Search NASA⌕ Search

SEARCH · Search NASA

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Integrated Building Energy Systems Design Considering Storage Technologies

The addition of storage technologies such as flow batteries, conventional batteries, and heat storage can improve the economic, as well as environmental attraction of micro-generation systems (e.g., PV or fuel cells with or without CHP) and contribute to enhanced demand response. The interactions among PV, solar thermal, and storage systems can be complex, depending on the tariff structure, load profile, etc. In order to examine the impact of storage technologies on demand response and CO2 emissions, a microgrid's distributed energy resources (DER) adoption problem is formulated as a mixed-integer linear program that can pursue two strategies as its objective function. These two strategies are minimization of its annual energy costs or of its CO2 emissions. The problem is solved for a given test year at representative customer sites, e.g., nursing homes, to obtain not only the optimal investment portfolio, but also the optimal hourly operating schedules for the selected technologies. This paper focuses on analysis of storage technologies in micro-generation optimization on a building level, with example applications in New York State and California. It shows results from a two-year research projectperformed for the U.S. Department of Energy and ongoing work. Contrary to established expectations, our results indicate that PV and electric storage adoption compete rather than supplement each other considering the tariff structure and costs of electricity supply. The work shows that high electricity tariffs during on-peak hours are a significant driver for the adoption of electric storage technologies. To satisfy the site's objective of minimizing energy costs, the batteries have to be charged by grid power during off-peak hours instead of PV during on-peak hours. In contrast, we also show a CO2 minimization strategy where the common assumption that batteries can be charged by PV can be fulfilled at extraordinarily high energy costs for the site.

25 ENERGY STORAGE↗

Making Coal Relevant for Small Scale Applications: Modular Gasification for Syngas/Engine CHP Applications in Challenging Environments

