' to assess the project status. The Software Support Environment (SSE) provides automated tools and standards to be used by all software developers. Together, these three systems are vital to the successful execution of the program.

Pittman, Clarence W.↗

A software environment for effective reliability management for pulsed power design

The reliable design of magnetically insulated transmission lines (MITLs) for very high current pulsed power machines must be accomplished in the future by utilizing a variety of sophisticated modeling tools. The complexity of the models required is high and the number of sub-models and approximations large. The potential for significant analyst error using a single tool is large, with possible reliability issues associated with the plasma modeling tools themselves or the chosen approach by the analyst to solve a given problem. Here, we report on a software infrastructure design that provides a workable framework for building self-consistent models and constraining feedback to limit analyst error. The framework and associated tools aid the development of physical intuition, the development of increasingly sophisticated models, and the comparison of performance results. The work lays the computational foundation for designing state-of-the-art pulsed-power experiments. The design and useful features of this environment are described. We discuss the utility of the Git source code management system and a GitLab interface for use in project management that extends beyond software development tasks.

42 ENGINEERING↗

Scale-up of Novel Low-Cost Carbon Fibers Leading to High-Volume Commercial Launch

The project started in September, 2012 with the goal of scaling up from the existing laboratory scale process for producing carbon fiber (CF) from polyolefin (PO) based precursor fiber using a Dow proprietary sulfonation-desulfonation stabilization process. The award was used to develop a process that was capable of producing market development quantities of CF from PO precursor fiber at a rate of 4 kg/h of CF. The CF would target properties that met or exceeded the Department of Energy (DOE) Vehicles Technology [1] standard; i.e., 172 GPa modulus and 1.72 GPa strength at greater than or equal to 1% strain. The Dow proprietary process was capable of meeting and exceeding these targets properties. Project DE-EE0005760 resulted from a Collaborative Research and Development Agreement (CRADA) between Dow and Oak Ridge National Laboratory (ORNL) with support from the Michigan Economic Development Corporation (MEDC) and DOE. In the first budget period, the main goal was to design a sulfonation-desulfonation market development plant capable of stabilizing PO precursor fiber at a rate of 5 kg/h using a sulfonation solution. The detailed design, location, and cost estimate were determined as scheduled in the Project Management Plan (PMP). In parallel with this DOE award project was a fundamentals and economic evaluation funded by The Dow Chemical Company (Dow). The goal of the Dow sponsored project was to finalize the mass balances, energy balances, and levelized cost to produce CF using the Dow process. A Go-No-Go decision was scheduled in June, 2013 based on the findings of the DOE sponsored scale up project and the Dow sponsored project. In June, 2013, Dow made the No-Go decision to halt and abandon the Dow proprietary sulfonation-desulfonation process for stabilizing PO precursor fibers for the manufacturing of CF. This No-Go decision was identified in the original proposal and at the start of this project, and the decision was made as scheduled. The decision was based on the high levelized economic cost of the process relative to the manufacture of CF from polyacrylonitrile (PAN) precursor fibers. The capital required to sulfonate the fibers adds a significant cost to the process due to the need for investment in a sulfuric acid recovery plant. This high additional capital over the capital for a PAN based CF plant, reduces the levelized economic cost to slightly advantaged over PAN based CF. The sulfonation-desulfonation stabilization route failed to meet the Dow’s return on investment criterion and the cost advantage target set forth for the DOE project. The DOE and Dow decided to halt spending on the project until a new PO fiber stabilization process could be identified that met the DOE physical properties standard and the levelized economic cost constraints of Dow. When the new technology was developed, then award DE-EE0005760 would be re-started with the same goals of the development of a market development plant capable of producing CF at 4 kg/h with the properties that met or exceed those set forth by the Department of Energy Vehicles Technology standard. Progress on the development of the new process has been slow and thus has delayed the scale up project. Dow’s efforts to date have not progressed to the point of demonstrating a commercially-viable process for production of low cost CF from PO precursors for Dow’s rigorous economic constraints. After extensive discussions within Dow and consultation with DOE’s Advanced Manufacturing Office (AMO) Headquarters and Golden Field Office teams, Dow has decided to proceed with the formal recommendation to terminate subject project. DOE’s AMO Headquarters and Golden Field Office teams agreed with the termination of the project.

