Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Energy for the Future

Project Manager Ned Sauthoff provides an overview of the ITER project.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Environmental Effects of Sediment Transport Alteration and Impacts on Protected Species: Edgartown Tidal Energy Project

The Islands of Martha's Vineyard and Nantucket are separated from the Massachusetts mainland by Vineyard and Nantucket Sounds; water between the two islands flows through Muskeget Channel. The towns of Edgartown (on Martha's Vineyard) and Nantucket recognize that they are vulnerable to power supply interruptions due to their position at the end of the power grid, and due to sea level rise and other consequences of climate change. The tidal energy flowing through Muskeget Channel has been identified by the Electric Power Research Institute as the strongest tidal resource in Massachusetts waters. The Town of Edgartown proposes to develop an initial 5 MW (nameplate) tidal energy project in Muskeget Channel. The project will consist of 14 tidal turbines with 13 providing electricity to Edgartown and one operated by the University of Massachusetts at Dartmouth for research and development. Each turbine will be 90 feet long and 50 feet high. The electricity will be brought to shore by a submarine cable buried 8 feet below the seabed surface which will landfall in Edgartown either on Chappaquiddack or at Katama. Muskeget Channel is located between Martha's Vineyard and Nantucket. Its depth ranges between 40 and 160 feet in the deepest portion. It has strong currents where water is transferred between Nantucket Sound and the Atlantic Ocean continental shelf to the south. This makes it a treacherous passage for navigation. Current users of the channel are commercial and recreational fishing, and cruising boats. The US Coast Guard has indicated that the largest vessel passing through the channel is a commercial scallop dragger with a draft of about 10 feet. The tidal resource in the channel has been measured by the University of Massachusetts-Dartmouth and the peak velocity flow is approximately 5 knots. The technology proposed is the helical Gorlov-type turbine positioned with a horizontal axis that is positively buoyant in the water column and held down by anchors. This is the same technology proposed by Ocean Renewable Power Company in the Western Passage and Cobscook Bay near Eastport Maine. The blades rotate in two directions capturing the tides energy both during flood and ebb tides. The turbines will be anchored to the bottom and suspended in the water column. Initial depth of the turbines is expected to be about 25 feet below the surface to avoid impacting navigation while also capturing the strongest currents. The Town of Edgartown was initially granted a Preliminary Permit by the Federal Energy Regulatory Commission (FERC) on March 1, 2008, and has recently received a second permit valid through August 2014. The Preliminary Permit gives Edgartown the exclusive right to apply for a power generation license for power generated from the hydrokinetic energy in the water flowing in this area. Edgartown filed a Draft Pilot License Application with FERC on February 1, 2010 and an Expanded Environmental Notification Form with the Massachusetts Environmental Policy Act (MEPA) Office at the same time. It expects to file a Final License Application in late 2013. Harris Miller Miller & Hanson (HMMH) of Burlington Massachusetts is acting as the Project Manager for the Town of Edgartown and collaborating with other partners of the project including the University of Massachusetts - Dartmouth's Marine Renewable Energy Center and the Massachusetts Clean Energy Center. HMMH was awarded a grant under the Department of Energy's Advanced Water Program to conduct marine science and hydrokinetic site-specific environmental studies for projects actively seeking a FERC License. HMMH, on behalf of the Town, is managing this comprehensive study of the marine environment in Muskeget Channel and potential impacts of the tidal project on indicator species and habitats. The University of Massachusetts School of Marine Science and Technology (SMAST) conducted oceanographic studies of tidal currents, tide level, benthic habitat, and potential for biofouling and foundation scouring. Woods Hole Oceanographic Institution, cooperating with SMAST, developed an oceanographic model to predict changes in sediment transport as a result of the proposed tidal energy project. Provincetown Center for Coastal Studies prepared background material on protected species - including whales, seals, and sea turtles - in the project area and implemented an initial tagging program to record location specific information on seals and sea turtles. HMMH communicated research plans and findings with local stakeholder groups, state and federal resource agency staff, and the ocean power industry. The information is being used to prepare environmental permit applications and obtain approvals for project construction.

