Search NASA⌕ Search

SEARCH · Search NASA

Results for “Task scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

The Applied Meteorology Unit: Nineteen Years Successfully Transitioning Research into Operations for America's Space Program

The Applied Meteorology Unit (AMU) provides technology transition and technique development to improve operational weather support to the Space Shuttle and the entire American space program. The AMU is funded and managed by NASA and operated by a contractor that provides five meteorologists with a diverse mix of advanced degrees, operational experience, and associated skills including data processing, statistics, and the development of graphical user interfaces. The AMU's primary customers are the U.S. Air Force 45th Weather Squadron at Patrick Air Force Base, the National Weather Service Spaceflight Meteorology Group at NASA Johnson Space Center, and the National Weather Service Melbourne FL Forecast Office. The AMU has transitioned research into operations for nineteen years and worked on a wide range of topics, including new forecasting techniques for lightning probability, synoptic peak winds,.convective winds, and summer severe weather; satellite tools to predict anvil cloud trajectories and evaluate camera line of sight for Space Shuttle launch; optimized radar scan strategies; evaluated and implemented local numerical models; evaluated weather sensors; and many more. The AMU has completed 113 projects with 5 more scheduled to be completed by the end of 2010. During this rich history, the AMU and its customers have learned many lessons on how to effectively transition research into operations. Some of these lessons learned include collocating with the operational customer and periodically visiting geographically separated customers, operator submitted projects, consensus tasking process, use of operator primary advocates for each project, customer AMU liaisons with experience in both operations and research, flexibility in adapting the project plan based on lessons learned during the project, and incorporating training and other transition assistance into the project plans. Operator involvement has been critical to the AMU's remarkable success and many awards from NASA, the National Weather Association, and two citations from the Navy's Center of Excellence for Best Manufacturing Practices. This paper will present the AMU's proven methods and explain how they may be applied by other organizations to effectively transition research into operations.

Madura, John T.↗

Performance Testing of a Liquid Metal Pump for In-Space Power Systems

Fission surface power (FSP) systems could be used to provide power on the surface of the moon, Mars, or other planets and moons of our solar system. Fission power systems could provide excellent performance at any location, including those near the poles or other permanently shaded regions, and offer the capability to provide on demand power at any time, even at large distances from the sun. Fission-based systems also offer the potential for outposts, crew and science instruments to operate in a power-rich environment. NASA has been exploring technologies with the goal of reducing the cost and technical risk of employing FSP systems. A reference 40 kWe option has been devised that is cost-competitive with alternatives while providing more power for less mass anywhere on the lunar surface. The reference FSP system is also readily extensible for use on Mars, where it would be capable of operating through global dust storms and providing year-round power at any Martian latitude. Detailed development of the FSP concept and the reference mission are documented in various other reports. The development discussed in this paper prepares the way for testing of the Technology Demonstration Unit (TDU), which is a 10 kWe end-to-end test of FSP technologies intended to raise the entire FSP system to technology readiness level (TRL) 6. The Early Flight Fission Test Facility (EFF-TF) was established by NASA s Marshall Space Flight Center (MSFC) to provide a capability for performing hardware-directed activities to support multiple in-space nuclear reactor concepts by using a nonnuclear test methodology. This includes fabrication and testing at both the module/component level and at near prototypic reactor components and configurations allowing for realistic thermal-hydraulic evaluations of systems. The liquid-metal pump associated with the FSP system must be compatible with the liquid NaK coolant and have adequate performance to enable a viable flight system. Idaho National Laboratory (INL) was tasked with the modeling, design, and fabrication of an ALIP suitable for the FSP reference mission. A prototypic ALIP was fabricated under the direction of INL and shipped to MSFC for inclusion in the Technology Demonstration Unit (TDU), a quarter-scale end-to-end reactor simulator system that is scheduled for testing at NASA-GRC. Before inclusion in the TDU, the ALIP was tested in the ALIP test circuit (ATC), which is a rig developed and operated at MSFC for the specific purpose of providing accurate quantification of liquid metal pump performance. Data showing the pump performance curves (pressure, flowrate, and pump efficiency) are presented for various operating power levels, demonstrating the full performance envelope of the pump.

Polzin, Kurt↗

Affordable Development and Demonstration of a Small NTR Engine and Stage: How Small is Big Enough?

