Search NASA⌕ Search

SEARCH · Search NASA

Results for “RELIABLE OPERATION PERFORMANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Research and Development on the Storage Ring Vacuum System for the APS Upgrade Project

A number of research and development activities are underway at Argonne National Laboratory to build confidence in the designs for the storage ring vacuum system required for the Advanced Photon Source Up-grade project (APS-U) [1]. The predominant technical risks are: excessive residual gas pressures during operation; insufficient beam position monitor stability; excessive beam impedance; excessive heating by induced electrical surface currents; and insufficient operational reliability. Present efforts to mitigate these risks include: building and evaluating mockup assemblies; performing mechanical testing of chamber weld joints; developing computational tools; investigating design alternatives; and performing electrical bench measurements. Status of these activities and some of what has been learned to date will be shared.

APS-U, APS UPGRADE PROJECT, STORAGE RING VACUUM SY↗

Identification and prioritization of high risk deteriorating support infrastructure - 15475

Identification and prioritization for the re-capitalization of deteriorating waste processing and storage support infrastructure and information technology (IT) is essential for a safe, cost effective, and sustainable waste management program. Funding restraints have limited programs to performing only maintenance on aging infrastructure support systems whose operational costs, technological obsolescence, and reliability risks continue to grow without a disciplined and balanced re-capitalization program. Savannah River Site (SRS) comprises both Department of Energy Environmental Management and NNSA missions, and includes a lab, Savannah River National Laboratory. SRS has developed a crosscutting identification and prioritization tool and process that provides integration of all Site mission support infrastructure re-capitalization requirements and prioritizes into a single database that can be readily accessed for infrastructure investment decisions. This database, referred to as the SRS Critical Integrated Infrastructure Priority List (CIIPL) captures risk data that includes impacts toward safety, regulatory compliance, mission, and cost for inclusion in its prioritization process. Further, the CIIPL provides a status of each entered project's readiness for execution that includes funding source, reliability of current cost estimate, and an out year budget profile. The SRS CIIPL, created in 2009, was initially comprised of re-capitalization projects for the Site's common infrastructure (i.e. shared roads and utilities) that supported all Site missions and activities. As mission program funding became constrained, the value for a Site wide integrated prioritization tool became more apparent and the CIIPL grew to include all Site mission and tenant activities which included safeguards and security requirements. The SRS CIIPL has become a highly effective tool for achieving senior management situational awareness of the Site's most pressing support infrastructure and IT needs. The mission programs have used the CIIPL to prioritize and fund high risk projects within their own program budgets. This past year, the CIIPL was used as a budgeting and decision making tool to allocate funding for two common infrastructures high risk projects for the FY16 Site budget submission and has received laudatory comments from DOE headquarters review teams. The SRS CIIPL and its process can be a benefit to other waste management organizations by demonstrating a proven approach toward the integration of support infrastructure and IT re-capitalization requirements across diverse mission and tenant boundaries. The SRS CIIPL can provide senior management with an objective decision making tool that delivers a balanced evaluation of project requirements in terms of multiple risk criteria; safety, regulatory, mission, and cost impacts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY24 LWRS Program overview

This slide deck provides a brief overview of the Light Water Reactor Sustainability (LWRS) Program. It will be used during public presentations. The LWRS Program aims to enhance the safe, efficient, and economical performance of our nation's nuclear fleet and extend the operating lifetimes of this reliable source of electricity.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Hybrid Power Management (HPM)

The NASA Glenn Research Center s Avionics, Power and Communications Branch of the Engineering and Systems Division initiated the Hybrid Power Management (HPM) Program for the GRC Technology Transfer and Partnership Office. HPM is the innovative integration of diverse, state-of-the-art power devices in an optimal configuration for space and terrestrial applications. The appropriate application and control of the various power devices significantly improves overall system performance and efficiency. The advanced power devices include ultracapacitors and fuel cells. HPM has extremely wide potential. Applications include power generation, transportation systems, biotechnology systems, and space power systems. HPM has the potential to significantly alleviate global energy concerns, improve the environment, and stimulate the economy. One of the unique power devices being utilized by HPM for energy storage is the ultracapacitor. An ultracapacitor is an electrochemical energy storage device, which has extremely high volumetric capacitance energy due to high surface area electrodes, and very small electrode separation. Ultracapacitors are a reliable, long life, maintenance free, energy storage system. This flexible operating system can be applied to all power systems to significantly improve system efficiency, reliability, and performance. There are many existing and conceptual applications of HPM.

