Search NASA⌕ Search

SEARCH · Search NASA

Results for “Ground Operational Support System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Gateway Autonomy for Enabling Deep Space Exploration

The Gateway spacecraft is an important stepping-stone to exploration of the solar system, integrating commercial and international partners into a tightly coupled system, enabling cislunar activities, and implementing key technologies for missions to Mars. Autonomy is a capability area necessary to handle long communication outages where intervention from Earth is impossible, to prepare to operate with long communication delays that will be common in interplanetary travel, and to make spaceflight more affordable and accessible by reducing sustaining operations costs. The Gateway Concept of Operations states that one of Gateway’s goals is to “focus on infrastructure and systems that will allow autonomous operations aboard the Gateway with robotics, automated systems, advanced communications, and distributed computing.” Gateway’s Vehicle Systems Manager (VSM) and associated Autonomous Spacecraft Management Architecture (ASMA) are key products towards delivering autonomous capability. The primary functions of the control architecture are Mission Management and Timeline Execution, Resource Management, Fault Management, and Vehicle Control and Operation (VCO). In each of these areas, there is an initial level of capability to be delivered at launch, with plans to continue development and grow to greater capability. The initial deployment of VSM will focus on maintaining vehicle safety by focusing on full fault management capabilities and deploying only enough resource and timeline planning functionality to support that. The final deployment of VSM will add significant planning and control optimization functionality to support nominal operations for up to 21 days without ground support, even accommodating fault and failure conditions. While the VSM is the vehicle-level representation of autonomous reasoning, distributed automation is essential to provide the right scope and abstraction of information to process. Module and system support of automation and simplicity of interfaces are two important design paradigms that Gateway is focusing on to garner a systems approach to autonomy. Distribution of reasoning can increase complexity, so Gateway is also taking a strict hierarchical approach to information flow and decision making. VSM is not the only capability necessary to achieve an autonomous spacecraft. Robotics support for maintenance of the spacecraft will be essential to provide continued vehicle functionality even when crew is not present. Technical and programmatic challenges exist when implementing autonomous robotics operations. These challenges include sufficient network flexibility to support data transfer to the rest of the vehicle to coordinate module-to-module robotic walk-offs and finding the proper interfaces to allow sufficient dexterity. Communication system upgrades planned for Gateway include Delay Tolerant Networking to best utilize the complex network of relays that will be part of mature cislunar operations. Distributed computing and management will provide failure tolerance, robustness, and growth of capabilities while still allowing significant reuse of heritage software on heritage systems as well as reuse of common applications across a spacecraft to minimize new development, but this requires adherence to key standards and interfaces. The Gateway program has demonstrated significant progress towards these capabilities and has identified challenges other spacecraft developers should be aware of from the start.

Molly Anderson↗

Technology Transfer Challenges: A Case Study of User-Centered Design in NASA's Systems Engineering Culture

The Upper Stage (US) section of the National Aeronautics and Space Administration's (NASA) Ares I rocket will require internal access platforms for maintenance tasks performed by humans inside the vehicle. Tasks will occur during expensive critical path operations at Kennedy Space Center (KSC) including vehicle stacking and launch preparation activities. Platforms must be translated through a small human access hatch, installed in an enclosed worksite environment, support the weight of ground operators and be removed before flight - and their design must minimize additional vehicle mass at attachment points. This paper describes the application of a user-centered conceptual design process and the unique challenges encountered within NASA's systems engineering culture focused on requirements and "heritage hardware". The NASA design team at Marshall Space Flight Center (MSFC) initiated the user-centered design process by studying heritage internal access kits and proposing new design concepts during brainstorming sessions. Simultaneously, they partnered with the Technology Transfer/Innovative Partnerships Program to research inflatable structures and dynamic scaffolding solutions that could enable ground operator access. While this creative, technology-oriented exploration was encouraged by upper management, some design stakeholders consistently opposed ideas utilizing novel, untested equipment. Subsequent collaboration with an engineering consulting firm improved the technical credibility of several options, however, there was continued resistance from team members focused on meeting system requirements with pre-certified hardware. After a six-month idea-generating phase, an intensive six-week effort produced viable design concepts that justified additional vehicle mass while optimizing the human factors of platform installation and use. Although these selected final concepts closely resemble heritage internal access platforms, challenges from the application of the user-centered process provided valuable lessons for improving future collaborative conceptual design efforts.