This Front-End Engineering Design (FEED) study is funded by the US Department of Energy (DOE), and managed by the National Energy Technology Laboratory (NETL) through a Cooperative Agreement awarded to the University of Alaska Fairbanks (UAF) to perform a technical and cost study for the design and installation of a Hamilton-Maurer International (HMI) gasifier for generating a clean syngas for firing in reciprocating engines. An existing diesel engine generator (DEG) and a commercially available spark ignition engine are used to generate electricity with the low-Btu syngas. Other than the HMI gasifier, only commercially available technologies were assumed for this study. An important objective of this design study was to estimate capital and operating costs of small modular coal and coal/biomass fired generating units to provide wind regulation services. Although this study is based on retrofitting an existing coal fired power plant with the HMI gasifier, sufficient data was developed to characterize greenfield units. The original concept was to provide clean syngas and tars/oils from the gasification process to the existing Colt-Pielstick PC2.6B diesel engine generator (9.6 MWe) installed at the UAF Atkinson Power Plant. The intent was to convert the diesel engine to operate in a dual fuel mode, firing both syngas and tars/oils. As the project progressed, Fairbanks Morse Engine (FME), current licensee for the Colt-Pielstick engine line, was not able to develop a modification package for the engine to allow for syngas firing. Although this type of modification is available for firing natural gas, the capability does not extend to syngas. Western Energy Systems, distributor for Innio Jenbacher, was able to offer the Jenbacher Model JMS620 engine. After review of available options, the project team selected a design configuration using two Jenbacher engines rated at 1965 kWe each to fire the syngas, with the oils/tars directed to the Colt Pielstick diesel to be blended with ultra-low sulfur diesel oil (ULSD). The Jenbacher engines are expected to operate at continuous base load, with some load-following ability, while the existing diesel engine will operate in grid support service, with loads varying from a nominal 25% to 100%. An annual capacity factor for the diesel engine is projected to be between 50% and 60%. The overall gasifier and gas clean-up system is sized to produce enough syngas to adequately fuel three Jenbacher Engines for a nominal power output of 5.9 MWe, but this study assumes that only two Jenbacher engines will be installed due to space constraints in the Atkinson Power Plant, and because of expected air emission permit limitations. There is still potential that the excess syngas capacity equivalent to about 2 MWe could be used as supplemental fuel for the DEG. The exhaust from the Jenbacher engines is passed through heat recovery units to generate low pressure steam, thereby providing a significant portion of the steam required for operating the gasifier. The overall performance of the HMI gasifier/engine configuration is summarized as follows: 1) Overall electric efficiency, Jenbacher and diesel engines, based on gasifier fuel production (syngas and pyrolysis liquids) is 35.2% LHV, 2) Overall cogenerating efficiency (electricity plus steam), based on gasifier fuel production (syngas and pyrolysis liquids) is 54.8% LHV, 3) Overall electric efficiency, Jenbacher and diesel engines, based on coal input, is 29.6% LHV, and 4) Overall cogenerating efficiency, electricity plus steam, based on coal input is 46.0%. This project is estimated to have a Bare Erected Cost (BEC) of $\$$ 33.4 million and a Total Plant Cost (TPC) of $\$$ 45.7 million. Based on the original scope, sending both the clean syngas and the oils and tars to the existing diesel engine, the BEC and TPC values would have been $\$$ 23.3 million and $\$$ 32.1 million, respectively. A variable Cost of Electricity (COE) is calculated to reflect only those costs that will be incurred by incremental operation of the system for the HMI gasifier/Jenbacher engine combination. Operation of the diesel engine is determined separately. The variable COE values are: Case 1: 100% Usibelli Coal: (a) HMI gasifier/Jenbacher Engines -- 8.3 cents/kWh; (b) Diesel Engine -- 20.2 cents/kWh, and Case 2: 80% Usibelli Coal + 20% wood chips (proportion based on Btu input, LHV basis): (a) HMI Gasifier/Jenbacher -- 13.7 cents/kWh; (b) Diesel Engine -- 20.2 cents/kWh. The incremental cost of operating the gasifier/Jenbacher system increases with co-firing of wood chips due to the high cost of this material, over five times as costly as Usibelli coal delivered to the Atkinson Power building. The diesel cost is constant as the oils and tars are priced at the same value as the ULSD for the purposes of fueling the diesel engine. Section 8 of this report provides details of the O&M costs. The overall power system is configured to be modular and scalable to provide a wide range of generating capacity using the same components. This allows for reduction in cost, risk, schedule time to engineer and construct, and provides some degree of repeatability for air permitting.

01 COAL, LIGNITE, AND PEAT↗

A Methodology for Robust Load Reduction in Wind Turbine Blades Using Flow Control Devices

Decades of wind turbine research, development and installation have demonstrated reductions in levelized cost of energy (LCOE) resulting from turbines with larger rotor diameters and increased hub heights. Further reductions in LCOE by up-scaling turbine size can be challenged by practical limitations such as the square-cube law: where the power scales with the square of the blade length and the added mass scales with the volume (the cube). Active blade load control can disrupt this trend, allowing longer blades with less mass. This paper presents the details of the development of a robust load control system to reduce blade fatigue loads. The control system, which we coined sectional lift control or SLC, uses a lift actuator model to emulate an active flow control device. The main contributions of this paper are: (1) Methodology for SLC design to reduce dynamic blade root moments in a neighborhood of the rotor angular frequency (1P). (2) Analysis and numerical evidence supporting the use of a single robust SLC for all wind speeds, without the need for scheduling on wind speed or readily available measurements such as collective pitch or generator angular speed. (3) Intuition and numerical evidence to demonstrate that the SLC and the turbine controller do not interact. (4) Evaluation of the SLC using a full suite of fatigue and turbine performance metrics.

17 WIND ENERGY↗

Compression of high spectral resolution imagery

The Earth Orbiting Satellite (EOS), scheduled for launch in the mid-1990s, will include a next-generation multispectral imaging system (HIRIS) having unprecedented spatial and spectral resolution. Its high resolution, however, comes at the cost of a raw data rate which exceeds the communication channel capacity assigned to the entire EOS mission. This paper explores noisy compression algorithms which may compress multispectral data by up to 30:1 or more. Algorithm performance is measured using both traditional and mission-oriented criteria (e.g., feature classification consistency). It is shown that vector quantization, merged with suitable preprocessing techniques, is the most viable candidate.