Eichenberg, Dennis J.↗

Scale-Up of the Carbon Dioxide Removal by Ionic Liquid Sorbent (CDRILS) System

The Carbon Dioxide Removal by Ionic Liquid Sorbent (CDRILS) system is designed for efficient, safe and reliable carbon dioxide (CO2) removal from cabin air on long-duration missions to the Moon, deep space, and Mars. CDRILS integrates an ionic liquid sorbent with hollow fiber membrane contactors for rapid CO2 removal and recovery. The liquid-based system provides continuous CO2 delivery, which avoids complicated valve networks to switch between absorbing and desorbing beds and enables simpler integration to the Sabatier without the need for the CO2 Management System (CMS). Ionic liquids are particularly desirable as liquid absorbents for space applications since they are non-volatile, non-odorous, and have high oxidative stability. The hollow fiber membrane contactors offer both high contact area and rigorous containment between the gas and liquid phases in a microgravity environment. Scale-up of the CDRILS technology has presented a series of fascinating challenges, since the interaction between hollow fiber properties, ionic liquid properties and performance is complex. Properties measured with lab-scale hollow fiber contactors are used to estimate the performance of contactors that are similar in scale to flight-scale demonstrations. To accomplish this, component and system models have been built to relate the key scrubber and stripper design and operating variables with performance, and experiments directed to validate the models have been performed. System size, weight and power are determined by component selection, arrangement, and operating conditions. Reliability will be extremely important for any long-range mission and depends on the stability of the ionic liquids and hollow fiber contactors. We report on our continuing long term stability experiments for the ionic liquid and contactor materials and our investigation of the physical properties of additional ionic liquids.

Yates, Stephen F.↗

Electrical Energy Storage Data Submission Guidelines

Energy storage technologies are positioned to play a substantial role in power delivery systems. They are being touted as an effective new resource to maintain reliability and allow for increased penetration of renewable energy. However, due to their relative infancy, there is a lack of knowledge on how these resources truly operate over time. Data analysis can help ascertain the operational and performance characteristics of these emerging technologies. Rigorous testing and data analysis are important for all stakeholders to ensure a safe, reliable system that performs predictably on a macro level. Standardizing testing and analysis approaches to verifying the performance of energy storage devices, equipment, and systems when integrating them into the grid will improve the understanding and benefit of energy storage over time from technical and economic vantage points. Demonstrating the life-cycle value and capabilities of energy storage systems begins with the data the provider supplies for analysis. After review of energy storage data received from several providers, it has become clear that some of these data are inconsistent and incomplete, raising the question of their efficacy for robust analysis. This report reviews and proposes general guidelines such as sampling rates and data points that providers must supply for robust data analysis to take place. Consistent guidelines are the basis of the proper protocol and ensuing standards to (a) reduce the time it takes data to reach those who are providing analysis; (b) allow them to better understand the energy storage installations; and (c) enable them to provide high-quality analysis of the installations. This report is intended to serve as a starting point for what data points should be provided when monitoring. As battery technologies continue to advance and the industry expands, this report will be updated to remain current.

25 ENERGY STORAGE↗

Reliability Quantification of Advanced Stirling Convertor (ASC) Components

The Advanced Stirling Convertor, is intended to provide power for an unmanned planetary spacecraft and has an operational life requirement of 17 years. Over this 17 year mission, the ASC must provide power with desired performance and efficiency and require no corrective maintenance. Reliability demonstration testing for the ASC was found to be very limited due to schedule and resource constraints. Reliability demonstration must involve the application of analysis, system and component level testing, and simulation models, taken collectively. Therefore, computer simulation with limited test data verification is a viable approach to assess the reliability of ASC components. This approach is based on physics-of-failure mechanisms and involves the relationship among the design variables based on physics, mechanics, material behavior models, interaction of different components and their respective disciplines such as structures, materials, fluid, thermal, mechanical, electrical, etc. In addition, these models are based on the available test data, which can be updated, and analysis refined as more data and information becomes available. The failure mechanisms and causes of failure are included in the analysis, especially in light of the new information, in order to develop guidelines to improve design reliability and better operating controls to reduce the probability of failure. Quantified reliability assessment based on fundamental physical behavior of components and their relationship with other components has demonstrated itself to be a superior technique to conventional reliability approaches based on utilizing failure rates derived from similar equipment or simply expert judgment.

