CONCENTRATED SOLAR POWER COUPLED WITH WASTE HEAT RECOVERY SYSTEM FOR INNOVATIVE CLINKER CALCINATION PROCESS
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal (TCCR) process to remove 137 Cs from tank waste supernate using an ion exchange process. The TCCR unit processes dissolved salt from Tank 10H through a series of ion exchange columns containing crystalline silicotitanate (CST) and the effluent is then discharged to Tank 11H. Four interim samples pulled from Tank 11H during and just after the completion of processing of Batch 3 through the TCCR process have been analyzed for 137 Cs activity and density. The 137 Cs activity was found to decrease with each subsequent sample, which is consistent with the addition of decontaminated solution to Tank 11H. When compared to the expected composition from mixing the Tank 10H Batch 3 feed with the material already present in Tank 11H, the bulk chemical composition was as expected. A corrosion control sample collected from Tank 11H in June 2020 showed changes in the chemical composition and 137 Cs activity when compared to the composition measured at the end of Batch 2 processing. As there were no additions made to the tank during this period, these changes were attributed to leaching of the solids present in Tank 11H. Additional analyses of the 4 th interim sample are pending and will be documented in a revision to this report.
Savannah River Mission Completion (SRMC) is currently operating the Tank Closure Cesium Removal 1A (TCCR 1A) process to remove 137 Cs from tank waste supernate using an ion exchange process. The TCCR 1A unit processes dissolved salt fed from Tank 10H through a series of ion exchange columns containing crystalline silicotitanate (CST, IONSIV TM R9120-B, 30x60) and the effluent is then discharged to Tank 11H. In support of the TCCR 1A program, SRNL analyzed samples taken from Tank 11H (without tank mixing) before, during, and at the completion of TCCR 1A Batch 1 processing. Tank 11H serves as the receipt tank for the filtered and cesium removed product from the TCCR 1A system. Processing of Batch 1 commenced on January 13, 2022 and completed on February 17, 2022, after processing approximately 70,100 gallons. A pre-production sample was collected from the heel remaining in Tank 11H just before Batch 1 processing began. In addition, five interim surface samples were collected from Tank 11H during processing, and both a surface and a variable depth sample (VDS, ~7” from tank bottom) were collected just after processing completed. Analysis of all samples included density and gamma spectroscopy, in addition to a more comprehensive suite of analytes for the pre- and post-production samples. The density of the pre-production sample was the highest of all samples measured and was then observed to decrease for the first two interim samples, followed by becoming fairly consistent for the remainder of the samples (~1.3 g/mL). The density of 1.3 g/mL is similar to the density measured for one of the three Tank 10H qualification samples (HTF-10-21-126). The 137 Cs activity was found to decrease as additional decontaminated effluent from the TCCR columns was added to Tank 11H during processing; however, an increase in activity was observed during periods of no processing which can be attributed to leaching of 137 Cs from the known solids in Tank 11H. The Cs isotope concentrations in the Tank 11H postproduction surface sample were determined to be 99.7-99.8% lower than the concentrations measured in the Tank 10H feed as measured by mass spectrometry.
