Search NASA⌕ Search

SEARCH · Search NASA

Results for “Unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Design considerations for the CELSS test facility engineering development unit

The NASA Controlled Ecological Life Support System (CELSS) Program has the goal of developing life support systems for humans in space based on the use of higher plants. The program has supported research at universities with a primary focus of increasing the productivity of candidate crop plants. To understand the effects of the space environment on plant productivity, the CELSS Test Facility (CTF) has been developed as an instrument that will permit the evaluation of plant productivity on Space Station Freedom. The CFT will maintain specific environmental conditions and collect data on gas exchange rates and biomass accumulation over the growth period of several crop plants grown sequentially from seed to harvest. To better understand the systems needed to support plants and maintain the evironmental conditions required by CTF, an Engineering Development Unit (EDU) is being constructed at NASA Ames Research Center (ARC) in the Advanced Life Support Division. The EDU will provide the means of testing and evaluating hardware solutions to CTF requirements. This paper reviews the CTF science and functional requirements, and provides a description of the EDU objectives, design approach, subsystem descriptions, and some of the technology tools employed in accomplishing the design.

Kliss, M.↗

Closure Report for Corrective Action Unit 107: Low Impact Soil Sites, Nevada Test Site, Nevada

Corrective Action Unit (CAU) 107 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Low Impact Soil Sites' and consists of the following 15 Corrective Action Sites (CASs), located in Areas 1, 2, 3, 4, 5, 9, 10, and 18 of the Nevada Test Site: CAS 01-23-02, Atmospheric Test Site - High Alt; CAS 02-23-02, Contaminated Areas (2); CAS 02-23-03, Contaminated Berm; CAS 02-23-10, Gourd-Amber Contamination Area; CAS 02-23-11, Sappho Contamination Area; CAS 02-23-12, Scuttle Contamination Area; CAS 03-23-24, Seaweed B Contamination Area; CAS 03-23-27, Adze Contamination Area; CAS 03-23-28, Manzanas Contamination Area; CAS 03-23-29, Truchas-Chamisal Contamination Area; CAS 04-23-02, Atmospheric Test Site T4-a; CAS 05-23-06, Atmospheric Test Site; CAS 09-23-06, Mound of Contaminated Soil; CAS 10-23-04, Atmospheric Test Site M-10; and CAS 18-23-02, U-18d Crater (Sulky). Closure activities were conducted from February through April 2009 according to the FFACO (1996; as amended February 2008) and Revision 1 of the Streamlined Approach for Environmental Restoration Plan for CAU 107 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2009). The corrective action alternatives included No Further Action and Closure in Place with Administrative Controls. Closure activities are summarized.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Aquifer Hydraulic Testing and Characterization Plan for the Ringold Formation Unit A in the Hanford 200-ZP-1 Groundwater Operable Unit and Vicinity

This document presents a plan for testing and characterizing the hydraulic properties of the Ringold Formation, member of Wooded Island – unit A (Rwia) in the 200-ZP groundwater operable unit. The testing approach includes multiple field methods and associated analyses designed to investigate and understand aquifer hydraulic properties over a range of scales. Testing was designed to achieve specific testing objectives identified previously in the 200 ZP-1 Groundwater Operable Unit Ringold Formation Unit A Characterization Sampling and Analysis Plan (Ringold A SAP). The test plan provides necessary technical and operational detail for writing subsequent field test instruction documents specific to each testing location. Hydraulic characterization activities will proceed in a phased manner focusing on areas identified to have knowledge gaps and also critical for remedy modifications and/or selection. These activities are designed to minimize impact to pump-and-treat (P&T) operations and to use existing P&T injection and extraction wells as stress wells, and include use of the new Rwia monitoring wells installed for Ringold A SAP activities. ZP-1 hydraulic testing will include slug testing in new Rwia wells, shutdown-recovery tests in multiple Rwia and composite Ringold Formation member of Wooded Island – unit E (Rwie)-Rwia aquifer test locations, installation of new Automated Water Level Network stations in Rwia monitoring wells, characterization of P&T and barometric responses, identifying the vertical distribution of hydraulic conductivity in the Rwia and Rwie units using electromagnetic borehole flowmeter tests, and single-well tracer testing in select Rwia monitoring wells. Slug testing to be conducted during drilling is described under the Ringold A SAP. The remaining testing activities are to be conducted after well drilling and completion and are described in this test plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Decision Document/Closure Report for Corrective Action Unit 370: T-4 Atmospheric Test Site, Nevada Test Site, Nevada, Revision 0, with ROTCs 1-2

This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit (CAU) 370, T-4 Atmospheric Test Site, located in Area 4 at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 370 is comprised of Corrective Action Site (CAS) 04-23-01, Atmospheric Test Site T-4. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 370 due to the implementation of the corrective action of closure in place with administrative controls. To achieve this, corrective action investigation (CAI) activities were performed from June 25, 2008, through April 2, 2009, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 370: T-4 Atmospheric Test Site and Record of Technical Change No. 1.

