Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Pilot Demonstration of Technology for the Production of High Value Materials from the Ultra-Fine (PM2.5) Fraction of Coal Combustion Ash

The overall objective of this research was to determine the feasibility of recovering a very fine fraction of fly ash, that is 5 microns in diameter or less and examining the characteristics of these materials in new or at least less traditional applications. These applications included as a polymer filler or as a 'super' pozzolanic concrete additive. As part of the effort the ash from 6 power plants was investigated and characterized. This work included collection from ESP Hoppers and ponds. The ash was thoroughly characterized chemically and physically. Froth flotation was used to reduce the carbon and testing showed that flotation could effectively reduce carbon to acceptable levels (i.e. 0.5% LOI) for most of the substrates tested. in order to enable eventual use as fillers. Hydraulic classification was used in the separation of the fine ash from the coarse ash. Hydraulic classification requires the ash to be dispersed to be effective and a range of dispersants were tested for adsorption as well as sedimentation rate. A wide range of dosages were required (0.3 to 10 g/kg). In general the ponded ash required less dispersant. A model was developed for hydraulic classification. A pilot-scale hydraulic classifier was also designed and operated for the project. Product yields of up to 21% of feed solids were achieved with recoveries of <5 {micro}m particles as high as 64%. Mean particle sizes (D{sub 50}) of the ultra fine ash (UFA) products varied from 3.7 to 10 {micro}m. A patent was filed on the classifier design. A conceptual design of a Process Demonstration Unit (PDU) with a feed rate of 2 tons of raw ash feed per hour was also completed. Pozzolanic activity was determined for the UFA ashes in mortars. In general the overall strength index was excellent with values of 90% achieved in 3 days and {approx}100% in 7 days. Three types of thermoplastic polymers were evaluated with the UFA as a filler: high density polyethylene, thermoplastic elastomer and polyethylene terphthalate filled polymers were prepared and subjected to SEM analysis to verify that the UFA was well dispersed. The addition of fillers increased the modulus of the HDPE composite, but decreased both the offset yield stress and offset yield strain, showing that the fillers essentially made the composite stiffer but the transition to plastic deformation occurred earlier in filled HDPE as stress was applied. Similar results were obtained with TPE, however, the decrease in either stress or strain at offset yield were not as significant. Dynamic mechanical analyses (DMA) were also completed and showed that although there were some alterations in the properties of the HDPE and TPE, the alterations are small, and more importantly, transition temperatures are not altered. The UFA materials were also tested in expanded urethanes, were improvements were made in the composites strength and stiffness, particularly for lighter weight materials. The results of limited flammability and fire safety testing were encouraging. A flowsheet was developed to produce an Ultra-Fine Ash (UFA) product from reclaimed coal-fired utility pond ash. The flowsheet is for an entry level product development scenario and additional production can be accommodated by increasing operating hours and/or installing replicate circuits. Unit process design was based on experimental results obtained throughout the project and cost estimates were derived from single vendor quotes. The installation cost of this plant is estimated to be $2.1M.

01 COAL, LIGNITE, AND PEAT↗

Rapid Cost Assessment of Space Mission Concepts Through Application of Complexity-Based Cost Indices

This slide presentation reviews the development of a rapid cost assessment models for evaluation of exploration missions through the application of complexity based cost indices. In Fall of 2004, NASA began developing 13 documents, known as "strategic roadmaps," intended to outline a strategy for space exploration over the next 30 years. The Third Strategic Roadmap, The Strategic Roadmap for Solar System Exploration, focused on strategy for robotic exploration of the Solar System. Development of the Strategic Roadmap for Solar System Exploration led to the investigation of a large variety of missions. However, the necessity of planning around scientific inquiry and budgetary constraints made it necessary for the roadmap development team to evaluate potential missions not only for scientific return but also cost. Performing detailed cost studies for each of the large number of missions was impractical given the time constraints involved and lack of detailed mission studies; so a method of rapid cost assessment was developed by us to allow preliminary analysis. It has been noted that there is a strong correlation between complexity and cost and schedule of planetary missions. While these correlations were made after missions had been built and flown (successfully or otherwise), it seemed likely that a similar approach could provide at least some relative cost ranking. Cost estimation relationships (CERs) have been developed based on subsystem design choices. These CERs required more detailed information than available, forcing the team to adopt a more high level approach. Costing by analogy has been developed for small satellites, however, planetary exploration missions provide such varying spacecraft requirements that there is a lack of adequately comparable missions that can be used for analogy.

cost estimation↗

CatCost: A Free Tool for Rapidly and Accurately Estimating Catalyst Manufacturing Costs