Quick, Jason↗

Turbofan Engine Power Extraction Demonstration Final Report

As GE Aerospace advances toward a revolutionary step change in propulsion efficiency, the integration and demonstration of new engine architectures and technology systems are essential. The NASA Turbofan Engine Power Extraction Demonstration (PEx), conducted through the Hybrid Thermally Efficient Core (HyTEC) project, aims to develop and demonstrate megawatt-class hybrid electric capability on a modern commercial turbofan engine. The hybrid electric system is critical to meeting the needs of the U.S. aviation industry for next-generational propulsion systems with greater efficiency, durability, and range. This supports energy independence and helps ensure the security and resilience of one of America's largest export industries. The PEx project specifically targets three key objectives: mechanically integrating hybrid electric capability into a commercial turbofan engine, integrating electric machine control with turbofan control for advanced power management, and de-risking performance modeling of future hybrid electric architectures. To mature these technologies to Technology Readiness Level (TRL) 6, a series of electric power system component tests and a baseline engine performance test campaign were conducted. These efforts culminated in an integrated hybrid electric turbofan test campaign demonstrating power extraction, power insertion, and power transfer between spools. Tests of the electric power system were completed at GE Aerospace’s Electrical Power Integrated Systems Center in Dayton, Ohio and engine tests were completed at Peebles Test Operation in Peebles, Ohio. Hybrid electric trade studies extended the demonstrated capability to altitude using the validated cycle model from the PEx test campaigns, allowing for comments on expanded mission benefits not demonstrated in the ground campaign. The knowledge gained from PEx also supports GE Aerospace’s Compact Core Demonstrator as part of HyTEC Phase 2 and ultimately informs the implementation of hybrid electric systems in the next generation of GE Aerospace commercial engine products. This report provides a summary of the program background, test campaigns, trade studies, and insights into the technical maturation required to support future commercial products.

Hybrid Electric↗

Predictability of Top of Descent Location for Operational Idle-Thrust Descents

To enable arriving aircraft to fly optimized descents computed by the flight management system (FMS) in congested airspace, ground automation must accurately predict descent trajectories. To support development of the trajectory predictor and its uncertainty models, commercial flights executed idle-thrust descents at a specified descent speed, and the recorded data included the specified descent speed profile, aircraft weight, and the winds entered into the FMS as well as the radar data. The FMS computed the intended descent path assuming idle thrust after top of descent (TOD), and the controllers and pilots then endeavored to allow the FMS to fly the descent to the meter fix with minimal human intervention. The horizontal flight path, cruise and meter fix altitudes, and actual TOD location were extracted from the radar data. Using approximately 70 descents each in Boeing 757 and Airbus 319/320 aircraft, multiple regression estimated TOD location as a linear function of the available predictive factors. The cruise and meter fix altitudes, descent speed, and wind clearly improve goodness of fit. The aircraft weight improves fit for the Airbus descents but not for the B757. Except for a few statistical outliers, the residuals have absolute value less than 5 nmi. Thus, these predictive factors adequately explain the TOD location, which indicates the data do not include excessive noise.

Stell, Laurel L.↗

Design and Development of Functionally Operative and Visually Appealing Remote Firing Room Displays

This internship provided an opportunity for an intern to work with NASA's Ground Support Equipment (GSE) for the Spaceport Command and Control System (SCCS) at Kennedy Space Center as a remote display developer, under NASA mentor Kurt Leucht. The main focus was on creating remote displays for the hypergolic and high pressure helium subsystem team to help control the filling of the respective tanks. As a remote display developer for the GSE hypergolic and high pressure helium subsystem team the intern was responsible for creating and testing graphical remote displays to be used in the Launch Control Center (LCC) on the Firing Room's computer monitors. To become more familiar with the subsystem, the individual attended multiple project meetings and acquired their specific requirements regarding what needed to be included in the remote displays. After receiving the requirements, the next step was to create a display that had both visual appeal and logical order using the Display Editor, on the Virtual Machine (VM). In doing so, all Compact Unique Identifiers (CUI), which are associated with specific components within the subsystem, will need to be included in each respective display for the system to run properly. Then, once the display was created it needed to be tested to ensure that the display runs as intended by using the Test Driver, also found on the VM. This Test Driver is a specific application that checks to make sure all the CUIs in the display are running properly and returning the correct form of information. After creating and locally testing the display it will need to go through further testing and evaluation before deemed suitable for actual use. By the end of the semester long experience at NASA's Kennedy Space Center, the individual should have gained great knowledge and experience in various areas of display development and testing. They were able to demonstrate this new knowledge obtained by creating multiple successful remote displays that will one day be used by the hypergolic and high pressure helium subsystem team in one of the LCC's firing rooms to fill the new Orion spacecraft.

