Search NASA⌕ Search

SEARCH · Search NASA

Results for “Task, C++”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Geothermal Reservoir Simulation Analysis in Support of Electricity Co-Production Feasibility Study at the Blackburn Oil Field, Nevada

Geothermal electricity co-production is a viable option for oil reservoirs producing large water cuts with elevated wellhead temperatures. Repurposing existing oil wells significantly reduces initial investment costs historically associated with geothermal resource utilization. The National Renewable Energy Laboratory (NREL), partnering with Gradient Geothermal, Inc. (formerly known as Transitional Energy) and Grant Canyon Oil and Gas, has been tasked to evaluate the feasibility of geothermal electricity co-production at the Blackburn Oil Field with Organic Rankine Cycle (ORC) generators. The Devonian steady-state reservoir has historically been producing high water cuts of 240 degrees F (115.6 degrees C) observed at the wellhead without documented pressure drawdown or thermal breakthrough. An estimated initial reservoir temperature of approx. 260 degrees F (126.7 degrees C) has been observed in the field and history-matched in a wellbore production analysis and reservoir simulation. Our objective was to develop a conceptual geological model of the subsurface, simulate a natural-state reservoir, model production scenarios, and complete a technical feasibility analysis to accomplish this task. Through extensive modeling and the use of available proprietary and public data, it was possible simulate three scenarios that indicated minimal thermal decline over the duration of a simulated ten-year production and re-injection scheme.

Blackburn Nevada↗

DCIF (Directional Cooling-Induced Fracturing) Westerly Granite AE Borehole Damage Effect Test (Task 3-0)

Directional Cooling-Induced Fracturing (DCIF) experiments were conducted on three rectangular Westerly granite blocks (width=depth=4.0", height=2.0") which were preheated to 200, 400, and 600 degree C to induce damage (microcracks) with varying degrees. Liquid nitrogen was poured in a small, 1"-diameter copper cup attached to the top of the sample, and the resulting acoustic emissions (AEs) and temperature changes on the surface of the sample were monitored. The experiments were conducted under one selected biaxial stress (5.8MPa). The obtained AEs were used to determine the microcracking source locations and amplitude, and the associated moment tensors. The onset time of the AEs was correlated with the cooling temperature, which was used to show that the temperature at the onset of microcracking is not affected significantly by the preexisting damage, compared to the impact of the stress in the sample. Included in this submission are the animations of the AE locations and graphics displaying the measured temperature-AE activity changes for samples with different degrees of microcrack damage.

15 GEOTHERMAL ENERGY↗

High Temperature Piezoelectric Drill

Venus is one of the planets in the solar systems that are considered for potential future exploration missions. It has extreme environment where the average temperature is 460 deg C and its ambient pressure is about 90 atm. Since the existing actuation technology cannot maintain functionality under the harsh conditions of Venus, it is a challenge to perform sampling and other tasks that require the use of moving parts. Specifically, the currently available electromagnetic actuators are limited in their ability to produce sufficiently high stroke, torque, or force. In contrast, advances in developing electro-mechanical materials (such as piezoelectric and electrostrictive) have enabled potential actuation capabilities that can be used to support such missions. Taking advantage of these materials, we developed a piezoelectric actuated drill that operates at the temperature range up to 500 deg C and the mechanism is based on the Ultrasonic/Sonic Drill/Corer (USDC) configuration. The detailed results of our study are presented in this paper

Rock sampling↗

TU-F-18A-09: CT Number Stability Across Patient Sizes Using Virtual-Monoenergetic Dual-Energy CT

