Search NASA⌕ Search

SEARCH · Search NASA

Results for “LUNAR PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

NASA’s Deep Space Network (DSN) Lunar Exploration Upgrades (DLEU)

In the near future, the National Aeronautics and Space Administration (NASA) will returnhumansto the moon beginning the next era of human exploration. NASA’s Space Communications and Navigation (SCaN) program will play a vital role in establishing communications and navigation support to realize the ambitious goals of the Artemis program. SCaN’s overall lunar communications support plan will be covered in a separate 2023 SpaceOps paper: “NASA’s Communications and Navigation Architecture Plans to Support the Return to the Moon and a Sustainable Lunar Presence.” The four-point plan,as it currently stands, includes lunar relay services, a dedicated set of new ground stations, international partner contributions,and supportthrough the Deep Space Network (DSN)and associated upgrades. This paper will have a more granular focus on the DSN and NASA’s plans to upgrade and expand the network to be better suited for human spaceflight on and around the lunar surface. NASA’s Deep Space Network (DSN) will be a critical communications component for the upcoming lunar activities. There will be multiple spacecraft, using different bands, and some of those spacecraft will be transmitting and receiving using multiple bands, requiring DSN support of S-band (2 GHz), X-band (7 GHz up, 8 GHz down), and K-band (22.5 GHz up, 26 GHz down). Since there may be more than one spacecraft in the beamwidth of the DSN antennas, the DSN support will require an extension of the DSN’s capability to support multiple spacecraft using one antenna, expanding it to provide two simultaneous uplinks in the different bands at each antenna. Achieving this requires using new techniques for manufacturing the frequency selective surfaces, called dichroics, which steer the different frequency beams from and to the appropriate transmitting and receiving equipment, along with the addition of a new K-band uplink system. Additionally, due to the relative closeness of the moon from Earth (as opposed to the planetary missionsthe DSN supports daily), significantly higher data rates on both uplink and downlinkare requiredare possible and desirable by the lunar missions, specifically up to 20 Mbps on the uplink and 150 Mbps on the downlink, both using Low Density Parity Check (LDPC) error correcting codes. And, again due to the relative closeness of the moon, there is a need for low latency data delivery of the high rate downlink telemetry which requires a change in the current DSN paradigm of delivering higher rate data with higher latency.

Moon↗

The Mission Assessment Post Processor (MAPP): A New Tool for Performance Evaluation of Human Lunar Missions

The National Aeronautics and Space Administration s (NASA) Constellation Program paves the way for a series of lunar missions leading to a sustained human presence on the Moon. The proposed mission design includes an Earth Departure Stage (EDS), a Crew Exploration Vehicle (Orion) and a lunar lander (Altair) which support the transfer to and from the lunar surface. This report addresses the design, development and implementation of a new mission scan tool called the Mission Assessment Post Processor (MAPP) and its use to provide insight into the integrated (i.e., EDS, Orion, and Altair based) mission cost as a function of various mission parameters and constraints. The Constellation architecture calls for semiannual launches to the Moon and will support a number of missions, beginning with 7-day sortie missions, culminating in a lunar outpost at a specified location. The operational lifetime of the Constellation Program can cover a period of decades over which the Earth-Moon geometry (particularly, the lunar inclination) will go through a complete cycle (i.e., the lunar nodal cycle lasting 18.6 years). This geometry variation, along with other parameters such as flight time, landing site location, and mission related constraints, affect the outbound (Earth to Moon) and inbound (Moon to Earth) translational performance cost. The mission designer must determine the ability of the vehicles to perform lunar missions as a function of this complex set of interdependent parameters. Trade-offs among these parameters provide essential insights for properly assessing the ability of a mission architecture to meet desired goals and objectives. These trades also aid in determining the overall usable propellant required for supporting nominal and off-nominal missions over the entire operational lifetime of the program, thus they support vehicle sizing.