Ground Support Systems↗

Health monitoring system for the SSME - Program overview

This paper considers the design of a health management system (HMS) program for enhancement of the safety of SSME operations during ground tests and space missions. The fault detection techniques based on time series, nonlinear regression, and clustering algorithms were developed and were demonstrated based on data from SSME ground test failures. The fault detection algorithms of the HMS system exhibited 100 percent detection of faults and an extremely low fault alarm rate, and were robust to sensor loss. A preliminary design of hardware architecture capable of supporting real-time operation of the HMS functions is described.

Hawman, Michael W.↗

Clinical Decision Support Project

As NASA plans for exploration missions into deep space, significant challenges are realized due to the distance from Earth. Beside the effects of microgravity and radiation exposure, the astronauts face the additional constraints of isolation, lack of resupply, increasingly difficult evacuation, and delayed and disrupted communication with ground-based medical care providers. These constraints require a paradigm shift from current medical care where crews rely on the real-time communications with ground-based medical care providers toward Earth-independent medical operations for astronaut medical care. Medical expertise and decision-making are ground-based for current International Space Station and planned Lunar missions. However, a deep space exploration crew will need to autonomously perform the detection, diagnosis, treatment, and prevention of medical conditions. One approach to provide Earth-independent medical operations is to augment the requisite knowledge, skills, and abilities (KSAs) of a time-constrained crew—operating under stressful conditions, combatting fatigue, and facing a potential medical crisis—with a robust clinical decision support system (CDSS). The CDSS is envisioned as an integrated, software-based tool deployed on a laptop computer or handheld device. The CDSS will assist the crew and ground support when interacting with knowledge/data bases (e.g. records, pharmacy, schedule), instrumentation (e.g. imaging, physiological monitoring devices), and habitat (e.g. wellness system, task performance system) and vehicle systems (e.g. environmental system, communication system). In addition, the human interface will employ a context-based approach that accounts for the crew’s situation. Thus, extraneous and clinically/operationally non-relevant information are reduced to avoid an increase in cognitive load. The framework of an ideal spaceflight CDSS is to include core and advanced analytical features that maintain a flexible platform for integrating new technology in the future. The Exploration Medical Capability (ExMC) Element of the Human Research Program (HRP) is expanding the boundaries of space medical systems to advance the care of astronauts on future exploration missions beyond low Earth orbit by actively identifying and testing next-generation medical care and crew health maintenance technologies. The Clinical Decision Support (CDS) project addressed ap Medical-701 within the Inflight Medical Conditions risk: “We need to increase inflight medical capabilities and identify new capabilities that (a) maximize benefit and/or (b) reduce “costs” on human system/mission/vehicle resources.” Though mass, volume, and power will face increasing constraints, the projected computational capabilities of spacecraft systems will increase exponentially as information technology advances in this decade and beyond. Hence, data, software, and computational resources will play an essential and synergistic role in maintaining crew health, wellness, and performance in deep space missions. The focus of the CDS project was to develop recommended requirements for an in-vehicle CDSS that acts as a ‘virtual assistant’ for delivering optimal health, performance, and medical care during exploration missions. In fiscal year 2022 (FY22), the CDS project was chartered to baseline and/or revise all CDS project related documentation and update the CDS project model to include the revised CDSS Concept of Operations, revised systems-based modeling language (SysML) activity diagrams, and baseline requirements. The focus of this presentation will be an overview of the CDS products and CDS model content.

