Search NASA⌕ Search

SEARCH · Search NASA

Results for “SHUTDOWN”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

CMS Tier-0 data processing during the detector commissioning in Run 3

The CMS Tier-0 system is responsible for the prompt processing and distribution of the data collected by the CMS Experiment. A number of upgrades were implemented during the long shutdown 2 of the Large Hadron Collider, which improved the performance and reliability of the system. In this report, these upgrades are discussed and a more detailed description of the Tier-0 system is given. The experience of the data taking during Run 3 detector commissioning as well as the performance of the system are highlighted.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Ice Thermal Storage Systems for Nuclear Power Plant Supplemental Cooling and Peak Power Shifting

Availability of cooling water has been one of the major issues for the nuclear power plant site selection. Cooling water issues have frequently disrupted the normal operation at some nuclear power plants during heat waves and long draught. One potential solution is to use ice thermal storage (ITS) systems that reduce cooling water requirements and boost the plant’s thermal efficiency in hot hours. ITS uses cheap off-peak electricity to make ice and uses the ice for supplemental cooling during peak demand time. ITS also provides a way to shift a large amount of electricity from off peak time to peak time. For once-through cooling plants near a limited water body, adding ITS can bring significant economic benefits and avoid forced derating and shutdown during extremely hot weather. For the new plants using dry cooling towers, adding the ITS systems can effectively reduce the efficiency loss during hot weather so that new plants could be considered in regions lack of cooling water. This paper will review light water reactor cooling issues and present the feasibility study results.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A proposed in-vessel calibration light source for the Joint European Torus

An in-vessel calibration light source (ICLS) is proposed for use during extended shutdown periods of the Joint European Torus (JET). The ICLS is primarily a 12 in. integrating sphere (4 in. opening) with four lamps (of known radiance), which can be positioned inside the JET vacuum vessel via the remote handling arm during interventions in the JET operating schedule. This will facilitate the in situ calibration of optical diagnostics, which rely on absolute light intensity measurements currently made when the diagnostics are removed from JET. The ICLS could ultimately reduce/remove the mechanical stresses associated with the repositioning of diagnostics for calibration purposes. At least 10 diagnostic systems ({approx}20 diagnostic subsystems) could benefit from the ICLS; in some instances the ICLS provides the only viable absolute-calibration strategy. Moreover, the ICLS will be a broad-spectrum white light source, enabling intensity calibrations at all visible wavelengths. A secondary benefit of the ICLS is in its use as an illumination source for making measurements of the reflectance (over a broad spectral range and at multiple angles) from the tiles lining the JET vacuum vessel. During the ITER-like wall intervention new Be, C, and W tiles will be installed in JET and their reflectance measured. Measurements made in subsequent JET interventions will provide data on the effect of high-temperature plasma operation on the reflectance of these tiles.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A time-resolved laser induced fluorescence study on the ion velocity distribution function in a Hall thruster after a fast current disruption

The temporal characteristics of the Xe{sup +} ion axial velocity distribution function (VDF) were recorded in the course of low-frequency discharge current oscillations ({approx}14 kHz) of the 5 kW class PPS X000 Hall thruster. The evolution in time of the ion axial velocity component is monitored by means of a laser induced fluorescence diagnostic tool with a time resolution of 100 ns. As the number of fluorescence photons is very low during such a short time period, a homemade pulse-counting lock-in system was used to perform real-time discrimination between background photons and fluorescence photons. The evolution in time of the ion VDF was observed at three locations along the thruster channel axis after a fast shutdown of the thruster power. The anode discharge current is switched off at 2 kHz during 5 {mu}s without any synchronization with the current oscillation cycle. This approach allows to examine the temporal behavior of the ion VDF during decay and ignition of the discharge as well as during forced and natural plasma oscillations. Measurements show that the distribution function of the axial component of the Xe{sup +} ion does change periodically in time with a frequency close to the current oscillation frequency in both forced and natural cases. The ion density and the mean velocity are found to oscillate, whereas the velocity dispersion stays constant, which indicates that ionization and acceleration layers have identical dynamics. Finally, variations over time in the electric field are for the first time experimentally evidenced in a crossed-field discharge.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Status of PLS-II Upgrade Program