The Nuclear Thermal Rocket (NTR) derives its energy from fission of uranium-235 atoms contained within fuel elements that comprise the engine's reactor core. It generates high thrust and has a specific impulse potential of approximately 900 seconds - a 100% increase over today's best chemical rockets. The Nuclear Thermal Propulsion (NTP) project, funded by NASA's AES program, includes five key task activities: (1) Recapture, demonstration, and validation of heritage graphite composite (GC) fuel (selected as the "Lead Fuel" option); (2) Engine Conceptual Design; (3) Operating Requirements Definition; (4) Identification of Affordable Options for Ground Testing; and (5) Formulation of an Affordable Development Strategy. During FY'14, a preliminary DDT&E plan and schedule for NTP development was outlined by GRC, DOE and industry that involved significant system-level demonstration projects that included GTD tests at the NNSS, followed by a FTD mission. To reduce cost for the GTD tests and FTD mission, small NTR engines, in either the 7.5 or 16.5 klbf thrust class, were considered. Both engine options used GC fuel and a "common" fuel element (FE) design. The small approximately 7.5 klbf "criticality-limited" engine produces approximately 157 megawatts of thermal power (MWt) and its core is configured with parallel rows of hexagonal-shaped FEs and tie tubes (TTs) with a FE to TT ratio of approximately 1:1. The larger approximately 16.5 klbf Small Nuclear Rocket Engine (SNRE), developed by LANL at the end of the Rover program, produces approximately 367 MWt and has a FE to TT ratio of approximately 2:1. Although both engines use a common 35 inch (approximately 89 cm) long FE, the SNRE's larger diameter core contains approximately 300 more FEs needed to produce an additional 210 MWt of power. To reduce the cost of the FTD mission, a simple "1-burn" lunar flyby mission was considered to reduce the LH2 propellant loading, the stage size and complexity. Use of existing and flight proven liquid rocket and stage hardware (e.g., from the RL10B-2 engine and Delta Cryogenic Second Stage) was also maximized to further aid affordability. This paper examines the pros and cons of using these two small engine options, including their potential to support future human exploration missions to the Moon, near Earth asteroids, and Mars, and recommends a preferred size. It also provides a preliminary assessment of the key activities, development options, and schedule required to affordably build, ground test and fly a small NTR engine and stage within a 10-year timeframe.

Spacecraft design↗

Using Virtual Reality and Motion Capture as Tools for Human Factors Engineering at Nasa Marshall Space Flight Center

MSFC’s Human Factors Engineering (HFE) team is responsible for all worksite analyses performed for the SLS pre-launch integration activities at Kennedy Space Center (KSC). There is a wide variety of tasks associated with pre-launch integration activities and it is important to verify that vehicle integration will be successful early in the design process. The VR work performed by the HFE team at MSFC has allowed fast changing layouts to be analyzed by various departments with minimal impact to cost or schedule. Implementing these methods for SLS allows for VR use in early design cycles, saving time and budget. Utilizing the resulting HFE analyses improves usability and safety. Ultimately, the goal is to provide a safe environment for the technicians assembling the vehicle and the astronaut crew at launch.

Andrews, Tanya↗

Upgraded demonstration vehicle task report

Vehicle/battery performance capabilities and interface problems that occurred when upgraded developmental batteries were integrated with upgraded versions of comercially available electric vehicles were investigated. Developmental batteries used included nickel zinc batteries, a nickel iron battery, and an improved lead acid battery. Testing of the electric vehicles and upgraded batteries was performed in the complete vehicle system environment to characterize performance and identify problems unique to the vehicle/battery system. Constant speed tests and driving schedule range tests were performed on a chassis dynamometer. The results from these tests of the upgraded batteries and vehicles were compared to performance capabilities for the same vehicles equipped with standard batteries.

Bryant, J.↗

Advanced Shuttle Strategies for Parallel QCCD Architectures

Trapped ions (TIs) are at the forefront of quantum computing implementation, offering unparalleled coherence, fidelity, and connectivity. However, the scalability of TI systems is hampered by the limited capacity of individual ion traps, necessitating intricate ion shuttling for advanced computational tasks. The quantum charge-coupled device (QCCD) framework has emerged as a promising solution, facilitating ion mobility for universal quantum computation. Current QCCD architectures predominantly feature a linear topology, which is increasingly recognized as inefficient for complex quantum operations. Anticipating the shift toward more efficacious designs, this article introduces an innovative quantum scheduling strategy optimized for parallel QCCD topologies. Our strategy proposes a probabilistic formula for ion movement, alongside ingenious methods for local layer generation and layer compression, yielding a significant reduction in ion shuttle times. Through simulations, we demonstrate that our strategy not only substantially outstrips the linear model but also exhibits better performance over other parallel strategies that employ greedy algorithms. This is achieved through our nuanced resolution of complexities, such as traffic blocks and trap capacity limitations. The consequent reduction in shuttle operations leads to lower energy consumption and an enhancement in the quantum computer's fidelity, ultimately accelerating program execution times.

