Search NASA⌕ Search

SEARCH · Search NASA

Results for “DISPATCH”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Development of a Control Platform for a Building-Scale Hybrid Solar PV-Natural Gas Microgrid

Building-scale microgrids are a type of behind-the-meter microgrids where the building operator has control of the distributed energy resources, including, in this case, a natural gas-fired microturbine in addition to solar PV and battery energy storage systems. There is a growing trend in deploying behind-the-meter microgrids due to their benefits including the resiliency of serving critical loads, especially in regions with abundant natural gas. In order to ensure distributed energy resources are dispatched optimally for the desired mode of operation, a hierarchical control platform including a centralized controller was developed and installed. The platform includes communication and control infrastructure that interface with controllers for distributed energy resources and the building automation system of a recently built energy efficient commercial building. Based on desirable outcomes under different grid and building conditions, operational modes were defined for the microgrid controller. The controller is programmed to map each mode to respective operational modes for distributed energy resources controllers. Experimental data for test runs corresponding to two operational modes confirm the communication and control infrastructure can execute hierarchical control commands. Finally, dispatch optimization for a year-long simulation of system operation is presented and the benefits of the hybrid solar PV-natural gas setup are evaluated.

Energy & Fuels↗

AI-Based Faster-Than-Real-Time Stability Assessment of Large Power Systems with Applications on WECC System

Achieving clean energy goals will require significant advances in regard to addressing the computational needs for next-generation renewable-dominated power grids. One critical obstacle that lies in the way of transitioning today’s power grid to a renewable-dominated power grid is the lack of a faster-than-real-time stability assessment technology for operating a fast-changing power grid. This paper proposes an artificial intelligence (AI) -based method that predicts the system’s stability margin information (e.g., the frequency nadir in the frequency stability assessment and the critical clearing time (CCT) value in the transient stability assessment) directly from the system operating conditions without performing the conventional time-consuming time-domain simulations over detailed dynamic models. Since the AI method shifts the majority of the computational burden to offline training, the online evaluation is extremely fast. This paper has tested the AI-based stability assessment method using multiple dispatch cases that are converted and tuned from actual dispatch cases of the Western Electricity Coordinating Council (WECC) system model with more than 20,000 buses. The results show that the AI-based method could accurately predict the stability margin of such a large power system in less than 0.2 milliseconds using the offline-trained AI agent. Therefore, the proposed method has great potential to achieve faster-than-real-time stability assessment for practical large power systems while preserving sufficient accuracy.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeling and Optimization of a Nuclear Integrated Energy System for the Remote Microgrid on El Hierro

Nuclear microreactors are a potential technology to provide heat and electricity for remote microgrids. There is potential for the microgrid on the island of El Hierro to use a microreactor, within an integrated energy system (IES), to generate electricity and provide desalinated water. This work proposes a workflow for optimizing and analyzing IESs for microgrids. In this study, an IES incorporating a microreactor, thermal energy storage (TES) system, combined heat and power plant, and a thermal desalination plant was designed, optimized, and analyzed using Idaho National Laboratory’s Framework for Optimization of Resources and Economics (FORCE) toolset. The optimization tool, Holistic Energy Resource Optimization Network (HERON), was used to determine the optimal capacity sizes and dispatch for the reactor and thermal energy storage systems to meet demand. The optimized reactor and TES sizes were found to be 11.61 MWth and 58.47 MWhth, respectively, when optimizing the IES to replace 95% of the island’s existing diesel generation needs. A dynamic model of the system was created in the Modelica language, using models from the HYBRID repository, to analyze and verify the dispatch from the optimizer. The dynamic model was able to meet the ramp rates while maintaining reactor power with minimal control adjustments.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Informed Feature Selection for Data Clustering of CSP Plant Production