Shah, Ashwin R.↗

IEA PVPS Task 13 Techno-Economic Study of Bifacial Photovoltaic Systems on Single Axis Trackers

The International Energy Agency PVPS Task 13 has assembled an international team of photovoltaic (PV) researchers from government labs, academia, and industry to study the specific application of bifacial PV modules deployed on tracking systems. This configuration is of particular interest as it has been identified as the PV system design with the lowest Levelized Cost of Electricity (LCOE) for over 90% of the world [1]. As such, much research, development, and commercial activity are focused on further optimizing this system design for different regions and markets, including field deployment and advanced modeling activities. Despite these efforts, many challenges remain to overcome with this system design. This conference paper will report on several areas the team is working on as part of this project. The first part of this study focuses on extensive interviews with PV tracker companies (we have identified 35) and customers worldwide to identify emerging technology trends, design diversity, market environments, and the reliability and performance of these systems. We will provide a market summary of technologies such as advanced tracking algorithms, methods for dealing with topography within the PV plant, different system configurations and layouts, backside irradiance optimization from albedo enhancement, and ground sculpting. We will also review dual-use applications of tracked bifacial systems, such as Agrivoltaics and Building-Integrated PV. These interviews are underway now, and we will be able to report our initial findings at the conference. The second part of the study focuses on summarizing performance monitoring and evaluation methods, with particular attention to capacity and acceptance testing for such systems. The third part of the study reviews performance modeling and yield assessment methods for these tracked bifacial PV systems. The final part of the study covers reliability and operations, and maintenance data from these systems.

albedo↗

An Assessment of the Impact of Stochastic Day-Ahead SCUC on Economic and Reliability Metrics at Multiple Timescales

This paper incorporates the stochastic day-ahead security-constrained unit commitment (DASCUC) within a multi-timescale, multi-scheduling application with commitment, dispatch, and automatic generation control. The stochastic DASCUC is solved using a progressive hedging algorithm with constrained ordinal optimization to accelerate the individual scenario solution. Sensitivity studies are performed in the RTS-96 system, and the results show how this new scheduling application would impact costs and reliability with a closer representation of timescales of system operations in practice.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operation and Control of Electric Vehicle Charger with Enhanced Dynamic Performance Under Non-Ideal Grid Voltage Condition

This paper presents a three-phase electric vehicle charger connected to the grid, featuring multiple boost converters on the DC side, specifically designed to ensure smooth, oscillation-free power transfer during unsymmetrical voltage sags. Precise control mechanisms are implemented on the boost converter side to regulate both voltage and current on the electric vehicle side, thereby maintaining optimal charging conditions. The control architecture for both the grid-connected and boost converter components is based on the Lyapunov energy function, which is employed to achieve superior dynamic performance and stability. The system's robustness and reliability are demonstrated through its ability to maintain stable operation and efficient power transfer despite fluctuations in grid conditions. Furthermore, the implementation of Lyapunov-based control ensures rapid response and minimal energy loss, enhancing the overall efficiency of the system. To validate the effectiveness of this approach, a comprehensive model of the system was developed and tested using MATLAB/Simulink, with detailed computer simulations conducted across various significant case studies.