43 PARTICLE ACCELERATORS↗

Definition of technology development missions for early space station satellite servicing, volume 2

The results of all aspects of the early space station satellite servicing study tasks are presented. These results include identification of servicing tasks (and locations), identification of servicing mission system and detailed objectives, functional/operational requirements analyses of multiple servicing scenarios, assessment of critical servicing technology capabilities and development of an evolutionary capability plan, design and validation of selected servicing technology development missions (TDMs), identification of space station satellite servicing accommodation needs, and the cost and schedule implications of acquiring both required technology capability development and conducting the selected TDMs.

Source record↗

Effects of competition on video-task performance in monkeys (Macaca mulatta)

The effects of competition on performance of a video-formatted task were examined in a series of experiments. Two rhesus monkeys (Macaca mulatta) were trained to manipulate a joystick to shoot at moving targets on a computer screen. The task was made competitive by requiring both animals to shoot at the same target and by rewarding only the animal that hit the target first each trial. The competitive task produced a significant and robust speed-accuracy trade-off in performance. The monkeys hit the target in significantly less time on contested than on uncontested trials. However, they required significantly more shots to hit the target on contested trials in relation to uncontested trials. This effect was unchanged when various schedules of reinforcement were introduced in the uncontested trials. This supports the influence of competition qua competition on performance, a point further bolstered by other findings of behavioral contrast presented here.

Washburn, David A.↗

The future of space imaging. Report of a community-based study of an advanced camera for the Hubble Space Telescope

The scientific and technical basis for an Advanced Camera (AC) for the Hubble Space Telescope (HST) is discussed. In March 1992, the NASA Program Scientist for HST invited the Space Telescope Science Institute to conduct a community-based study of an AC, which would be installed on a scheduled HST servicing mission in 1999. The study had three phases: a broad community survey of views on candidate science program and required performance of the AC, an analysis of technical issues relating to its implementation, and a panel of experts to formulate conclusions and prioritize recommendations. From the assessment of the imaging tasks astronomers have proposed for or desired from HST, we believe the most valuable 1999 instrument would be a camera with both near ultraviolet/optical (NUVO) and far ultraviolet (FUV) sensitivity, and with both wide field and high resolution options.

Brown, Robert A.↗

Base Support Building Solid Waste Management Unit (SWMU) 014 PlumeStop Injection Pilot Study Work Plan

This document is a Pilot Study Work Plan (PSWP) for a PlumeStop® permeable reactive barrier (PRB) at the Base Support Building (BSB; the Site) located at the John F. Kennedy Space Center (KSC), Florida. The Site has been designated as Solid Waste Management Unit (SWMU) 014 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action program. This document was prepared by AECOM Technical Services, Inc. (AECOM) for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0010, Task Order 80KSC021F0096. This PSWP details the permeable reactive barrier (PRB) being installed at the BSB to decrease concentrations of per- and polyfluoroalkyl substances (PFAS) in downgradient groundwater using PlumeStop®. PlumeStop® is a colloidal activated carbon that PFAS compounds readily adsorb to. This PSWP outlines the design criteria, injection plan, and performance monitoring schedule for the proposed PlumeStop® PRB study that will guide the possible selection for use and future design of future full-scale PlumeStop® PRBs at KSC.

PFAS↗

Forecasting Solar Photovoltaic Power Production: A Comprehensive Review and Innovative Data-Driven Modeling Framework

The intermittent and stochastic nature of Renewable Energy Sources (RESs) necessitates accurate power production prediction for effective scheduling and grid management. This paper presents a comprehensive review conducted with reference to a pioneering, comprehensive, and data-driven framework proposed for solar Photovoltaic (PV) power generation prediction. The systematic and integrating framework comprises three main phases carried out by seven main comprehensive modules for addressing numerous practical difficulties of the prediction task: phase I handles the aspects related to data acquisition (module 1) and manipulation (module 2) in preparation for the development of the prediction scheme; phase II tackles the aspects associated with the development of the prediction model (module 3) and the assessment of its accuracy (module 4), including the quantification of the uncertainty (module 5); and phase III evolves towards enhancing the prediction accuracy by incorporating aspects of context change detection (module 6) and incremental learning when new data become available (module 7). This framework adeptly addresses all facets of solar PV power production prediction, bridging existing gaps and offering a comprehensive solution to inherent challenges. By seamlessly integrating these elements, our approach stands as a robust and versatile tool for enhancing the precision of solar PV power prediction in real-world applications.

