Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

The Application of Lean Thinking Principles and Kaizen Practices for the Successful Development and Implementation of the Ares I-X Flight Test Rocket and Mission

On October 28, 2009 the Ares I-X flight test rocket launched from Kennedy Space Center and flew its suborbital trajectory as designed. The mission was successfully completed as data from the test, and associated development activities were analyzed, transferred to stakeholders, and well documented. A positive lesson learned from Ares I-X was that the application of lean thinking principles and kaizen practices was very effective in streamlining development activities. Ares I-X, like other historical rocket development projects, was hampered by technical, cost, and schedule challenges and if not addressed boldly could have resulted in cancellation of the test. The mission management team conducted nine major meetings, referred to as lean events, across its elements to assess plans, procedures, processes, requirements, controls, culture, organization, use of resources, and anything that could be changed to optimize schedule or reduce risk. The preeminent aspect of the lean events was the focus on value added activities and the removal or at least reduction in non-value added activities. Trained Lean Six Sigma facilitators assisted the Ares I-X developers in conducting the lean events. They indirectly helped formulate the mission s own unique methodology for assessing schedule. A core team was selected to lead the events and report to the mission manager. Each activity leveraged specialized participants to analyze the subject matter and its related processes and then recommended alternatives and solutions. Stakeholders were the event champions. They empowered and encouraged the team to succeed. The keys to success were thorough preparation, honest dialog, small groups, adherence to the Ares I-X ground rules, and accountability through disciplined reporting and tracking of actions. This lean event formula was game-changing as demonstrated by Ares I-X. It is highly recommended as a management tool to help develop other complex systems efficiently. The key benefits for Ares I-X were obtaining unambiguous schedule margin, defining enabling options for risk reduction, and most importantly a stronger more unified team.

Askins, B. R.↗

Developing integrated parametric planning models for budgeting and managing complex projects

The applicability of integrated parametric models for the budgeting and management of complex projects is investigated. Methods for building a very flexible, interactive prototype for a project planning system, and software resources available for this purpose, are discussed and evaluated. The prototype is required to be sensitive to changing objectives, changing target dates, changing costs relationships, and changing budget constraints. To achieve the integration of costs and project and task durations, parametric cost functions are defined by a process of trapezoidal segmentation, where the total cost for the project is the sum of the various project cost segments, and each project cost segment is the integral of a linearly segmented cost loading function over a specific interval. The cost can thus be expressed algebraically. The prototype was designed using Lotus-123 as the primary software tool. This prototype implements a methodology for interactive project scheduling that provides a model of a system that meets most of the goals for the first phase of the study and some of the goals for the second phase.