Purpose: Virtual-monoenergetic imaging uses dual-energy CT data to synthesize images corresponding to a single photon energy, thereby reducing beam-hardening artifacts. This work evaluated the ability of a commercial virtual-monoenergetic algorithm to achieve stable CT numbers across patient sizes. Methods: Test objects containing a range of iodine and calcium hydroxyapatite concentrations were placed inside 8 torso-shaped water phantoms, ranging in lateral width from 15 to 50 cm, and scanned on a dual-source CT system (Siemens Somatom Force). Single-energy scans were acquired from 70-150 kV in 10 kV increments; dual-energy scans were acquired using 4 energy pairs (low energy: 70, 80, 90, and 100 kV; high energy: 150 kV + 0.6 mm Sn). CTDIvol was matched for all single- and dual-energy scans for a given phantom size. All scans used 128×0.6 mm collimation and were reconstructed with 1-mm thickness at 0.8-mm increment and a medium smooth body kernel. Monoenergetic images were generated using commercial software (syngo Via Dual Energy, VA30). Iodine contrast was calculated as the difference in mean iodine and water CT numbers from respective regions-of-interest in 10 consecutive images. Results: CT numbers remained stable as phantom width varied from 15 to 50 cm for all dual-energy data sets (except for at 50 cm using 70/150Sn due to photon starvation effects). Relative to the 15 cm phantom, iodine contrast was within 5.2% of the 70 keV value for phantom sizes up to 45 cm. At 90/150Sn, photon starvation did not occur at 50 cm, and iodine contrast in the 50-cm phantom was within 1.4% of the 15-cm phantom. Conclusion: Monoenergetic imaging, as implemented in the evaluated commercial system, eliminated the variation in CT numbers due to patient size, and may provide more accurate data for quantitative tasks, including radiation therapy treatment planning. Siemens Healthcare.

07 ISOTOPE AND RADIATION SOURCES↗

Preparation of Aluminum Oxide Films Under Water Exposure – Preliminary Report on 6061 Series Alloys

Aluminum fuel cladding will undergo general corrosion with resulting formation of adherent oxide films during in-reactor and post-discharge exposures under various water conditions and temperatures. The presence of oxides with chemically-bound water can pose challenges for extended dry storage, and an action plan to identify needed technical and engineering activities and analyses to address the identified knowledge gaps and technical data needs was previously prepared [1]. This report is part of the Task 6 activities of that plan.

36 MATERIALS SCIENCE↗

Preparation of Aluminum Oxide Films Under Water Exposure – Preliminary Report on 5052 Series Alloys

Aluminum fuel cladding will undergo general corrosion with resulting formation of adherent oxide films during in-reactor and post-discharge exposures under various water conditions and temperatures. The presence of oxides with chemically-bound water can pose challenges for extended dry storage due to their potential to decompose and release free water and/or generate gases (e.g., oxygen, hydrogen) due to radiolysis, which may cause corrosion, pressurization, or flammability conditions within the storage container. Therefore, an action plan to identify needed technical and engineering activities and analyses to address the identified knowledge gaps and technical data needs was previously prepared. This report is part of the Task 6 activities of that plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Batch 10 Frit Development and Variability Study Matrix Design

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, and 26H, and Alternate Feed Stock-2 (AFS-2). H-Canyon also had a need to discard Sodium Reactor Experiment (SRE) material that was stored in Tanks 16.3 and 16.4. Savannah River Remediation (SRR) added a portion of the SRE material to Sludge Batch 9 (SB9) in Tank 40 and the remainder was added to SB10 that is currently being prepared in Tank 51. In support of sludge batch preparation and qualification efforts, SRR requested that the Savannah River National Laboratory (SRNL) complete the following tasks based on the SB10 projections provided by the SRR System Planning group.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Mercury Remediation Technology Development for Lower East Fork Poplar Creek—FY 2021 Update

