Search NASA⌕ Search

SEARCH · Search NASA

Results for “Program Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

The Human Research Program Grant Lifecycle & Data Integration Schedule: Infographic

The Human Research Program (HRP) Grant Lifecycle process can be described using information from several government authoritative sources with overlapping generalizations. It is the responsibility of the HRP Program Planning & Control (PP&C) Office and the Data Management Integration Office (DMIO)to interpret this information into a cohesive process that can be communicated to the human research organization. PP&C and DMIO have been exploring training opportunities to facilitate understanding through the form of infographics. This communication tool combines eye-catching visuals and text making complex information and data more digestible and shareable. The infographic poster tells a short story about a federally awarded grant and is intended to help both the new and experienced HRP workforce understand the timeline for a research procurement and where their specific tasks fall within the 4 phases of the grant lifecycle. The Pre-Award, Award, Post-Award, and Closeout phases are overlayed with business swimlanes so HRP stakeholders can see where they fit into the timeline rather than working in an isolated part. This includes the Chief Scientist Office (CSO), PP&C, the Data Management Integration Office (DMIO), the Principal Investigator (PI), the Element stakeholders, the LSDA Archivists, and the Research & Operations Integration (ROI) team along with the stakeholders in the Human Health and Performance Directorate. Additionally, the poster introduces (1) the HRP Data Integration Schedule identified in the HRP Data Management Plan HRP-48047, Table 8-2 and (2) a Smartsheet Solution to automate the grants tracking business process. Emphasis is given to the Data Integration Schedule which is the basis for the milestone tasks that are to be completed during the Post-Award phase in the grant lifecycle. The poster is also an opportunity to present the Smartsheet Solution, a software collaboration and work management tool used to assign tasks and track project progress. This PP&C FY24 effort will facilitate an end-to-end solution to track grants and provide insight to the health of HRP grant research procurements using metrics, reports, and dashboards.

J Peace↗

Evaluating GXS Impact in the Context of International Coordination

The proposed NOAA/NASA Geostationary eXtended Observations (GeoXO) program plans to include a hyperspectral infrared (IR) sounder on its central satellite. Expected to launch in the mid-2030s, the GeoXO Sounder (GXS) will join international counterparts in a geostationary orbit. Ahead of launch, the NASA Global Modeling and Assimilation Office (GMAO) assessed the potential effectiveness of GXS both as a single GEO IR sounder and as part of a global ring of such instruments, including those already being built by international agencies. Using an observing system simulation experiment (OSSE) framework, GXS was assessed from a global numerical weather prediction (NWP) perspective. The ability of GXS, both alone and as part of a global ring of GEO sounders, to improve weather prediction of thermodynamic variables was evaluated globally and regionally. Compared to a control, GXS dominated regional analysis and forecast improvements, and contributed significantly to global increases in forecast skill. However, more sustained global improvements on the order of 4 days rely on international partnerships. Using the FSOI metric over CONUS, the GXS observations provide the strongest radiance impact on the moist energy error norm reduction. Additionally, GXS shows the capability to improve hurricane forecast track errors, resulting in improved forecast warnings. Overall, the persistent atmospheric profile information from GXS over much of the western hemisphere provide an opportunity to improve the representation of weather systems and their forecasts.

Erica McGrath-Spangler↗

VIPER Rover: Flight Build and Environmental Test Status

The NASA Artemis Program plans to return humans to the Moon to stay. Extended human stays on the Moon will require substantial resources to sustain human presence, requiring continuous supplies delivered from the Earth. However, if some of the resources were indigenously available, Earth logistical requirements could be substantially reduced by “living off the land” with in-situ lunar resources. Local volatiles could be processed into propellants and human life-supporting needs, reducing risk of maintaining a permanent human presence on the Moon. LCROSS, LRO and other missions have confirmed the presence of lunar volatiles resources in polar regions, so the next step is to understand the physical distribution of those resources, as well as the scientific basis for how water got there, and why it is still there. The Volatiles Investigating Polar Exploration Resource (VIPER) is a surface mobility scientific platform, designed to spend ~100 days mapping and surveying four different Ice Stability Regions to understand the scientific nature and distribution of water and other volatiles. VIPER will also provide scientific mineralogical context of the lunar regolith, such as the presence of silicon and light metals in lunar regolith, providing a composite picture of resource availability and sustainment. This paper will discuss VIPER’s completion of the flight rover build, as well as current progress in environmental testing, preparedness for mission operations, and overall readying for launch integration with our CLPS partner. VIPER is managed within NASA’s Science Mission Directorate (SMD), utilizing the Commercial Lunar Payload Services (CLPS) lunar delivery model.