To make concentrating solar power (CSP) more cost competitive, rigourous optimizations must be run to improve plant design and operations. However, these optimizaitons rely on time consuming annual simulations that solve an electricity dispatch scheduling problem to maximize plant revenue. To reduce the runtime of annual dispatch simulations of CSP plants, a data clustering approach is utilized. This approach assumes that like days of revenue and electricity generation can be identified using weather and price data. Although weather and price are important factors for electricity production, this work investigates how thermal energy storage (TES) inventory at the beginning of a day, denoted as Si, can be used as a supplemental feature to group like days. A framework for creating and training a deep neural network to predict Si is proposed. This model is validated and assessed using eleven sets of testing data that were not used during training. Then, the data clustering approach is performed three seperate times with features of weather and price along with either Si from the neural network, Si from the full annual simulation, or no Si. Ultimately, the results suggest that using Si as an additional clustering feature improves the data clustering simulation accuracy by 1.4%.

Tuman, Matthew J. (ORCID:000900038772051X)↗

Deep-Learning-Based Multi-Timescale Load Forecasting in Buildings: Opportunities and Challenges from Research to Deployment

Electricity load forecasting for buildings and campuses is becoming increasingly important as the penetration of distributed energy resources (DERs) grows. Efficient operation and dispatch of DERs require reasonably accurate predictions of future energy consumption in order to conduct near-real-time optimized dispatch of on-site generation and storage assets. Electric utilities have traditionally performed load forecasting for load pockets spanning large geographic areas, and therefore, forecasting has not been a common practice by buildings and campus operators. Given the growing trends of research and prototyping in the grid-interactive efficient buildings domain, characteristics beyond simple algorithm forecast accuracy are important in determining the algorithm's true utility for smart buildings. Other characteristics include the overall design of the deployed architecture and the operational efficiency of the forecasting system. In this work, we present a deep-learning-based load forecasting system that predicts the building load at 1-hour intervals for 18 hours in the future. We also discuss challenges associated with the real-time deployment of such systems as well as the research opportunities presented by a fully functional forecasting system that has been developed within the National Renewable Energy Laboratory's Intelligent Campus program.

building load forecasting↗

EXERGETIC: De-Risking Next-Generation Resilient Geothermal Hybrids via At-Scale Evaluation Using Virtual Emulation Digital Twin Environment for Efficient Operation

