Search NASA⌕ Search

SEARCH · Search NASA

Results for “SPACE LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Total and Spectral Solar Irradiance Sensor (TSIS) Project Overview

The main objective of the Total and Spectral solar Irradiance Sensor (TSIS) is to acquire measurements to determine the direct and indirect effects of solar radiation on climate. TSIS total solar irradiance measurements will extend a 37-year long uninterrupted measurement record of incoming solar radiation, the dominant energy source driving the Earths climate and the most precise indicator of changes in the Suns energy output. TSIS solar spectral irradiance measurements will determine the regions of the Earths multi-layered atmosphere that are affected by solar variability, from which the solar forcing mechanisms causing changes in climate can be quantified. TSIS includes two instruments: the Total Irradiance Monitor (TIM) and the Spectral Irradiance Monitor (SIM), integrated into a single payload. The TSIS TIM and SIM instruments are upgraded versions of the two instruments that are flying on the Solar Radiation and Climate Experiment (SORCE) mission launched in January 2003. TSIS was originally planned for the nadir-pointing National Polar-orbiting Operational Environmental Satellite System (NPOESS) spacecraft. The TSIS instrument passed a Critical Design Review (CDR) for NPOESS in December 2009. In 2010, TSIS was re-planned for the Joint Polar Satellite System (JPSS) Polar Free Flyer (PFF). The TSIS TIM, SIM, and associated electronics were built, tested, and successfully completed pre-ship review as of December 2013.In early 2014, NOAA and NASA agreed to fly TSIS on the International Space Station (ISS). In the FY16 Presidents Budget, NASA assumes responsibility for the TSIS mission on ISS. The TSIS project includes requirements, interface, design, build and test of the TSIS payload, including an updated pointing system, for accommodation on the ISS. It takes advantage of the prior development of the TSIS sensors and electronics. The International Space Station (ISS) program contributions include launch services and robotic installation of the TSIS payload onto an ISS Express Logistics Carrier, mission operations, and communications. Total and Spectral solar irradiance data products will be produced, calibrated, and made publically available through the Goddard Earth Science Data and Information Services Center (GES DISC).The NASA GSFC TSIS project at GSFC is responsible for project management, system engineering, safety and mission assurance, and engineering oversight for the TSIS payload. The TSIS project has contracted with the University of Colorado Laboratory for Atmospheric and Space Physics (LASP) for the design, development and testing of TSIS, support for ISS integration, science operations of the TSIS instrument, data processing, data evaluation and delivery to the GES DISC. TSIS will be delivered to Kennedy Space Center for integration in 2017, with launch and installation onto ISS planned for late 2017-early 2018. After a 90-day check-out period, NASA plans five years of TSIS operations.

spectral emission↗

Development of the Artemis Distributed Simulation FOMs

The National Aeronautics and Space Administration (NASA) is formulating and developing the Artemis Program, a collaboration with domestic commercial and international partners that will establish a long term human presence on the Moon and extend human exploration beyond the Earth-Moon system ahead of exploring Mars. These Artemis partners are developing a portfolio of space and surface systems to support human missions to the lunar surface and beyond. The Artemis systems will provide the mobility, habitation, and logistics infrastructure that will support human exploration and foster robust scientific investigations. Each partner will contribute one or more elements to the Artemis Program with NASA having the overarching responsibility for defining the Artemis architecture and guiding the integration of this complex system of space systems. To successfully accomplish this audacious task, NASA will rely on the development and execution of many complex models and simulations. Many of these simulations will be provided by the Artemis partners. While each of these simulations will provide important insight into the characteristics and performance of an associated system, individually they will not provide insight into the integrated performance of the architecture and the system of systems working in concert to execute a given Artemis mission. To address this need, NASA is developing a distributed simulation capability called the Artemis Distributed Simulation (ADS). ADS’s distributed nature supports the complex aggregation of constituent Artemis element simulations. Artemis partner simulations will be able to join into an ADS-based distributed simulation and interact with other Artemis element simulations while limiting the exposure of proprietary designs and data. ADS is defining a distributed simulation capability built on international simulation interoperability standards, specifically the High Level Architecture (HLA) and the Space Reference Federation Object Model (SpaceFOM). While HLA and SpaceFOM provide the substantive necessary technology basis for ADS, additional common datatypes, message definitions, and execution protocols are required. These extensions constitute the ADS Federation Object Model (FOM). This paper describes the fundamental architectural elements of ADS and the FOM extensions needed to support the complex nature of the Artemis Program. This includes the examination of the ADS FOM modules, ADS base datatypes, ADS SpaceFOM Object Class extensions, new ADS Object Classes, and new ADS Interaction Classes.

