Search NASA⌕ Search

SEARCH · Search NASA

Results for “FISH”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

637 records · Page 36

Broadband multiwavelength properties of the archetypal blazar 3C 279 during the 2017 Event Horizon Telescope campaign

The archetypal blazar 3C 279 hosts a prominent relativistic jet and exhibits strong broadband variability across the electromagnetic spectrum. In April 2017, the Event Horizon Telescope (EHT) observed 3C 279, alongside one of the most extensive quasi-simultaneous multiwavelength (MWL) campaigns ever conducted. With the aim of investigating the physical processes governing 3C 279, we analyzed individual observations and multiband light curves, and constructed a new quasi-simultaneous MWL spectrum. We also performed phenomenological modeling using the turbulent extreme multi-zone (TEMZ) model to constrain the fundamental physical properties of the source. The EHT observations reveal a clear flux increase in the innermost core between April 5 and 11, 2017. Over a broader timescale, radio measurements at longer wavelengths show concurrent enhancements in core flux and polarization around mid-April, coinciding with the ejection of a superluminal knot. Record UV-optical flares with strong polarization variability occurred in late March, followed by gamma-ray activity that declined before the end of the EHT observing period. During this interval, the source remained in a low X-ray state and showed no detectable VHE emission. The TEMZ modeling suggests that the broadband spectrum and variability of 3C 279 can be explained within a jet scenario in which turbulent plasma cells are compressed by a stationary conical shock. However, alternative interpretations, such as magnetic reconnection or a moving shock-in-jet event, remain plausible. This coordinated MWL campaign advances our understanding of the origin of jet and gamma-ray emission in 3C 279, while also providing a comprehensive publicly available dataset that will serve as a valuable reference for future studies.

Principe, G. [Trieste U.; INFN, Trieste; Bologna, ↗

SPC-2772 Rev 2 General Build to Print Fabrication Specification for Nuclear Use Items

This specification is for use with Safety Significant structures, systems, and components. The scope is for build to print fabrication including, but not limited to, machining, forming, welding, cutting, assembling, etc. Specific scope and associated requirements will be identified in drawings and/or additional procurement documents. ASME B31 fabrication is not included in the scope of this specification. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70486 Rev 0 Stirling Engine Prototype Performance Specification

Idaho National Laboratory (INL) is developing a small microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. The purpose of this performance specification is to define requirements to build and test the Stirling Engine prototype, including interfacing with Kinnetech in the development/test of the engines. This specification includes prototyping components only and are not for use in the reactor. Prototype testing is a preliminary test to be conducted with conceptual equipment from which a final design will be developed. The results of the testing defined herein will not be used as a qualification test. The Stirling Engines have an engine controller module (QEC). Currently, the QEC doesn’t have a means to stop the engine. An analog controlled engine braking system must be developed and tested with the engine prototype. Any conflict between this specification and any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70525 Rev 2 Beryllium Metal Procurement Specification

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. Key to this design are neutron reflector components constructed of Beryllium Metal (S-65) which is a structural grade of hot-pressed beryllium block. MARVEL will be located at the Transient Reactor Test (TREAT) facility. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70804 Rev 1 Zircar ZAL-45 Alumina Standoff Plates for Use in MARVEL

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the MARVEL ZAL-45 standoff plates manufactured by Zircar. The design requires eight (8) ceramic standoff plates; however, the requested quantity shall be twelve to account for required testing after receipt of materials. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70843 Rev 0 MARVEL Control Drum Actuator Fabrication Specification

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of components that make up the control drum (CD) actuators. This specification outlines the requirements for fabrication, acknowledging that specific elements will integrate into final assemblies, while others will be delivered as standalone components. The Subcontractor is not responsible for the CD actuator’s final assembly. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-71123 Rev 1 MARVEL Control Drum Actuator Torsional Spring

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This specification defines the requirements for the procurement and factory acceptance testing of the MARVEL control drum actuator torsional spring. The purpose of this specification is to define the requirements to procure the MARVEL control drum actuator torsional spring component and witness a torsional spring rate Factory Acceptance Test (FAT) at the subcontractor’s facility with the contractor present. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