Baker, Richard L.↗

Constellation Program Life-cycle Cost Analysis Model (LCAM)

The Constellation Program (CxP) is NASA's effort to replace the Space Shuttle, return humans to the moon, and prepare for a human mission to Mars. The major elements of the Constellation Lunar sortie design reference mission architecture are shown. Unlike the Apollo Program of the 1960's, affordability is a major concern of United States policy makers and NASA management. To measure Constellation affordability, a total ownership cost life-cycle parametric cost estimating capability is required. This capability is being developed by the Constellation Systems Engineering and Integration (SE&I) Directorate, and is called the Lifecycle Cost Analysis Model (LCAM). The requirements for LCAM are based on the need to have a parametric estimating capability in order to do top-level program analysis, evaluate design alternatives, and explore options for future systems. By estimating the total cost of ownership within the context of the planned Constellation budget, LCAM can provide Program and NASA management with the cost data necessary to identify the most affordable alternatives. LCAM is also a key component of the Integrated Program Model (IPM), an SE&I developed capability that combines parametric sizing tools with cost, schedule, and risk models to perform program analysis. LCAM is used in the generation of cost estimates for system level trades and analyses. It draws upon the legacy of previous architecture level cost models, such as the Exploration Systems Mission Directorate (ESMD) Architecture Cost Model (ARCOM) developed for Simulation Based Acquisition (SBA), and ATLAS. LCAM is used to support requirements and design trade studies by calculating changes in cost relative to a baseline option cost. Estimated costs are generally low fidelity to accommodate available input data and available cost estimating relationships (CERs). LCAM is capable of interfacing with the Integrated Program Model to provide the cost estimating capability for that suite of tools.

Prince, Andy↗

Monte Carlo Tree Search Methods for the Earth-Observing Satellite Scheduling Problem

This work explores on-board planning for the single spacecraft, multiple ground station Earth-observing satellite scheduling problem through artificial neural network function approximation of state–action value estimates generated by Monte Carlo tree search (MCTS). An extensive hyperparameter search is conducted for MCTS on the basis of performance, safety, and downlink opportunity utilization to determine the best hyperparameter combination for data generation. A hyperparameter search is also conducted on neural network architectures. The learned behavior of each network is explored, and each network architecture’s robustness to orbits and epochs outside of the training distributions is investigated. Furthermore, each algorithm is compared with a genetic algorithm, which serves to provide a baseline for optimality. MCTS is shown to compute near-optimal solutions in comparison to the genetic algorithm. The state–action value networks are shown to match or exceed the performance of MCTS in six orders of magnitude less execution time, showing promise for execution on board spacecraft.

Adam P. Herrmann↗

System, method, and computer program product for scheduling tasks associated with continuation thread blocks

A system, method, and computer program product for scheduling tasks associated with continuation thread blocks. The method includes the steps of generating a first task metadata data structure in a memory, generating a second task metadata data structure in the memory, executing a first task corresponding to the first task metadata data structure in a processor, generating state information representing a continuation task related to the first task and storing the state information in the second task metadata data structure, executing the continuation task in the processor after the one or more child tasks have finished execution, and indicating that the first task has logically finished execution once the continuation task has finished execution. The second task metadata data structure is related to the first task metadata data structure, and at least one instruction in the first task causes one or more child tasks to be executed by the processor.