DC-DC boost converter↗

Demonstration of Grid Services Using Mixed Grid-Forming and Grid-Following Technologies at the Wheatridge Renewable Energy Facility (Final Technical Report)

This Final Technical Report summarizes the analytical, modeling, and engineering work performed to evaluate grid-forming (GFM) inverter capabilities within a large hybrid renewable energy facility. The project focused on assessing the ability of advanced inverter-based resources to provide essential reliability services through coordinated operation of grid-forming (GFM) and grid-following (GFL) technologies. During Budget Period 1, the project developed a comprehensive framework of GFM performance metrics, including angle support, voltage regulation, frequency response, damping behavior, and current-limiting performance. Extensive electromagnetic transient (EMT) studies and hardware-in-the-loop (HIL) testing were conducted to validate GFM behavior under a range of operating conditions, including weak-grid scenarios, voltage disturbances, and multi-resource interactions. The project also established validated modeling approaches, plant-level control integration strategies, commissioning frameworks, and high-speed measurement infrastructure to support future field demonstration. Although the project concluded prior to field demonstration, the results provide a utility-scale foundation for evaluating, modeling, and deploying grid-forming technologies. The methodologies and tools developed contribute to industry understanding of inverter-based resource behavior and support future power system reliability under increasing renewable penetration.

14 SOLAR ENERGY↗

A Formal Approach for Designing and Evaluating Procedures

Operator interaction with modern control systems is a topic of great concern in high-risk industries such as nuclear power and commercial aviation. The issues associated with such systems focus on the ability of the operators (e.g., pilots) to achieve mission goals safely while containing failures. Operators must be able to interact safely and reliably with highly automatic and complex systems across the full spectrum of possible operating conditions, including normal, abnormal, and emergency situations. In environments such as commercial aviation, operator interaction with the machine is specified through a set of standard operating procedures (SOP). A procedure represents a collective agreement on the 'best' way to perform a given task. The intent of this paper is to suggest a formal methodology, for designing and evaluating procedures, that is both reliable and systematic. Our approach involves two major elements: a model of the machine and a list of the operator's task specifications (goals). We use formal modeling paradigms for describing the system and super-imposing on it the operator's tasks. Such paradigms, based on recent frameworks such as Statecharts and Hierarchical Hybrid Machines appear to be adequate methods for analyzing operator interaction with modern control systems. To illustrate this methodology, we model and analyze the sequence of actions for an emergency procedure. The procedure, Irregular Engine Start, for a medium-range aircraft, specifies the sequence of immediate actions that must be performed by the crew to avoid an uncontrolled rise in engine temperature during start-up. A model of engine behavior during a hot start is constructed. It also describes the various actions that can be taken by the crew and the resulting outcomes. The model is then opened up as a tree of all possible action sequences. This action tree allows us to trace the correct sequences necessary to achieve the desired end-goal (secure and shut down of the engine). In conclusion, we argue that the current process of designing and evaluating procedures can be improved. We discuss the implications of this approach for designing and evaluating this and other types of procedures. We conclude with insights about the benefits and limitation of this methodology, and offer suggestions for future research.

Degani, Asaf↗

NREL’s Wind Turbine Drivetrain Condition Monitoring and Wind Plant Operation and Maintenance Research During the 2010s: A US Land-Based Perspective

The wind industry has seen tremendous growth during the past two decades, with the global cumulative installation capacity reaching more than 650 gigawatts by the end of 2019. Despite performance and reliability improvements of utility-scale wind turbines over the years, the industry still experiences premature component failures, leading to increased operation and maintenance (O&M) costs. Among various turbine components, gearboxes—and, more broadly, drivetrains—have shown to be costly to maintain throughout the design life of a wind turbine. The problem of premature component failure is industry wide. As early as 2007, the US Department of Energy (DOE) started to address this challenge through the National Renewable Energy Laboratory’s (NREL’s) reliability initiative that first focused on gearboxes and more recently expanded to entire drivetrains. The wind turbine drivetrain condition monitoring and wind plant O&M research that is the subject of this paper is part of the NREL initiative and includes a few research and development (R&D) activities conducted during the 2010s. These activities included technology evaluation during the first few years; novel monitoring technique investigation (specifically, compact filter analysis) during the middle years; and data and physics domain modeling for fault detection and prediction in recent years. A high-level summary of these activities is provided in this paper along with some key observations from each activity. Most of the work discussed has been published and can be referred to for more information. They reflect the expected evolution of wind turbine condition monitoring and O&M in the US market—primarily, a land-based perspective. In addition, we have identified several R&D opportunities that can be picked up by the research community to help industry advance in related areas, making wind power more cost competitive in the future.