In 2014, the Department of Energy (DOE) Office of River Protection and its contractors began to develop a performance assessment for the near-surface disposal of low-level and mixed low-level waste at the Hanford Site's Integrated Disposal Facility (IDF). The IDF is a doubly-lined landfill that was constructed between 2004 and 2006 to be the disposal facility for the vitrified low-activity waste that will be produced at the Waste Treatment and Immobilization Plant (WTP). IDF is also expected to receive solid secondary waste produced at the WTP and other solid wastes from site activities. The IDF has been in a preoperational state awaiting authorization from DOE and a RCRA permit modification from the State of Washington Department of Ecology to receive waste. Both the Disposal Authorization Statement and permit modification require a performance assessment demonstrating that the system of engineered and natural features will limit releases of radionuclides and hazardous chemicals from the IDF and be protective of human health and the environment. The simulated duration is 10,000 years. Based on the analyses presented in the 2017 Integrated Disposal Facility Performance Assessment, DOE issued a conditional Operating Disposal Authorization Statement for the IDF in June 2018. The long-term performance of the IDF to be protective of human health and the environment was evaluated under the requirements of DOE Order 435.1, Radioactive Waste Management. Computer simulations were performed to evaluate whether or not the IDF would comply with DOE requirements. In the time that has passed since the performance assessment was approved by DOE, new information has been discovered that had not been considered in the performance assessment. Since this new information has not been evaluated, the potential impact of the changes have not been taken into consideration in DoE's disposal authorization. DOE and its contractors follow a change control process to screen and, when necessary, evaluate new information that could potentially impact the conclusions of the completed performance assessment. This paper will describe the change control process and provide two examples of evaluations performed following the change control process. The first example evaluates a new waste form for liquid secondary waste that was not evaluated in the performance assessment. In the performance assessment, liquid secondary waste was assumed to be solidified with grout. A new recommendation to dispose of the liquid secondary waste after drying it to a powder was evaluated. The second example evaluates inventory implications from changes to the flow sheet that estimates the feed composition to the low-activity waste vitrification facility. The changes result in higher strontium concentrations in the vitrified waste stream. (authors)
Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal (TCCR) process to remove 137 Cs from tank waste supernate using an ion exchange process. The TCCR unit processes dissolved salt from Tank 10H through a series of ion exchange columns containing crystalline silicotitanate (CST) and the effluent is then discharged to Tank 11H. Four interim samples pulled from Tank 11H during and just after the completion of processing of Batch 3 through the TCCR process have been analyzed for 137 Cs activity and density. The 137 Cs activity was found to decrease with each subsequent sample, which is consistent with the addition of decontaminated solution to Tank 11H. When compared to the expected composition from mixing the Tank 10H Batch 3 feed with the material already present in Tank 11H, the bulk chemical composition was as expected. A corrosion control sample collected from Tank 11H in June 2020 showed changes in the chemical composition and 137 Cs activity when compared to the composition measured at the end of Batch 2 processing. As there were no additions made to the tank during this period, these changes were attributed to leaching of the solids present in Tank 11H. Revision 1 of this report contains additional analyses of the fourth interim sample including inductively coupled plasma – mass spectrometry (ICP-MS) results and activities of other radionuclides. These results are consistent with the previously reported results, showing leaching from the Tank 11H heel. Notably, the 90 Sr activity was about 2.7x higher than calculated from a mixture of the original Tank 11H supernate and the Tank 10H supernate as treated by TCCR, suggesting additional leaching of Sr from the Tank 11H heel solids. In addition, Revision 1 includes analysis results for the Batch 3 Post-Production surface and variable depth samples collected in October of 2020. The Post-Production surface sample was similar in composition to the fourth interim surface sample, except for the increased Cs-137 and oxalate concentrations that were presumably associated with leaching of the Tank 11H heel solids.
Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal (TCCR) process to remove 137 Cs from tank waste supernate using an ion exchange process. As part of that process, Savannah River National Laboratory (SRNL) receives and analyzes samples in support of the qualification of each batch to be processed. SRNL recently received supernate samples retrieved from Tank 10H as well as in-tank batch contact samples for characterization in support of qualifying Batch 3 for processing through the TCCR unit. Some results from analysis of those samples have been previously reported. This report documents the remaining analyses of the in-tank batch contact samples as well as the results of ZAM (Zheng, Anthony, Miller) isotherm modeling performed for comparison to the measured results. Results of the additional analyses include analysis of the loading of other radionuclides besides 137 Cs on the crystalline silicotitanate (CST) contained within the in-tank batch contact test samples. Results from those analyses revealed the next highest contributor to the activity on the CST was 90 Sr with an average loading of 2.76E+08 dpm/g CST compared to 3.56E+10 dpm/g CST for the 137Cs. Isotopes of plutonium were also detected on the samples. ZAM modeling was performed using the measured composition of the Tank 10H Batch 3 qualification samples. The modeling predicted a maximum Cs loading approximately 2.2x higher than the measured result. This is a slightly lower ratio (expected/measured) compared to what was observed for the prior TCCR in-tank batch contact testing performed for Batches 1A and 2 where the ZAM results were 2.7-2.8x higher than the measured values.
Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal (TCCR) process to remove 137 Cs from tank waste supernate using an ion exchange process. As part of that process, Savannah River National Laboratory (SRNL) receives and analyzes samples in support of the qualification of each batch to be processed. SRNL recently received supernate samples retrieved from Tank 10H as well as in-tank batch contact samples for characterization in support of qualifying Batch 3 for processing through the TCCR unit. SRNL received and characterized a set of dip samples collected from Tank 10H (one surface and one variable depth sample). No solids were observed in either sample and therefore the samples were combined, and a suite of analyses were performed on the composite sample. The density of the combined sample was 1.174 g/mL (0.18 %RSD), which was consistent with the measured sodium concentration of 3.54 M (0.08 %RSD). The 137Cs activity in the sample was 4.75E+07 dpm/mL (4.28 %RSD) and the total Cs concentration was calculated to be 1.54 mg/L (1.16E-05 M). The in-tank batch contact samples consist of 0.1 g of crystalline silicotitanate (CST) contained within a teabag device. Duplicate samples were submerged in Tank 10H supernate for a period of about 13 days, after which time they were retrieved and transferred to SRNL for analysis. At SRNL the CST was rinsed to remove excess salt solution and the CST was then air dried before being digested for analysis. Results of the analysis indicated a 137 Cs loading of 3.66E+10 ± 1.40E+09 dpm/g or 16.5 ± 0.63 Ci/kg CST . This value represents a bounding upper limit as it includes the addition of two sigma uncertainty from replicate analysis of the individual teabag samples as well as the addition of the small amount of 137 Cs activity measured in the rinse solutions. The above values are based on the air-dried mass of CST. Correcting to the true dry mass using a F-factor of 0.8191 results in a maximum loading of 20.2 ± 0.77 Ci/kg CST .
The laboratory creates a variety of wastes, each with its own health and safety concerns, regulatory requirements, and disposal pathways. However, the basic process, from preplanning to waste disposal, is always essentially the same.
Abstract During vitrification of radioactive wastes, excessive foaming reduces processing rates within melters by hindering heat transfer from the molten glass pool to the reacting melter feed. Formulations of low‐activity waste (LAW) melter feeds, for vitrification at the Waste Treatment and Immobilization Plant at the Hanford Site, conventionally include the addition of sucrose to mitigate excessive foaming by hastening the denitration process. However, incomplete combustion of sucrose produces organics such as acetonitrile (C 2 H 3 N) that may exceed bounding limits of downstream effluent treatment facilities. Using boron nitride (BN) as an alternate reductant to sucrose, in a representative LAW melter feed reduced C 2 H 3 N production by 90% by preventing the low‐temperature sucrose–nitrate reactions. Furthermore, foaming was suppressed due to the higher decomposition temperature of BN than H 3 BO 3 meaning a delayed reaction of a large fraction of boron with the transient glass‐forming melt until above the foam onset temperature, thus reducing the quantity and viscosity of the connected melt and trapping less gas in the foam layer.
Process acceptable knowledge (AK) is a waste stream characterization method that can be used to meet all or part of the waste analysis requirements appropriate for the waste. The method may include documented knowledge of process (KOP), additional characterization data, and/or facility records of analysis. LANL will use process AK to ensure chemical compatibility; assign matrix parameter categories and Environmental Protection Agency (EPA) hazardous waste numbers (HWNs) commonly referred to as EPA codes to waste streams; and determine the waste material parameters and radionuclides present in waste streams.
