Search NASASearch

SEARCH · Search NASA

Results for “N,S-doped carbon nanotubes”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,470 records · Page 36

NASA's Innovative Entry Systems and TPS Technologies Enabling Commercial Space Missions

For over six decades, the NASA Ames Entry Systems and Technology Division has been a cornerstone of U.S. space exploration, delivering critical atmospheric entry solutions since Project Mercury and now increasingly supporting the commercial space sector. The Division provides reliable entry system solutions through a unique blend of expertise, national facilities, and systems integration knowledge, a combination that is difficult to replicate outside a dedicated government entity. Consistently successful, the TS Division remains central to NASA’s exploration objectives and significantly contributes to the transfer of technology to the commercial space sector, supporting more than ten commercial space companies and supplying flight heatshields to three of them in the past five years. Its strengths in Thermal Protection System (TPS) materials, aerothermodynamics, ground test facilities, and Entry, Descent, and Landing (EDL) systems engineering drive rapid development and sustained U.S. competitiveness in space. The Division's expertise in reusable and ablative thermal protection systems, as well as mechanically deployable entry systems primarily developed for NASA missions, now benefits commercial space missions. This presentation will highlight the vision and needs of these commercial space companies, how NASA-invented technologies meet mission requirements, and how these technologies enable and distinguish their efforts.

Ethiraj Venkatapathy

Performance of the Satellite Test Assistant Robot in JPL's Space Simulation Facility

An innovative new telerobotic inspection system called STAR (the Satellite Test Assistant Robot) has been developed to assist engineers as they test new spacecraft designs in simulated space environments. STAR operates inside the ultra-cold, high-vacuum, test chambers and provides engineers seated at a remote Operator Control Station (OCS) with high resolution video and infrared (IR) images of the flight articles under test. STAR was successfully proof tested in JPL's 25-ft (7.6-m) Space Simulation Chamber where temperatures ranged from +85 C to -190 C and vacuum levels reached 5.1 x 10 -6 torr. STAR's IR Camera was used to thermally map the entire interior of the chamber for the first time. STAR also made several unexpected and important discoveries about the thermal processes occurring within the chamber. Using a calibrated test fixture arrayed with ten sample spacecraft materials, the IR camera was shown to produce highly accurate surface temperature data. This paper outlines STAR's design and reports on significant results from the thermal vacuum chamber test.

Douglas McAffee

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

The In-Orbit Battery Reconditioning Experience On Board the Orion 1 Spacecraft

The Orion 1 spacecraft is a three-axis stabilized geostationary earth orbiting commercial communications satellite which was launched on November 29, 1994 aboard an Atlas II launch vehicle. The power subsystem is a dual bus, dual battery semi-regulated system with one 78 Ampere-hour nickel-hydrogen battery per bus. The batteries were built and tested by Eagle Picher Industries, Inc., of Joplin, MO and were integrated into the spacecraft by its manufacturer, Matra Marconi Space UK Ltd. This paper presents the results obtained during the first four in-orbit reconditioning cycles and compares the battery performance to ground test data. In addition, the on-station battery management strategy and implementation constraints are described. Battery performance has been nominal throughout each reconditioning cycle and subsequent eclipse season.

Hoover, S. A.

U.S. Pacific Coast Workshop Report on Preconstruction Research Recommendations (U.S. Offshore Wind Synthesis of Environmental Effects Research (SEER) Project)

In May 2022, the U.S. Offshore Wind Synthesis of Environmental Effects Research (SEER) project team hosted a stakeholder workshop focused on preconstruction (baseline) research needs for potential floating offshore wind (OSW) energy development on the U.S. Pacific Coast, including California, Oregon, and Washington. Prior to the workshop, the SEER team developed a set of initial synthesized research recommendations that were identified based on a review of relevant, publicly available resources and with advisory group input. The workshop covered three marine life breakout groups on subsequent days to discuss research recommendations related to 1) marine mammals and sea turtles, 2) fish and invertebrates, and 3) birds and bats. As part of the workshop, over a hundred participants from the public and private sectors provided feedback on various aspects of the initial research recommendations, including associated data and knowledge gaps, benefits/limitations of available methods and technologies, and technological advancements or infrastructure needed to address the recommendation. Approximately 1,000 total comments were received on the workshop MURAL boards and were synthesized in this report. Based on workshop feedback, SEER developed a final database of over 500 specific research recommendations based on more than 40 resources. In Fall 2022, the full database and a tool with updated synthesized research recommendations were disseminated on Tethys (https://tethys.pnnl.gov) to assist with informing future funding opportunities and research programming. There is a continued need to improve awareness of the potential environmental effects, monitoring technologies, and management strategies for floating OSW energy development on the U.S. Pacific Coast. Coordination of these activities will require the sustained involvement of multiple stakeholders from across sectors. Beyond the baseline considerations discussed in this workshop, future state-of-the-science activities should be planned to consider research needs across wind energy life cycle phases for all relevant wildlife taxa and associated habitat and ecosystem processes.