HLA↗

Development of the Artemis Distributed Simulation FOMs

The National Aeronautics and Space Administration (NASA) is formulating and developing the Artemis Program, a collaboration with domestic commercial and international partners that will establish a long term human presence on the Moon and extend human exploration beyond the Earth-Moon system ahead of exploring Mars. These Artemis partners are developing a portfolio of space and surface systems to support human missions to the lunar surface and beyond. The Artemis systems will provide the mobility, habitation, and logistics infrastructure that will support human exploration and foster robust scientific investigations. Each partner will contribute one or more elements to the Artemis Program with NASA having the overarching responsibility for defining the Artemis architecture and guiding the integration of this complex system of space systems. To successfully accomplish this audacious task, NASA will rely on the development and execution of many complex models and simulations. Many of these simulations will be provided by the Artemis partners. While each of these simulations will provide important insight into the characteristics and performance of an associated system, individually they will not provide insight into the integrated performance of the architecture and the system of systems working in concert to execute a given Artemis mission. To address this need, NASA is developing a distributed simulation capability called the Artemis Distributed Simulation (ADS). ADS’s distributed nature supports the complex aggregation of constituent Artemis element simulations. Artemis partner simulations will be able to join into an ADS-based distributed simulation and interact with other Artemis element simulations while limiting the exposure of proprietary designs and data. ADS is defining a distributed simulation capability built on international simulation interoperability standards, specifically the High Level Architecture (HLA) and the Space Reference Federation Object Model (SpaceFOM). While HLA and SpaceFOM provide the substantive necessary technology basis for ADS, additional common datatypes, message definitions, and execution protocols are required. These extensions constitute the ADS Federation Object Model (FOM). This paper describes the fundamental architectural elements of ADS and the FOM extensions needed to support the complex nature of the Artemis Program. This includes the examination of the ADS FOM modules, ADS base datatypes, ADS SpaceFOM Object Class extensions, new ADS Object Classes, and new ADS Interaction Classes.

HLA↗

In-Space Recycler Technology Demonstration

In 2014, a 3D printer was installed and used successfully on the International Space Station (ISS), creating the first additively manufactured part in space. While additive manufacturing is a game changing technology for exploration missions, the process still requires raw feedstock material to fabricate parts. Without a recycling capability, a large supply of feedstock would need to be stored onboard, which negates the logistical benefits of these capabilities. Tethers Unlimited, Inc. (TUI), received a Small Business Innovation Research (SBIR) award to design and build the first In-space Recycler for demonstration aboard the ISS in 2017. To fully test this technology in microgravity, parts will be 3D printed, recycled into reusable filament, and then reprinted into new parts. Recycling scrap into printer filament is quite challenging in that a recycler must be able to handle a large variety of possible scrap configurations and densities. New challenges include: dealing with inevitable contamination of the scrap material, minimizing damage to the molecular structure of the plastic during reprocessing, managing a larger volume of hot liquid plastic, and exercising greater control over the cooling/resolidification of the material. TUI has developed an architecture that addresses these challenges by combining standard, proven technologies with novel, patented processes developed through this effort. Results show that the filament diameter achieved is more consistent than commercial filament, with only minimal degradation of material properties over recycling steps. In May 2016, TUI completed fabrication of a flight prototype, which will ultimately progress to the demonstration unit for the ISS as a testbed for future exploration missions. This capability will provide significant cost savings by reducing the launch mass and volume required for printer feedstock as well as reduce waste that must be stored or disposed.