14 SOLAR ENERGY↗

Truss structure tele-manipulation experiment using ETS-7

A robot experiment concept of space truss telemanipulation by National Aerospace Laboratory (NAL) is described in its flight model development. The experiment will be carried out on the Engineering Test Satellite No. 7 (ETS-7) using its robot arm. The satellite is scheduled to be launched in 1997 by National Space Development Agency of Japan (NASDA). The truss flight model is composed of deployable truss system and assemble truss joint. Those truss components will be manipulated by the ETS-7 robot arm using its small grapple fixture type-N (GPF-N), and the experimental task operation will be executed from the ground control station.

Matsumoto, Kohtaro↗

Galileo - The Serial-Production AIT Challenge

The Galileo Project is one of the most demanding projects of ESA, being Europe's autarkic navigation system and a constellation composed of 30 satellites. This presentation points out the different phases of the project up to the full operational capability and the corresponding launch options with respect to launch vehicles as well as launch configurations. One of the biggest challenges is to set up a small serial 'production line' for the overall integration and test campaign of satellites. This production line demands an optimization of all relevant tasks, taking into account also backup and recovery actions. A comprehensive AIT concept is required, reflecting a tightly merged facility layout and work flow design. In addition a common data management system is needed to handle all spacecraft related documentation and to have a direct input-out flow for all activities, phases and positions at the same time. Process optimization is a well known field of engineering in all small high tech production lines, nevertheless serial production of satellites are still not the daily task in space business and therefore new concepts have to be put in place. Therefore, and in order to meet the satellites overall system optimization, a thorough interface between unit/subsystem manufacturing and satellite AIT must be realized to ensure a smooth flow and to avoid any process interruption, which would directly lead to a schedule impact.

Ragnit, Ulrike↗

Automated Management of Small Unmanned Aircraft System Communications and Navigation Contingency

The number of small Unmanned Aircraft System (sUAS) operating in the low-altitude of the National Airspace System (NAS) has been rapidly increasing in the past few years and this number is expected to grow in the future. However, aside from a few special cases, all sUAS must fly within visual line-of-sight (VLOS) of their operators and this limitation is blocking highly anticipated beyond visual line-of-sight (BVLOS) sUAS applications such as package delivery from practice. To enable routine low-altitude BVLOS operations, there needs to be a traffic management ecosystem that complements the FAA’s Air Traffic Management (ATM) system, which does not provide air traffic services under 400 feet above ground level (AGL). NASA has been pioneering research and development of this ecosystem under UAS Traffic Management (UTM) project since 2015 in a series of Technical Capability Levels (TCL) activities that are increasingly complex. In TCL1, completed in 2015, visual line-of-sight operations such as agriculture, firefighting, and infrastructure monitoring were addressed with a focus on geofencing and operations scheduling. Technologies and requirements needed for BVLOS operations in sparsely populated areas were examined in TCL2 in 2016, and those for operations over moderately populated areas in TCL3 in 2017 and 2018. TCL4 is building on the earlier TCLs and focuses on technologies and requirements for operations in higher-density urban areas for tasks such as newsgathering and package delivery and for managing large-scale contingencies. To coordinate and facilitate the incremental implementation of the UTM ecosystem in the NAS, a Research Transition Team (RTT) has been formed between the FAA, NASA, and industry. The RTT is divided into four subgroups, concept and use case development, data exchange and information architecture, sense and avoid, and communications and navigation (C&N). This paper focuses on C&N subgroup activities, in particular about the development of automated sUAS communications and navigation contingency management. The goal of this development is to prepare sUAS to display predictable behavior while handling C&N off-nominal events. It is expected that the adoption of the presented automated contingency management by the sUAS community will accommodate and inform rulemaking towards governing low-altitude BVLOS operations.