Decision Support↗

Flight operations and performance of Skylab life support and environmental control systems

The design and performance of the Skylab thermal and environmental control systems is considered. The Orbital Workshop had a combined active and passive thermal control system. The refrigeration system was designed to store food and biomedical samples and to cool drinking water. The atmosphere control system included active humidity control, molecular sieves and charcoal canisters to control carbon dioxide, odor, and contaminants, and the gas supply system. Mission support preparation, including instrumentation, ground data system, system troubleshooting, and training, is surveyed. Major in-flight anomalies occurred with the thermal control system when the meteoroid shield was lost during SL-1 ascent and when the Airlock Module coolant loop malfunctioned during SL-2 manned operations. The atmosphere control system performed without major anomaly throughout the manned missions.

Hopson, G. D.↗

Dynamic Path Planning Automation Concept for Advanced Air Mobility

Advanced Air Mobility (AAM) aims to develop an air transportation system for novel air vehicles between local, regional, intraregional, and urban places. Safety and efficiency of increasingly complex AAM operations are expected to require extensive use of automation, ranging from controlling the revolutionary new aircraft to managing flights dynamically in the high tempo airspace and aerodrome operations. Both onboard and ground automation will play central roles in assisting AAM operators with managing the flight paths of their fleet. This document presents a concept for dynamic path planning (DPP) automation applicable to AAM and other flight operations. The role of the DPP automation system is fivefold: (1) it creates a flight path with desired qualities of being feasible, deconflicted, harmonized, flexible, and optimal; (2) it monitors the progress of flight in a dynamic operating environment; (3) it supports the user in evaluating continued acceptability of the flight path in changing conditions; (4) it revises the flight path as needed to maintain the desired flight path qualities; and (5) it coordinates the flight path with airspace users and service providers. Key users of the DPP automation system include flight planners, pilots, and airspace service providers The concept allows for the system to be installed onboard the aircraft as well as on the ground. The system responds automatically to the dynamic operating environment to ensure that a safe and operationally acceptable flight path is available throughout the flight.

Vivek Sharma↗

Application of the Hardman methodology to the Single Channel Ground-Airborne Radio System (SINCGARS)

The HARDMAN methodology was applied to the various configurations of employment for an emerging Army multipurpose communications system. The methodology was used to analyze the manpower, personnel and training (MPT) requirements and associated costs, of the system concepts responsive to the Army's requirement for the Single Channel Ground-Airborne Radio System (SINCGARS). The scope of the application includes the analysis of two conceptual designs Cincinnati Electronics and ITT Aerospace/Optical Division for operating and maintenance support addressed through the general support maintenance echelon.

Source record↗

NASA Marshall Space Flight Center atomic oxygen investigations

An overview of the MSFC atomic oxygen investigations is provided, including descriptions of flight studies, ground-based testing, contractual efforts, and future focus. Summary results of flight experiments on STS-5, STS-8, and STS 41-G are presented. The development of the MSFC Atomic Oxygen Resistive Monitor for the upcoming EOIM-3 (Evaluation of Oxygen Interaction with Materials 3) flight experiment is reviewed. Materials characterization work and ground-based testing are described. Contractual efforts, such as the development of atomic oxygen resistant coatings for the space station, are discussed. Future emphasis is placed on ground-based testing via the development and operation of a state-of-the-art atomic oxygen simulation system and on the continuation of flight studies in support of multi-programs.

Source record↗

Research and development for Onboard Navigation (ONAV) ground based expert/trainer system: Preliminary user's guide

The purpose is to present procedures for preparation, operation, monitoring, and recovery of the Shuttle Entry phase expert system that is part of the Onboard Navigation (ONAV) Ground Based Expert System Trainer System for aircraft/space shuttle navigation. This user's guide is primarily intended for functional users of the system. It includes procedures for system operation in support of training activities as well as operational tasks. In addition, information is provided which enables maintenance personnel to handle updates, modifications, etc. to the system.

Bochsler, Daniel C.↗

Space station control center architecture

The Space Station control center (SSCC) is under the cognizance of the Johnson Space Center and is located adjacent to the Shuttle's mission control center. Responsibility for design, development, and operations of the control center is the responsibility of the mission operations directorate at JSC. Space Station Ground Systems Division is responsible for design and development of the control center systems which is currently in process under the mission support contractor team led by Loral Space Information Systems. It is early in the life cycle of the SSCC project. System functional design review was completed. Subsystem requirements are now being developed and reviewed. A new facility will be available for development activities.