Recycling↗

Progress on the International Space Station - We're Part Way up the Mountain

The first phase of the International Space Station construction has been completed, and research has begun. Russian, U.S., and Canadian hardware is on orbit, and Italian logistics modules have visited often. With the delivery of the U.S. Laboratory, Destiny, significant research capability is in place, and dozens of U.S. and Russian experiments have been conducted. Crew members have been on orbit continuously since November 2000. Several "bumps in the road" have occurred along the way, and each has been systematically overcome. Enormous amounts of hardware and software are being developed by the International Space Station partners and participants around the world and are largely on schedule for launch. Significant progress has been made in the testing of completed elements at launch sites in the United States and Kazakhstan. Over 250,000 kilograms of flight hardware have been delivered to the Kennedy Space Center and integrated testing of several elements wired together has progressed extremely well. Mission control centers are fully functioning in Houston, Moscow, and Canada, and operations centers Darmstadt, Tsukuba, Turino, and Huntsville will be going on line as they are required. Extensive coordination efforts continue among the space agencies of the five partners and two participants, involving 16 nations. All of them continue to face their own challenges and have achieved significant successes. This paper will discuss the contributions of the International Space Station partners and participants, their accomplished milestones, and upcoming events. The International Space Station program, the largest and most complicated peacetime project in history, has progressed part way up the mountain, and the partners are continuing their journey to the top. The International Space Station (ISS) is unprecedented in its technological, engineering, and management complexity, and is one of the largest international collaborations ever undertaken. The ISS is a dramatic example of the ability of nations to work together as a team toward common goals and dreams. The challenges encountered and overcome by the international ISS team have been likened to climbing a mountain. Construction of the ISS has progressed rapidly in the past year. ISS is now a functioning microgravity laboratory in space hosting a permanent human presence, prompting the characterization that we are "part way up the mountain, and the team continues its climb."

Fortenberry, Lindy↗

Social factors in space station interiors

Using the example of the chair, which is often written into space station planning but which serves no non-cultural function in zero gravity, difficulties in overcoming cultural assumptions are discussed. An experimental approach is called for which would allow designers to separate cultural assumptions from logistic, social and psychological necessities. Simulations, systematic doubt and monitored brainstorming are recommended as part of basic research so that the designer will approach the problems of space module design with a complete program.

Cranz, Galen↗

Cabin Air Quality On Board Mir and the International Space Station: A Comparison

The maintenance of the cabin atmosphere aboard spacecraft is critical not only to its habitability but also to its function. Ideally, air quality can be maintained by striking a proper balance between the generation and removal of contaminants. Both very dynamic processes, the balance between generation and removal can be difficult to maintain and control because the state of the cabin atmosphere is in constant evolution responding to different perturbations. Typically, maintaining a clean cabin environment on board crewed spacecraft and space habitats is the central function of the environmental control and life support (ECLS) system. While active air quality control equipment is deployed on board every vehicle to remove carbon dioxide, water vapor, and trace chemical components from the cabin atmosphere, perturbations associated with logistics, vehicle construction and maintenance, and ECLS system configuration influence the resulting cabin atmospheric quality. The air-quality data obtained from the International Space Station (ISS) and NASA-Mir programs provides a wealth of information regarding the maintenance of the cabin atmosphere aboard long-lived space habitats. A comparison of the composition of the trace chemical contaminant load is presented. Correlations between ground-based and in-flight operations that influence cabin atmospheric quality are identified and discussed, and observations on cabin atmospheric quality during the NASA-Mir expeditions and the International Space Station are explored.