The Pohang Light Source (PLS) at the Pohang Accelerator Laboratory has been operated first at 2.0 GeV since 1995, and later was upgraded to 2.5 GeV. During this time, 6 insertion devices like undulators and multipole wigglers have been put into operation to produce special photon beams, with a total of 27 beamlines installed and 3 beamlines under construction. Recently, Korea synchrotron user's community is demanding high beam stability, higher photon energies as well as more straight sections for insertion devices in the PLS. To meet the user requirements, the PLS-II upgrade program has been launched in January, 2009, incorporating a modified chromatic version of Double Bend Achromat (DBA) to achieve almost twice as many straight sections as the current PLS with a design goal of the relatively low emittance, {epsilon}, of 5.9 nm{center_dot}rad. In the PLS-II, the top-up injection using full energy linac is planned for much higher stable beam as well and thus the production of hard x-ray undulator radiation of 8 to 13 keV is anticipated to allow for the successful research program namely Protein Crystallography. The PLS-II machine components of storage ring, linear accelerator and photon beamlines will be partly dismantled and reinstalled in a 6-months shutdown beginning January, 2011 and then the PLS-II upgrade be started the initial commissioning with a 100 mA beam current from July in 2011.

43 PARTICLE ACCELERATORS↗

Funding for NSF underground laboratory is rejected

The Deep Underground Science and Engineering Laboratory (DUSEL), which proponents hope could provide a niche for the US particle-physics community, faces a shutdown as early as 1 April; the National Science Board (NSB) has rejected $19 million in funding needed to keep the project going through the fall of this year. The lab is housed in a disused gold mine in South Dakota's Black Hills.

54 ENVIRONMENTAL SCIENCES↗

Development of a Negative Hydrogen Ion Source for Spatial Beam Profile Measurement of a High Intensity Positive Ion Beam

We have been developing a negative hydrogen ion (H{sup -} ion) source for a spatial beam profile monitor of a high intensity positive ion beam as a new diagnostic tool. In case of a high intensity continuous-wave (CW) deuteron (D{sup +}) beam for the International Fusion Materials Irradiation Facility (IFMIF), it is difficult to measure the beam qualities in the severe high radiation environment during about one-year cyclic operation period. Conventional techniques are next to unusable for diagnostics in the operation period of about eleven months and for maintenance in the one-month shutdown period. Therefore, we have proposed an active beam probe system by using a negative ion beam and started an experimental study for the proof-of-principle (PoP) of the new spatial beam profile monitoring tool. In this paper, we present the status of development of the H{sup -} ion source as a probe beam source for the PoP experiment.

43 PARTICLE ACCELERATORS↗

H- Ion Source Development for the FNAL 750keV Injector Upgrade

The new FNAL 750keV injector upgrade for the replacement of the 40 year old Fermi National Laboratory (FNAL) Cockcroft-Walton accelerators with a new ion source and 200MHz Radio Frequency Quadrupole (RFQ), Low Energy Beam Transport (LEBT) and Medium Energy Beam Transport (MEBT) [1], has been built and is now being tested prior to installation during the 2012 shutdown. The new H-' ion source is a round aperture magnetron which was developed at Brookhaven National Lab (BNL) by Jim Alessi[2]. Operational experience from BNL has shown that this type of source is more reliable with a longer lifetime (on the order of 6 to 9 months) due to better power efficiency. With a similar duty factor to BNL, we expect to have a comparable lifetime between source changes. The new source design reliably produces 90mA of H-' beam current at 15Hz rep-rate, 250mus pulse width, and a duty factor of 0.38%A The measured emittances at the end of the LEBT are horizontally H = 0.21I mm- mrad and vertically V = 0.17I mm- mrad. With 35kV extraction the power efficiency is 60mA/kW. The source design, along with data from a test stand and the LEBT, will be presented in this paper.