Williams, Jacob↗

NASA's Deep Space Network (DSN) Lunar Exploration Upgrades (DLEU)

In the near future, the National Aeronautics and Space Administration (NASA) will return to the moon beginning the next era of human exploration. NASA’s Space Communications and Navigation (SCaN) program will play a vital role in establishing communications and navigation support to realize the ambitious goals of the Artemis program. SCaN’s overall lunar communications support plan will be covered in a separate 2023 SpaceOps paper: “NASA’s Communications and Navigation Architecture Plans to Support the Return to the Moon and a Sustainable Lunar Presence”. The plan as it currently stands, includes a three-fold approach of lunar relay services, a dedicated set of new ground stations and support through the Deep Space Network (DSN). This paper will have a more granular focus on the DSN and NASA’s plans to upgrade and expand the network to be better suited for human spaceflight on and around the lunar surface. NASA’s Deep Space Network (DSN) will be a critical communications component for the upcoming lunar activities. There will be multiple spacecraft, using different bands, and some of those spacecraft will be transmitting and receiving using multiple bands, requiring DSN support of S-band (2 GHz), X-band (7 GHz up, 8 GHz down), and K-band (22.5 GHz up, 26 GHz down). Since there may be more than one spacecraft in the beamwidth of the DSN antennas, the DSN support will require an extension of the DSN’s capability to support multiple spacecraft using one antenna, expanding it to provide two simultaneous uplinks in the different bands at each antenna. Achieving this requires using new techniques for manufacturing the frequency selective surfaces, called dichroics, which steer the different frequency beams from and to the appropriate transmitting and receiving equipment, along with the addition of a new K-band uplink system. Additionally, due to the relative closeness of the moon from Earth (as opposed to the planetary missions the DSN supports daily), significantly higher data rates on both uplink and downlink are required, specifically up to 20 Mbps on the uplink and 150 Mbps on the downlink, both using Low Density Parity Check (LDPC) error correcting codes. And, again due to the relative closeness of the moon, there is a need for low latency data delivery of the high rate downlink telemetry which requires a change in the current DSN paradigm of delivering higher rate data with higher latency.

deep space network↗

Digital Elevation Map Parametric Error Analysis Using Corresponding NAC Images

Future lunar landing systems, particularly those used to land humans on the lunar surface aspart of the ARTEMIS program, will require precision navigation relative to the lunar surface. The most common way to meet these stringent navigation require-ments is through terrain relative navigation (TRN), which localizes a spacecraft by comparing descent im-agery with a predefined map of the surface. The accu-racy achievable using TRN is limited by the accuracy of the reference Digital Elevation Map (DEM). It is therefore critical for future lunar missions that potential errors in DEMs be quantified. This paper describes one of NASA’s current efforts to develop a process for evaluating lunar DEM quality.

Chris R Gnam↗

Goddard trajectory determination

Goddard Trajectory Determination System (GTDS), programs designed to support Earth, lunar and interplanetary missions are used as research and development tool. Program displays research and development used in trajectory determination, preflight and postflight analyses, simulation of tracking data, ephemeris generation, and related tasks.

Dixon, B.↗

Thermal Sensitivity Study of Lunar Terrain Vehicle Wheels

Since the early development of lunar vehicles for the Apollo program, designing a wheel capable of functioning in the harsh equatorial lunar environment was identified as a uniquely difficult engineering challenge. The Lunar Terrain Vehicle (LTV) must contend with many of the same challenges encountered during the Apollo missions, but with the addition of colder, more complex thermal environments at the lunar south pole and longer Artemis mission timelines. A full thermal assessment of LTV wheels should capture these and other details to assess heat leak through the wheels and extreme hot and cold temperatures. The goals of this study are to provide bounding lunar south pole thermal environments; to define sensitivity to interactions between the wheel and the lunar surface in different operation modes, such as parked and traversing; and to identify thermal performance concerns related to the use of shape memory alloys.

Lunar Terrain Vehicle↗

High-precision gravimetric survey in support of lunar laser ranging at Haleakala, Maui, 1976 - 1978

The planning, observations and adjustment of high-precision gravity survey networks established on the islands of Maui and Oahu as part of the geodetic-geophysical program in support of lunar laser ranging at Haleakala, Maui, Hawaii are described. The gravity survey networks include 43 independently measured gravity differences along the gravity calibration line from Kahului Airport to the summit of Mt. Haleakala, together with some key points close to tidal gauges on Maui, and 40 gravity differences within metropolitan Honolulu. The results of the 1976-1978 survey are compared with surveys made in 1961 and in 1964-1965. All final gravity values are given in the system of the international gravity standardization net 1971 (IGSN 71); values are obtained by subtracting 14.57 mgal from the Potsdam value at the gravity base station at the Hickam Air Force Base, Honolulu.