CatCost, a free online tool, quickly and accurately estimates pre-commercial catalyst manufacturing costs by incorporating innovative decision-logic with industry-standard methods into a user-friendly platform. CatCost improves research efficiency and reduces commercialization risk by identifying cost drivers in catalyst production, enabling better R&D decisions to accelerate technology adoption into the marketplace.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Rapid Turnaround of Costing/Designing of Space Missions Operations

The Ground Segment Team (GST), at NASA's Jet Propulsion Laboratory in Pasadena, California, provides high-level mission operations concepts and cost estimates for projects that are in the formulation phase. GST has developed a tool to track costs, assumptions, and mission requirements, and to rapidly turnaround estimates for mission operations, ground data systems, and tracking for deep space and near Earth missions. Estimates that would often take several weeks to generate are now generated in minutes through the use of an integrated suite of cost models. The models were developed through interviews with domain experts in areas of Mission Operations, including but not limited to: systems engineering, payload operations, tracking resources, mission planning, navigation, telemetry and command, and ground network infrastructure. Data collected during interviews were converted into parametric cost models and integrated into one tool suite. The tool has been used on a wide range of missions from small Earth orbiters, to flagship missions like Cassini. The tool is an aid to project managers and mission planners as they consider different scenarios during the proposal and early development stages of their missions. The tool is also used for gathering cost related requirements and assumptions and for conducting integrated analysis of multiple missions.

Cost estimation↗

Hawaii Clean Energy Initiative (HCEI) Scenario Analysis: Quantitative Estimates Used to Facilitate Working Group Discussions (2008-2010)

This report provides details on the Hawaii Clean Energy Initiative (HCEI) Scenario Analysis to identify potential policy options and evaluate their impact on reaching the 70% HECI goal, present possible pathways to attain the goal based on currently available technology, with an eye to initiatives under way in Hawaii, and provide an 'order-of-magnitude' cost estimate and a jump-start to actionthat would be adjusted with a better understanding of the technologies and market.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hanford Tank Farm Vapors Abatement Technology and Vendor Proposals Assessment

Suspected chemical vapor releases from the Hanford nuclear waste tank system pose concerns for worker exposure. Washington River Protection Solutions (WRPS) contracted the Savannah River National Laboratory (SRNL) to explore abatement technologies and strategies to remediate the vapors emitted through the ventilation system. In response, SRNL conducted an evaluation of technologies to abate, or reduce, vapor emissions to below 10% of the recognized occupational exposure limits (OELs). The evaluation included a review of published literature and a broadly communicated Request for Information to commercial vendors through a Federal Business Opportunities (Fed Biz Opps) web posting. In addition, SRNL conducted a workshop and post-workshop conference calls with interested suppliers (vendors) to assess proposals of relevant technologies. This report reviews applicable technologies and summarizes the approaches proposed by the vendors who participated in the workshop and teleconference interviews. In addition, the report evaluates the estimated performance of the individual technologies for the various classes of chemical compounds present in the Hanford Chemicals of Potential Concern (COPCs) list. Similarly, the report provides a relative evaluation of the vendor proposed approaches against criteria of: technical feasibility (and maturity), design features, operational considerations, secondary waste generation, safety/regulatory, and cost / schedule. These rough order-of-magnitude (ROM) cost estimates are intended to provide a comparison basis between technologies and are not intended to be actual project estimates.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data Mining Approaches for Modeling Complex Electronic Circuit Design Activities

A printed circuit board (PCB) is an essential part of modern electronic circuits. It is made of a flat panel of insulating materials with patterned copper foils that act as electric pathways for various components such as ICs, diodes, capacitors, resistors, and coils. The size of PCBs has been shrinking over the years, while the number of components mounted on these boards has increased considerably. This trend makes the design and fabrication of PCBs ever more difficult. At the beginning of design cycles, it is important to estimate the time to complete the steps required accurately, based on many factors such as the required parts, approximate board size and shape, and a rough sketch of schematics. Current approach uses multiple linear regression (MLR) technique for time and cost estimations. However, the need for accurate predictive models continues to grow as the technology becomes more advanced. In this paper, we analyze a large volume of historical PCB design data, extract some important variables, and develop predictive models based on the extracted variables using a data mining approach. The data mining approach uses an adaptive support vector regression (ASVR) technique; the benchmark model used is the MLR technique currently being used in the industry. The strengths of SVR for this data include its ability to represent data in high-dimensional space through kernel functions. The computational results show that a data mining approach is a better prediction technique for this data. Our approach reduces computation time and enhances the practical applications of the SVR technique.