VIPER↗

Viper Rover: Flight Build and Environmental Test Status

The NASA Artemis Program plans to return humans to the Moon to stay. Extended human stays on the Moon will require substantial resources to sustain human presence, requiring continuous supplies delivered from the Earth. However, if some of the resources were indigenously available, Earth logistical requirements could be substantially reduced by “living off the land” with in-situ lunar resources. Local volatiles could be processed into propellants and human life-supporting needs, reducing risk of maintaining a permanent human presence on the Moon. LCROSS, LRO and other missions have confirmed the presence of lunar volatiles resources in polar regions, so the next step is to understand the physical distribution of those resources, as well as the scientific basis for how water got there, and why it is still there. The Volatiles Investigating Polar Exploration Resource (VIPER) is a surface mobility scientific platform, designed to spend ~100 days mapping and surveying four different Ice Stability Regions to understand the scientific nature and distribution of water and other volatiles. VIPER will also provide scientific mineralogical context of the lunar regolith, such as the presence of silicon and light metals in lunar regolith, providing a composite picture of resource availability and sustainment. This paper will discuss VIPER’s completion of the flight rover build, as well as current progress in environmental testing, preparedness for mission operations, and overall readying for launch integration with our CLPS partner. VIPER is managed within NASA’s Science Mission Directorate (SMD), utilizing the Commercial Lunar Payload Services (CLPS) lunar delivery model.

rover↗

VIPER Rover Flight Build and Environmental Test Status

The NASA Artemis Program plans to return humans to the Moon to stay. Extended human stays on the Moon will require substantial resources to sustain human presence, requiring continuous supplies delivered from the Earth. However, if some of the resources were indigenously available, Earth logistical requirements could be substantially reduced by “living off the land” with in-situ lunar resources. Local volatiles could be processed into propellants and human life-supporting needs, reducing risk of maintaining a permanent human presence on the Moon. LCROSS, LRO and other missions have confirmed the presence of lunar volatiles resources in polar regions, so the next step is to understand the physical distribution of those resources, as well as the scientific basis for how water got there, and why it is still there. The Volatiles Investigating Polar Exploration Resource (VIPER) is a surface mobility scientific platform, designed to spend ~100 days mapping and surveying four different Ice Stability Regions to understand the scientific nature and distribution of water and other volatiles. VIPER will also provide scientific mineralogical context of the lunar regolith, such as the presence of silicon and light metals in lunar regolith, providing a composite picture of resource availability and sustainment. This paper will discuss VIPER’s completion of the flight rover build, as well as current progress in environmental testing, preparedness for mission operations, and overall readying for launch integration with our CLPS partner. VIPER is managed within NASA’s Science Mission Directorate (SMD), utilizing the Commercial Lunar Payload Services (CLPS) lunar delivery model.

rover↗

Model Correlation and Thermal Analysis of xEMU Boot at Lunar South Pole Temperatures

The National Aeronautics and Space Administration (NASA) Artemis program plans to send astronauts to the lunar south pole, a region of the moon that is colder than previous lunar missions and low earth orbit operations. The spacesuit boots that will be used on these missions will be directly impacted by these extremely cold temperatures (down to ~50 K). To assess the performance of the Exploration Extravehicular Mobility Unit (xEMU) lunar boot in these extreme temperatures, the boot was tested at the Jet Propulsion Lab (JPL) in the Cryogenic Ice Transfer, Acquisition Development, and Excavation Laboratory (CITADEL) thermal vacuum (TVAC) chamber. This data was used to correlate thermal models to predict operational performance of the boots on the lunar south pole. This paper documents the data analysis, thermal boot model correlation, and operational predictions conducted using data from the xEMU TVAC test. Data from the test series was used to determine expected thermal conductances within the boot and between the boot and environment. These conductances were used to correlate a Thermal Desktop model of the xEMU boot across 10 different test points which varied external temperature, internal boot ventilation flowrate, and contact pressure. The correlated model was then used to predict operational performance in the lunar south pole. While the predictions indicate promising evidence for performance of the boots at the 100K test point, there is still substantial uncertainty in performance, particularly at the 48K test point. The results of this test series and model correlation stress the importance of improved testing for characterizing the expected thermal resistance between the outside of the boot and the lunar surface.

thermal analysis↗

Model Correlation and Thermal Analysis of xEMU Boot at Lunar South Pole Temperatures