Schenck, B. E.↗

A Joinable Undercarriage to Maximize Payload (JUMP) Lunar Lander for Cargo Delivery to the Lunar Surface

Currently, NASA has engaged industry to develop a series of small to medium capacity landers with payload capacities of up to 5-9 tons by the mid to late 2020s. This contrasts with the former Constellation program, where the Altair lunar lander was targeting a payload capability of roughly 14-20 tons. Investment in smaller landers may present future challenges in delivering habitat modules larger than lunar lander cabins or small logistics modules to the lunar surface. Additionally, given a projected SLS flight rate of 1-2 launches per year, a lunar surface buildup from small elements seems problematic at best. While commercial launchers provide a supplement to SLS, many of the current and projected launch vehicles deliver less than 20 tons to a Trans-Lunar Injection – even fewer to the lunar surface. However, a possible solution could emerge if the lander itself could be launched in pieces with a buildup in Cislunar space. Thus, launchers with these capacities could contribute to a lunar lander capable of delivering 30 tons or more to the lunar surface. This paper introduces the notional concept of a Joinable Undercarriage to Maximized Payload (JUMP) lander. Key elements of a proposed JUMP lander concept will be discussed, followed by recommendations and forward work.

Human spaceflight↗

Mass driver retrievals of earth-approaching asteroids

Mass driver tugs can be designed to move Apollo and Amor asteroids at opportunities of low velocity increment to the vicinity of the earth. The cost of transferring asteroids through a velocity interval of 3 km/sec by mass driver is about 16 cents per kilogram amortized over 10 years, about ten times less than that required to retrieve lunar resources during the early phases of a program of space manufacturing. About 22 per cent of a 200-meter diameter asteroid could be transferred to high earth orbit by an automated 100 megawatt solar-powered mass driver in a period of five years for a cost of approximately $1 billion. Estimates of the total investment of a space manufacturing program could be reduced twofold by using asteroidal instead of lunar resources; such a program could begin several years sooner with minimal concurrent development if asteroidal search programs and mass driver development are immediately accelerated.

Oleary, B.↗

CECE: A Deep Throttling Demonstrator Cryogenic Engine for NASA's Lunar Lander

As one of the first technology development programs awarded under NASA's Vision for Space Exploration, the Pratt & Whitney Rocketdyne (PWR) Deep Throttling, Common Extensible Cryogenic Engine (CECE) program was selected by NASA in November 2004 to begin technology development and demonstration toward a deep throttling, cryogenic Lunar Lander engine for use across multiple human and robotic lunar exploration mission segments with extensibility to Mars. The CECE program leverages the maturity and previous investment of a flight-proven hydrogen/oxygen expander cycle engine, the RL10, to develop and demonstrate an unprecedented combination of reliability, safety, durability, throttlability, and restart capabilities in a high-energy, cryogenic engine. NASA Marshall Space Flight Center and NASA Glenn Research Center personnel were integral design and analysis team members throughout the requirements assessment, propellant studies and the deep throttling demonstrator elements of the program. The testbed selected for the initial deep throttling demonstration phase of this program was a minimally modified RL10 engine, allowing for maximum current production engine commonality and extensibility with minimum program cost. In just nine months from technical program start, CECE Demonstrator No. 1 engine testing in April/May 2006 at PWR's E06 test stand successfully demonstrated in excess of 10:1 throttling of the hydrogen/oxygen expander cycle engine. This test provided an early demonstration of a viable, enabling cryogenic propulsion concept with invaluable system-level technology data acquisition toward design and development risk mitigation for both the subsequent CECE Demonstrator No. 2 program and to the future Lunar Lander Design, Development, Test and Evaluation effort.