54 ENVIRONMENTAL SCIENCES↗

Test Rack Development for Extended Operation of Advanced Stirling Convertors at NASA Glenn Research Center

The U.S. Department of Energy, Lockheed Martin Space Systems Company, Sunpower Inc., and NASA Glenn Research Center (GRC) have been developing an Advanced Stirling Radioisotope Generator (ASRG) for use as a power system on space science missions. This generator will make use of free-piston Stirling convertors to achieve higher conversion efficiency than with currently available alternatives. One part of NASA GRC's support of ASRG development includes extended operation testing of Advanced Stirling Convertors (ASCs) developed by Sunpower Inc. and GRC. The ASC consists of a free-piston Stirling engine integrated with a linear alternator. NASA GRC has been building test facilities to support extended operation of the ASCs for several years. Operation of the convertors in the test facility provides convertor performance data over an extended period of time. One part of the test facility is the test rack, which provides a means for data collection, convertor control, and safe operation. Over the years, the test rack requirements have changed. The initial ASC test rack utilized an alternating-current (AC) bus for convertor control; the ASRG Engineering Unit (EU) test rack can operate with AC bus control or with an ASC Control Unit (ACU). A new test rack is being developed to support extended operation of the ASC-E2s with higher standards of documentation, component selection, and assembly practices. This paper discusses the differences among the ASC, ASRG EU, and ASC-E2 test racks.

Dugala, Gina M.↗

SU-D-204-07: Comparison of AAPM TG150 Draft Image Receptor Tests with Vendor Automated QC Tests for Five Mobile DR Units

Purpose: To determine the consistency of digital detector (DR) tests recommended by AAPM TG150 and tests provided by commercially available DirectView Total Quality Tool (TQT). Methods: The DR tests recommended by the TG150 Detector Subgroup[1] were performed on 4 new Carestream DRX-Revolution and one Carestream DRX1C retrofit of a GE AMX-4 that had been in service for three years. After detector calibration, flat-field images plus images of two bar patterns oriented parallel and perpendicular to the A-C axis, were acquired at conditions recommended by TG150. Raw images were harvested and then analyzed using a MATLAB software previously validated[2,3,4]. Data were analyzed using ROIs of two different dimensions: 1) 128 x 128 ROIs matching the detector electronics; and 2) 256 x 256 ROIs, each including 4 adjacent smaller ROIs. TG150 metrics from 128 x 128 ROIs were compared to TQT metrics, which are also obtained from 128 x 128 ROIs[5]. Results: The results show that both TG150 and TQT measurements were consistent among these detectors. Differences between TG150 and TQT values appear systematic. Compared with 128 x 128 ROIs, noise and SNR non-uniformity were lower with 256 x 256 ROIs, although signal non-uniformity was similar, indicating detectors were appropriately calibrated for gain and offset. MTF of the retrofit unit remained essentially the same between 2012 and 2015, but was inferior to the new units. The older generator focal spot is smaller (0.75mm vs. 1.2mm), and the SID for acquisition is 182cm as well, so focal spot dimensions cannot explain the difference. The difference in MTF may be secondary to differences in generator X-ray spectrum or by unannounced changes in detector architecture. Further investigation is needed. Conclusion: The study shows that both TG150 and TQT tests are consistent. The numerical value of some metrics are dependent on ROI size.

60 APPLIED LIFE SCIENCES↗

A Review of Power Distribution Test Feeders in the United States and the Need for Synthetic Representative Networks

Under the increasing penetration of distributed energy resources and new smart network technologies, distribution utilities face new challenges and opportunities to ensure reliable operations, manage service quality, and reduce operational and investment costs. Simultaneously, the research community is developing algorithms for advanced controls and distribution automation that can help to address some of these challenges. However, there is a shortage of realistic test systems that are publically available for development, testing, and evaluation of such new algorithms. Concerns around revealing critical infrastructure details and customer privacy have severely limited the number of actual networks published and that are available for testing. In recent decades, several distribution test feeders and US-featured representative networks have been published, but the scale, complexity, and control data vary widely. This paper presents a first-of-a-kind structured literature review of published distribution test networks with a special emphasis on classifying their main characteristics and identifying the types of studies for which they have been used. As a result, this both aids researchers in choosing suitable test networks for their needs and highlights the opportunities and directions for further test system development. In particular, we highlight the need for building large-scale synthetic networks to overcome the identified drawbacks of current distribution test feeders.

