Search NASA⌕ Search

SEARCH · Search NASA

Results for “program metrics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

TRACKING SURPLUS PLUTONIUM FROM WEAPONS TO DISPOSITION

Supporting nuclear nonproliferation and global security principles, beginning in 1994 the United States has withdrawn more than 50 metric tons (MT) of government-controlled plutonium from potential use in nuclear weapons. The Department of Energy (DOE), including the National Nuclear Security Administration, established protocols for the tracking of this "excess" and "surplus" plutonium, and for reconciling the current storage and utilization of the plutonium to show that its management is consistent with the withdrawal policies. Programs are underway to ensure the safe and secure disposition of the materials that formed a major part of the weapons stockpile during the Cold War, and growing quantities have been disposed as waste, after which they are not included in traditional nuclear material control and accountability (NMC&A) data systems. A combination of resources is used to perform the reconciliations that form the basis for annual reporting to DOE, to U.S. Department of State, and to international partners including the International Atomic Energy Agency.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Scalable Programming Workflows for Validation of Quantum Computers

Hybrid quantum-classical workflows have become standard methods for executing variational algorithms and other quantum simulation techniques, which are key applications for noisy intermediate scale quantum (NISQ) computers. Validating these simulations is an important task which helps gauge the progress of quantum computer development, and classical simulation can serve as a tool to this end. Both exact and more scalable approximate methods with quantifiable error bounds can be used in validation tasks where the applicable metrics include the distance from a calculable ground truth, the quality of an error model fit to data, etc. Here we present a library extension that includes methods for validation of quantum simulations based on scalable hybrid workflows executable on high performance computers. We provide examples that use approximate methods based on tensor networks and stabilizer simulators to bound the error of quantum simulations on NISQ hardware.

Nguyen, Thien↗

Overview of the fusion nuclear science facility, a credible break-in step on the path to fusion energy

The Fusion Nuclear Science Facility (FNSF) is examined here as part of a two step program from ITER to commercial power plants. This first step is considered mandatory to establish the materials and component database in the real fusion in-service environment before proceeding to larger electricity producing facilities. The FNSF can be shown to make tremendous advances beyond ITER, toward a power plant, particularly in plasma duration and fusion nuclear environment. A moderate FNSF is studied in detail, which does not generate net electricity, but does reach the power plant blanket operating temperatures. The full poloidal Dual Coolant Lead Lithium (DCLL) blanket is chosen, with alternates being the Helium Cooled Lead Lithium (HCLL) and Helium Cooled Ceramic Breeder/Pebble Bed (HCCB/PB). Several power plant relevant choices are made in order to follow the philosophy of targeted technologies. Any fusion core component must be qualified by fusion relevant neutron testing and highly integrated non-nuclear testing before it can be installed on the FNSF in order to avoid the high probability of constant failures in a plasma-vacuum system. A range of missions for the FNSF, or any fusion nuclear facility on the path toward fusion power plants, are established and characterized by several metrics. A conservative physics strategy is pursued to accommodate the transition to ultra-long plasma pulses, and parameters are chosen to represent the power plant regime to the extent possible. An operating space is identified, and from this, one point is chosen for further detailed analysis, with R = 4.8 m, a = 1.2 m, IP = 7.9 MA, BT = 7.5 T, βN Gr = 0.9, fBS = 0.52, q95 = 6.0, H98 ∼1.0, and Q = 4.0. The operating space is shown to be robust to parameter variations. A program is established for the FNSF to show how the missions for the facility are met, with a He/H, a DD and 5 DT phases. The facility requires ∼25 years to complete its DT operation, including 7.8 years of neutron production, and the remaining spent on inspections and maintenance. The DD phase is critical to establish the ultra-long plasma pulse lengths. The blanket testing strategy is examined, and shows that many sectors have penetrations for heating and current drive (H/CD), diagnostics, or Test Blanket Modules (TBMs). The hot cell is a critical facility element in order for the FNSF to perform its function of developing the in-service material and component database. The pre-FNSF R&D is laid out in terms of priority topics, with the FNSF phases driving the time-lines for R&D completion. A series of detailed technical assessments of the FNSF operating point are reported in this issue, showing the credibility of such a step, and more detailed emphasis on R&D items to pursue. These include nuclear analysis, thermo-mechanics and thermal-hydraulics, liquid metal thermal hydraulics, transient thermo-mechanics, tritium analysis, maintenance assessment, magnet specification and analysis, materials assessments, core and scrape-off layer (SOL)/divertor plasma examinations.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