Giuliano, Victor J.↗

Space Program

Solar phenomena, planetary and lunar compositions, plasmas, interplanetary particles, satellite probes, animal neurophysiology, engineering structures, and related space activities

NEUROPHYSIOLOGY↗

Electrodynamic Dust Shield (EDS) for Firefly Aerospace’s Blue Ghost Mission 1

As part of the NASA Commercial Lunar Payload Services (CLPS) program, the EDS payload is manifested as part of Firefly Aerospace’s Blue Ghost Mission 1. Dust will adversely affect the operation of most mechanical systems required by lunar missions. The EDS payload will demonstrate active lunar dust removal from glass and thermal radiator surfaces.

Alexis Hongamen↗

A Notional Artemis Lunar Surface Exploration Package (ArLSEP) based on the Gandalf Staff Platform

Introduction: The Artemis program is planning to deliver crew and cargo to the lunar surface, but there is no current package for supporting lunar in-struments and experiments similar to the Apollo Lunar Surface Exploration Package (ALSEP). This abstract provides a possible concept for such a package using the Gandalf Staff Platform as a common core. Gandalf Staff: The Gandalf Staff is an early prototype system developed over FY’21/FY’22 using NASA Science Technology Mission Directorate (STMD) Center Information Fund (CIF) grants to de-sign, build and test “proof-of-concept” components. These components include a 24v battery powered monopole that powers a suite of subsystems, including a Graphical User Interface (GUI) for crew, surface voice and data communications, Lunar Search and Rescue (LunaSAR) navigation and communications, LiDAR, field site external lighting, 360-degree camera, and a geothermal instrument for measuring sub-surface temperature gradient. The staff can be carried independently by an Extra-Vehicular Activity (EVA) astronaut, or can be mounted into a tripod for “hands free” support at a surface site being investigated. The staff can be attached to an external solar array and power storage system for long-duration operations. [1,2] ALSEP: An ASLEP flew on each mission Apollo 12 to Apollo 17. For Apollo 11, a simplified packaged called the Early Apollo Scientific Experiments Pack-age (EASEP) was flown. Each package included a “Central Station” that provided the power and communications connected to a variety of instruments and sensors. The power was provided by a Radioisotope Thermoelectric Generator (RTG) fueled by Plutoni-um-238 generating 70 watts of power (initially, decayed over time) [3]. The communications system provide for direct to Earth data transfer from the lunar surface. Each pack-age was stowed externally in the Lunar Module (LM) Scientific Equipment (SEQ) bay with a mass up to 163 kg (Apollo 17). The crew unloaded the ALSEP from the LM and deployed the instruments on the lunar surface. Although designed to operate for only 1 year, many sites operated for up to 8 years successfully [4]. The Active Seismic Experiment (ASE) included 3 geophones for detecting seismic waves created by mortars and thumpers deployed by the crew. Other active experiments measured the lunar atmosphere, the heat flow in the subsurface, the lunar gravity and potential gravity waves, the lunar magnetic field, the solar wind and plasma interactions in cislunar space. Passive experiments included collectors for dust and cosmic rays, and retroreflectors for precise measurements of distance using a laser from Earth. The ALSEP program continues to generate insights into lunar formation and evolution. ArLSEP Concepts: The lunar surface science package for the Artemis program will hopefully exceed the capability of the ALSEP. There are multiple issues for discussion leading to the design of a new ArLSEP, needing requirements definition from the science community, NASA mission architecture, and NASA budget planners. 1. Delivery Mechanism Two possible projects currently provide capability to deliver scientific cargo to the lunar surface: 1) the Commercial Lunar Payload Services (CLPS) [5] and the Human Landing System (HLS) [6, 7]. Each project is controlled by a different organization within NASA and budgeted with different criteria although both support lunar exploration. The HLS system delivers crew (and potentially cargo) to human landing sites. If an ArLSEP is “predeployed” to such a site, the design must include power (either from the vehicle or independently) to keep the electronics functioning until deployed by the crew. If an ArLSEP is delivered on a vehicle after the crew is present on the lunar surface, safety protocols require adequate distance from the humans for impact from descent propelled sur-face regolith ejecta. This distance can not exceed the capability of the crew to walk (if no rover) to the vehicle for ArLSEP deployment. 2. Overall Guidelines The general design of ArLSEP will likely follow the ALSEP with a common system for communications and power; however, significant architecture differences between Apollo and Artemis exist. Power: The RTG will not be available for early Artemis missions nor likely follow-on Lunar Exploration Transportation Services (LETS) missions [8]. Thus, ArLSEP power must be supplied by solar arrays with sufficient battery capability to “keep alive” necessary electronics during any lunar surface eclipse period. Communication: The Artemis program is developing a series of communications satellites for lunar orbit to provide surface transmission of data and voice to Earth. Called “LunaNET”, this network is component useful for ArLSEP since south polar locations may not always have direct “line-of-sight” to Earth [9]. 3. Concept of Operations (ConOps) The general ConOps for ArLSEP is to deliver the package to lunar surface before the crew arrives, and then have the crew deploy the package after some period of time. This requires coordinated design (for power systems) and launch window (for schedule) on both the cargo and crew missions. Once the ArLSEP is deployed, it will operate autonomously for a number of years. It should be designed to be EVA compatible for crew maintenance and upgrade. 4. Notional Design (for discussion purpose only) The landing site near the South Pole is expected to have no eclipse cycle exceeding 5 days, so the “keep alive” power is 144 hours (6 days to include margin). A 12v ArLSEP will use rechargeable LiFePO4 cells, which are common in the Electric Vehicle (EV) industry. With a current of 5 amps and a 125 watt system, the mass is about 90kg. The comm. system and structure adds another 10kg, thus the “Central Station” is approximately 100kg. The solar power is collected on four arrays (each 2m above the surface), and the entire ArLSEP is designed to stow in a 2m x 1m x 1m volume. The experiment and instrument design will vary for each installation and add mass to the total (although they are expected to fit within the 2m3 volume). Seismic wave generation will likely not be provided with mortars, thus an electric “thumper” will be required. Active instruments such as imaging systems and sensing instruments will benefit from the additional power and communication capability provided by ArLSEP. Passive systems such as retroreflectors, witness plates, and cosmic dust collectors can be added to either the landing vehicle and/or the ArLSEP. With repeated HLS missions to the same human site, the ArLSEP can be expanded and easily maintained for long duration science collection on the lunar surface.