Etnyre, Vance A.↗

Space Technology 5: Pathfinder for Future Micro-Sat Constellations

The Space Technology 5 (ST-5) Project, currently in the implementation phase, is part of the National Aeronautics and Space Administration (NASA) s New Millennium Program (NMP). ST-5 will consist of a constellation of three miniature satellites, each with mass less than 25 kg and size approximately 60 cm by 30 cm. ST-5 addresses technology challenges, as well as fabrication, assembly, test and operations strategies for future micro-satellite missions. ST-5 will be deployed into a highly eccentric, geo-transfer orbit (GTO). This will expose the spacecraft to a high radiation environment as well as provide a low level magnetic background. A three-month flight demonstration phase is planned to validate the technologies and demonstrate concepts for future missions. Each ST-5 spacecraft incorporates NMP competitively-selected breakthrough technologies. These include Cold Gas Micro-Thrusters for propulsion and attitude control, miniature X-band transponder for space-ground communications, Variable Emittance Coatings for dynamic thermal control, and CULPRiT ultra low power logic chip used for Reed-Solomon encoding. The ST-5 spacecraft itself is a technology that can be infused into future missions. It is a fully functional micro-spacecraft built within tight volume and mass constraints. It is built to withstand a high radiation environment, large thermal variations, and high launch loads. The spacecraft power system is low-power and low-voltage, and is designed to turn on after separation &om the launch vehicle. Some of the innovations that are included in the ST-5 design are a custom spacecraft deployment structure, magnetometer deployment boom, nutation damper, X-band antenna, miniature spinning sun sensor, solar array with triple junction solar cells, integral card cage assembly containing single card Command and Data Handling and Power System Electronics, miniature magnetometer, and lithium ion battery. ST-5 will demonstrate the ability of a micro satellite to perform research-quality science. Each ST-5 spacecraft will deploy a precision magnetometer to be used both for attitude determination and as a representative science instrument. The spacecraft has been developed with a low magnetic signature to avoid interference with the magnetometer. The spacecraft will be able to detect and respond autonomously to science events, i.e. significant changes in the magnetic field measurements. The three spacecraft will be a pathfinder for future constellation missions. They will be deployed to demonstrate an appropriate geometry for scientific measurements as a constellation. They will be operationally managed as a constellation, demonstrating automation and communication strategies that will be useful for future missions. The technologies and future mission concepts will be validated both on the ground and in space. Technologies will be validated on the ground by a combination of component level and system level testing of the flight hardware in a thermal vacuum environment. In flight, specific validation runs are planned for each of the technologies. Each validation run consists of one or more orbits with a specific validation objective. This paper will describe the ST-5 mission, and the applicability of the NMP technologies, spacecraft, and mission concepts to future missions. It will also discuss the validation approach for the ST-5 technologies and mission concepts.

Carlisle, Candace↗

ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

In 2008 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organization to find ways to reduce the costs of International Space station (ISS) console operations in the Mission Control Center (MCC). Each MOD organization was asked to identify projects that would help them attain a goal of a 30% reduction in operating costs by 2012. The MOD Operations and Planning organization responded to this challenge by launching several software automation projects that would allow them to greatly improve ISS console operations and reduce staffing and operating costs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the plan of eliminating two full time ISS console support positions by 2012. This will account for an overall 10 EP reduction in staffing for the Operations and Planning organization. These automation projects focused on utilizing software to automate many administrative and often repetitive tasks involved with processing ISS planning and daily operations information. This information was exchanged between the ground flight control teams in Houston and around the globe, as well as with the ISS astronaut crew. These tasks ranged from managing mission plan changes from around the globe, to uploading and downloading information to and from the ISS crew, to even more complex tasks that required multiple decision points to process the data, track approvals and deliver it to the correct recipient across network and security boundaries. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture between several planning tools; as well as a engaging a previously research level technology (TRL 2-3) developed by Ames Research Center (ARC) that utilized an intelligent agent based system to manage and automate file traffic flow, archiving f data, and generating console logs. This technology called OCAMS (OCA (Orbital Communication System) Management System), is now considered TRL level 9 and is in daily use in the Mission Control Center in support of ISS operations. These solutions have not only allowed for improved efficiency on console; but since many of the previously manual data transfers are now automated, many of the human error prone steps have been removed, and the quality of the planning products has improved tremendously. This has also allowed our Planning Flight Controllers more time to focus on the abstract areas of the job, (like the complexities of planning a mission for 6 international crew members with a global planning team), instead of being burdened with the administrative tasks that took significant time each console shift to process. The resulting automation solutions have allowed the Operations and Planning organization to realize significant cost savings for the ISS program through 2020 and many of these solutions could be a viable

Hall, Timothy A.↗

Systems Analysis Approach for the NASA Environmentally Responsible Aviation Project

This conference paper describes the current systems analysis approach being implemented for the Environmentally Responsible Aviation Project within the Integrated Systems Research Program under the NASA Aeronautics Research Mission Directorate. The scope and purpose of these systems studies are introduced followed by a methodology overview. The approach involves both top-down and bottoms-up components to provide NASA s stakeholders with a rationale for the prioritization and tracking of a portfolio of technologies which enable the future fleet of aircraft to operate with a simultaneous reduction of aviation noise, emissions and fuel-burn impacts to our environment. Examples of key current results and relevant decision support conclusions are presented along with a forecast of the planned analyses to follow.