International land Model Benchmarking (ILAMB) Package v002.00

As a contribution to International Land Model Benchmarking (ILAMB) Project, we are providing new analysis approaches, benchmarking tools, and science leadership. The goal of ILAMB is to assess and improve the performance of land models through international cooperation and to inform the design of new measurement campaigns and field studies to reduce uncertainties associated with key biogeochemical processes and feedbacks. ILAMB is expected to be a primary analysis tool for CMIP6 and future model-data intercomparison experiments. This team has developed initial prototype benchmarking systems for ILAMB, which will be improved and extended to include ocean model metrics and diagnostics.

54 ENVIRONMENTAL SCIENCES↗

Optimal calibration of gates in trapped-ion quantum computers

Abstract To harness the power of quantum computing, it is essential that a quantum computer provide maximal possible fidelity for a quantum circuit. To this end, much work has been done in the context of qubit routing or embedding, i.e., mapping circuit qubits to physical qubits based on gate performance metrics to optimize the fidelity of execution. Here, we take an alternative approach that leverages a unique capability of a trapped-ion quantum computer, i.e., the all-to-all qubit connectivity. We develop a method to determine a fixed number (budget) of quantum gates that, when calibrated, will maximize the fidelity of a batch of input quantum programs. This dynamic allocation of calibration resources on randomly accessible gates, determined using our heuristics, increases, for a wide range of calibration budget, the average fidelity from 70% or lower to 90% or higher for a typical batch of jobs on an 11-qubit device, in which the fidelity of calibrated and uncalibrated gates are taken to be 99% and 90%, respectively. Our heuristics are scalable, more than 2.5 orders of magnitude faster than a randomized method for synthetic benchmark circuits generated based on real-world use cases.

Maksymov, Andrii (ORCID:0000000282442851)↗

ExaSAT: An exascale co-design tool for performance modeling

One of the emerging challenges to designing HPC systems is understanding and projecting the requirements of exascale applications. In order to determine the performance consequences of different hardware designs, analytic models are essential because they can provide fast feedback to the co-design centers and chip designers without costly simulations. However, current attempts to analytically model program performance typically rely on the user manually specifying a performance model. Here we introduce the ExaSAT framework that automates the extraction of parameterized performance models directly from source code using compiler analysis. The parameterized analytic model enables quantitative evaluation of a broad range of hardware design trade-offs and software optimizations on a variety of different performance metrics, with a primary focus on data movement as a metric. Finally, we demonstrate the ExaSAT framework’s ability to perform deep code analysis of a proxy application from the Department of Energy Combustion Co-design Center to illustrate its value to the exascale co-design process. ExaSAT analysis provides insights into the hardware and software trade-offs and lays the groundwork for exploring a more targeted set of design points using cycle-accurate architectural simulators.

97 MATHEMATICS AND COMPUTING↗

Size and Distribution of Parr Produced from Natural‐ and Hatchery‐Origin Steelhead Spawning Naturally in a Small Pacific Northwest Coastal Stream