17 WIND ENERGY↗

Brush Seals for Improved Steam Turbine Performance

GE Energy has retrofitted brush seals into more than 19 operating steam turbines. Brush seals offer superior leakage control compared to labyrinth seals, owing to their compliant nature and ability to maintain very tight clearances to the rotating shaft. Seal designs have been established for steam turbines ranging in size from 12 MW to over 1200 MW, including fossil, nuclear, combined-cycle and industrial applications. Steam turbines present unique design challenges that must be addressed to ensure that the potential performance benefits of brush seals are realized. Brush seals can have important effects on the overall turbine system that must be taken into account to assure reliable operation. Subscale rig tests are instrumental to understanding seal behavior under simulated steam-turbine operating conditions, prior to installing brush seals in the field. This presentation discusses the technical challenges of designing brush seals for steam turbines; subscale testing; performance benefits of brush seals; overall system effects; and field applications.

Turnquist, Norman↗

The psychological certificate of the computer

A systems structural approach is reported to study the operator for a computerized man machine system psychologically in order to obtain relative estimates for his performance in the particular system he serves. Considered are the reliability of sensorimotor control functions for the reconstructed system and its indices according to the level of effectiveness of the operator's accomplishment of intellectual operations.

Mileryan, Y. A.↗

Energy Storage Improves Power Plant Flexibility and Economic Performance

Most existing coal-fired power plants were designed for sustained operation at full load to maximize efficiency, reliability, and revenue, as well as to operate air pollution control devices at design conditions. Depending on plant type and design, these plants can adjust output within a fixed range in response to plant operating or market conditions. The need for flexibility driven by increased penetration of variable and non-dispatchable power generation, such as wind and solar, is shifting the traditional mission profile of thermoelectric power plants in three ways: more frequent shutdowns when market or grid conditions warrant, more aggressive load ramp rates (rate of output change), and a lower minimum sustainable load, which provides a wider operating range and helps avoid costly plant shutdowns. Recent studies have shown that the flexibility of a coal-fired power plant can be improved by energy storage. The objective of this work was to analyze a set of energy storage options and determine their impact on the flexibility and economics of a representative coal-fired power plant. The effect of three energy storage systems integrated with a coal power plant on plant flexibility and economics was investigated. The results obtained in this project show that energy storage systems integrated with a thermal power plant improve plant flexibility and participation in the energy and ancillary services markets, which improves plant financial performance.

20 FOSSIL-FUELED POWER PLANTS↗

Transient Stability Study of a Real-World Microgrid with 100% Renewables

This paper performs a transient stability study of a real-world microgrid that can operate with 100% renewables to better understand the stability and reliability of the microgrid under various dynamic scenarios. In particular, the operation of multiple grid-forming (GFM) and grid-following (GFL) inverters in such a power system is not well understood under dynamic operation conditions, such as islanding and black start; therefore, in this paper, an electromagnetic transient model of the microgrid is developed to investigate the stability of the system under various dynamic operating conditions and to identify potential reliability risks. The PSCAD/EMTDC simulation with the high-fidelity model provides helpful insights into the optimal operation modes of GFM and GFL inverters as well as the stability and reliability of the microgrid. It can also inform field deployment in terms of inverter control parameters and coordination as well as the expected performance of black start and unplanned islanding.

black start↗

Transient Stability Study of a Real-World Microgrid with 100% Renewables

This paper performs a transient stability study of a real-world microgrid that can operate with 100% renewables to better understand the stability and reliability of the microgrid under various dynamic scenarios. In particular, the operation of multiple grid-forming (GFM) and grid-following (GFL) inverters in such a power system is not well understood under dynamic operation conditions, such as islanding and black start; therefore, in this paper, an electromagnetic transient model of the microgrid is developed to investigate the stability of the system under various dynamic operating conditions and to identify potential reliability risks. The PSCAD/EMTDC simulation with the high-fidelity model provides helpful insights into the optimal operation modes of GFM and GFL inverters as well as the stability and reliability of the microgrid. It can also inform field deployment in terms of inverter control parameters and coordination as well as the expected performance of black start and unplanned islanding.

black start↗