99 GENERAL AND MISCELLANEOUS↗

National Modeling of Geothermal District Energy Systems with Ambient-Temperature Loops Using dGeo: Preprint

Geothermal district energy systems (DES) with ambient-temperature loops, also known as thermal energy networks, are one option for decarbonizing space heating and cooling loads. Geothermal fifth-generation DES include an "ambient" temperature thermal loop that connects heat pumps at each building with thermal balancing sources such as geothermal borehole fields. Heating and cooling are provided via a water-source heat pump at each end-user. This project seeks to analyze the nationwide potential for ambient-temperature loop districts by creating a new module within the Distributed Geothermal Market Demand Model (dGeo). dGeo is an agent-based modeling tool for distributed geothermal resources; it can investigate potential on a nationwide or statewide scale using geospatial data for all 50 states and thermal demands for existing buildings. This process allows for high-level estimates of technical and economic potential for ambient-temperature loop districts across the United States. Using GHEDesigner, a lookup table was created to size borehole fields for different thermal loads and ground conditions experienced across the country. A cost and financing structure, along with incentives, were applied. Cost estimates include costs for the distribution network, borehole field installation and operation, and circulation pump operation, while savings are calculated based on agent energy bills. This newly developed module can be used for assessing which areas of the country have the highest potential for agent benefits from ambient-temperature loop installation and assess the impact of different costing and pricing future scenarios. While the code is still under development and nationwide simulations are ongoing, initial results for two states are provided. Future work includes expanding the module to consider mixed residential and commercial districts and considering multiple costing scenarios.

ambient temperature loop↗

National Modeling of Geothermal District Energy Systems with Ambient-Temperature Loops Using dGeo

Geothermal district energy systems (DES) with ambient-temperature loops, also known as thermal energy networks, are one option for decarbonizing space heating and cooling loads. Geothermal fifth-generation DES include an "ambient" temperature thermal loop that connects heat pumps at each building with thermal balancing sources such as geothermal borehole fields. Heating and cooling are provided via a water-source heat pump at each end-user. This project seeks to analyze the nationwide potential for ambient-temperature loop districts by creating a new module within the Distributed Geothermal Market Demand Model (dGeo). dGeo is an agent-based modeling tool for distributed geothermal resources; it can investigate potential on a nationwide or statewide scale using geospatial data for all 50 states and thermal demands for existing buildings. This process allows for high-level estimates of technical and economic potential for ambient-temperature loop districts across the United States. A lookup table was created using GHEDesigner to size borehole fields for different thermal loads and ground conditions experienced across the country. A cost and financing structure, along with incentives, were applied. Cost estimates include costs for the distribution network, borehole field installation and operation, and circulation pump operation, while savings are calculated based on energy bills for building owners (agents). This newly developed module can be used for assessing which areas of the country have the highest potential for agent benefits from ambient-temperature loop installation and assess the impact of future cost and price scenarios. Initial results for statewide analysis (for Vermont) and nationwide (for United States) are provided. Future work includes expanding the module to consider mixed residential and commercial districts as well as evaluating multiple cost scenarios.

ambient-temperature loop↗

Fuel Fabrication Facility Study for FCF HALEU

Nuclear energy technology developers seek to bring to market new advanced reactor designs and new light water reactor fuel designs, many of which would deploy fuel made from uranium with 235 U enrichment ranging from 5% to 19.75%. There is currently no commercial supply of uranium in this enrichment range, which is higher than used in today’s light water reactors but still lower than the safeguards limit of 20% 235 U. This limitation is a barrier to development of demonstration of these new nuclear energy technologies. As a means to address this near-term need, DOE and Idaho National Laboratory (INL) has considered how the HALEU product from sodium-bonded spent fuel treatment in the INL Fuel Conditioning Facility (FCF), located at the Materials and Fuels Complex (MFC), might be provided and fabricated into some of the new fuel designs. The evaluation presented in this report addresses the potential establishment of two types of fuel fabrication capability at INL, represented generically as a ceramic-type (or pellet-type) fuel fabrication line and a metallic fuel fabrication line. Because the FCF HALEU feedstock contains residual transuranic contamination and a relatively small amount of residual fission products, fabrication with that material is necessarily performed inside of engineered confinement barriers, such as gloveboxes, which would be filled with inert gas for most of the fuel types considered. The throughput rate of the fabrication lines envisioned is 2.5 metric tons of HALEU fuel per year, which is judged to be sufficiently representative of engineering-scale. Space in three existing buildings was identified for consideration in this study of pre-conceptual equipment layouts. The scope and nature of the work needed to prepare each of the three buildings for each type of fuel fabrication was identified (though not in engineering detail), and three-dimensional models of envisioned fabrication equipment were laid out in each of the buildings to assess adequacy of space. The study concluded that either type of fuel fabrication line can feasibly be installed and operated in either of the three buildings. However, each of the three buildings presents different challenges in preparation, due to accommodating current missions that would need to be relocated or necessary decontamination and decommissioning work to free-up space for fuel fabrication, or due to complications of accessibility. Rough order-of-magnitude (ROM) cost estimates for preparing buildings begin at $10M ( 20%/+50%) and would increase with increased complexity of building modifications. The cost of fabrication equipment and gloveboxes is roughly estimated to be $21M (-20%/+50%) for a metallic fuel fabrication line and $27M (-20%/+50%) for a ceramic/intermetallic fuel fabrication line. Nominal operating costs are estimated to be $7M per year (in 2019 dollars), increasing from lower amounts needed as the operating crew is being assembled and trained.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Benchmarking NPP Decommissioning Costs - Outcomes of the OECD Nuclear Energy Agency Activity - 19117