Abstract Recent studies suggest that steelhead Oncorhynchus mykiss produced from local hatchery‐origin (HOR) adults have lower lifetime fitness than their natural‐origin (NOR) counterparts. To increase our understanding of this pattern, we compared age‐1 parr size and distribution produced by a local integrated population of HOR and NOR adults spawning naturally across a range of environmental conditions. Across 8 years, we used genetic parentage assignments and field measurements of parr in conjunction with creek temperature and flow data to find small, nonbiologically significant differences in size between parr of different parent origins. This suggests that parr produced by HOR adults are acquiring enough resources to grow at a rate similar to that of parr produced by NOR adults. In contrast to origin, we found strong positive associations between mean size of parr and annual mean water temperature and summer flow. Additionally, the distribution of parr was similar and HOR‐produced parr were not skewed relative to the location of the hatchery. Parr occupying the full extent of accessible and suitable habitat might be a positive outcome for hatchery programs seeking to supplement an existing population or replace an extirpated population. However, these results also imply that HOR fish could be competing with NOR fish for food and space, which might be less desirable if the goal of the hatchery program is harvest and not supplementation. Our results highlight the importance of clearly articulated goals for the hatchery program, as the observed pattern could be deemed a benefit or a risk depending on the hatchery's purpose. Lastly, projections for higher water temperatures and reduced summer flows, when considered in the context of the correlations we observed for size of parr, imply that coastal steelhead populations could start experiencing negative climate impacts with respect to steelhead parr growth metrics during the summer in the next few decades.

Kennedy, Benjamen M.↗

BISON analyses of TRISO fuel performance, its dependence on time-at-temperature, and possible implications for fuel design and qualification

The Advanced Gas Reactor Fuel Development and Qualification (AGR) program has established a substantial technical foundation to support private entry into the U.S. high-temperature gas-cooled reactor market. However, emerging tristructural isotropic (TRISO)-fueled reactor applications include small modular reactors and microreactors with longer fuel residence times, which may expose fuels to higher time-at-temperature (TAT) values than were explored by the AGR program. Increased TAT could affect diffusive and thermomechanical behaviors such as Pd penetration, fission gas release, creep, and fission product transport. In this work, we applied multiscale best-estimate BISON fuel performance modeling to assess these effects within a representative design space based on the AGR-5/6/7 experiment and analyzed trends in predicted particle and compact fuel performance metrics with possible implications for near-term fuel design and qualification. BISON unambiguously predicted that TRISO fuel performance is sensitive to TAT. Increasing TAT was not predicted to increase the magnitude of failure-inducing tangential stresses in particle coating layers. Predictions obtained using a mechanistic model for Pd penetration indicated that penetration depth does not depend strongly on TAT. While these observations suggest that AGR testing provides a conservative upper bound for the steady-state operation of TRISO particles at lower powers and higher residence times, BISON also predicted that the release of poorly retained Ag would increase with TAT. Because these analyses applied models to extrapolate beyond the available experimental data, the authors recommend performing targeted experiments to confirm these predictions. Nevertheless, these predictions may provide reactor developers with enough confidence to make near-term design decisions associated with the potential fuel performance trade-offs of increasing TAT.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Commercial Building Energy Saver, API (CBES API) v2.0

The CBES API provides Application Programming Interface to a suite of functions to improve energy efficiency of buildings, including building energy benchmarking, preliminary retrofit analysis using a pre-simulation database DEEP, and detailed retrofit analysis using energy modeling with the EnergyPlus simulation engine. New capabilities in version 2.0 include renewable technologies (PV, storage), advanced HVAC systems, demand response measures, TDV (Time Dependent Valuation energy) metrics, as well as shading from adjacent buildings, trees or roof obstructions. The CBES API is used to power the LBNL CBES Web App. It can be used by third party developers and vendors.

Hong, Tianzhen↗

Projected Benefits of EERE's Portfolio - FY 2011

This collection of data tables and charts shows the benefits metrics related to energy security, environmental impacts, and economic impacts for the entire EERE portfolio of renewable energy technologies. Data are presented for the years 2015, 2020, 2030, and 2050, for both the NEMS and MARKAL models.