The DOE-GTO-funded project, award number 5.1.2.12, entitled "EXERGETIC - De-risking Next Generation Resilient Geothermal Hybrids via at-Scale Evaluation Using a Virtual Emulation Digital Twin Environment for Efficient Operation," advances the solution to these challenges by developing and validating a geothermal co-emulation environment implemented at the National Laboratory of the Rockies (NLR)'s Advanced Research on Integrated Energy Systems (ARIES) platform. This framework enables the de-risking of next-generation geothermal and geothermal hybrid systems through high-fidelity modeling, real-time digital emulation, advanced control strategies, and techno-economic assessment. The project focused on geothermal hybrid configurations that integrate geothermal power plants with concentrated solar power and underground thermal energy storage, enabling enhanced efficiency, flexibility, and grid support capabilities. The main goal of this project was the development of a geothermal digital co-emulation environment to demonstrate the technical and economic value of geothermal hybrid systems and their contribution to grid stability and flexibility. The EXERGETIC framework combined physics-based models, controls, and real assets at ARIES, including digital real-time simulators (DRTS), a 20-MW-scale controllable grid interface (CGI), and a 2-MW conventional generator. Detailed transient models were developed for the key subsystems of a hybrid geothermal plant, including parabolic trough solar collectors, reservoir thermal energy storage (RTES), and a binary Organic Rankine Cycle (ORC) power plant. The ORC model explicitly captured thermal inertia and off-design operation and integrated control strategies to dynamically respond to electric load profiles. The models were validated against published experimental and numerical studies, demonstrating strong agreement and confirming the accuracy and robustness of the modeling approach. The resulting digital twin represents geothermal-solar-storage systems at multiple scales (1 MW to 100 MW) and enables realistic emulation of grid-connected operation. The control architecture allows the geothermal resource to provide stable baseload generation, while solar and stored thermal energy supply flexible, dispatchable support during periods of high demand or variable grid conditions. A key contribution of the EXERGETIC project is the demonstration that geothermal hybrid systems can be designed to be active grid assets rather than passive baseload generators. Using the ARIES platform, the digital twin was evaluated under multiple grid scenarios, including load following, voltage support at the distribution level, and frequency response at the transmission level. Results show that hybrid geothermal systems can respond effectively to dynamic grid conditions, providing inertia-like behavior, primary frequency support, and voltage regulation through coordinated control. In addition to the performance and grid services capability analysis of geothermal and hybrid geothermal systems, the EXERGETIC project also focused on scalability and techno-economic analysis of geothermal hybrid plants. In particular, for the scalability analysis, machine-learning (ML)-based surrogate models were trained using data generated from the geothermal digital twin under different grid-connected scenarios and plant capacities. These ML models demonstrated strong interpolation and extrapolation capabilities across plant sizes, accurately reproducing both steady-state and transient responses with very low errors. Regarding the techno-economic analysis, plant performance results were integrated with cost models for hybrid geothermal systems, and the levelized cost of electricity (LCOE) was used as the main economic metric to evaluate system performance across a range of system capacities, solar shares, solar multiples, and storage durations. Results indicate that economies of scale significantly reduce geothermal LCOE as plant capacity increases, with large-scale systems (25-100 MW) achieving substantially lower costs than small plants. Hybridization with solar thermal energy and storage further improves economic performance by increasing capacity utilization and enabling flexible dispatch. In addition, thermal storage plays a critical role in reducing LCOE by maximizing geothermal, solar, and stored energy resources. In summary, the results from this project demonstrate that geothermal hybrid systems represent a promising alternative for increasing the energy conversion efficiency of geothermal technologies, contributing to the preservation of geothermal resources, and supporting the transition of geothermal plants from traditional baseload resources into flexible, resilient, and cost-competitive energy conversion technologies.

15 GEOTHERMAL ENERGY↗

A maintenance model for k-out-of-n subsystems aboard a fleet of advanced commercial aircraft

Proposed highly reliable fault-tolerant reconfigurable digital control systems for a future generation of commercial aircraft consist of several k-out-of-n subsystems. Each of these flight-critical subsystems will consist of n identical components, k of which must be functioning properly in order for the aircraft to be dispatched. Failed components are recoverable; they are repaired in a shop. Spares are inventoried at a main base where they may be substituted for failed components on planes during layovers. Penalties are assessed when failure of a k-out-of-n subsystem causes a dispatch cancellation or delay. A maintenance model for a fleet of aircraft with such control systems is presented. The goals are to demonstrate economic feasibility and to optimize.

Miller, D. R.↗

Performance and economy of a fault-tolerant multiprocessor

The FTMP (Fault-Tolerant Multiprocessor) is one of two central aircraft fault-tolerant architectures now in the prototype phase under NASA sponsorship. The intended application of the computer includes such critical real-time tasks as 'fly-by-wire' active control and completely automatic Category III landings of commercial aircraft. The FTMP architecture is briefly described and it is shown that it is a viable solution to the multi-faceted problems of safety, speed, and cost. Three job dispatch strategies are described, and their results with respect to job-starting delay are presented. The first strategy is a simple First-Come-First-Serve (FCFS) job dispatch executive. The other two schedulers are an adaptive FCFS and an interrupt driven scheduler. Three failure modes are discussed, and the FTMP survival probability in the face of random hard failures is evaluated. It is noted that the hourly cost of operating two FTMPs in a transport aircraft can be as little as one-to-two percent of the total flight-hour cost of the aircraft.