17 WIND ENERGY

Battery Study for the Shuttle Orbiter EAPU Upgrade

The use of Electric Auxiliary Power Unit (EAPU) in commercial, and military aviation, and in commercial electric automobiles, is reviewed. The specifications of the battery to be used in the space shuttle are reviewed, and the possible vendors discussed. The testing activity and the reliability and the safety features are presented.

Otzinger, Burton

Anode-less Solid-State Li–S Batteries Enabled by Fe-Stabilized Polysulfides

Anode-less solid-state lithium-sulfur batteries (SSLSBs) with lithium sulfide (Li 2 S) as the cathode promise a high energy density and ease of manufacturing. However, Li 2 S is plagued by poor conductivity, sluggish activation kinetics, and a poor cycle life. Here, in this study, we report an FeCl 3 -activated Li 2 S (FLS) cathode with solid-state polysulfide intermediates generated through a redox reaction between FeCl 3 and Li 2 S. This strategy is shown to boost the electrical conductivity of Li 2 S by 7 orders of magnitude and lower the activation barrier. During cycling, Fe plays a significant role in stabilizing the highly active polysulfide species, contributing to the exceptional electrochemical performance. The FLS cathode achieves 80% capacity retention over 500 cycles with >99% Li 2 S utilization. Furthermore, a Li-metal-free (anode-less) full cell retained over 80% of its initial capacity after 240 cycles. This work underscores the promise of leveraging Fe-stabilized polysulfides in enabling high-energy, long-lasting, solid-state Li-S batteries.

25 ENERGY STORAGE

Li 21 Ge 8 P 3 S 34 : New Lithium Superionic Conductor with Unprecedented Structural Type

Abstract Lithium superionic conductors are pivotal for enabling all‐solid‐state batteries, which aim to replace liquid electrolytes and enhance safety. Herein, we report the discovery of an unprecedented lithium superionic conductor, Li 21 Ge 8 P 3 S 34 , featuring a novel structural type and a new composition in the Li–Ge–P–S system. This material exhibits high lithium ionic conductivity of approximately 1.0 mS cm −1 at 303 K with a low activation energy of 0.20(1) eV. It's unique crystal structure was elucidated using three‐dimensional electron diffraction (3D ED) and further refined through combined powder X‐ray and neutron diffraction analyses. The structure consists of alternating two‐dimensional slabs: one of corner‐sharing GeS 4 tetrahedra and the other of isolated PS 4 tetrahedra, enabling efficient lithium‐ion transport through a tetrahedrally interconnected network of 1D, 2D, and 3D diffusion pathways. This distinctive structural motif provides a novel design strategy for next‐generation solid electrolytes, broadening the structural landscape of lithium superionic conductors. With further advancements in compositional tuning and interfacial engineering, Li 21 Ge 8 P 3 S 34 could contribute to the development of high‐performance all‐solid‐state batteries.

Chemistry

Energy-Optimal Vehicle Longitudinal Motion Control via Pontryagin’s Minimum Principle and Ultra-Local Model

Longitudinal vehicle motion control is essential for enhancing performance and optimizing a vehicle’s energy usage. However, it remains a challenging task due to the nonlinear and uncertain nature of vehicle dynamics, along with varying driving conditions. This paper presents a novel ultra-local optimal control approach based on Pontryagin’s Minimum Principle (PMP) that circumvents the need for detailed system identification by employing an ultra-local model. The control objective is to minimize the total energy consumption under boundary conditions while ensuring smooth traction force generation. The proposed approach is evaluated using a high-fidelity vehicle model in three representative scenarios: (i) nominal driving, (ii) a change in tire road friction coefficient (TRFC) from 0.5 to 0.65 and road slope from 0% to 5% during the maneuver, with target velocity unchanged, and (iii) a change in target velocity from 20 m/s to 0 m/s during the maneuver, while maintaining nominal TRFC and slope conditions. The simulation results demonstrate that the proposed method delivers robust performance, effectively balancing consumption and tracking accuracy in all tested scenarios.

Waleed khan, Muhammad [The University of Texas at

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce Askins

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce R Askins

Glauber’s Salt Composites for HVAC Applications: A Study on the Use of the T-History Method with a Modified Data Evaluation Methodology

Phase change materials (PCMs) can be utilized in buildings for peak load shifting in air conditioning systems, and the use of salt hydrate-based PCMs can reduce the cost of thermal energy storage devices. Glauber’s salt is an economical salt hydrate PCM with a melting point of around 32 °C. However, the desired melting range typically falls between 18 and 22 °C for building air conditioning applications. Although many researchers have characterized Glauber’s salt and its composites with modified melting points, enthalpy–temperature curves for composites of Glauber’s salt and NaCl are unavailable. In this study, we report the melting and solidification enthalpy–temperature curves for two different composites of Glauber’s salt and NaCl with a melting point of 21 °C obtained by the T-history method. Both composites contain NaCl to suppress the melting point, borax to reduce supercooling, and sodium polyacrylate as a thickener to enhance cyclic stability. The first composite with 12 wt.% NaCl demonstrated 139 kJ·kg−1 of latent heat of fusion, and the second composite with 9 wt.% NaCl demonstrated 171 kJ·kg−1. Both the composites have high volumetric energy densities compared to their organic counterparts with similar melting points.