benefits estimates↗

Clean Cities Coalitions: 2016 Activity Report

The U.S. Department of Energy's (DOE's) national network of Clean Cities Coalitions advance the nation's economic, environmental, and energy security by supporting local actions to promote the use of domestic fuels within transportation. The nearly 100 Clean Cities coalitions, whose territory covers 80% of the U.S. population, bring together stakeholders in the public and private sectors to use alternative and renewable fuels, idle-reduction (IR) measures, fuel economy improvements, and new transportation technologies as they emerge. To ensure success, coalitions leverage a robust set of expert resources and tools provided by national laboratories and DOE. Each year, Clean Cities coordinators submit annual reports of their activities and accomplishments for the previous calendar year. Data and information are submitted via an online tool that is maintained as part of the Alternative Fuels Data Center (AFDC) at the National Renewable Energy Laboratory (NREL). Coordinators submit a range of data that characterize the membership, funding, projects, and activities of their coalitions. They also submit data about sales of alternative fuels; use of alternative fuel vehicles (AFVs), plug-in electric vehicles (PEVs), and hybrid electric vehicles (HEVs); IR initiatives; fuel economy improvement activities; and programs to reduce vehicle miles traveled (VMT). NREL analyzes the submitted data to determine how broadly energy use in the U.S. has shifted due to coalition activities, which are summarized in this report.

2016 metrics↗

Midwestern Regional Carbon Sequestration Partnership (MRCSP) Phase III (Development Phase) (Final Report)

The Midwest Regional Carbon Sequestration Partnership (MRCSP) was founded in 2003 as part of the U.S. Department of Energy’s (DOE’s) Regional Carbon Sequestration Partnership (RCSP) Initiative. The public/private consortium, funded through the MRCSP, brings together nearly 40 industry partners in 10 contiguous states in Mid-West and North-East regions. Battelle, as the project lead, oversees research & development, operations, and coordinates activities among various partners. Since its founding, MRCSP has made significant progress towards advancing CCS and CCUS technologies for participating states in the region. Between 2008 to 2020, Phase III of the MRCSP program focused on the development of large-scale injection tests. This report is part of a series of topical reports prepared under the MRCSP Phase III. The MRCSP Final Technical Report summarizes the research conducted while monitoring large-scale injection tests at a CO 2 -EOR facility in Northern Michigan. The project successfully injected more than one million metric tons of CO 2 into depleted oil fields in the Northern Niagaran Pinnacle Reef Trend (NNPRT) for enhanced oil recovery (EOR). These commercial-scale tests provided valuable real-world knowledge that has been used to refine technologies and methods, reduce uncertainties, and demonstrate safety and effectiveness of CCUS technologies to increase public acceptance. The Final Technical Report provides an overview of Phase III efforts including advancing the understanding of the regional geology, storage capacities, deployment of many monitoring and modeling techniques and its efficacy, and technical demonstration of large-scale CO 2 injection, containment, and associated storage in the NNPRT region. Specific topical reports on the subjects covered in the Final Technical Report are also available through EDX/OSTI.

01 COAL, LIGNITE, AND PEAT↗

High-burnup Experiments in Reactivity Initiated Accidents (HERA)

High-burnup Experiments in Reactivity-initiated Accidents (HERA) is a joint experimental program (JEEP) operating within the United States (U.S.) Nuclear Energy Agency’s (NEA’s) framework for irradiation experiments (FIDES). HERA is dedicated to the understanding of light water reactor (LWR) fuel performance at high burnup under reactivity-initiated accidents (RIA). In-pile RIA experiments have been performed on high-burnup fuels (e.g., above 60 gigawatt days per metric ton of uranium [GWd/MTU]) in the CABRI reactor at the Cadarache site in southern France, and the Nuclear Safety Research Reactor (NSRR) in Japan. However, most of these experiments have taken place with heavily corroded Zircaloy claddings with pulse widths that are narrower (e.g., 5 ms – 30 ms full-width-half-max [FWHM]) than what would be likely in a commercial LWR (e.g., 30 ms – 80 ms FWHM). A few tests were performed in the CABRI facility with FWHM up to 76 ms, though only one “blistered” rod experienced cladding failure. Heavy waterside corrosion and narrow pulse widths are both known to increase the vulnerability of LWR fuel to pellet cladding mechanical interaction (PCMI). The HERA proposal is designed to: (1) quantify the impact of pulse width on fuel performance, offering new insight into the applicability of existing data; (2) generate new data on high burnup fuel under pulse conditions prototypic of LWRs; (3) quantify the additional margin provided by modern cladding alloys to PCMI failure limits; and (4) offer improved data for modelers using specially designed tests that eliminate key uncertainties in high-burnup fuel tests.