24 POWER TRANSMISSION AND DISTRIBUTION↗

CHP Fuel Cell Durability Demonstration - Final Report

Plug Power has managed a demonstration project that has tested multiple units of its high-temperature, PEM fuel cell system in micro-combined heat and power (μ-CHP) applications in California. The specific objective of the demonstration project was to substantiate the durability of GenSys Blue, and, thereby, verify its technology and commercial readiness for the marketplace. In the demonstration project, Plug Power, in partnership with the National Fuel Cell Research Center (NFCRC) at the University of California, Irvine (UCI), and Sempra, will execute two major tasks: • Task 1: Internal durability/reliability fleet testing. Six GenSys Blue units will be built and will undergo an internal test regimen to estimate failure rates. This task was modified to include 3 GenSys Blue units installed in a lab at UCI. • Task 2: External customer testing. Combined heat and power units will be installed and tested in real-world residential and/or light commercial end user locations in California.

Petrecky, James↗

Evaluation and comparison of ERTS measurements of major crops and soil associations for selected test sites in the central United States

The author has identified the following significant results. Multispectral scanner data obtained by ERTS-1 over six test sites in the Central United States were analyzed and interpreted. ERTS-1 data for some of the test sites were geometrically corrected and temporally overlayed. Computer-implemented pattern recognition techniques were used in the analysis of all multispectral data. These techniques were used to evaluate ERTS-1 data as a tool for soil survey. Geology maps and land use inventories were prepared by digital analysis of multispectral data. Identification and mapping of crop species and rangelands were achieved throught the analysis of 1972 and 1973 ERTS-1 data. Multiple dates of ERTS-1 data were examined to determine the variation with time of the areal extent of surface water resources on the Southern Great Plain.

Baumgardner, M. F.↗

Metrology for Industry for use in the Manufacture of Grazing Incidence Beam Line Mirrors

The goal of this SBIR was to determine the slope sensitivity of Specular Reflection Deflectometry (SRD) and whether shearing methods had the sensitivity to be able to separate errors in the test equipment from slope error in the unit under test (UUT), or mirror. After many variations of test parameters it does not appear that SRD yields results much better than 1 μ radian RMS independent of how much averaging is done. Of course, a single number slope sensitivity over the full range of spatial scales is not a very insightful number in the same sense as a single number phase or height RMS value in interferometry does not tell the full story. However, the 1 μ radian RMS number is meaningful when contrasted with a sensitivity goal of better than 0.1 μ radian RMS. Shearing is a time proven method of separating the errors in a measurement from the actual shape of a UUT. It is accomplished by taking multiple measurements while moving the UUT relative to the test instrument. This process makes it possible to separate the two errors sources but only to a sensitivity of about 1 μ radian RMS. Another aspect of our conclusions is that this limit probably holds largely independent of the spatial scale of the test equipment. In the proposal for this work it was suggested that a test screen the full size of the UUT could be used to determine the slopes on scales of maybe 0.01 to full scale of the UUT while smaller screens and shorter focal length lenses could be used to measure shorter, or smaller, patches of slope. What we failed to take into consideration was that as the scale of the test equipment got smaller so too did the optical lever arm on which the slope was calculated. Although we did not do a test with a shorter focal length lens over a smaller sample area it is hard to argue with the logic that the slope sensitivity will be about the same independent of the spatial scale of the measurement assuming the test equipment is similarly scaled. On a more positive note, SRD does appear to be a highly flexible, easy to implement, rather inexpensive test for free form optics that require a dynamic range that exceeds that of interferometry. These optics are quite often specified to have more relaxed slope errors, on the order of 1 μ radian RMS or greater. It would be shortsighted to not recognize the value of this test method in the bigger picture.