Macatangay, Ariel↗

A logistics and potential hazard study of propellant systems for a Saturn 5 derived heavy lift (three-stage core) launch vehicle

The Bush Administration has directed NASA to prepare for a return to the Moon and on to Mars - the Space Exploration Initiative. To meet this directive, powerful rocket boosters will be required in order to lift payloads that may reach the half-million pound range into low earth orbit. In this report an analysis is presented on logistics and potential hazards of the propellant systems envisioned for future Saturn 5 derived heavy lift launch vehicles. In discussing propellant logistics, particular attention has been given to possible problems associated with procurement, transportation, and storage of RP-1, HL2, and LOX, the heavy lift launch vehicle propellants. Current LOX producing facilities will need to be expanded and propellant storage and some support facilities will require relocation if current Launch Pads 39A and/or 39B are to be used for future heavy noise-abatement measures. Included in the report is a discussion of suggested additional studies, primarily economic and environmental, which should be undertaken in support of the goals of the Space Exploration Initiative.

Whitney, E. Dow↗

Development of large earth orbital space station

This paper outlines the major aspects of the development of large earth orbital space stations. At the outset, the uses of the space station are surveyed and the major systems and configurational drivers enumerated. A representative 12-man space station, studied by the Space Division of North American Rockwell Corporation under NASA contract is described. The subsequent discussion centers around earth-to-orbit logistics and possible future missions with emphasis on the establishment of a branch station geosynchronous orbit. In dealing with the associated transportation between low and high orbits, the concept of a geospace shuttle station oscillating between near-earth and synchronous orbit is compared with conventional shuttle vehicles with chemical and nuclear propulsion. In the final part, the evolution of the 12-man space station to a larger space base is described.

Ehricke, K. A.↗

RS-25 for the NASA Cargo Launch Vehicle: The Evolution of SSME for Space Exploration

A key element of the National Vision for Space Exploration is the development of a heavy-lift Cargo Launch Vehicle (CaLV). Missions to the Moon, Mars, and beyond are only possible with the logistical capacity of putting large payloads in low-earth orbit. However, beyond simple logistics, there exists the need for this capability to be as cost effective as possible to ensure mission sustainability. An element of the CaLV project is, therefore, the development of the RS-25, which represents the evolution of the proven Space Shuttle Main Engine (SSME) into a high-performance, cost-effective expendable rocket engine. The development of the RS-25 will be built upon the foundation of over one million seconds of accumulated hot-fire time on the SSME. Yet in order to transform the reusable SSME into the more cost-effective, expendable RS-25 changes will have to be made. Thus the project will inevitably strive to maintain a balance between demonstrated heritage products and processes and the utilization of newer technology developments. Towards that end, the Core Stage Engine Office has been established at the NASA Marshall Space Flight Center to initiate the design and development of the RS-25 engine. This paper is being written very early in the formulation phase of the RS-25 project. Therefore the focus of this paper will be to present the scope, challenges, and opportunities for the RS-25 project. Early schedules and development decisions and plans will be explained. For not only must the RS-25 project achieve cost effectiveness through the development of new, evolved components such as a channel-wall nozzle, a new HIP-bonded main combustion chamber, and several others, it must simultaneously develop the means whereby this engine can be manufactured on a scale never envisioned for the SSME. Thus, while the overall project will span the next eight to ten years, there is little doubt that even this schedule is aggressive with a great deal of work to accomplish.