Lala, J. H.↗

Uncertainty in estimates of the number of extraterrestrial civilizations

Estimation of the number N of communicative civilizations by means of Drake's formula involves the combination of several quantities, each of which is to some extent uncertain. The uncertainty in any quantity may be represented by a probability distribution function, even if that quantity is itself a probability. The uncertainty of current estimates of N is derived principally from uncertainty in estimates of the lifetime of advanced civilizations. It is argued that this is due primarily to uncertainty concerning the existence of a "Galactic Federation" which is in turn contingent upon uncertainty about whether the limitations of present-day physics are absolute or (in the event that there exists a yet-undiscovered "hyperphysics") transient . It is further argued that it is advantageous to consider explicitly these underlying assumptions in order to compare the probable numbers of civilizations operating radio beacons, permitting radio leakage, dispatching probes for radio surveillance or dispatching vehicles for manned surveillance.

Peter A Sturrock↗

Monitoring and control requirement definition study for Dispersed Storage and Generation (DSG). Volume 2, appendix A: Selected DSG technologies and their general control requirements

A consistent approach was sought for both hardware and software which will handle the monitoring and control necessary to integrate a number of different DSG technologies into a common distribution dispatch network. It appears that the control of each of the DSG technologies is compatible with a supervisory control method of operation that lends itself to remote control from a distribution dispatch center.

Source record↗

Large spaceborne antenna technology: A system perspective

Land Mobile Satellite System (LMSS) is a communication system which provides radio communication to a large group of users within a vast geographical area (e.g. communications to and from mobile vehicles anywhere within the U.S.). Such radio communication may be in the form of radio telephone, paging, dispatch, or data transmission. The intended applications of LMSS range from emergency medical to disaster relief, from law enforcement to truck dispatch. By providing service to vast rural areas, LMSS compliments the current terrestrial service in the metropolitan areas and hence provides for a nationally ubiquitous coverage.

Naderi, F.↗

Fault-tolerant software for the FIMP

The work reported here provides protection against software failures in the task dispatcher of the FTMP, a particularly critical portion of the system software. Faults in other system modules and application programs can be handled by similar techniques but are not covered in this effort. Goals of the work reported here are: (1) to develop provisions in the software design that will detect and mitigate software failures in the dispatcher portion of the FTMP Executive and, (2) to propose the implementation of specific software reliability measures in other parts of the system. Beyond the specific support to the FTMP project, the work reported here represents a considerable advance in the practical application of the recovery block methodology for fault tolerant software design.

Hecht, H.↗

Fault-free performance validation of fault-tolerant multiprocessors

A validation methodology for testing the performance of fault-tolerant computer systems was developed and applied to the Fault-Tolerant Multiprocessor (FTMP) at NASA-Langley's AIRLAB facility. This methodology was claimed to be general enough to apply to any ultrareliable computer system. The goal of this research was to extend the validation methodology and to demonstrate the robustness of the validation methodology by its more extensive application to NASA's Fault-Tolerant Multiprocessor System (FTMP) and to the Software Implemented Fault-Tolerance (SIFT) Computer System. Furthermore, the performance of these two multiprocessors was compared by conducting similar experiments. An analysis of the results shows high level language instruction execution times for both SIFT and FTMP were consistent and predictable, with SIFT having greater throughput. At the operating system level, FTMP consumes 60% of the throughput for its real-time dispatcher and 5% on fault-handling tasks. In contrast, SIFT consumes 16% of its throughput for the dispatcher, but consumes 66% in fault-handling software overhead.

Czeck, Edward W.↗

Automated power management and control

A comprehensive automation design is being developed for Space Station Freedom's electric power system. A joint effort between NASA's Office of Aeronautics and Exploration Technology and NASA's Office of Space Station Freedom, it strives to increase station productivity by applying expert systems and conventional algorithms to automate power system operation. The initial station operation will use ground-based dispatches to perform the necessary command and control tasks. These tasks constitute planning and decision-making activities that strive to eliminate unplanned outages. We perceive an opportunity to help these dispatchers make fast and consistent on-line decisions by automating three key tasks: failure detection and diagnosis, resource scheduling, and security analysis. Expert systems will be used for the diagnostics and for the security analysis; conventional algorithms will be used for the resource scheduling.