(HERA)↗

Panel Session 117: Panel: Operational Excellence Through a Strong Safety Culture (R9.1)

This panel focused on the what the Department of Energy (DOE) and its contractors are doing to promote safety and excellence. The Integrated Safety Management System (ISMS) is crucial, but additional support provided by the Energy Facility Contractors Group (EFCOG), DOE, and environmental, safety, and health (ES and H) professionals in the field are equally imperative. The panelists discussed the importance of sharing lessons learned as well as are developing performance metrics to track operational and safety successes. This panel focused on current trends in building a strong operational safety culture and will include results from recent national workshops. Safety culture is the foundation of strong operational performance. Panel discussion included best practices from industry, DOE, and US NRC and also review tools being used to measure and evaluate safety culture programs. Panelists with presentations: Strong Safety Culture Promotes Operational Excellence (Kliss McNeel, Patricia Hughes); Safety Culture (Patricia Allen); DOE Safety Culture Improvement (Julie Goeckner); Supporting Safety Culture on the Front Line (Jan Preston); Interdependence of Safety Culture and Organizational Performance (Rizwan Shah)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhancing the Earth System Grid Authentication Infrastructure through Single Sign-On and Autoprovisioning

Climate scientists face an overarching need to efficiently access and manipulate climate model data. Increasingly, researchers must assemble and analyze large datasets that are archived in different formats on disparate platforms and must extract portions of datasets to compute statistical or diagnostic metrics in place. The need for a common virtual environment in which to access both climate model datasets and analysis tools is therefore keenly felt. The software infrastructure to support such an environment must not only provide ready access to climate data but must also facilitate the use of visualization software, diagnostic algorithms, and related resources. To this end, the Earth System Grid Center for Enabling Technologies (ESG-CET) was established in 2006 by the Scientific Discovery through Advanced Computing program of the U.S. Department of Energy through the Office of Advanced Scientific Computing Research and the Office Biological and Environmental Research within the Office of Science. ESG-CET is working to advance climate science by developing computational resources for accessing and managing model data that are physically located in distributed multiplatform archives. In this paper, we discuss recent development and implementation efforts by the Earth System Grid (ESG) concerning its security infrastructure. ESG's requirements are to make user logon as easy as possible and to facilitate the integration of security services and Grid components for both developers and system administrators. To meet that goal, we leverage existing primary authentication mechanisms, deploy a 'lightweight' but secure OpenID WebSSO, deploy a 'lightweight' X.509-PKI, and use autoprovisioning to ease the burden of security configuration management. We are close to completing the associated development and deployment.

54 ENVIRONMENTAL SCIENCES↗

On-Ramp Wireless: Program Final Report

The objective of the project was to develop and demonstrate a centrally managed, wide area wireless distribution grid sensor and faulted circuit indicator system capable of monitoring underground and other hard-to-reach distribution circuits while delivering the reliability, ease of installation, security, battery life and low cost structure required to be a commercially viable product for the electric utility industry. This integrated wireless grid monitoring system enables utilities across the United States to enhance the reliability of their distribution grids, improve performance metrics (i.e., SAIFI, CAIDI, SAIDI), support dynamic load management and predictive maintenance, and enable future remote monitoring applications necessary to achieve the goals of the Smart Grid. This project scope included: conceptual design; trade studies focused on maximizing ease of installation, sensing capabilities, power budget analysis to reduce maintenance costs and time to replace; sensor product development; and field technology demonstration. The trade studies included Radio Frequency (RF) propagation. The RF Trade Study was completed for the 2.4 GHz ISM-band and not extended to 1 GHz band due to availability of suitable radio solutions and associated impacts to overall commercial value of the solution. The technology demonstrations/field trials were performed in partnership with Southern California Edison and San Diego Gas and Electric. The sensing systems included fault indicator and wireless analog sensor devices from Schweitzer Engineering Labs (SEL) and smart transformer monitoring devices from Gridsense. Both SEL and Gridsense worked with ORW during this project to During the demonstration phase, sensors were deployed in multiple locations. Resulting data was analyzed for the following: RF performance, communication systems reliability, sensor system capabilities, and system level analytics relative to the commercial value to the smart grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