36 MATERIALS SCIENCE↗

Development of Intelligent Monitoring System (IMS) Modules for the Aquistore CO 2 Storage Project

The monitoring data generated at a CO 2 storage site can quickly result in large amounts of data, often requiring significant labor- and time-intensive efforts to process and analyze before being able to make operational decisions. Implementing an intelligent monitoring system (IMS) can reduce the associated data-processing and analysis costs, which can thereby improve the efficiency of the monitoring process and enable real-time operational decision-making. The Energy & Environmental Research Center (EERC) has completed a 3-year project focused on developing an IMS comprising new workflows, algorithms, and a user interface for the automation and integration of geologic carbon dioxide (CO 2 ) storage site-monitoring and simulation data. The design for the IMS was based on using injection and monitoring data acquired from Aquistore, an operating CO 2 storage project. Managed by the Petroleum Technology Research Centre, the Aquistore Project is injecting CO 2 captured from SaskPower’s coal-fired Boundary Dam Power Station into a deep saline formation for geologic storage. Using data from the Aquistore Project provided a real-world basis to develop an IMS.

47 OTHER INSTRUMENTATION↗

Amine-Appended Metal–Organic Frameworks as Switch-Like Adsorbents for Energy-Efficient Carbon Capture

The goal of this final project report is to comprehensively summarize the work conducted on project FP-00006194. In accordance with the Project Management Plan (PMP) revised May 2019, and Statement of Project Objectives (SOPO) within, Lawrence Berkeley National Laboratory (LBNL), with industrial partners such as Mosaic Materials, Svante, and Electricore, as well as CCSI 2 , has developed a cost-effective post-combustion CO 2 capture system using diamineappended metal–organic frameworks (MOFs). This project involved (i) synthesis and characterization of framework materials that exhibit a switch-like CO 2 adsorption behavior, (ii) scaling-up of MOF production, development of production cost models, and fabrication of materials, and (iii) deployment of materials in a patented VeloxoTherm process and characterization to optimize the material’s performance in the context of real process streams and conditions. During each of the four project budget periods, the project team met Success Criteria for Year 1 to 3; however, because of the decision to halt the project in Q1 2021, Success Criteria for Year 4 were not achieved.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

FY2019 Radionuclide Migration Tests

The Waste Management Project provides safe, compliant, and cost-effective waste management services for the Hanford Site and the U.S. Department of Energy (DOE) complex. Part of these services includes safe disposal of low-level waste and mixed low-level waste at the Hanford Low-Level Waste Burial Grounds in accordance with the requirements of DOE Order 435.1, Radioactive Waste Management. To partially satisfy these requirements, performance assessment analyses were completed and approved. DOE Order 435.1 also requires continuing data collection to increase confidence in the critical assumptions used in these analyses to characterize the operational features of the disposal facility that are relied on to satisfy the performance objectives identified in the order.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Concrete Property and Radionuclide Migration Tests

The Waste Management Project provides safe, compliant, and cost-effective waste management services for the Hanford Site and the DOE Complex. Part of theses services includes safe disposal of LLW and MLLW at the Hanford Low-Level Waste Burial Grounds (LLBG) in accordance with the requirements listed in DOE Order 435.1, Radioactive Waste Management. To partially satisfy these requirements, a Performance Assessment (PA) analyses were completed and approved. DOE Order 435.1 also requires that continuing data collection be conducted to enhance confidence in the critical assumptions used in these analyses to characterize the operational features of the disposal facility that are relied upon to satisfy the performance objectives identified in the Order. One critical assumption is that concrete will frequently be used as waste form or container material to control and minimize the release of radionuclide constituents in waste into the surrounding environment. Data was collected to (1) quantify radionuclide migration through concrete materials similar to those used to encapsulate waste in the LLBG, (2) measure the properties of the concrete materials, especially those likely to influence radionuclide migration, and (3) quantify the stability of U-bearing solid phases of limited solubility in concrete.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Helios program and the sun

Helios A and B are the first two missions inside the orbit of the Mercury towards the sun. They were launched from Cape Kennedy December 10, 1974 and January 15, 1976 respectively. The interplanetary cruise in the ecliptic plane carried the Helios Solar Probes in an ecliptical orbit around the sun to perihelions as close as 0.31 (Helios A) and 0.29 (Helios B) Astronomical Units to the sun. In this technical paper the scientific mission and German and American plans and design versus accomplished mission are presented by the German and United States Project Managers and the Mission Operations Manager. A brief outline of the scope of the project, spacecraft and experiments development, integration and test programs is given. Engineering and system performance results from the Helios A and B flights, which succeeded in passing closer to the sun than any previous spacecraft, are presented. Some of the preliminary scientific findings of the ten active and two passive experiments of this ambitious German/United States cooperative project are outlined.