Unmanned Aviation System (UAS) Traffic Management↗

Automated Management of Small Unmanned Aircraft System (UAS) Communications and Navigation Contingency

The number of small Unmanned Aircraft System (sUAS) operating in the low-altitude of the National Airspace System (NAS) has been rapidly increasing in the past few years and this number is expected to grow in the future. However, aside from a few special cases, all sUAS must fly within visual line-of-sight (VLOS) of their operators and this limitation is blocking highly anticipated beyond visual line-of-sight (BVLOS) sUAS applications such as package delivery from practice. To enable routine low-altitude BVLOS operations, there needs to be a traffic management ecosystem that complements the FAA’s Air Traffic Management (ATM) system, which does not provide air traffic services under 400 feet above ground level (AGL). NASA has been pioneering research and development of this ecosystem under UAS Traffic Management (UTM) project since 2015 in a series of Technical Capability Levels (TCL) activities that are increasingly complex. In TCL1, completed in 2015, visual line-of-sight operations such as agriculture, firefighting, and infrastructure monitoring were addressed with a focus on geofencing and operations scheduling. Technologies and requirements needed for BVLOS operations in sparsely populated areas were examined in TCL2 in 2016, and those for operations over moderately populated areas in TCL3 in 2017 and 2018. TCL4 is building on the earlier TCLs and focuses on technologies and requirements for operations in higher-density urban areas for tasks such as newsgathering and package delivery and for managing large-scale contingencies. To coordinate and facilitate the incremental implementation of the UTM ecosystem in the NAS, a Research Transition Team (RTT) has been formed between the FAA, NASA, and industry. The RTT is divided into four subgroups, concept and use case development, data exchange and information architecture, sense and avoid, and communications and navigation (C&N). This paper focuses on C&N subgroup activities, in particular about the development of automated sUAS communications and navigation contingency management. The goal of this development is to prepare sUAS to display predictable behavior while handling C&N off-nominal events. It is expected that the adoption of the presented automated contingency management by the sUAS community will accommodate and inform rulemaking towards governing low-altitude BVLOS operations.

Unmanned Aviation Systems (UAS) Traffic Management↗

Software cost/resource modeling: Deep space network software cost estimation model

A parametric software cost estimation model prepared for JPL deep space network (DSN) data systems implementation tasks is presented. The resource estimation model incorporates principles and data from a number of existing models, such as those of the General Research Corporation, Doty Associates, IBM (Walston-Felix), Rome Air Force Development Center, University of Maryland, and Rayleigh-Norden-Putnam. The model calibrates task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit JPL software lifecycle statistics. The estimation model output scales a standard DSN work breakdown structure skeleton, which is then input to a PERT/CPM system, producing a detailed schedule and resource budget for the project being planned.

Tausworthe, R. J.↗

Variable Radius Nacelle Studies

An overview of the active shape control for a variable radius nacelle leading edge program is presented. The current technical plan and schedule will be discussed. Results from the structural shape change of curved plates demonstration will be presented, as well as the NASA LaRC concept for a variable radius nacelle leading edge. Results of a Boeing systems integration study of this concept will be discussed briefly. The status of the sensors, actuators, and computational design tools tasks will also be presented.

McGowan, David M.↗

Systems Innovation: Modernization & Efficiencies for ESH&Q Reviews

Environmental compliance reviews at INL have traditionally been managed through fragmented systems, relying on multiple spreadsheets and manual processes. This inefficiency led to time-consuming status updates and redundant tasks, such as manually sending reminder emails and transferring data from Excel to the Environmental Review Process (ERP). Initial attempts to streamline these processes using Power Automate and Excel revealed significant limitations, necessitating a more comprehensive solution. To address these immediate inefficiencies, automated workflows were developed using Power Automate. These workflows were designed to send scheduled status update reminders and capture responses through standardized forms, with submitted data flowing directly into centralized Excel trackers. This automation reduced the administrative burden, improved data accuracy, and enabled faster, more consistent reporting. Specifically, email automation achieved a 65% efficiency gain, while data integration saw a 48% improvement, resulting in 91% of project statuses being updated within two months. Despite the improvements brought by Power Automate, the fragmented nature of the review processes persisted. To further enhance efficiency and accuracy, the Integrated Review Tool (IRT) was developed. The IRT aims to centralize review initiation and connect team systems, creating an interconnected data infrastructure that preserves team autonomy while enhancing overall efficiency. This tool automates email reminders, centralizes reviews, and streamlines data integration, significantly improving the accuracy and efficiency of environmental compliance reviews. The design and development of the IRT involved advanced systems methodology, process mapping, project management, and collaboration with subject matter experts. The minimum viable product design is 100% complete, and system development is currently underway, with expected outcomes including a centralized entry point for all ESH&Q reviews, automated routing, real-time tracking and analytics, AI integration, and a user-friendly interface. This project demonstrates the potential of leveraging automation and integrated systems to enhance efficiency, accuracy, and decision-making in environmental reporting and compliance processes at INL.

99 - GENERAL AND MISCELLANEOUS↗