Dolce, James L.↗

MSAT broadcast voice services

Later this year the MSAT satellite network will be delivering mobile and remote communications throughout North America. Its services include a family of Broadcast Voice Services, the first of which will be MSAT Dispatch Radio, which will extend the features and functionality of terrestrial Specialized Mobile Radio (SMR) to the entire continent. This paper describes the MSAT Broadcast Voice Services in general, and MSAT Dispatch Radio in particular, and provides examples of commercial and government applications.

Jones, John W.↗

Windshear Prediction

Windshear microbursts and extreme air turbulence caused by sudden intense changes in wind direction or speed are difficult to detect and thus dangerous to air traffic. They have been positively identified as the cause of 28 aviation accidents that claimed 491 lives. Many groups are investigating ways to detect and predict windshear. The Federal Aviation Consulting Services, Ltd. (FACS) is applying artificial intelligence to windshear prediction. FACS' artificial intelligence based airline dispatcher program is intended as a backup not a replacement for human dispatcher. It would incorporate the same data that a human would request to make a decision and then draw a conclusion using the same rules of logic as the human expert.

Source record↗

Electric Power Monitor

Control center for SAMAC (System Automatic Monitor and Control) is a sophisticated dispatch computer system, developed by Rockwell International and operated by Philadelphia Electric Co. SAMAC monitors and controls the generation and distribution of electric power throughout the Philadelphia electric network. With the assistance of NASA's Apollo computer system technology, it enables human operators to isolate and correct power distribution problems more rapidly than was possible with earlier dispatch systems without centralized computer control.

Source record↗

Operating The Central Process Systems At Glenn Research Center

As a research facility, the Glenn Research Center (GRC) trusts and expects all the systems, controlling their facilities to run properly and efficiently in order for their research and operations to occur proficiently and on time. While there are many systems necessary for the operations at GRC, one of those most vital systems is the Central Process Systems (CPS). The CPS controls operations used by GRC's wind tunnels, propulsion systems lab, engine components research lab, and compressor, turbine and combustor test cells. Used widely throughout the lab, it operates equipment such as exhausters, chillers, cooling towers, compressors, dehydrators, and other such equipment. Through parameters such as pressure, temperature, speed, flow, etc., it performs its primary operations on the major systems of Electrical Dispatch (ED), Central Air Dispatch (CAD), Central Air Equipment Building (CAEB), and Engine Research Building (ERB). In order for the CPS to continue its operations at Glenn, a new contract must be awarded. Consequently, one of my primary responsibilities was assisting the Source Evaluation Board (SEB) with the process of awarding the recertification contract of the CPS. The job of the SEB was to evaluate the proposals of the contract bidders and then to present their findings to the Source Selecting Official (SSO). Before the evaluations began, the Center Director established the level of the competition. For this contract, the competition was limited to those companies classified as a small, disadvantaged business. After an industry briefing that explained to qualified companies the CPS and type of work required, each of the interested companies then submitted proposals addressing three components: Mission Suitability, Cost, and Past Performance. These proposals were based off the Statement of Work (SOW) written by the SEB. After companies submitted their proposals, the SEB reviewed all three components and then presented their results to the SSO. While the SEB does not select the company receiving the contract, they can make recommendations based on their findings to the SSO, who actually awards the contract. The SEB began work for this contract in July 2003 by writing the SOW and the selection will tentatively occur July 30, 2004. Contract awarding will take place Aug. 15. Following the awarding, the winning company has a 30-day Phase-in Period beginning Sept. 1,2004 and full performance will begin October 1.

Weiler, Carly P.↗