The National Aeronautics and Space Administration (NASA) Artemis program plans to send astronauts to the lunar south pole, a region of the moon that is colder than previous lunar missions and low earth orbit operations. The spacesuit boots that will be used on these missions will be directly impacted by these extremely cold temperatures (down to ~50 K). To assess the performance of the Exploration Extravehicular Mobility Unit (xEMU) lunar boot in these extreme temperatures, the boot was tested at the Jet Propulsion Lab (JPL) in the Cryogenic Ice Transfer, Acquisition Development, and Excavation Laboratory (CITADEL) thermal vacuum (TVAC) chamber. This data was used to correlate thermal models to predict operational performance of the boots on the lunar south pole. This paper documents the data analysis, thermal boot model correlation, and operational predictions conducted using data from the xEMU TVAC test. Data from the test series was used to determine expected thermal conductances within the boot and between the boot and environment. These conductances were used to correlate a Thermal Desktop model of the xEMU boot across 10 different test points which varied external temperature, internal boot ventilation flowrate, and contact pressure. The correlated model was then used to predict operational performance in the lunar south pole. While the predictions indicate promising evidence for performance of the boots at the 100K test point, there is still substantial uncertainty in performance, particularly at the 48K test point. The results of this test series and model correlation stress the importance of improved testing for characterizing the expected thermal resistance between the outside of the boot and the lunar surface.

xEMU↗

Integrated High Payoff Rocket Propulsion Technologies Program Material Development Plan

In this viewgraph presentation, IMWG (IHPRPT Materials Working Group) government and industry members, together with the IHPRPT (Integrated High Payoff Rocket Propulsion Technologies Program Material Development Plan) National Component Leads, have developed a materials plan to address the critical needs of the IHPRPT community: (1) liquids boost and orbit transfer; (2) solids boost and orbit transfer; (3) tactical propulsion; and (4) spacecraft propulsion. Criticality of materials' role in achieving IHPRPT goals is evidenced by the significant investment over the next five years.

Clinton, R. G., Jr.↗

Preliminary planning for the Satellite Precipitation And Cloud Experiment (SPACE) Field Program

Preliminary planning has been performed to support NASA/Marshall Space Flight Center (MSFC) in the coordination of the field experiment to be conducted in Central Tennessee, Northern Alabama, and Mississippi during the Spring/Summer of 1986. The goal of Satellite Precipitation and Cloud Experiments (SPACE) is to investigate mesoscale cloud/precipitation systems and development of associated satellite remote sensing technology. The field program will incorporate remote sensing observations from aircraft, satellite imagery, radar observations, ground based lightning measurements, rawinsonde observations, and various surface meteorological observations. The coordination of existing and special observation networks will provide a data base for analysis of precipitation events and provide ground truth comparisons for remote sensing capabilities. Existing surface-based observational networks include National Weather Service Meso/Alpha Scale Rawinsonde, radar, and surface measurements; the Tennessee Valley Authority automated and manual precpitation recording stations; and NASA/MSFC lightning measurement stations. Special observational features to be implemented include a meso/beta scale rawinsonde network, a special surface observational network within the rawinsonde network, and the installation of a RADAP II/ICRAD data processing unit on the National Weather Service radar at Nashville, TN. Initial coordination of these observational requirements to accomplish the goals of SPACE have been performed.

Williams, S. F.↗

Human Research Program Integrated Research Plan

Crew health and performance are critical to successful human exploration beyond low Earth orbit. The Human Research Program (HRP) is essential to enabling extended periods of space exploration because it provides knowledge and tools to mitigate risks to human health and performance. Risks include physiological effects from radiation and hypogravity environments, as well as unique challenges in medical support, human factors, and behavioral or psychological factors. The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies and tools to enable safe, reliable, and productive human space exploration. Without HRP results, NASA will face unknown and unacceptable risks for mission success and post-mission crew health. This Integrated Research Plan (IRP) describes (1) HRP's approach and research activities that are intended to address the needs of human space exploration and serve HRP customers and (2) the method of integration for risk mitigation. The scope of the IRP is limited to the activities that can be conducted with the resources available to the HRP; it does not contain activities that would be performed if additional resources were available. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration.

Steinberg, Susan↗

UH-60 Airloads Program - Status and plans

The present paper addresses the background of the UH-60 Airloads Program, the instrumentation, data requirements, and the development of the data collection and storage systems. An outline of the data points to be collected and detail of data access are presented. The Outside Experiment Program, in which researchers outside of NASA propose potential flight experiments, is described. Attention is given to the development of research systems necessary to conduct the program. Significant improvements in data acquisition, processing, and storage quality are stated as the primary objectives as dictated from lessons learned during past rotor airloads flight research programs.

Kufeld, Robert M.↗

A description of the research for period 3 of a research program on the planning and control for space robotic manipulators

The objective of this research program is to develop control techniques to enable future space robotic systems to meet their mission objectives. This report covers our work during the past year, 1 Feb. 1991 - 31 Jan. 1992 in this three-year research program (1 Aug. 1990 - 31 Jul. 1993). During this past year, we have made very significant progress in our theoretical and analytical work on algorithm development, our simulation studies, and our experimental investigation. This progress is summarized.