This paper describes work at the OECD Nuclear Energy Agency (NEA) on benchmarking in the context of nuclear power plant decommissioning costs. The NEA's Decommissioning Cost Estimation Group (DCEG) benchmarking activity was conducted during 2017-2018, and the report is scheduled for publication by NEA during the first half of 2019. The DCEG's activity focuses on identifying possible benchmarking approaches and discussing their specific application to decommissioning costing, including the 'added value' in developing decommissioning cost benchmarking approaches. It includes consideration of prevailing barriers to the sharing of information and data required for decommissioning cost benchmarking, and explores a range of possible initiatives intended to facilitate implementation of benchmarking approaches in nuclear decommissioning costing (i.e. a possible 'road map' for implementation). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost-Benefit Analysis for the Advanced Near Net Shape Technology (ANNST) Method for Fabricating Stiffened Cylinders

Low Technology Readiness Levels (TRLs) and high levels of uncertainty make it challenging to develop cost estimates of new technologies in the R&D phase. It is however essential for NASA to understand the costs and benefits associated with novel concepts, in order to prioritize research investments and evaluate the potential for technology transfer and commercialization. This paper proposes a framework to perform a cost-benefit analysis of a technology in the R&D phase. This framework was developed and used to assess the Advanced Near Net Shape Technology (ANNST) manufacturing process for fabricating integrally stiffened cylinders. The ANNST method was compared with the conventional multi-piece metallic construction and composite processes for fabricating integrally stiffened cylinders. Following the definition of a case study for a cryogenic tank cylinder of specified geometry, data was gathered through interviews with Subject Matter Experts (SMEs), with particular focus placed on production costs and process complexity. This data served as the basis to produce process flowcharts and timelines, mass estimates, and rough order-of-magnitude cost and schedule estimates. The scalability of the results was subsequently investigated to understand the variability of the results based on tank size. Lastly, once costs and benefits were identified, the Analytic Hierarchy Process (AHP) was used to assess the relative value of these achieved benefits for potential stakeholders. These preliminary, rough order-of-magnitude results predict a 46 to 58 percent reduction in production costs and a 7-percent reduction in weight over the conventional metallic manufacturing technique used in this study for comparison. Compared to the composite manufacturing technique, these results predict cost savings of 35 to 58 percent; however, the ANNST concept was heavier. In this study, the predicted return on investment of equipment required for the ANNST method was ten cryogenic tank barrels when compared with conventional metallic manufacturing. The AHP study results revealed that decreased final cylinder mass and improved quality assurance were the most valued benefits of cylinder manufacturing methods, therefore emphasizing the relevance of the benefits achieved with the ANNST process for future projects.