Mercury remediation is a high priority for the US Department of Energy (DOE) Oak Ridge Office of Environmental Management. Mercury contamination in the environment can be found at all three DOE facilities in Oak Ridge, Tennessee, but the greatest environmental risk concern relative to Hg on the Oak Ridge Reservation is likely associated with historical Hg losses at and near the Y-12 National Security Complex (Y-12). Mercury in water and fish from East Fork Poplar Creek (EFPC) downstream of Y-12 exceeds regulatory thresholds. Because of the complexities of Hg transport and fate in the aquatic environment, conventional remedial options for EFPC are highly uncertain. DOE is using a phased adaptive management approach to Hg remediation at Y-12, with a focus in the next few years on construction of the Mercury Treatment Facility (MTF) to treat the most contaminated Y-12 outfall entering EFPC (DOE 2017a; DOE 2017b). Once operational, the MTF will provide additional protection against inadvertent releases of Hg into the stream from decontamination and decommissioning of Y-12 Hg-use buildings. Although the MTF is anticipated to substantially decrease Hg water concentrations and flux in upper EFPC (UEFPC), research and technology development are needed to develop appropriate and longer-term remedial solutions for the downstream environment. Since late 2014, the Oak Ridge Office of Environmental Management and URS | CH2M Oak Ridge LLC/Restoration Services Inc. have supported DOE’s Oak Ridge National Laboratory (ORNL) Environmental Sciences Division staff in conducting field and laboratory studies to develop Hg remedial technology solutions for lower EFPC (LEFPC). Whereas previous annual reporting updates for Hg remediation technology development for LEFPC have focused on presenting detailed results from the previous fiscal year, this FY 2021 update takes a comprehensive, higher-level approach to the research and technology development activities conducted since 2014. The report is organized to be consistent with the three tasks defined in the LEFPC strategic plan

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of manual control theory to the study of biological stress

A study was run using both a stable, third-order task and an adaptive first-order unstable task singly and in combination to test the effects of 2 min hypoxia (22000 ft) on human operator. The results indicate that the RMS error in the stable task does not change as a function of hypoxic stress whereas the error in an unstable task changes significantly. Models involving human operator parameter changes and noise injection are discussed.

Replogle, C. R.↗

Conceptual design study for a teleoperator visual system, phase 1

Results are reported for work performed during the first phase of the conceptual design study for a teleoperator visual system. This phase consists of four tasks: General requirements, concept development, subsystem requirements and analysis, and concept evaluation.

Adams, D.↗

EVA manipulation and assembly of space structure columns

Assembly techniques and hardware configurations used in assembly of the basic tetrahedral cell by A7LB pressure-suited subjects in a neutral bouyancy simulator were studied. Eleven subjects participated in assembly procedures which investigated two types of structural members and two configurations of attachment hardware. The assembly was accomplished through extra-vehicular activity (EVA) only, EVA with simulated manned maneuvering unit (MMU), and EVA with simulated MMU and simulated remote manipulator system (RMS). Assembly times as low as 10.20 minutes per tetrahedron were achieved. Task element data, as well as assembly procedures, are included.

Loughead, T. E.↗

Summary of the electromagnetic compatibility evaluation of the proposed satellite power system

The effects of the proposed solar power satellite (SPS) operations on electronic equipment and systems by fundamental, harmonic, and intermodulation component emissions from the orbital station; and the fundamental, harmonic, and structural intermodulation emissions from the rectenna site were evaluated. The coupling and affects interactions affecting a wide spectrum of electronic equipment are considered. The primary EMC tasking areas are each discussed separately.

Morrison, E. L., Jr.↗

Atmospheric environment for Space Shuttle (STS-4) launch

Selected atmospheric conditions observed near space shuttle STS-4 launch time on June 27, 1982, at Kennedy Space Center, Florida are summarized. Values of ambient pressure, temperature, moisture, ground winds, visual observations (cloud), and winds aloft are included. The sequence of prelaunch Jimsphere measured vertical wind profiles is given as well as the wind and thermodynamic parameters measured at the surface and aloft in the SRB descent/impact ocean area. Final meteorological tapes, which consist of wind descent were constructed. The STS-4 ascent meteorological data tape was constructed by Marshall Space Flight Center in response to shuttle task agreement No. 989-13-22-368 with Johnson Space Center.