43 PARTICLE ACCELERATORS↗

Upgrade of the gas flow control system of the resistive current leads of the LHC inner triplet magnets: Simulation and experimental validation

The 600 A and 120 A circuits of the inner triplet magnets of the Large Hadron Collider are powered by resistive gas cooled current leads. The current solution for controlling the gas flow of these leads has shown severe operability limitations. In order to allow a more precise and more reliable control of the cooling gas flow, new flowmeters will be installed during the first long shutdown of the LHC. Because of the high level of radiation in the area next to the current leads, the flowmeters will be installed in shielded areas located up to 50 m away from the current leads. The control valves being located next to the current leads, this configuration leads to long piping between the valves and the flowmeters. In order to determine its dynamic behaviour, the proposed system was simulated with a numerical model and validated with experimental measurements performed on a dedicated test bench.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Verification of voltage/frequency requirement for emergency diesel generator in nuclear power plant using dynamic modeling

One major cause of the plant shutdown is the loss of electrical power. The study is to comprehend the coping action against station blackout including emergency diesel generator, sequential loading of safety system and to ensure that the emergency diesel generator should meet requirements, especially voltage and frequency criteria using modeling tool. This paper also considered the change of the sequencing time and load capacity only for finding electrical design margin. However, the revision of load list must be verified with safety analysis. From this study, it is discovered that new load calculation is a key factor in EDG localization and in-house capability increase.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Raman measurements in silica glasses irradiated with energetic ions

Ion irradiation with energetic He{sup +} (2.5 MeV), O{sup 4+} (13.5 MeV), Si{sup 4+} (24.4 MeV) and Cu{sup 7+} (32.6 MeV) species at several fluences (from 5 × 10{sup 12} to 1.65 × 10{sup 15} ion/cm{sup 2}) were performed in three types of SiO{sub 2} glasses with different OH content (KU1, KS-4V and Infrasil 301). After ion implantation the Raman spectra were measured and compared with the spectra of unirradiated samples. Irradiated samples of the three fused silica grades exhibit changes in the broad and asymmetric R-band (ω{sub 1} around 445 cm{sup −1}), in D{sub 1} (490 cm−1) and D{sub 2} (605 cm{sup −1}) bands associated to small-membered rings. The D{sub 2} band shows an increase with increasing fluences for different ions, indicating structural changes. Raman spectra of ion-irradiated samples were compared with the spectra of neutron irradiated samples at fluences 10{sup 17} n/cm{sup 2} and 1018 n/cm{sup 2}. Macroscopic surface cracking was detected, mainly at fluences corresponding to deposited energies between 10{sup 23} eV/cm{sup 3} and 10{sup 24} eV/cm{sup 3} (after ion beam shutdown)

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Status of research toward the ITER disruption mitigation system

An overview of the present status of research toward the final design of the ITER disruption mitigation system (DMS) is given. The ITER DMS is based on massive injection of impurities, in order to radiate the plasma stored energy and mitigate the potentially damaging effects of disruptions. The design of this system will be extremely challenging due to many physics and engineering constraints such as limitations on port access and the amount and species of injected impurities. Additionally, many physics questions relevant to the design of the ITER disruption mitigation system remain unsolved such as the mechanisms for mixing and assimilation of injected impurities during the rapid shutdown and the mechanisms for the subsequent formation and dissipation of runaway electron current.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Monitoring system for testing the radiation hardness of a KINTEX-7 FPGA

A much more efficient Ring Imaging Cherenkov sub-detector system will be rebuilt in the second long shutdown of Large Hadron Collider for the LHCb experiment. Radiation-hard electronic components together with Commercial Off-The-Shelf ones will be used in the new Cherenkov photon detection system architecture. An irradiation program was foreseen to determine the radiation tolerance for the new electronic devices, including a Field Programmable Gate Array from KINTEX-7 family of XILINX. An automated test bench for online monitoring of the XC7K70T KINTEX-7 device operation in radiation conditions was designed and implemented by the LHCb Romanian group.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Hints from Run 1 and prospects from Run 2 at ATLAS

The Large Hadron Collider at CERN has allowed the ATLAS experiment to collect a large amount of proton-proton collision data at 7 TeV and 8 TeV centre-of-mass energies throughout Run 1. This dataset was used to discover a Higgs boson with Standard Model-like properties at a mass of about 125 GeV. Furthermore, an impressive number of searches for deviations from the Standard Model expectations have been carried out. To date, no evidence for new physics beyond the SM has been found. However, a few hints in form of 2-3 σ deviations have been observed. After an 18-month shutdown, in which the ATLAS detector has undergone various upgrades, the LHC has again started to deliver collision data at an increased centre-of-mass energy of 13 TeV, providing a much improved sensitivity for various searches, in particular for high mass particles. Some representative hints at the LHC Run 1 are presented, a brief overview of ATLAS upgrades and prospects for SUSY searches with early Run 2 data are given.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Instrumentation for the upgrade to the JET core charge-exchange spectrometers