Kynard, Michael H.↗

Design of a Microgravity Hybrid Inflatable Airlock

Spacewalks, or extra-vehicular activities (EVAs), are a critical component of human space exploration for science activities and habitat construction and maintenance. For NASA's proposed lunar Gateway system, an airlock module is required for vehicle maintenance, repair, and exploration. Traditional airlock structures are fully metallic, with two chambers, known as an equipment lock and a crew lock. The larger volume, called the equipment lock, serves as the storage, logistics and electronics area, while the smaller volume, called the crew lock, serves as the volume to transition from the vacuum of space to the pressurized cabin. A traditional metallic structure design offers mass efficiency for these elements, but cannot offer volume efficiency. The potential to use an inflatable fabric pressure shell supplemented by a metallic support structure allows for efficiency in both mass and volume. Inflatable structures are being used for human habitable space modules, starting with the Bigelow Expandable Activities Module on the International Space Station. They are high-strength fabric-based structures that are compactly stowed for launch and then, once in space, they are expanded and rigidized with internal pressure. They provide significant launch volume savings over metallic structures. For Gateway, a hybrid airlock design is proposed with both metallic and inflatable structural elements, taking advantage of each material's capabilities. A metallic equipment lock serves as both a docking node and provides pressurized volume for pre-EVA activities including pre-breathe and suit donning/doffing. A rigid equipment lock offers stowage space during launch for integrated hardware and suits. Adding an integrated inflatable crew lock provides the volume required for EVAs with minimal use of launch volume. Using dual inflatable crew locks provides redundancy and the capability to move large pieces of equipment into and out of the vehicle for repair and maintenance. The inflatable crew lock is deflated and packaged in the launch shroud and expanded after installation on the Gateway. This packing capability allows additional volume to be added to the equipment lock and fully utilize the capability of the launch vehicle. This report outlines the work completed to design, analyze, and test the systems of a microgravity airlock with inflatable crew locks. In detail, it includes launch vehicles, structural sizing of the metallic equipment lock, the fabric layers of the inflatable crew lock, the internal structure of the crew lock, the space suit interface elements, the crew restraint system, the hatches and pass-throughs, the material and thermal elements, and the crew operations for the usage of the system. This paper is meant to offer a reference design for a hybrid microgravity airlock design for deep space human exploration.

Litteken, Douglas↗

Design of a Microgravity Hybrid Inflatable Airlock

Spacewalks, or extra-vehicular activities (EVAs), are a critical component of human space exploration for science activities and habitat construction and maintenance. For NASA's proposed lunar Gateway system, an airlock module is required for vehicle maintenance, repair, and exploration. Traditional airlock structures are fully metallic, with two chambers, known as an equipment lock and a crew lock. The larger volume, called the equipment lock, serves as the storage, logistics and electronics area, while the smaller volume, called the crew lock, serves as the volume to transition from the vacuum of space to the pressurized cabin. A traditional metallic structure design offers mass efficiency for these elements, but cannot offer volume efficiency. The potential to use an inflatable fabric pressure shell supplemented by a metallic support structure allows for efficiency in both mass and volume. Inflatable structures are being used for human habitable space modules, starting with the Bigelow Expandable Activities Module on the International Space Station. They are high-strength fabric-based structures that are compactly stowed for launch and then, once in space, they are expanded and rigidized with internal pressure. They provide significant launch volume savings over metallic structures. For Gateway, a hybrid airlock design is proposed with both metallic and inflatable structural elements, taking advantage of each material's capabilities. A metallic equipment lock serves as both a docking node and provides pressurized volume for pre-EVA activities including pre-breathe and suit donning/doffing. A rigid equipment lock offers stowage space during launch for integrated hardware and suits. Adding an integrated inflatable crew lock provides the volume required for EVAs with minimal use of launch volume. Using dual inflatable crew locks provides redundancy and the capability to move large pieces of equipment into and out of the vehicle for repair and maintenance. The inflatable crew lock is deflated and packaged in the launch shroud and expanded after installation on the Gateway. This packing capability allows additional volume to be added to the equipment lock and fully utilize the capability of the launch vehicle. This report outlines the work completed to design, analyze, and test the systems of a microgravity airlock with inflatable crew locks. In detail, it includes launch vehicles, structural sizing of the metallic equipment lock, the fabric layers of the inflatable crew lock, the internal structure of the crew lock, the space suit interface elements, the crew restraint system, the hatches and pass-throughs, the material and thermal elements, and the crew operations for the usage of the system. This paper is meant to offer a reference design for a hybrid microgravity airlock design for deep space human exploration.