ALSEP↗

NASA LSII Lunar Simulant Project

Introduction: America has entered a new era of exploration. NASA’s Artemis program will lead humanity forward to the Moon and prepare us for the next giant leap, the exploration of Mars [1]. To champion technologies needed to live on and explore the Moon, NASA’s Space Technology Mission Directorate (STMD) established the Lunar Surface Innovation Initiative (LSII)[2].LSII's technology development portfolio includes: Utilizing the Moon’s resources; Establishing sustainable surface power; Building machinery and electronics that work in extreme environments, like super-chilly permanently shadowed craters; Mitigating lunar dust; Carrying out surface excavation, manufacturing and construction duties; and Extreme access which includes navigating and exploring the surface/subsurface. To support the development and testing of these technologies, LSII created the lunar simulant project, to create and/or acquire low-, medium-and high-fidelity lunar simulants to match the needs of STMD projects at all levels of technology readiness levels (TRL), as well as other NASA programs. There is not one bulk lunar simulant that will satisfy the needs of all projects. NASA's Approach to Simulants: Just as LSII's activities are being implemented through a combination of unique NASA work and public-private partnerships, NASA will work with commercial simulant providers to acquire simulants that meet NASA's needs. If warranted, NASA will develop simulants using government agencies, as was done with the NASA/USGS Lunar Highlands Type (NU-LHT)series of lunar simulants [3].NASA is also collaborating with the Johns Hopkins University Applied Physics Laboratory(JHUAPL) Lunar Surface Innovation Consortium (LSIC) in the development and characterization of lunar simulants [4]. Within NASA, a small team (< 10 people) is coordinating simulant activities across the agency, with team members located at several NASA centers. The overall objective of the project is to procure lunar simulants in sufficient amounts for earth-based testing of subsystems and systems in a variety of environments (i.e., laboratory, high-bay, thermal-vacuum chambers), required for Artemis missions to the Moon, as well as other missions carrying NASA lunar payloads, such as the Commercial Lunar Payload Services (CLPS)program [5]. Lunar Highlands Simulant: NASA's Artemis Program is targeting the lunar south pole region for initial human missions and the Artemis Base Camp. Hence, the LSII lunar simulant project is currently focusing on the mineralogy and properties of lunar highlands regolith [6 and 7]. Plagioclase-rich rocks (e.g., anorthosite, norite) are the dominant constituent in highlands simulants, with Shawmere, Stillwater, and White Mountain anorthosites being used in commercially available simulants. However, because these feedstocks are terrestrial in nature, they include hydrated minerals, carbon-bearing minerals, and other chemical signatures that are not present on the Moon, and these minor mineral assemblages need to be taken into account when trying to understand test procedures and results. Glass Component: While much attention has been placed on the rock/mineral component of lunar simulants, glass is just as important when creating simulants. The glass component in lunar regoliths is often greater than 50% by volume [8]. This component includes impact melt glass, dark matrix breccias, and agglutinates. However, this component is difficult, time-consuming and expensive to make. Most lunar simulants, past and current, have relied on basaltic cinder as a feedstock for glass. Getting better glass components at a lower cost, particularly agglutinates and glass with an anorthositic composition is a near-term objective that the NASA simulant project is trying to address . Characterization: It is extremely important for lunar simulants to be characterized by several analytical methods. Gruener et al. [9] and JHUAPL LSIC [10] conducted initial assessments of some of the commercially available simulants in 2019 and early 2020, before the global pandemic. Further analyses are needed to better quantify important parameters such as, modal mineralogy and glass content, particle shape, and particle size distribution. These quantified results can then be used in determining figures of merit (FOM) that show how well simulants compare to lunar regolith [11 and 12].

