Search NASA⌕ Search

SEARCH · Search NASA

Results for “test support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Field Test Report: Preliminary Aquifer Test Characterization Results for Well 299-W15-225: Supporting Phase I of the 200-ZP-1 Groundwater Operable Unit Remedial Design

This report examines the hydrologic test results for both local vertical profile characterization and large-scale hydrologic tests associated with a new extraction well (well 299-W15-225) that was constructed during FY2009 for inclusion within the future 200-West Area Groundwater Treatment System that is scheduled to go on-line at the end of FY2011. To facilitate the analysis of the large-scale hydrologic test performed at newly constructed extraction well 299-W15-225 (C7017; also referred to as EW-1 in some planning documents), the existing 200-ZP-1 interim pump-and-treat system was completely shut-down ~1 month before the performance of the large-scale hydrologic test. Specifically, this report 1) applies recently developed methods for removing barometric pressure fluctuations from well water-level measurements to enhance the detection of hydrologic test and pump-and-treat system effects at selected monitor wells, 2) analyzes the barometric-corrected well water-level responses for a preliminary determination of large-scale hydraulic properties, and 3) provides an assessment of the vertical distribution of hydraulic conductivity in the vicinity of newly constructed extraction well 299-W15-225. The hydrologic characterization approach presented in this report is expected to have universal application for meeting the characterization needs at other remedial action sites located within unconfined and confined aquifer systems.

54 ENVIRONMENTAL SCIENCES↗

Functional Evaluation of the DOZA DKG-05D Electronic Dosimeter System

The DOZA DKG-05D electronic personal dosimeter (EPD) was the subject of a limited type-test evaluation in support of Plutonium Production Reactor Agreement (PPRA) Implementation. The primary goal of this evaluation was to provide confidence in the functionality of the dosimeter and identify potential weaknesses in PPRA applications. The tests were based on IEC-61526, recommendations of the International Electrotechnical Commission pertaining to EPDs. All tests were performed in Pacific Northwest National Laboratory’s (PNNL) Radiological Calibrations and Standards Facility in the 318 building. The first testing category was functional considerations. The tests found that the mechanical characteristics of the DKG-05D support usability. However, user controls are not intuitive and straightforward, and the user instructions were unclear and difficult to follow. The unit functioned in a variety of humidity conditions. In high temperature conditions it performed well. However, in cold conditions the display began to fade, which limits its usefulness below about 5 °C. The vendor claims that the unit functions to -20 °C, and it may be correctly recording doses at that low temperature, but the doses cannot be read in real time. Testing found that battery life is generally good, operating for 200 hours on a full charge. This is far more than needed for the intended application. Charging the battery, however, had some pitfalls resulting from two charging modes. The high-current mode would be automatically selected if the battery charge fell below a threshold value when inserted in the charger. Otherwise, a low-current mode would be selected. In some cases a battery needing recharging would not get sufficient current to fully charge in a reasonable time period. There were also problems found in the low-battery indication and there was a possibility for data loss in the low-battery condition. The EPD generally performed well in measuring dose and dose rate. There were some small problems with non-linearity over a range of doses, but these non-linearities were at extremely low and very high doses and would not adversely affect the performance in our intended application. The testing resulted in the general conclusion that the DOZA DKG-05D is suitable for use in PPRA applications for real-time indication of dose received by a user and for estimation of stay times in radiation zones. It can be used as a supplement to a passive dosimeter, but it should not be used for measuring the user’s dose of record.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Multipactor Physics, Acceleration, and Breakdown in Dielectric-Loaded Accelerating Structures

The objective of this 3-year program is to study the physics issues associated with rf acceleration in dielectric-loaded accelerating (DLA) structures, with a focus on the key issue of multipactor loading, which has been found to cause very significant rf power loss in DLA structures whenever the rf pulsewidth exceeds the multipactor risetime (~10 ns). The experiments are carried out in the X-band magnicon laboratory at the Naval Research Laboratory (NRL) in collaboration with Argonne National Laboratory (ANL) and Euclid Techlabs LLC, who develop the test structures with support from the DoE SBIR program. There are two main elements in the research program: (1) high-power tests of DLA structures using the magnicon output (20 MW @11.4 GHz), and (2) tests of electron acceleration in DLA structures using relativistic electrons from a compact X-band accelerator. The work during this period has focused on a study of the use of an axial magnetic field to suppress multipactor in DLA structures, with several new high power tests carried out at NRL, and on preparation of the accelerator for the electron acceleration experiments.