Ricketts, Scott↗

Risk Model for EM Decision Support Toolsets

The Government Office of Accountability (GAO) has published several reports identifying the need for the Department of Energy (DOE) Office of Environmental Management (EM) to address mounting costs for DoE's cleanup program. DOEEM could greatly benefit from independent decision tool-sets/models that would allow them to evaluate options and inform business decision at the enterprise level considering site-specific life cycle costs and system plans. Program goals: Develop a tool-set that enables EM to independently evaluate alternatives, assess outcomes from different contracting strategies, and inform critical decisions for the enterprise. Project goals: Adaption of a Risk Model for integration with complimentary tool-sets for project level decision making. Operational Events: Discrete event model that evaluates operational variables (e.g. capacity, throughput, maintenance constraints) and identify bottlenecks. Identifying and Bounding Project Risk: Identify risks that impact confidence in meeting goals (e.g. production). Life cycle Cost: Evaluate impacts of staffing levels, inventory, and capital investments on life cycle costs. Methods and approach: Monte Carlo Analysis is being executed to generate results: Input derives from Risk Register Data; Tied to Projected and Target Schedules; Incorporates float duration within the model. Assumes associated risk mitigation actions being completed within a timeline of five fiscal years. Metrics include: Confidence in Meeting Production Goal; Confidence in Safety Standards; Confidence in Continuous Operation; Other Metrics can be added as appropriate regarding specific site needs. The adapted risk model can be used as a stand alone decision tool or can be integrated complementary tool-sets (i.e. process and cost models) for project-specific decisions. These support tool-sets can then be integrated with others for site- and complex- level evaluations. Future work includes designing an adaptable and modular framework that would allow integration of multiple tool-sets for holistic and/or targeted evaluation of alternative strategies for decision making that could lead to risk and cost reduction across the enterprise.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enabling a New Planning and Scheduling Paradigm

The Flight Projects Directorate at NASA's Marshall Space Flight Center is developing a new planning and scheduling environment and a new scheduling algorithm to enable a paradigm shift in planning and scheduling concepts. Over the past 33 years Marshall has developed and evolved a paradigm for generating payload timelines for Skylab, Spacelab, various other Shuttle payloads, and the International Space Station. The current paradigm starts by collecting the requirements, called "tasks models," from the scientists and technologists for the tasks that they want to be done. Because of shortcomings in the current modeling schema, some requirements are entered as notes. Next a cadre with knowledge of vehicle and hardware modifies these models to encompass and be compatible with the hardware model; again, notes are added when the modeling schema does not provide a better way to represent the requirements. Finally, another cadre further modifies the models to be compatible with the scheduling engine. This last cadre also submits the models to the scheduling engine or builds the timeline manually to accommodate requirements that are expressed in notes. A future paradigm would provide a scheduling engine that accepts separate science models and hardware models. The modeling schema would have the capability to represent all the requirements without resorting to notes. Furthermore, the scheduling engine would not require that the models be modified to account for the capabilities (limitations) of the scheduling engine. The enabling technology under development at Marshall has three major components. (1) A new modeling schema allows expressing all the requirements of the tasks without resorting to notes or awkward contrivances. The chosen modeling schema is both maximally expressive and easy to use. It utilizes graphics methods to show hierarchies of task constraints and networks of temporal relationships. (2) A new scheduling algorithm automatically schedules the models without the intervention of a scheduling expert. The algorithm is tuned for the constraint hierarchies and the complex temporal relationships provided by the modeling schema. It has an extensive search algorithm which can exploit timing flexibilities and constraint and relationship options. (3) A web-based architecture allows multiple remote users to simultaneously model science and technology requirements and other users to model vehicle and hardware characteristics. The architecture allows the users to submit scheduling requests directly to the scheduling engine and immediately see the results. These three components are integrated so that science and technology experts with no knowledge of the vehicle or hardware subsystems and no knowledge of the internal workings of the scheduling engine have the ability to build and submit scheduling requests and see the results. The immediate feedback will hone the users' modeling skills and ultimately enable them to produce the desired timeline. This paper summarizes the three components of the enabling technology and describes how this technology would make a new paradigm possible.