Ivanco, Marie L.↗

SLUDGE TREATMENT PROJECT COST COMPARISON BETWEEN HYDRAULIC LOADING AND SMALL CANISTER LOADING CONCEPTS

The Sludge Treatment Project (STP) is considering two different concepts for the retrieval, loading, transport and interim storage of the K Basin sludge. The two design concepts under consideration are: (1) Hydraulic Loading Concept - In the hydraulic loading concept, the sludge is retrieved from the Engineered Containers directly into the Sludge Transport and Storage Container (STSC) while located in the STS cask in the modified KW Basin Annex. The sludge is loaded via a series of transfer, settle, decant, and filtration return steps until the STSC sludge transportation limits are met. The STSC is then transported to T Plant and placed in storage arrays in the T Plant canyon cells for interim storage. (2) Small Canister Concept - In the small canister concept, the sludge is transferred from the Engineered Containers (ECs) into a settling vessel. After settling and decanting, the sludge is loaded underwater into small canisters. The small canisters are then transferred to the existing Fuel Transport System (FTS) where they are loaded underwater into the FTS Shielded Transfer Cask (STC). The STC is raised from the basin and placed into the Cask Transfer Overpack (CTO), loaded onto the trailer in the KW Basin Annex for transport to T Plant. At T Plant, the CTO is removed from the transport trailer and placed on the canyon deck. The CTO and STC are opened and the small canisters are removed using the canyon crane and placed into an STSC. The STSC is closed, and placed in storage arrays in the T Plant canyon cells for interim storage. The purpose of the cost estimate is to provide a comparison of the two concepts described.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Systems design study of the Pioneer Venus spacecraft. Appendices to volume 1, sections 8-11 (part 3 of 3)

Power subsystem cost/weight tradeoffs are discussed for the Venus probe spacecraft. The cost estimations of power subsystem units were based upon DSCS-2, DSP, and Pioneer 10 and 11 hardware design and development and manufacturing experience. Parts count and degree of modification of existing hardware were factored into the estimate of manufacturing and design and development costs. Cost data includes sufficient quantities of units to equip probe bus and orbiter versions. It was based on the orbiter complement of equipment, but the savings in fewer slices for the probe bus balance the cost of the different probe bus battery. The preferred systems for the Thor/Delta and for the Atlas/Centaur are discussed. The weights of the candidate designs were based upon slice or tray weights for functionally equivalent circuitry measured on existing hardware such as Pioneers 10 and 11, Intelsat 3, DSCS-2, or DSP programs. Battery weights were based on measured cell weight data adjusted for case weight or off-the-shelf battery weights. The solar array weight estimate was based upon recent hardware experience on DSCS-2 and DSP arrays.

Source record↗

Magnetohydrodynamics MHD Engineering Test Facility ETF 200 MWe power plant. Conceptual Design Engineering Report CDER. Volume 3: Costs and schedules

The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.

Source record↗

Analysis of Hanford-based Options for Sustainable DOE Facilities on the West Coast

Large-scale conventional energy projects result in lower costs of energy (COE). This is true for most renewable energy projects as well. The Office of Science is interested in its facilities meeting the renewable energy mandates set by Congress and the Administration. Those facilities on the west coast include a cluster in the Bay Area of California and at Hanford in central Washington State. Land constraints at the California facilities do not permit large scale projects. The Hanford Reservation has land and solar insolation available for a large scale solar project as well as access to a regional transmission system that can provide power to facilities in California. The premise of this study is that a large-scale solar project at Hanford may be able to provide renewable energy sufficient to meet the needs of select Office of Science facilities on the west coast at a COE that is competitive with costs in California despite the lower solar insolation values at Hanford. The study concludes that although the cost of solar projects continues to decline, estimated costs for a large-scale project at Hanford are still not competitive with avoided power costs for Office of Science facilities on the west coast. Further, although it is possible to transmit power from a solar project at Hanford to California facilities, the costs of doing so add additional costs. Consequently, development of a large- scale solar project at Hanford to meet the renewable goals of Office of Science facilities on the west coast is currently uneconomic. This may change as solar costs decrease and California-based facilities face increasing costs for conventional and renewable energy produced in the state. PNNL should monitor those cost trends.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

HVAC Design Strategy for a Hot-Humid Production Builder, Houston, Texas (Fact Sheet)

BSC worked directly with the David Weekley Homes - Houston division to redesign three floor plans in order to locate the HVAC system in conditioned space. The purpose of this project is to develop a cost effective design for moving the HVAC system into conditioned space. In addition, BSC conducted energy analysis to calculate the most economical strategy for increasing the energy performance of future production houses. This is in preparation for the upcoming code changes in 2015. The builder wishes to develop an upgrade package that will allow for a seamless transition to the new code mandate. The following research questions were addressed by this research project: 1. What is the most cost effective, best performing and most easily replicable method of locating ducts inside conditioned space for a hot-humid production home builder that constructs one and two story single family detached residences? 2. What is a cost effective and practical method of achieving 50% source energy savings vs. the 2006 International Energy Conservation Code for a hot-humid production builder? 3. How accurate are the pre-construction whole house cost estimates compared to confirmed post construction actual cost? BSC and the builder developed a duct design strategy that employs a system of dropped ceilings and attic coffers for moving the ductwork from the vented attic to conditioned space. The furnace has been moved to either a mechanical closet in the conditioned living space or a coffered space in the attic.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