Kimmel, William M.↗

Balancing Participation and Speed: A Polycentric Governance Lens on Renewable‐Energy Siting

Siting and permitting for renewable projects vary in process and authority structures. Such variation can create coordination challenges and inconsistent public participation processes. We develop a Governance Trade-Off Matrix to classify permitting processes by (1) authority structure (polycentric vs. monocentric) and (2) procedural extensiveness (minimal vs. extensive). The matrix shows when jurisdictional dispersion enables timely implementation and when it creates coordination breakdowns. We propose testable hypotheses on how governance design affects project timelines, conflict escalation, and local acceptance. Here, the framework highlights design levers, like single lead agencies, structured public involvement, and statutory shot clocks, to reconcile meaningful local input with urgent climate imperatives.

14 SOLAR ENERGY↗

The International Space Life Sciences Strategic Planning Working Group

Throughout the 1980s, ESA and the space agencies of Canada, Germany, France, Japan, and the U.S. have pursued cooperative projects bilaterally and multilaterally to prepare for, and to respond to, opportunities in space life sciences research previously unapproachable in scale and sophistication. To cope effectively with likely future space research opportunities, broad, multilateral, coordinated strategic planning is required. Thus, life scientists from these agencies have allied to form the International Space Life Sciences Strategic Planning Working Group. This Group is formally organized under a charter that specifies the purpose of the Working Group as the development of an international strategic plan for the space life sciences, with periodic revisions as needed to keep the plan current. The plan will be policy-, not operations-oriented. The Working Group also may establish specific implementation teams to coordinate multilateral science policy in specific areas; such teams have been established for space station utilization, and for sharing of flight equipment.

White, Ronald J.↗

Fuzzy Logic Trajectory Design and Guidance for Terminal Area Energy Management

The second generation reusable launch vehicle will leverage many new technologies to make flight to low earth orbit safer and more cost effective. One important capability will be completely autonomous flight during reentry and landing, thus making it unnecessary to man the vehicle for cargo missions with stringent weight constraints. Implementation of sophisticated new guidance and control methods will enable the vehicle to return to earth under less than favorable conditions. The return to earth consists of three phases--Entry, Terminal Area Energy Management (TAEM), and Approach and Landing. The Space Shuttle is programmed to fly all three phases of flight automatically, and under normal circumstances the astronaut-pilot takes manual control only during the Approach and Landing phase. The automatic control algorithms used in the Shuttle for TAEM and Approach and Landing have been developed over the past 30 years. They are computationally efficient, and based on careful study of the spacecraft's flight dynamics, and heuristic reasoning. The gliding return trajectory is planned prior to the mission, and only minor adjustments are made during flight for perturbations in the vehicle energy state. With the advent of the X-33 and X-34 technology demonstration vehicles, several authors investigated implementing advanced control methods to provide autonomous real-time design of gliding return trajectories thus enhancing the ability of the vehicle to adjust to unusual energy states. The bulk of work published to date deals primarily with the approach and landing phase of flight where changes in heading angle are small, and range to the runway is monotonically decreasing. These benign flight conditions allow for model simplification and fairly straightforward optimization. This project focuses on the TAEM phase of flight where mathematically precise methods have produced limited results. Fuzzy Logic methods are used to make onboard autonomous gliding return trajectory design robust to a wider energy envelope, and the possibility of control surface failures, thus increasing the flexibility of unmanned gliding recovery and landing.

Burchett, Bradley↗

The Utility of the OMI HCHO/NO2 in Air Quality Decision-Making Activities

I will discuss a novel and practical application of the OMI HCHU and NO2 data products to the "weight of evidence" in the air quality decision-making process (e.g., State Implementation Plan (SIP)) for a city, region, or state to demonstrate that it is making progress toward attainment of the National Ambient Air Quality Standard (NAAQS) for ozone. Any trend, or lack thereof, in the observed OMI HCHO/NO2 may support that an emission control strategy implemented to reduce ozone is or is not occurring for a metropolitan area. In addition, the observed OMI HCHO/NO2 may be used to define new emission control strategies as the photochemical environments of urban areas evolve over time. I will demonstrate the utility of the OMI HCHO/NO2 over the U.S. for air quality applications with support from simulations with both a regional model and a photochemical box model. These results support mission planning of an OMI-like instrument for the proposed GEO-CAPE satellite that has as one of its objectives to study air quality from space. However, I'm attending the meeting as the Aura Deputy Project Scientist, so I don't technically need to present anything to justify the travel.