11.4 GHz↗

DuraMelter 100 Sub-Envelope Changeover Testing Using LAW Sub-Envelope A2 and B1 Feeds in Support of the LAW Pilot Melter (Final Report)

This report provides the results from tests that were performed on a DM100 system with LAW Sub-Envelope A2 and Bl feeds in support of the subsequent Pilot Melter tests. The principal objectives of the DM100 tests were to determine the processing characteristics as the simulated melter feed transitioned from the LAW Sub-Envelope A2 to the Sub-Envelope Bl composition. Of particular interest was the presence or absence of secondary salt phases because of their potential deleterious effects on melter lifetime and product quality.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cryogenic System for the Cryomodule Test Facility at Fermilab

This paper provides an overview of the current progress and near-future plans for the cryogenic system at the new Cryomodule Test Facility (CMTF) at Fermilab, which includes the helium compressors, refrigerators, warm vacuum compressors, gas and liquid storage, and a distribution system. CMTF will house the Project X Injector Experiment (PXIE), which is the front end of the proposed Project X. PXIE includes one 162.5 MHz half wave resonator (HWR) cryomodule and one 325 MHz single spoke resonator (SSR) cryomodule. Both cryomodules contain superconducting radio-frequency (SRF) cavities and superconducting magnets operated at 2.0 K. CMTF will also support the Advanced Superconducting Test Accelerator (ASTA), which is located in the adjacent New Muon Lab (NML) building. A cryomodule test stand (CMTS1) located at CMTF will be used to test 1.3 GHz cryomodules before they are installed in the ASTA cryomodule string. A liquid helium pump and transfer line will be used to provide supplemental liquid helium to ASTA.

White, Michael↗

United States Supports Distributed Wind Technology Improvements; NREL (National Renewable Energy Laboratory)

This presentation provides information on the activities conducted through the Competitiveness Improvement Project (CIP), initiated in 2012 by the U.S. Department of Energy (DOE) and executed through the National Renewable Energy Laboratory (NREL) to support the distributed wind industry. The CIP provides research and development funding and technical support to improve distributed wind turbine technology and increase the competitiveness of U.S. small and midsize wind turbine manufacturers. Through this project, DOE/NREL assists U.S. manufacturers to lower the levelized cost of energy of wind turbines through component improvements, manufacturing process upgrades, and turbine testing. Ultimately, this support is expected to lead to turbine certification through testing to industry-recognized wind turbine performance and safety standards.

17 WIND ENERGY↗

Virtualized hardware environments for supporting digital I and C verification - 324

The technology of virtualized hardware testing platforms within the nuclear context in order to provide a framework for evaluating virtualized hardware/software approaches is discussed. To understand the applicability of virtualized hardware approaches, we have developed a virtual hardware model of an actual smart sensor using the Imperas product OVPsim development environment, as is seen in . An evaluation of the modeling effort required to create the digital I and C smart sensor is provided, followed by an analysis and findings on the various tools in the OVPsim environment for supporting testing, evidence collecting, and analysis. The analyzed tools include traditional input/output testing, model-based testing, mutation testing, and fault injection techniques. Finally, the goal of this research effort is to analyze virtual hardware platforms and present findings to the nuclear community on the efficacy and viability of this technology as a complementary means to actual hardware-in-the-loop testing Factory Acceptance Testing for Nuclear Power Plant (NPP) digital I and C systems. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Operando carbon corrosion measurements in fuel cells using boron-doped carbon supports