J E Gruener↗

Modification of Roberts' Theory for Rocket Exhaust Plumes Eroding Lunar Soil

In preparation for the Apollo program, Leonard Roberts developed a remarkable analytical theory that predicts the blowing of lunar soil and dust beneath a rocket exhaust plume. Roberts' assumed that the erosion rate is determined by the "excess shear stress" in the gas (the amount of shear stress greater than what causes grains to roll). The acceleration of particles to their final velocity in the gas consumed a portion of the shear stress. The erosion rate continues to increase until the excess shear stress is exactly consumed, thus determining the erosion rate. He calculated the largest and smallest particles that could be eroded based on forces at the particle scale, but the erosion rate equation assumes that only one particle size exists in the soil. He assumed that particle ejection angles are determined entirely by the shape of the terrain, which acts like a ballistic ramp, the particle aerodynamics being negligible. The predicted erosion rate and particle upper size limit appeared to be within an order of magnitude of small-scale terrestrial experiments, but could not be tested more quantitatively at the time. The lower particle size limit and ejection angle predictions were not tested.

Metzger, Philip T.↗

NASA’s Artemis Human Landing Systems: Enabling Lunar Exploration

On March 26, 2019, in keeping with Space Policy Directive-1, NASA was charged with landing the first woman and the next man on the South Pole of the Moon by 2024, followed by a sustained presence on and around the Moon by 2028. NASA’s Human Landing System (HLS) Program is responsible for the transportation in deep space to carry humans to and from the surface of the Moon, to be designed and developed by American companies for NASA’s Artemis lunar exploration program. On April 30, 2020, NASA announced the awardees for NASA’s Human Landing System contracts under Appendix H of the NextSTEP-2 Broad Agency Announcement: A Blue Origin-led team including Lockheed Martin, Northrup Grumman, and Draper; Dynetics (a Leidos company); and SpaceX. The companies began work in a multi-month base period during which NASA teams will work with the companies to streamline requirements, to establish standards and methods, to review required products and to share the NASA’s expertise in human spaceflight systems development. Following the base period, which ends in the spring of 2021, NASA will determine which company or companies will develop Artemis human landing systems for the initial demonstration missions, including the goal of landing on the Moon in 2024.This paper examines how the Human Landing System program is at the center of NASA’s Artemis lunar exploration program, designed to yield groundbreaking science, develop and utilize lunar surface resources and leverage the Moon as a proving ground for future Mars missions. While achieving the 2024 goal requires a focus on speed and the use of mature technologies, planning toward sustained operations to and from the lunar surface requires a focus on reliability and reusability.

Lisa Watson-Morgan↗