Duncan, Bryan↗

Study of multiple asteroid flyby missions

The feasibility, scientific objectives, mission profile characteristics, and implementation of an asteroid belt exploration mission by a spacecraft guided to intercept three or more asteroids at close range are discussed. A principal consideration in planning a multiasteroid mission is to cut cost by adapting an available and flight-proven spacecraft design such as Pioneer F and G, augmenting its propulsion and guidance capabilities and revising the scientific payload complement in accordance with required mission characteristics. Spacecraft modification necessary to meet the objectives and requirements of the mission were studied. A ground rule of the study was to hold design changes to a minimum and to utilize available technology as much as possible. However, with mission dates not projected before the end of this decade, a reasonable technology growth in payload instrument design and some subsystem components is anticipated that can be incorporated in the spacecraft adaptation.

Source record↗

Mars Pathfinder mission operations concepts

The Mars Pathfinder Project plans a December 1996 launch of a single spacecraft. After jettisoning a cruise stage, an entry body containing a lander and microrover will directly enter the Mars atmosphere and parachute to a hard landing near the sub-solar latitude of 15 degrees North in July 1997. Primary surface operations last for 30 days. Cost estimates for Pathfinder ground systems development and operations are not only lower in absolute dollars, but also are a lower percentage of total project costs than in past planetary missions. Operations teams will be smaller and fewer than typical flight projects. Operations scenarios have been developed early in the project and are being used to guide operations implementation and flight system design. Recovery of key engineering data from entry, descent, and landing is a top mission priority. These data will be recorded for playback after landing. Real-time tracking of a modified carrier signal through this phase can provide important insight into the spacecraft performance during entry, descent, and landing in the event recorded data is never recovered. Surface scenarios are dominated by microrover activity and lander imaging during 7 hours of the Mars day from 0700 to 1400 local solar time. Efficient uplink and downlink processes have been designed to command the lander and microrover each Mars day.

Sturms, Francis M., Jr.↗

Design for Reliability and Safety Approach for the NASA New Launch Vehicle

The United States National Aeronautics and Space Administration (NASA) is in the midst of a space exploration program intended for sending crew and cargo to the international Space Station (ISS), to the moon, and beyond. This program is called Constellation. As part of the Constellation program, NASA is developing new launch vehicles aimed at significantly increase safety and reliability, reduce the cost of accessing space, and provide a growth path for manned space exploration. Achieving these goals requires a rigorous process that addresses reliability, safety, and cost upfront and throughout all the phases of the life cycle of the program. This paper discusses the "Design for Reliability and Safety" approach for the NASA new crew launch vehicle called ARES I. The ARES I is being developed by NASA Marshall Space Flight Center (MSFC) in support of the Constellation program. The ARES I consists of three major Elements: A solid First Stage (FS), an Upper Stage (US), and liquid Upper Stage Engine (USE). Stacked on top of the ARES I is the Crew exploration vehicle (CEV). The CEV consists of a Launch Abort System (LAS), Crew Module (CM), Service Module (SM), and a Spacecraft Adapter (SA). The CEV development is being led by NASA Johnson Space Center (JSC). Designing for high reliability and safety require a good integrated working environment and a sound technical design approach. The "Design for Reliability and Safety" approach addressed in this paper discusses both the environment and the technical process put in place to support the ARES I design. To address the integrated working environment, the ARES I project office has established a risk based design group called "Operability Design and Analysis" (OD&A) group. This group is an integrated group intended to bring together the engineering, design, and safety organizations together to optimize the system design for safety, reliability, and cost. On the technical side, the ARES I project has, through the OD&A environment, implemented a probabilistic approach to analyze and evaluate design uncertainties and understand their impact on safety, reliability, and cost. This paper focuses on the use of the various probabilistic approaches that have been pursued by the ARES I project. Specifically, the paper discusses an integrated functional probabilistic analysis approach that addresses upffont some key areas to support the ARES I Design Analysis Cycle (DAC) pre Preliminary Design (PD) Phase. This functional approach is a probabilistic physics based approach that combines failure probabilities with system dynamics and engineering failure impact models to identify key system risk drivers and potential system design requirements. The paper also discusses other probabilistic risk assessment approaches planned by the ARES I project to support the PD phase and beyond.