Jaap, John↗

Integrating Electric Vehicle Charging Infrastructure into Commercial Buildings and Mixed-Use Communities: Design, Modeling, and Control Optimization Opportunities: Preprint

This paper discusses modeling and field studies of controlled EV charging that have been performed with the goal of minimizing requirements for infrastructure upgrades, minimizing building peak demand charges, and maximizing the use of on-site generation. We present a large-scale workplace charging pilot of a demand-controlled scheduled EV charging system with over 250 active daily commuters, successfully demonstrating management of aggregate charging power to avoid new infrastructure investments, mitigate peak demand charges, and provide cost-effective workplace charging to users. In addition to understanding opportunities for demand management, integrating these controllable loads into the energy modeling process for new buildings will also be necessary. This paper then presents an example energy modeling process that evaluates the potential effects of EV charging on building load profiles and infrastructure requirements for a mixed-use community. Finally, we discuss an illustration of how EV charging can be controlled to be synergistic with other building loads and distributed generation.

buildings↗

Use of Frequency Response Metrics to Assess the Planning and Operating Requirements for Reliable Integration of Variable Renewable Generation

An interconnected electric power system is a complex system that must be operated within a safe frequency range in order to reliably maintain the instantaneous balance between generation and load. This is accomplished by ensuring that adequate resources are available to respond to expected and unexpected imbalances and restoring frequency to its scheduled value in order to ensure uninterrupted electric service to customers. Electrical systems must be flexible enough to reliably operate under a variety of"change" scenarios. System planners and operators must understand how other parts of the system change in response to the initial change, and need tools to manage such changes to ensure reliable operation within the scheduled frequency range. This report presents a systematic approach to identifying metrics that are useful for operating and planning a reliable system with increased amounts of variable renewable generation which builds on existing industry practices for frequency control after unexpected loss of a large amount of generation. The report introduces a set of metrics or tools for measuring the adequacy of frequency response within an interconnection. Based on the concept of the frequency nadir, these metrics take advantage of new information gathering and processing capabilities that system operators are developing for wide-area situational awareness. Primary frequency response is the leading metric that will be used by this report to assess the adequacy of primary frequency control reserves necessary to ensure reliable operation. It measures what is needed to arrest frequency decline (i.e., to establish frequency nadir) at a frequency higher than the highest set point for under-frequency load shedding within an interconnection. These metrics can be used to guide the reliable operation of an interconnection under changing circumstances.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A survey on wind power ramp forecasting.

The increasing use of wind power as a source of electricity poses new challenges with regard to both power production and load balance in the electricity grid. This new source of energy is volatile and highly variable. The only way to integrate such power into the grid is to develop reliable and accurate wind power forecasting systems. Electricity generated from wind power can be highly variable at several different timescales: sub-hourly, hourly, daily, and seasonally. Wind energy, like other electricity sources, must be scheduled. Although wind power forecasting methods are used, the ability to predict wind plant output remains relatively low for short-term operation. Because instantaneous electrical generation and consumption must remain in balance to maintain grid stability, wind power's variability can present substantial challenges when large amounts of wind power are incorporated into a grid system. A critical issue is ramp events, which are sudden and large changes (increases or decreases) in wind power. This report presents an overview of current ramp definitions and state-of-the-art approaches in ramp event forecasting.

17 WIND ENERGY↗

Automated Planning and Scheduling for Planetary Rover Distributed Operations

Automated planning and Scheduling, including automated path planning, has been integrated with an Internet-based distributed operations system for planetary rover operations. The resulting prototype system enables faster generation of valid rover command sequences by a distributed planetary rover operations team. The Web Interface for Telescience (WITS) provides Internet-based distributed collaboration, the Automated Scheduling and Planning Environment (ASPEN) provides automated planning and scheduling, and an automated path planner provided path planning. The system was demonstrated on the Rocky 7 research rover at JPL.

Backes, Paul G.↗

Enhancing capillary trapping effectiveness through proper time scheduling of injection of supercritical CO 2 in heterogeneous formations