Chemistry

Design, Build, and Testing of the Roman Space Telescope’s Wide Field Instrument Optical Stimulus System (SORC)

The Stimulus Of Ray Cones (SORC) is an optical stimulus system developed to verify, characterize, and calibrate the Roman Space Telescope’s (RST) Wide Field Instrument (WFI) under simulated operational conditions. SORC provides several critical test modes, the primary being point-source mode, which projects an image anywhere on the Focal Plane Assembly (FPA) detectors. This mode provides precise position knowledge of the FPA within WFI. Additional modes enable capturing WFI pupil alignment, evaluation of WFI’s selectable optical elements, and verification of focal plane fiber operation for higher-level system testing. The light source system incorporates a suite of narrowband and broadband fiber fed sources spanning the visible to near-infrared range, with options for pulsed or continuous wave illumination. SORC was designed and built at NASA’s Goddard Spaceflight Center (GSFC). Initial system-level testing occurred under ambient conditions in GSFC’s Spacecraft Systems Development and Integration Facility (SSDIF), followed by vacuum testing at operational temperatures (SORC at 214-222 K) in the Space Environment Simulator (SES). The system was then shipped to BAE Systems in Boulder, CO for post-shipment ambient and cryogenic testing before integration with WFI for two thermal vacuum test campaigns at cryogenic temperatures. This presentation will focus on design, development, and performance of SORC. Details of WFI verification and calibration using SORC, along with test results, have been published previously and will be referenced only as needed to describe SORC. The SORC ground test capability is critical to ensuring WFI meets stringent optical performance requirements, directly supporting the mission’s science objectives.

Stimulus of Ray Cones

Systematic determination of a material’s magnetic ground state from first principles

Abstract We present a self-consistent method based on first-principles calculations to determine the magnetic ground state of materials, regardless of their dimensionality. Our methodology is founded on satisfying the stability conditions derived from the linear spin wave theory (LSWT) by optimizing the magnetic structure iteratively. We demonstrate the effectiveness of our method by successfully predicting the experimental magnetic structures of NiO, FePS 3 , FeP, MnF 2 , FeCl 2 , and CuO. In each case, we compared our results with available experimental data and existing theoretical calculations reported in the literature. Finally, we discuss the validity of the method and the possible extensions.

Chemistry

Battery Definition for the Mars Environmental Survey Mission (MESUR) Pathfinder

Silver-zinc (Ag-Zn) battery technology has been baselined as the energy storage system for the MESUR mission. The mission profile will require the operation of this battery in a manner not usually seen for this technology. In particular, the combination of storage time followed by multiple cycles as a function of fluctuating temperatures and charge/discharge rates, and limited available time for charging has not been previously demonstrated.

Ag-Zn

Deep RL for Fast Long-Horizon Operations Scheduling on NASA's Carruthers Geocorona Observatory Mission

Spacecraft operations scheduling is a highly constrained, long-horizon combinatorial optimization problem that traditionally relies on heuristics, constraint programming, or manual planning. We present a scalable deep reinforcement learning framework developed and deployed for NASA’s Carruthers Geocorona Observatory mission. Our framework introduces a macro-action abstraction known as activity blocks coupled with dynamic action-masking to navigate the intractably large search space and strictly enforce complex power, thermal, and instrument constraints. The resulting architecture generates globally feasible schedules with overwhelming probability, establishes operational trust, and executes a full training cycle in under six hours, circumventing the need for policy robustness by enabling rapid, on-demand retraining. Further, resulting schedules outperform baseline heuristics in scheduled science quality. The deep reinforcement learning framework was deployed as the default operational scheduler for the Carruthers Geocorona Observatory mission from the outset of the mission, demonstrating that deep reinforcement learning can be trusted for real spacecraft operations under complex, evolving constraints.

Geocorona

The 1977 Goddard Space Flight Center Battery Workshop

The papers presented were derived from transcripts taken at the Tenth Annual Battery Workshop held at the Goddard Space Flight Center, November 15-17, 1977. The Workshop was attended by manufacturers, users, and government representatives interested in the latest results of testing, analysis, and development of the sealed nickel cadmium cell system. The purpose of the Workshop was to share flight and test experience, stimulate discussion on problem areas, and to review the latest technology improvements.

G Halpert