Carbonaceous materials are the most common catalyst supports in proton exchange membrane fuel cell (PEMFCs), yet their corrosion is one of the limiting factors in achieving high durability. Herein, we doped carbon supports with boron (B) to increase the corrosion-resistance of the support. Two types of B-doped carbons were synthesized and studied as platinum support materials. Further, they varied in their morphologies, surface areas, and the types of boron species. The durability of Pt/B-doped carbon catalysts was investigated using the US-DOE catalysts’ supports accelerated stress test (AST) and a mass-spectrometer connected to the fuel cell effluent stream to quantify the mass of corroded carbon support in operando. The addition of boron to the carbon increased the stability of Pt catalysts in long-term usage of PEMFC. After 4000 AST cycles, more than 50% of initial current density was preserved for the boron-containing systems, while less than 30% of it remained with Vulcan carbon (Pt/V). Also, the Pt/B-doped carbon samples demonstrated better electrochemical active surface area (ECSA) stability when compared to Pt/V. Carbon loss measurements showed that B-doped carbons have higher resistance to electrochemical corrosion than unmodified carbon. Specifically, the substitutional boron-doped carbon demonstrated an extremely high stability and low corrosion rate.

25 ENERGY STORAGE↗

Long Island Smart Energy Corridor

The Long Island Power Authority (LIPA) has teamed with Stony Brook University (Stony Brook or SBU) and Farmingdale State College (Farmingdale or FSC), two branches of the State University of New York (SUNY), to create a “Smart Energy Corridor.” The project, located along the Route 110 business corridor on Long Island, New York, demonstrated the integration of a suite of Smart Grid technologies from substations to end-use loads. The Smart Energy Corridor Project included the following key features: -TECHNOLOGY: Demonstrated a full range of smart energy technologies, including substations and distribution feeder automation, fiber and radio communications backbone, advanced metering infrastructure (AM”), meter data management (MDM) system (which LIPA implemented outside of this project), field tools automation, customer-level energy management including automated energy management systems, and integration with distributed generation and plug-in hybrid electric vehicles. -MARKETING: A rigorous market test that identified customer response to an alternative time-of-use pricing plan and varying levels of information and analytical support. -CYBER SECURITY: Tested cyber security vulnerabilities in Smart Grid hardware, network, and application layers. Developed recommendations for policies, procedures, and technical controls to prevent or foil cyber-attacks and to harden the Smart Grid infrastructure. -RELIABILITY: Leveraged new Smart Grid-enabled data to increase system efficiency and reliability. Developed enhanced load forecasting, phase balancing, and voltage control techniques designed to work hand-in-hand with the Smart Grid technologies. -OUTREACH: Implemented public outreach and educational initiatives that were linked directly to the demonstration of Smart Grid technologies, tools, techniques, and system configurations. This included creation of full-scale operating models demonstrating application of Smart Grid technologies in business and residential settings. Farmingdale State College held three international conferences on energy and sustainability and Smart Grid related technologies and policies. These conferences, in addition to public seminars increased understanding and acceptance of Smart Grid transformation by the general public, business, industry, and municipalities in the Long Island and greater New York region. - JOB CREATION: Provided training for the Smart Grid and clean energy jobs of the future at both Farmingdale and Stony Brook. Stony Brook focused its “Cradle to Fortune 500” suite of economic development resources on the opportunities emerging from the project, helping to create new technologies, new businesses, and new jobs. To achieve these features, LIPA and its sub-recipients, FSC and SBU, each have separate but complementary objectives. At LIPA, the Smart Energy Corridor (1) meant validating Smart Grid technologies; (2) quantifying Smart Grid costs and benefits; and (3) providing insights into how Smart Grid applications can be better implemented, readily adapted, and replicated in individual homes and businesses. LIPA installed 2,550 AMI meters (exceeding the 500 AMI meters in the original plan), created three “smart” substations serving the Corridor, and installed additional distribution automation elements including two-way communications and digital controls over various feeders and capacitor banks. It gathered and analyzed customer behavior information on how they responded to a new “smart” TOU rate and to various levels of information and analytical tools.

24 POWER TRANSMISSION AND DISTRIBUTION↗

VTR Startup Fuel Paper for NFSM

A 2017 report issued by the Department of Energy Office of Nuclear Energy’s (DOE-NE) Nuclear Energy Advisory Committee (NEAC) discussed needs and requirements for a new test reactor in the U.S. The report included a recommendation to “proceed immediately with pre-conceptual design planning activities to support a new test reactor (including cost and schedule estimates).”

99 GENERAL AND MISCELLANEOUS↗