Johnson, D. L.↗

Atmospheric environment for Space Shuttle (STS-5) launch

This report presents a summary of selected atmospheric conditions observed near Space Shuttle STS-5 launch time on November 11, 1982, at Kennedy Space Center, Florida. Values of ambient pressure, temperature, moisture, ground winds, visual observations (cloud), and winds aloft are included. The sequence of prelaunch Jimsphere measured vertical wind profiles is given in this report. Also presented are the wind and thermodynamic parameters measured at the surface and aloft in he SRB descent/impact ocean area. Final meteorological tapes, which consist of wind and thermodynamic parameters versus altitude, for STS-5 vehicle ascent and SRB descent have been constructed. The STS-5 ascent meteorological data tape has been constructed by Marshall Space Flight Center in response to Shuttle task agreement No. 936-53-22-368 with Johnson Space Center.

Johnson, D. L.↗

Atmospheric environment for Space Shuttle (STS-6) launch

Selected atmospheric conditions observed near Space Shuttle STS-6 launch time on April 4, 1983, at Kennedy Space Center, Florida are summarized. Values of ambient pressure, temperature, moisture, ground winds, visual observations (cloud), and winds aloft are included. The sequence of prelaunch Jimsphere measured vertical wind profiles is given. Also presented are the wind and thermodynamic parameters measured at the surface and aloft in the SRB descent/impact ocean area. Final meteorological tapes, which consist of wind and thermodynamic parameters versus altitude, for STS-6 veicle ascent and SRB descent were constructed. The STS-6 ascent meteorological data tape was constructed by Marshall Space Flight Center in response to Shuttle task agreement No. 936-53-22-368 with Johnson Space Center.

Johnson, D. L.↗

Atmospheric environment for Space Shuttle (STS-7) launch

Selected atmospheric conditions observed near Space Shuttle STS-7 launch time on June 18, 1983, at Kennedy Space Center, Florida are summarized. Values of ambient pressure, temperature, moisture, ground winds, visual observations (cloud), and winds aloft are included. The sequence of prelaunch Jimsphere measured vertical wind profiles is given in this report. Also presented are wind and thermodynamic parameters representative of surface and aloft conditions in the SRB descent/impact ocean area. Final meteorological tapes, which consist of wind and thermodynamic parameters versus altitude, for STS-7 vehicle ascent and Acoustic/SRB descent have been constructed. The STS-7 ascent meteorological data tape has been constructed by Marshall Space Flight Center in response to Shuttle task agreement No. 936-53-22-368 with Johnson Space Center.

Johnson, D. L.↗

Atmospheric environment for Space Shuttle (STS-9) launch

This report presents a summary of selected atmospheric conditions observed near Space Shuttle STS-9 launch time on November 28, 1983, at Kennedy Space Center, Florida. Values of ambient pressure, temperature, moisture, ground winds, visual observations (cloud), and winds aloft are included. The sequence of prelaunch Jimsphere measured vertical wind profiles is given in this report. The final meteorological tape, which consists of wind and thermodynamic parameters versus altitude, for STS-9 vehicle ascent has been constructed. The STS-9 ascent meteorological data tape has been constructed by Marshall Space Flight Center in response to Shuttle task agreement No. 561-81-22-368 with Johnson Space Center.

Johnson, D. L.↗

Atmospheric environment for space shuttle (STS-13) launch

Selected atmospheric conditions observed near Space Shuttle STS-13 launch time on April 6, 1984, at Kennedy Space Center Florida are summarized. Values of ambient pressure, temperature, moisture, ground winds, visual observations (cloud), and winds aloft are included. The sequence of prelaunch Jimsphere measured vertical wind profiles is given. The final meteorological tape, which consists of wind and thermodynamic parameters versus altitude, for STS-13 vehicle ascent was constructed by Marshall Space Flight Center in response to shuttle task agreement No. 561-81-22-368 with Johnson Space Center.

Johnson, D. L.↗