Ousley, G. W.↗

ASK Magazine

Most of this issue is about ACE (Advanced Composition Explorer). We've collected stories by four members of the ACE management team: Don Margolies, the mission manager from Goddard Space Flight Center; Frandsen, science payloads manager from the Caltech Jet Propulsion Laboratory; Mary Chin, project manager in charge of spacecraft development at the Johns Hopkins Applied Physics Laboratory; and Frank Snow, operations and ground systems manager at Goddard.

Post, Todd↗

Lidar Remote Sensing of Forests: New Instruments and Modeling Capabilities

Lidar instruments provide scientists with the unique opportunity to characterize the 3D structure of forest ecosystems. This information allows us to estimate properties such as wood volume, biomass density, stocking density, canopy cover, and leaf area. Structural information also can be used as drivers for photosynthesis and ecosystem demography models to predict forest growth and carbon sequestration. All lidars use time-in-flight measurements to compute accurate ranging measurements; however, there is a wide range of instruments and data types that are currently available, and instrument technology continues to advance at a rapid pace. This seminar will present new technologies that are in use and under development at NASA for airborne and space-based missions. Opportunities for instrument and data fusion will also be discussed, as Dr. Cook is the PI for G-LiHT, Goddard's LiDAR, Hyperspectral, and Thermal airborne imager. Lastly, this talk will introduce radiative transfer models that can simulate interactions between laser light and forest canopies. Developing modeling capabilities is important for providing continuity between observations made with different lidars, and to assist the design of new instruments. Dr. Bruce Cook is a research scientist in NASA's Biospheric Sciences Laboratory at Goddard Space Flight Center, and has more than 25 years of experience conducting research on ecosystem processes, soil biogeochemistry, and exchange of carbon, water vapor and energy between the terrestrial biosphere and atmosphere. His research interests include the combined use of lidar, hyperspectral, and thermal data for characterizing ecosystem form and function. He is Deputy Project Scientist for the Landsat Data Continuity Mission (LDCM); Project Manager for NASA s Carbon Monitoring System (CMS) pilot project for local-scale forest biomass; and PI of Goddard's LiDAR, Hyperspectral, and Thermal (G-LiHT) airborne imager.

Cook, Bruce D.↗

Flying Drones Beyond Visual Line of Sight Using 4G LTE: Issues and Concerns

The purpose of this paper is to address the extent in which 4G LTE can be used for air traffic management of small Unmanned Air Vehicles (sUAVs) and the limitations and enhancements that may be necessary. We provide a brief overview of the communications aspects of the Unmanned Aerial System (UAS) Traffic Management Project followed by the evolving trends in air traffic management including beyond visual line of sight (BVLOS) operations concepts and current BVLOS operational systems. Issues and Concerns are addressed including the rapidly evolving global regulations and the resulting communications requirements as well LTE downlink and uplink interference at altitude and how that interference affects command and control reliability as well as application data capabilities and mobility performance.

Ivancic, William D.↗

Flying Drones Beyond Visual Line of Sight Using 4G LTE: Issues and Concerns

The purpose of this paper is to address the extent in which 4G LTE can be used for air traffic management of small Unmanned Air Vehicles (sUAVs) and the limitations and enhancements that may be necessary. We provide a brief overview of the communications aspects of the Unmanned Aerial System (UAS) Traffic Management Project followed by the evolving trends in air traffic management including beyond visual line of sight (BVLOS) operations concepts and current BVLOS operational systems. Issues and Concerns are addressed including the rapidly evolving global regulations and the resulting communications requirements as well LTE downlink and uplink interference at altitude and how that interference affects command and control reliability as well as application data capabilities and mobility performance.

Ivancic, William D.↗