INTERFACES. A Program for Determining the 3D Structures of Surfaces Sites Using NMR Data

Dynamic nuclear polarization surface enhanced NMR spectroscopy has enabled the determination of high-resolution structures from surface-supported molecules, including singlesite heterogeneous catalysts. Structure determinations have largely mimicked the approaches used in biomolecular NMR spectroscopy, namely, using distance measurements to constrain a conformational search. These early demonstrations made use of purpose-built software, which has limited the adoption of the technique. Herein, we describe the open-source program INTERFACES (Interpret NMR to Elucidate or Reconstruct the Full Atomistic Configurations of External Surfaces) which automates the analysis of RE(SP)DOR data as well as the structure determination for surface sites. Distances, angles, dihedral angles, complex orientation, and distance from the support can all be sampled to find all structures that agree with the experimental data. A χ 2 metric is used to define the error ranges of the REDOR fits and produce structures with an arbitrary level of confidence. Structural solutions are then provided as both overlays and ORTEP-like probability ellipsoids.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

National Ignition Facility. Facility and Infrastructure Systems Maintenance Plan

Ensuring the reliability of the NIF, including its support systems, laser systems, target diagnostic systems, and utilities, is essential to the availability of the NIF in its support of NNSA missions. NIF is a key capability in the DOE Stockpile Stewardship Program and supports high energy physics experiments for nuclear weapons, energy, and astrophysics applications. High system reliability provides opportunities for shots and scientific discoveries with opportunities to enhance and upgrade capabilities. This Maintenance Plan (MP) identifies the policies and procedures used to perform and support asset management of the NIF Facility and Infrastructure Systems (FInS), NIF Lasers & Alignment (LASE), NIF Target Experimental Operations (TOPS), NIF Target Area Science and Engineering (TASE), and NIF&PS Control Systems (NCS). The FInS systems include the facility, HVAC, contamination control, beampath, and Line Replaceable Units (LRUs) as well as utilities which create the beampath environments, such as vacuum, argon, or clean dry air. The LASE systems are Programmatic systems which include laser diagnostics, alignment, power conditioning, pulsed power, and input laser systems. The TOPS and TASE systems are also Programmatic systems which include target and diagnostic delivery systems and positioners, many different insertable and fixed target diagnostics, and cryogenic and target gas fill systems. Finally, the NCS systems include both software and hardware for industrial and shot operation control systems. Policies governing administrative and operational practices related to maintenance of FInS, LASE, TOPS, TASE, and NCS systems are described in this plan. In addition, the plan provides processes and procedures for managing, tracking, and documenting the work. This document, the NIF Operations Management Plan, NIF-5020544 (Ref. 1), and NIF Shot Operations Plan, NIF-5018506 (Ref. 2), together satisfy the requirements of the Conduct of Operations. Duties, responsibilities, and reporting requirements of the various positions associated with FInS, LASE, and TOPS maintenance are detailed in this plan. The FInS systems include both Real Property systems with asset management requirements specified in DOE Order 430.1C (Ref. 3) and Programmatic systems. In addition, for FInS, there is a list of the System Level Maintenance Plans (SLMPs) in NIF-1007419198 (Ref. 4) which provide the system descriptions and maintenance plan and schedule. In addition, the list includes the Reliability Centered Maintenance (RCM) and Experience Centered Maintenance (ECM) evaluations that have been performed for applicable FInS systems as well as reliability criticality per Section 3.5. The -AM version of the NIF Maintenance Plan focuses on the reliability program for FInS, LASE, TOPS, TASE, and NCS within the context of the overall NIF Reliability, Availability, and Maintainability (RAM) program and incorporates changes since the -AL version from August 2011 and has been updated to be fully consistent with the updates to Ref. 1. It also includes asset management considerations, updates to the Work Order (WO) process within the NIF Computerized Maintenance Management System (CMMS) which is EAM infor® System Maintenance and Reliability Tracking (SMaRT) (Ref. 5), and updates to metrics and key performance indicators (KPIs).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