The Department of Energy (DOE) is the owner and part operator of multiple facilities in Northern California. The facilities include those located at Lawrence Livermore National Laboratory (LLNL), Lawrence Berkeley National Laboratory (LBNL), Sandia National Laboratories/California (SNL/CA) and SLAC National Accelerator Laboratory (SLAC) among other sites. Through their operations, the facilities generate hazardous waste and, thereby, are subject to the requirements of Chapter 31 of the Title 22 California Code of Regulations, Waste Minimization. The Northern California sites are primarily research and development facilities in the areas relating to national security, high-energy physics, engineering, bioscience and environmental health and safety disciplines. As mentioned above these DOE facilities are primarily research and development facilities. The hazardous wastes generated may be associated with operations that range in size from small, bench scale R&D to major maintenance and operations waste streams. Therefore, even though this document breaks down the waste streams based on California Waste Codes (CWC), the quantities of waste within one waste code category could be from many different locations and dissimilar processes. Because of the nature of the work at the sites, it is not economically feasible to try to implement source reduction measures for every process that generates a portion of the waste stream. This document identifies the processes that generate the major portion of the waste within an identified major waste stream and reports on progress made toward source reduction. In accomplishing the mission, it is DOE’s goal to eliminate waste generation and emissions giving priority to those that may present the greatest risk to human health and the environment.
This system design description (SDD) defines the technical, functional, and performance requirements of the Low-Activity Waste (LAW) Facility primary offgas process system (LOP) and the LAW Facility secondary offgas/vessel vent process system (LVP). This document details waste treatment requirements, environmental compliance requirements, and authorization basis requirements of the LOP and LVP systems as they are currently known and understood.
Tank 48H contains roughly 270,000 gallons of radioactive waste material. The waste stored in this tank was to be processed in multiple stages utilizing facilities at the Savannah River Site (SRS) almost 30 years ago. The In-Tank Precipitation Process (ITP) was initiated in Tank 48H, which precipitated highly radioactive cesium-137 using sodium tetraphenylborate (NaTPB). While the process succeeded in precipitating the Cs, Sr, and other actinides, it also generated an unexpectedly large amount of benzene. The evolved benzene created a safety concern and made the waste incompatible with further downstream processing. This halted the ITP, and a new method of treatment was required to continue processing the legacy waste contained in Tank 48H. A myriad of treatment options have been proposed with multiple teams of researchers assembled to work on this highly complex issue over the last few decades. This review investigated one potentially viable treatment option, in-tank oxidation with sodium permanganate. Permanganate has been well known in literature as a strong oxidizing agent for organic compounds, as well as being utilized at the Savannah River Site (SRS) in other processes. A small number of studies have been conducted utilizing waste simulants to evaluate the use of permanganate as an oxidant for tetraphenylborate (TPB). A search of the literature and data from these studies indicates that permanganate could be a viable treatment for destruction of TPB in Tank 48H. While the scoping studies had a small number of individual experiments and nonideal conditions, the permanganate decomposed up to 90% of the TPB. A free hydroxide concentration above 1.0 M is required for tank corrosion control. Simulant studies indicate no decrease in TPB decomposition by permanganate until pH 14. The simulant studies show an increase in TPB decomposition as the temperature of the solution is increased to 40 °C. The post-reaction analysis of previous simulant tests did not look at all of the organic degradation products. Investigations into what these organic products are and in what quantity will help guide determinations as to whether the downstream processing facilities are able to handle the material that will be generated. Study on the time frame for the reaction between permanganate and TPB should be investigated as the literature reports only extend out to two weeks reaction time. The permanganate treatment conditions indicate no corrosion control concerns and a longer timescale reaction may be needed for in-tank treatment. In addition, further study would be useful to identify a lower boundary condition for the ratio of TPB and oxidant. The simulant tests applied large excesses of permanganate, and this may be unnecessary. The size constraint of the tank means that there will be practical limitations on the amount of sodium permanganate that can be added to the tank. The amount of permanganate should be minimized as much as possible while still ensuring decomposition of the TPB to minimize the amount of manganese dioxide solids generated.