Litteken, Douglas↗

Space station freedom resource nodes internal thermal control system

This paper presents an overview of the design and operation of the internal thermal control system (ITCS) developed for Space Station Freedom by the NASA-Johnson Space Center and McDonnell Douglas Aerospace to provide cooling for the resource nodes, airlock, and pressurized logistics modules. The ITCS collects, transports and rejects waste heat from these modules by a dual-loop, single-phase water cooling system. ITCS performance, cooling, and flow rate requirements are presented. An ITCS fluid schematic is shown and an overview of the current baseline system design and its operation is presented. Assembly sequence of the ITCS is explained as its configuration develops from Man Tended Capability (MTC), for which node 2 alone is cooled, to Permanently Manned Capability (PMC) where the airlock, a pressurized logistics module, and node 1 are cooled, in addition to node 2. A SINDA/FLUINT math model of the ITCS is described, and results of analyses for an MTC and a PMC case are shown and discussed.

Merhoff, Paul↗

STS-102 Post Flight Presentation

The crewmembers of STS-102, Commander James Wetherbee, Pilot James Kelly, and Mission Specialists Andrew Thomas and Paul Richards, narrate this video as footage of from the ceremonial breakfast, crew suitup, and launch of Discovery are seen. Various on-orbit activities are shown, including the opening of the payload bay doors, the rendezvous and docking of Discovery with the International Space Station (ISS), the spacewalks, and the transfer operations of moving cargo from the Leonardo Multipurpose Logistics Module. The video ends with Discovery undocking from the ISS and the landing of the orbiter.

Source record↗

STS-111 Crew Interviews: Phillippe Perrin, Mission Specialist 1

STS-111 Mission Specialist 1 Phillippe Perrin is seen during this preflight interview, where he gives a quick overview of his mission before answering questions about his inspiration to become an astronaut and his career path. Perrin outlines his role in the mission in general, and specifically during the docking and extravehicular activities (EVAs). He describes what the crew exchange will be like (transferring the Expedition 5 crew in place of the Expedition 4 crew on the International Space Station (ISS)) and the payloads (Mobile Base System (MBS) and the Leonardo Multi-Purpose Logistics Module). Perrin discusses the planned EVAs in detail and outlines what supplies will be left for the resident crew of the ISS. He also provides his thoughts about the significance of the mission to France and the value of the ISS.

Source record↗

The Integrated Air Transportation System Evaluation Tool

Throughout U.S. history, our nation has generally enjoyed exceptional economic growth, driven in part by transportation advancements. Looking forward 25 years, when the national highway and skyway systems are saturated, the nation faces new challenges in creating transportation-driven economic growth and wealth. To meet the national requirement for an improved air traffic management system, NASA developed the goal of tripling throughput over the next 20 years, in all weather conditions while maintaining safety. Analysis of the throughput goal has primarily focused on major airline operations, primarily through the hub and spoke system.However, many suggested concepts to increase throughput may operate outside the hub and spoke system. Examples of such concepts include the Small Aircraft Transportation System, civil tiltrotor, and improved rotorcraft. Proper assessment of the potential contribution of these technologies to the domestic air transportation system requires a modeling capability that includes the country's numerous smaller airports, acting as a fundamental component of the National Air space System, and the demand for such concepts and technologies. Under this task for NASA, the Logistics Management Institute developed higher fidelity demand models that capture the interdependence of short-haul air travel with other transportation modes and explicitly consider the costs of commercial air and other transport modes. To accomplish this work, we generated forecasts of the distribution of general aviation based aircraft and GA itinerant operations at each of nearly 3.000 airport based on changes in economic conditions and demographic trends. We also built modules that estimate the demand for travel by different modes, particularly auto, commercial air, and GA. We examined GA demand from two perspectives: top-down and bottom-up, described in detail.

Wingrove, Earl R., III↗