Safie, Fayssal, M.↗

SEEDS Moving Groups and CHARIS Status Updates

We present the status update for the SEEDS Moving Groups category. To date, we have observed 59 targets and currently have more than 20 candidates. We also present the expected scientific capabilities of CHARIS, the Coronagraphic High Angular Resolution Imaging Spectrograph, which is being built for the Subaru 8.2 m telescope of the National Astronomical Observatory of Japan. CHARIS will be implemented behind the new extreme adaptive optics system at Subaru, SCExAO, and the existing 188-actuator system AO188. CHARIS will offer three observing modes over near~infrared wavelengths from 0.9 to 2.4 microns (the y-, J-, H-, and K-bands), including a low-spectral-resolution mode covering this entire wavelength range and a high-resolution mode within a single band. With these capabilities, CHARIS will offer exceptional sensitivity for discovering giant exoplanets, and will enable detailed characterization of their atmospheres, CHARIS, the only planned high-contrast integral field spectrograph on an 8m-class telescope in the Northern Hemisphere, will complement the similar instruments such as Project 1640 at Palomar, and GPI and SPHERE in Chile.

McElwain, Michael↗

Solar System Escape Architecture for Revolutionary Science

Our most distance spacecraft, Voyager 1 and Voyager 2, recently reached the boundary of the solar system known as the Heliopause. Beyond this boundary lies interstellar space, and, at tremendous distance, the stars. The Voyager spacecraft have shown us that the Heliopause is a dynamic, rapidly changing environment, varying greatly as the fields and effects emanating from the sun are met by a host of forces pushing in from our nearby galactic neighborhood. This is the region we aim to explore. Specifically we aim to develop a mission architecture and spacecraft concept capable of reaching the Heliopause (approximately100 AU (Astronomical Units)) region in multiple directions of interest, with a variety of scientific instrument suites, within a reasonable timeframe (about 15 years.) This report details our Phase 1 work including science goal definition, trajectory planning, technology research, mission planning, instrument selection, spacecraft design, and more. We present an architecture employing a 250-meter by 250-meter solar sail with a 175 kilogram spacecraft. This spacecraft could carry a variety of instrument suites depending on the destination, time, and other factors. The spin-stabilized spacecraft would powered by a small radioisotope power system (about 20 watts), makes use of an optical communication system, and carries 3 extensible booms for instrument accommodation as visible in the sketch and rendering below. We conclude that it would be reasonable to implement the architecture described herein in the 2020-2030 timeframe based on likely near-term technological and material advances. We are confident that cruise times of around 15 years could be achieved to science-rich destinations. This report details the approach we used to come to these conclusions and identifies some of the steps along the way. We utilized a variety of methodologies involving our full capability at JPL (Jet Propulsion Laboratory) - from small point studies to large collaborative engineering processes. This paper also describes potential industry partnerships and costing information, and includes the methods used to account for our project’s significant deviation from any prior mission in the NASA costing tool database. Outreach and public engagement is an important part of NASA activities. We engaged in several different forms of this outreach and describe them in this report. We conclude with some open questions and a summary of activities we hope to engage in with Phase 2 funding. The entire team would like to thank the NIAC (NASA Innovative Advanced Concepts) program for the opportunity to investigate this fascinating and challenging concept. The Voyager program gives us tantalizing clues as to the nature and behavior of the Heliopause – the boundary between the sun’s influence and the interstellar medium. This information comes from forty-year old instruments designed to study the outer planets. A targeted Heliopause investigation would give insight into the formation of the solar system, the role of the sun in the local interstellar neighborhood, and contribute to human exploration planning by helping to predict periods of low galactic cosmic ray (GCR) penetration into the inner solar system.