Schmalz, Karen↗

Efficient mission control for the 48-satellite Globalstar Constellation

The Globalstar system is being developed by Globalstar, Limited Partnership and will utilize 48 satellites in low earth orbit (See Figure 1) to create a world-wide mobile communications system consistent with Vice President Gore's vision of a Global Information Infrastructure. As a large long term commercial system developed by a newly formed organization, Globalstar provides an excellent opportunity to explore innovative solutions for highly efficient satellite command and control. Design and operational concepts being developed are unencumbered by existing physical and organizational infrastructures. This program really is 'starting with a clean sheet of paper'. Globalstar operations challenges can appear enormous. Clearly, assigning even a single person around the clock to monitor and control each satellite is excessive for Globalstar (it would require a staff of 200! . Even with only a single contact per orbit per satellite, data acquisitions will start or stop every 45 seconds! Although essentially identical, over time the satellites will develop their own 'personalities'and will re quire different data calibrations and levels of support. This paper discusses the Globalstar system and challenges and presents engineering concepts, system design decisions, and operations concepts which address the combined needs and concerns of satellite, ground system, and operations teams. Lessons from past missions have been applied, organizational barriers broken, partnerships formed across the mission segments, and new operations concepts developed for satellite constellation management. Control center requirements were then developed from the operations concepts.

Smith, Dan↗

Case for Deploying Complex Systems Utilizing Commodity Components

This viewgraph representation presents a study of the transition of computer networks and software engineering at the Huntsville Operations Support Center (HOSC) from a client/server UNIX based system to a client/server system based on commodity priced and open system components. Topics covered include: an overview of HOSC ground support systems, an analysis for changes to the existing ground support system, an analysis of options considered for the transition to a new system, and a consideration of goals for a new system.

Bryant, Barry S.↗

Customer Avionics Interface Development and Analysis (CAIDA) Lab DEWESoft Display Creation

The Customer Avionics Interface Development and Analysis (CAIDA) Lab supports the testing of the Launch Control System (LCS), NASA's command and control system for the Space Launch System (SLS), Orion Multi-Purpose Crew Vehicle (MPCV), and ground support equipment. The objectives of the year-long internship were to support day-to-day operations of the CAIDA Lab, create prelaunch and tracking displays for Orion's Exploration Flight Test 1 (EFT-1), and create a program to automate the creation of displays for SLS and MPCV to be used by CAIDA and the Record and Playback Subsystem (RPS).

DEWESoft↗

Customer Avionics Interface Development and Analysis (CAIDA): Software Developer for Avionics Systems

The Customer Avionics Interface Development and Analysis (CAIDA) supports the testing of the Launch Control System (LCS), NASA's command and control system for the Space Launch System (SLS), Orion Multi-Purpose Crew Vehicle (MPCV), and ground support equipment. The objective of the semester-long internship was to support day-to-day operations of CAIDA and help prepare for verification and validation of CAIDA software.

Mitchell, Sherry L.↗

Overview of Crew Operations for Transit to Mars

Crewed Mars missions are estimated to be 700-1,200 days in length which is two to three times longer than any continuous human spaceflight mission to date. When architecting a Mars mission there are numerous resources that must be considered, evaluated, and planned for, including—but not limited to—mass, cost, performance, and risk. Crew time is a limited resource that will need to be appropriately allocated during future Mars missions. NASA’s “Moon to Mars Objectives” specifically recognizes as Recurring Tenets the need to return crews safely to Earth while mitigating adverse impacts to crew health and maximizing crew time available for science and engineering activities within planned mission durations. Crew operations and the crew time allocation for a Mars missions will likely be different than current operational planning aboard the ISS due to communication delays, crew health and performance needs, transportation system needs, potential vehicle dormancy, and mass ejection. Crew will need to operate much more Earth independently and potentially be responsible for more operations since traditional Earth ground support will be delayed. Incidents requiring immediate crew action will therefore either be the responsibility of the crew or an automated feature of the transit vehicle. This paper discusses the operational challenges of a Mars transit mission and the associated activities that will need to take place during each operational phase of transit to and from Mars.

Crew Time↗