Dubowsky, Steven↗

Comparing and Integrating Constraint Programming and Temporal Planning for Quantum Circuit Compilation

Recently, the makespan-minimization problem of compiling a general class of quantum algorithms into near-term quantum processors has been introduced to the AI community. The research demonstrated that temporal planning is a strong solution approach for the studied class of quantum circuit compilation (QCC) problems. In this paper, we explore the use of methods from operations research, specifically constraint programming (CP), as an alternative and complementary approach to temporal planning. We also extend previous work by introducing two new problem variations that incorporate important characteristics identified by the quantum computing community. We apply temporal planning and CP to the baseline and extended QCC problems as both stand-alone and hybrid approaches. The hybrid method uses solutions found by temporal planning to warm-start CP, leveraging the ability of temporal planning to find satisficing solutions to problems with a high degree of task optionality, an area that CP typically struggles with. These solutions are then used to seed the CP formulation which significantly benefits from inferred bounds on planning horizon and task counts provided by the warm-start. Our extensive empirical evaluation indicates that while stand-alone CP is not competitive with temporal planning, except for the smallest problems, CP in a hybrid setting is beneficial for all temporal planners in all problem classes.

quantum circuit compilation↗

The cryogenics analysis program for Apollo mission planning and analysis

The cryogenics analysis program was developed as a simplified tool for use in premission planning operations for the Apollo command service module. Through a dynamic development effort, the program has been extended to include real time and postflight analysis capabilities with nominal and contingency planning features. The technical aspects of the program and a comparison of ground test and mission data with data generated by using the cryogenics analysis program are presented. The results of the program capability to predict flight requirements also are presented. Comparisons of data from the program with data from flight results, from a tank qualifications program, and from various system anomalies that have been encountered are discussed. Future plans and additional considerations for the program also are included. Among these plans are a three tank management scheme for hydrogen, venting profile generation for Skylab, and a capability for handling two gas atmospheres. The plan for two gas atmospheres will involve the addition of the capability to handle nitrogen as well as oxygen and hydrogen.

Scott, W.↗

National Electric Vehicle Infrastructure Formula Program (ANNUAL REPORT | PLAN YEAR 2023–2024)

The 2021 Infrastructure Investment and Jobs Act, also known as the Bipartisan Infrastructure Law (BIL), invests $\$$7.5 billion to build out a national electric vehicle (EV) charging network and created the Joint Office of Energy and Transportation (Joint Office) to “study, plan, coordinate, and implement issues of joint concern between the two agencies.” The BIL represents a historic effort to electrify the U.S. transportation system, which has significant potential to reduce U.S. greenhouse gas emissions and help tackle the climate crisis. The U.S. transportation sector accounts for one-third of the nation’s greenhouse gas emissions—the largest share of all primary sectors, including electricity production, industry, commercial and residential, and agriculture. The National Electric Vehicle Infrastructure (NEVI) Formula Program, one of the BIL funding programs, was launched in February 2022, providing nearly $\$$5 billion over 5 years to help states, the District of Columbia, and Puerto Rico (hereafter referred to as “states”) create a network of EV charging stations beginning with designated Federal Highway Administration (FHWA) Alternative Fuel Corridors (AFCs), with an emphasis on the Interstate Highway System. The funding is made available to the states in allocations each year pending FHWA certification of the state’s annual deployment plan. The NEVI program is in its third year, so there's a lot to celebrate. As of July 2024, 39 states have released solicitations for their NEVI programs and eight states have opened their first NEVI-funded stations (61 ports in total), which have already powered thousands of charging sessions for EV drivers across America. Additional stations are in the pipeline with more than 2,500 additional ports having been awarded or conditionally awarded by the states. All states released their Fiscal Year (FY) 2024 deployment plan updates to reflect the new minimum requirements and guidance, and several states added newly designated EV AFCs in their FY 2024 deployment plan updates, bringing the total AFC network of EV corridors to more than 81,000 miles.

33 ADVANCED PROPULSION SYSTEMS↗

Detailed Test Plan Redundant Sensor Strapdown IMU Evaluation Program

The test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The subjects discussed are: (1) test philosophy and limitations, (2) test sequence, (3) equipment specifications, (4) general operating procedures, (5) calibration procedures, (6) alignment test phase, and (7) navigation test phase. The data and analysis requirements are analyzed.

Hartwell, T.↗

The NASA-OAST earth-to-orbit propulsion technology program - The action plan

The paper discusses the primary objective of the NASA-OAST earth-to-orbit (ETO) propulsion technology program, namely, to completely overhaul the nation's liquid rocket design and analysis capabilities which were found to be severely limited when used for the design and development of the Space Shuttle Main Engine (SSME). Meeting this objective is to provide a much sounder, very comprehensive technology base that will enable the cost-effective low-risk development, acquisition, and operation of high-performance, expendable, or reusable ETO propulsion systems. This in turn will enable the future development of space transportation system launch vehicles with greatly reduced life-cycle costs. Work is carried out in three major areas: combustion devices, turbomachinery, and controls and health management.

Escher, W. J. D.↗