The Hanford Site stores an estimated 56 million gallons of mixed radioactive and chemically hazardous waste in large underground tanks. In support of the Direct Feed Low-Activity Waste (DFLAW) program for expediting Hanford tank waste supernate treatment, laboratory-scale ion exchange processing using prototypic unit operations was conducted on AW-105 tank waste at the Pacific Northwest National Laboratory Radiochemical Processing Laboratory. This report describes the batch contact testing for tanks AN-107 and AP-105 to help evaluate CST performance on tanks waste supernate after processing it in the ion exchange columns. Batch columns were performed with the wastes at six Na concentrations.
Radioactive waste with the decommissioning process at the Fukushima Daiichi Nuclear Power Plant (FDNPP), contains borate with relatively high concentration. As with general low-level wastes, such waste is also assumed the solidification with cementitious materials which calcium silicate hydrate (C-S-H) is one of the main components. In this study, the sorption behavior of strontium (Sr) ions and barium (Ba) ions to C-S-H in the presence of borate was examined by the sorption experiments without drying process. In the sorption experiments, C-S-H was synthesized by the mixture of calcium oxide, fumed silica and a solution with setting the Ca/Si molar ratios to 0.4, 0.8, 1.2 and 1.6. The total amount of a solid phase was 1.5 g, and the total volume of the solution containing borate and adsorbed ions (Sr or Ba) was 30 mL. The concentration of borate was set to 0 M or 0.6 M and the sodium/boron (Na/B) ratios was set to 0.2 or 1.0 by mixing boric acid and sodium hydroxide. The concentration of Sr ions or Ba ions was adjusted to 1 mM. The sorption period was set to 7 days. In the results, the sorption ratios of Sr ions and Ba ions for C-S-H exceeded 80% under all experimental conditions, although the sorption competition of cations with Na ions and the inhibition of the C-S-H formation with generating borate compounds observed by Raman spectroscopy might slightly reduce the sorption of them. These suggest that cationic radionuclides will be immobilized by C-S-H contained in the cements even in the presence of borate. (authors)
Gibbsite, bayerite, and boehmite are important aluminum (oxy)hydroxide minerals in nature and have been widely deployed in various industrial applications. They are also major components in caustic nuclear wastes stored at various U.S. locations. Knowledge of their crystallization and phase transformation processes contributes to understanding their occurrence and could help optimize waste treatment processes. While it has been reported that partial conversion of bayerite and gibbsite to boehmite occurs in basic solutions at elevated temperatures, systematic studies of factors affecting the phase transformation as well as the underlying reaction mechanisms are non-existent, particularly in highly alkaline solutions. We explored the effects of sodium hydroxide concentrations (0.1~3 M), reaction temperature (60~100 ?) and aluminum concentrations (0.1~1 M) on the crystallization and transformation of these aluminum (oxy)hydroxides. Detailed structural and morphological characterization by X-ray diffraction (XRD), scanning electron microscopy (SEM), and nuclear magnetic resonance (NMR) spectrometry revealed that these processes depend largely on the reaction temperature and the Al/OH- ratio. When 1 = Al/OH- = 2.5, the reactions favor formation of high crystallinity precipitates, whereas at Al/OH- ratio ? 2.5 precipitation ceases unless the Al concentration is higher than 1 M. We identified pseudoboehmite, bayerite and gibbsite as intermediate phases to bayerite, gibbsite and boehmite, respectively, all of which transform via dissolution-reprecipitation. Gibbsite transforms to boehmite in both acidic and weak caustic environments at temperatures above 80 oC. However, a ‘bar-shaped’ gibbsite morphology dominates in highly caustic environments (3 M NaOH). The findings enable a robust basis for selection of various solid phases by tuning the reaction conditions.