The impact of geologic heterogeneity on capillary trapping of supercritical CO 2 (scCO 2 ) has been recognized and appraised through laboratory experimentation and modeling. However, how different injection strategies can be optimized to improve capillary trapping has not received adequate attention. Here, we present a study based on stochastic analysis to show the impact of injection scheduling on capillary trapping of scCO 2 in heterogeneous geological formations. Improvement of trapping efficiency consists of maximizing the trapped volume within a predefined secure zone of the storage formation with the goal of avoiding plume intersection with potential leakage pathways. Using knowledge acquired from physical experiments in intermediate-scale tanks with controlled heterogeneity, we conduct numerical simulations following a stochastic approach to extend the observed outcomes to a series of equally probable permeability scenarios. Our simulations involve the same combination of surrogate fluids that are used in the experiments to mimic viscosity and density contrasts between scCO 2 and brine. To account for uncertainty of formation heterogeneity, several permeability fields with three different variances and two horizontal correlation lengths are generated. The same volume of scCO 2 is emplaced using four different modes of injection scheduling. Results suggest that injection strategies aimed at enhancing capillary trapping of scCO 2 and increasing the probability of constraining the plume within a secure zone are strictly related to the specific heterogeneity of the reservoir. Finally, this preliminary theoretical finding suggests the potential for maximizing secure capillary trapping through the proper selection of injection schedule to fit the formation heterogeneity.

58 GEOSCIENCES↗

The Effect of Biologically Effective Dose and Radiation Treatment Schedule on Overall Survival in Stage I Non-Small Cell Lung Cancer Patients Treated With Stereotactic Body Radiation Therapy

Purpose: To determine the effect of biologically effective dose (BED{sub 10}) and radiation treatment schedule on overall survival (OS) in patients with early-stage non-small cell lung cancer (NSCLC) undergoing stereotactic body radiation therapy (SBRT). Methods and Materials: Using data from 65 treatment centers in the United States, we retrospectively reviewed the records of T1-2 N0 NSCLC patients undergoing SBRT alone from 2006 to 2014. Biologically relevant covariates, including dose per fraction, number of fractions, and time between fractions, were used to quantify BED{sub 10} and radiation treatment schedule. The linear-quadratic equation was used to calculate BED{sub 10} and to generate a dichotomous dose variable of <105 Gy versus ≥105 Gy BED{sub 10}. The primary outcome was OS. We used the Kaplan-Meier method, the log–rank test, and Cox proportional hazards regression with propensity score matching to determine whether prescription BED{sub 10} was associated with OS. Results: We identified 747 patients who met inclusion criteria. The median BED{sub 10} was 132 Gy, and 59 (7.7%) had consecutive-day fractions. Median follow-up was 41 months, and 452 patients (60.5%) had died by the conclusion of the study. The 581 patients receiving ≥105 Gy BED{sub 10} had a median survival of 28 months, whereas the 166 patients receiving <105 Gy BED{sub 10} had a median survival of 22 months (log–rank, P=.01). Radiation treatment schedule was not a significant predictor of OS on univariable analysis. After adjusting for T stage, sex, tumor histology, and Eastern Cooperative Oncology Group performance status, BED{sub 10} ≥105 Gy versus <105 Gy remained significantly associated with improved OS (hazard ratio 0.78, 95% confidence interval 0.62-0.98, P=.03). Propensity score matching on imbalanced variables within high- and low-dose cohorts confirmed a survival benefit with higher prescription dose. Conclusions: We found that dose escalation to 105 Gy BED{sub 10} and beyond may improve survival in NSCLC patients treated with SBRT.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Iterative Repair Planning for Spacecraft Operations Using the Aspen System

This paper describes the Automated Scheduling and Planning Environment (ASPEN). ASPEN encodes complex spacecraft knowledge of operability constraints, flight rules, spacecraft hardware, science experiments and operations procedures to allow for automated generation of low level spacecraft sequences. Using a technique called iterative repair, ASPEN classifies constraint violations (i.e., conflicts) and attempts to repair each by performing a planning or scheduling operation. It must reason about which conflict to resolve first and what repair method to try for the given conflict. ASPEN is currently being utilized in the development of automated planner/scheduler systems for several spacecraft, including the UFO-1 naval communications satellite and the Citizen Explorer (CX1) satellite, as well as for planetary rover operations and antenna ground systems automation. This paper focuses on the algorithm and search strategies employed by ASPEN to resolve spacecraft operations constraints, as well as the data structures for representing these constraints.

Rabideau, G.↗