Spacecraft↗

Software cost/resource modeling: Deep space network software cost estimation model

A parametric software cost estimation model prepared for JPL deep space network (DSN) data systems implementation tasks is presented. The resource estimation model incorporates principles and data from a number of existing models, such as those of the General Research Corporation, Doty Associates, IBM (Walston-Felix), Rome Air Force Development Center, University of Maryland, and Rayleigh-Norden-Putnam. The model calibrates task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit JPL software lifecycle statistics. The estimation model output scales a standard DSN work breakdown structure skeleton, which is then input to a PERT/CPM system, producing a detailed schedule and resource budget for the project being planned.

Tausworthe, R. J.↗

International solar system exploration - Opportunities and obstacles

A review is conducted of the exploration of the solar system carried out with the aid of various types of spacecraft during the past two decades, taking into account also space missions planned for thy next few years. A wealth of information has been obtained regarding the planets and their satellites. However, there remain many important questions concerning the solar system, and a continuation of space exploration for the solution of these questions appears highly desirable, particularly when the comparatively little cost of these missions is taken into account. However, major fiscal limitations within the U.S. economy have led to pressure to postpone any new solar system exploration projects unless there can be major reductions in their cost. A special committee has been studying the options for future low-cost solar system exploration missions, giving attention also to some options for international implementation. Various aspects of joint space projects are examined.

Moore, J. W.↗

Materials Assessment of Components of the Extravehicular Mobility Unit

Current research interests for Extravehicular Mobility Unit (EMU) design and development are directed toward enhancements of the Shuttle EMU, implementation of the Mark 3 technology for Shuttle applications, and development of a next generation suit (the X suit) which has applications for prolonged space flight, longer extravehicular activity (EVA), and Moon and Mars missions. In this research project two principal components of the EMU were studied from the vantage point of the materials and their design criteria. An investigation of the flexible materials which make up the lay-up of materials for abrasion and tear protection, thermal insulation, pressure restrain, etc. was initiated. A central focus was on the thermal insulation. A vacuum apparatus for measuring the flexibility of the materials was built to access their durability in vacuum. Plans are to include a Residual Gas Analyzer on the vacuum chamber to measure volatiles during the durability testing. These tests will more accurately simulate space conditions and provide information which has not been available on the materials currently used on the EMU. Durability testing of the aluminized mylar with a nylon scrim showed that the material strength varied in the machine and transverse directions. Study of components of the EMU also included a study of the EMU Bearing Assemblies as to materials selection, engineered materials, use of coatings and flammability issues. A comprehensive analysis of the performance of the current design, which is a stainless steel assembly, was conducted and use of titanium alloys or engineered alloy systems and coatings was investigated. The friction and wear properties are of interest as are the general manufacturing costs. Recognizing that the bearing assembly is subject to an oxygen environment, all currently used materials as well as titanium and engineered alloys were evaluated as to their flammability. An aim of the project is to provide weight reduction since bearing weights constitute 1/3 of the total EMU weight. Our investigations have shown favorable properties using a titanium or nickel base alloy in conjunction with a coating system. Interest lies in developing titanium as a more nonflammable material. Methodology for doing this lies in adding coatings and surface alloying the titanium. This report is brief and does not give all necessary details. The reader should contact the authors as to the detailed study and for viewing of raw data.

Olivas, John D.↗

Guidance and Control Software Project Data - Volume 2: Development Documents

The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the development documents from the GCS project. Volume 2 contains three appendices: A. Guidance and Control Software Development Specification; B. Design Description for the Pluto Implementation of the Guidance and Control Software; and C. Source Code for the Pluto Implementation of the Guidance and Control Software

Hayhurst, Kelly J.↗