Charge-exchange spectroscopy on JET has become particularly challenging with the introduction of the ITER-like wall. The line intensities are weaker and contaminated by many nuisance lines. We have therefore upgraded the instrumentation to improve throughput and allow the simultaneous measurement of impurity and fuel-ion charge exchange by splitting the light between two pairs of imaging spectrometers using dichroic beam splitters. Imaging instruments allow us to stack 11 × 1 mm diameter fibres on the entrance slits without cross talk. CCD cameras were chosen to have 512 × 512 pixels to allow frame transfer times <0.2 ms which with minimum exposure times of 5 ms give tolerable smearing even without a chopper. The image plane is optically demagnified 2:1 to match the sensor size of these cameras. Because the image plane of the spectrometer is tilted, the CCD must also be tilted to maintain focus over the spectrum (Scheimpflug condition). To avoid transverse keystoning (causing the vertical height of the spectra to change across the sensor), the configuration is furthermore designed to be telecentric by a suitable choice of the lens separation. The lens configuration is built almost entirely from commercial off-the-shelf components, which allowed it to be assembled and aligned relatively rapidly to meet the deadline for in-vessel calibration in the JET shutdown.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Upgrades to the in-vessel calibration light source on JET

Since 2010, an in-vessel calibration light source (ICLS) has been used periodically on JET to calibrate a range of diagnostics at UV, visible, and IR wavelengths. During shutdowns, the ICLS (which is essentially an integrating sphere) is positioned within the vacuum vessel by the remote handling (RH) system. Following the 2013 calibration runs, several changes were made to improve the efficiency and quality of the calibrations. Among these was the replacement of a 20 m “umbilical” cable which carried power and other electrical signals through a vessel port to/from a control cubicle. A lightweight 2 m cable now plugs directly into a single connector on the RH manipulator system, greatly reducing the time required for deployment and improving operational flexibility; e.g., the vessel access “floor” no longer needs to be installed. This change also means the system would be compatible with calibrations after a high neutron-fluence period of operation. An on-board micro-spectrometer now allows for real-time verification of the emitted spectrum. Finally, new “baffles” were designed and installed within the integrating sphere itself, greatly improving the spectral radiance uniformity at non-normal viewing angles (necessary due to orientation uncertainties with the RH system).

Conway, N. J.↗

A Spitzer Model-C Stellarator fusion reactor

Tokamaks are affected by two serious problems. The first problem is the radiation damage to the internal reactor structures by energetic neutrons carrying 80% of the total fusion energy that are generated by the deuterium–tritium fusion cycle that tokamaks are planning to use. The second problem is a loss of plasma control because of the onset of instabilities, causing the sudden shutdown of the tokamak itself. Certainly, no electric utility knowing about these disruptive events would dare to use a tokamak reactor for powering the turbines of its power plant! This paper describes a new fusion reactor based on the Model-C Stellarator that would not be affected by these fatal phenomena.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Real-Time In-Pile Acoustic Measurement Infrastructure at the Advanced Test Reactor

The core of any nuclear reactor presents a particularly harsh environment for sensors and instrumentation. The reactor core also imposes challenging constraints on signal transmission from inside the reactor core to outside of the reactor vessel. In this paper, an acoustic measurement infrastructure installed at the Advanced Test Reactor (ATR), located at Idaho National Laboratory, is presented. The measurement infrastructure consists of ATR in-pile structural components, coolant, acoustic receivers, primary coolant pumps (PCPs), a data acquisition system, and signal-processing algorithms. Intrinsic and cyclic acoustic signals generated by the operation of the PCPs are collected and processed. Finally, the characteristics of the intrinsic signal can indicate the process state of the ATR (such as reactor startup, reactor criticality, reactor attaining maximum power, and reactor shutdown) during operation (i.e., real-time measurement).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