47 OTHER INSTRUMENTATION↗

Closure Report Central Nevada Test Area Subsurface Corrective Action Unit 443

The U.S. Department of Energy (DOE) Office of Legacy Management (LM) prepared this Closure Report for the subsurface Corrective Action Unit (CAU) 443 at the Central Nevada Test Area (CNTA), Nevada, Site. CNTA was the site of a 0.2- to 1-megaton underground nuclear test in 1968. Responsibility for the site’s environmental restoration was transferred from the DOE, National Nuclear Security Administration, Nevada Field Office to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 443 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended 2011) and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New results for geologic units mapping of Utah test sites using Landsat TM data

This paper continues a study on the accuracy of geological mapping using Landsat Thematic Mapper data (Short, 1984). In June 1976, both the White Mountain alteration zone and the Waterpocket Fold sedimentary rock sites in Utah were surveyed by the Bendix 24-band scanner on a NASA NC-130B aircraft. Mid-June 1984 TM data for these two sites have been processed like the 1976 data to test the quality of simulation of TM data. Principal-components (PC) color composite images for White Mountain show close correspondence to the Bendix PC images. At this site carbonate strata are uniquely discriminated in both Bendix and TM composites that use an inverted PC 3 image. Alunite/kaolinite and hematite/limonite alteration zones developed on volcanic flows are also sharply separated, but iron oxide and silicified zones are less so. The accuracy of rock-units mapping at the Waterpocket Fold site by supervised classification of the June TM data is significantly better, reaching 70 percent in the best case, than for January 1983 data for that site.

Short, N. M.↗

Custom Unit Pump Design and Testing for the EVA PLSS

This paper describes the effort by the Texas Engineering Experiment Station (TEES) and Honeywell for NASA to design and test a pre-flight prototype pump for use in the Extra-vehicular activity (EVA) portable life support subsystem (PLSS). Major design decisions were driven by the need to reduce the pump s mass, power, and volume compared to the existing PLSS pump. In addition, the pump must accommodate a much wider range of abnormal conditions than the existing pump, including vapor/gas bubbles and increased pressure drop when employed to cool two suits simultaneously. A positive displacement, external gear type pump was selected because it offers the most compact and highest efficiency solution over the required range of flow rates and pressure drops. An additional benefit of selecting a gear pump design is that it is self priming and capable of ingesting non-condensable gas without becoming air locked. The chosen pump design consists of a 28 V DC, brushless, sealless, permanent magnet motor driven, external gear pump that utilizes a Honeywell development that eliminates the need for magnetic coupling. Although the planned flight unit will use a sensorless motor with custom designed controller, the pre-flight prototype to be provided for this project incorporates Hall effect sensors, allowing an interface with a readily available commercial motor controller. This design approach reduced the cost of this project and gives NASA more flexibility in future PLSS laboratory testing. The pump design was based on existing Honeywell designs, but incorporated features specifically for the PLSS application, including all of the key features of the flight pump. Testing at TEES verified that the pump meets the design requirements for range of flow rates, pressure drop, power consumption, working fluid temperature, operating time, gas ingestion , and restart capability under both ambient and vacuum conditions. The pump operated between 40 and 240 lbm/hr flowrate, 35 to 100 F pump temperature range, and 5 to 10 psid pressure rise. Power consumption of the pump controller at the nominal operating point in both ambient and vacuum conditions was 9.5 W, which was less than the 12 W predicted. Gas ingestion capabilities were tested by injecting 100 cc of air into the fluid line; the pump operated normally throughout this test. The test results contained a number of anomalies, specifically power increases and a few flow stoppages, that prompted TEES and Honeywell to disassemble and inspect the pump. Inspection indicated contamination in the pump and fit issues may have played roles in the observed anomalies. Testing following reassembly indicated that the performance of the pump 1) matched both the predicted performance values, 2) the performance values measured prior to disassembly, and 3) was free of the anomalies noted in the pre-disassembly testing.

Schuller, Michael↗

Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Test Report, Electromagnetic Interference (EMI)/Electromagnetic Radiation(EMR) and Electromagnetic Capability (EMC) for the EOS/AMSU-A1

This document contains the procedure and the test results of the Advanced Microwave Sounding Unit-A (AMSU-A) Earth Observing System (EOS) Project, assembly part number 1356008-1, serial number 202, Electromagnetic Interference (EMI) and Electromagnetic Susceptibility (EMC) qualification test. The test was conducted in accordance with the approved EMI/EMC Test Plan/Procedure, Specification number AE-26151/8B, dated 10 September 1998. Aerojet intends that the presentation and submittal of this document, prepared in accordance with the objectives established by the aforementioned Test Plan/Procedure, document number AE-26151/8B, will satisfy the data requirement with respect to the AMSU-A/EOS instrument operational compliance of the EMI/EMC test requirement. Test for the AMSU-A/EOS instrument have been completed and all the requirements per General Interface Requirement Document (GIRD), GSFC 422-11-12-01, for EOS Common Spacecraft/Instruments, paragraph 10.11, were met with the exceptions of the test methods CE03, RE01, and RE02, as described in this document.

Paliwoda, L.↗