16 TIDAL AND WAVE POWER↗

Earned Value Management (EVM) Implementation Handbook

The purpose of this handbook is to provide EVM guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts, and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project’s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical, cost and schedule problems as well as the intended course and success of corrective actions.

Christopher Lewis Sadler↗

Habitat Demonstration Unit Project Leadership and Management Strategies

This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and disciplines to enable a successful tiger team approach. Advocacy was established with key stakeholders and NASA Headquarters (HQ) by defining a strategic vision, mission, goals and objectives for the project and team. As a technology-pull testbed capability the HDU project was able to collaborate and leverage the Exploration Technology Development Program (ETDP) and individual NASA center investments which capitalized on their respective center core competencies and skills. This approach enable the leveraging of over $7.5m of value to create an operational habitat demonstration unit 2010 PEM configuration.

Kennedy, Kriss J.↗

The NCC project: A quality management perspective

The Network Control Center (NCC) Project introduced the concept of total quality management (TQM) in mid-1990. The CSC project team established a program which focused on continuous process improvement in software development methodology and consistent deliveries of high quality software products for the NCC. The vision of the TQM program was to produce error free software. Specific goals were established to allow continuing assessment of the progress toward meeting the overall quality objectives. The total quality environment, now a part of the NCC Project culture, has become the foundation for continuous process improvement and has resulted in the consistent delivery of quality software products over the last three years.

Lee, Raymond H.↗

Application of a Heat Integrated Post-combustion CO 2 Capture System with Hitachi Advanced Solvent into Existing Coal-Fired Power Plant (Final Technical Report)

The goal of this final project report is to comprehensively summarize the work conducted on project DE-FE0007395. In accordance with the Project Management Plan (PMP), Revision F dated 5/10/2019, and Statement of Project Objectives (SOPO) within, the University of Kentucky (UK) Center for Applied Energy Research (CAER) (Recipient) has successfully demonstrated a unique, versatile CO 2 capture system (CCS) using a heat integrated process combined with two-stage stripping for process intensification, heat recovery and demineralized (DM) water generation. This project involved the design, fabrication, installation, testing of and data analysis from the UK CAER 0.7 MWe small pilot scale CO2 capture process installed at Kentucky Utilities (KU) E.W. Brown Generating Station in Harrodsburg, KY. During each of the four project Budget Periods (BPs), UK CAER met all project deliverables, all project milestones, with National Energy Technology Laboratory (NETL) approved adjustments made to the campaign long-term hours during BP4. The CCS was constructed in modular skids. Two solvent campaigns were initially conducted; the first with a 30 wt% monoethanolamine (MEA) as a baseline, and the second with the Hitachi H3-1 advanced solvent. Additional tests were performed with two advanced solvents including CAER and Proprietary Solvent C. Short-period testing with a higher concentration of 40 wt% MEA was conducted to evaluate the potential saving with high alkalinity. From the various solvent campaigns, unique aspects of the UK CAER CCS technology, as well as its flexibility and versatility were experimentally validated and demonstrated. With respect to solvent evaluation efforts in identifying candidates with significant operational and capital cost savings potential, performance of solvents were evaluated to determine the energy requirements for regeneration; environmental impacts from secondary emissions and degradation products; degradation rates, solvent make-up rates and stability. The assessments were done from parametric tests that determined optimum operating conditions for the individual solvents to maximize process efficiency and minimize the parasitic load of the power plant, and from long term campaigns (1000 hours for 30 wt% MEA and 1000 hours for H3-1) which collectively informed the techno-economic analyses (TEA) of the process. The long term campaigns included corrosion studies which used three types of metal coupons in different sections of the process: (absorber, primary stripper, lean carbon-loaded and rich carbon loaded flow streams in process) to mimic heat and flow dynamics process equipment were exposed to. The estimated corrosion rates were used to elucidate corrosion mechanisms and to further guide process material selection for potential capital cost savings.

gas separation↗

Development of a site analysis tool for distributed wind projects

The Cadmus Group, Inc., in collaboration with the National Renewable Energy Laboratory (NREL) and Encraft, was awarded a grant from the Department of Energy (DOE) to develop a site analysis tool for distributed wind technologies. As the principal investigator for this project, Mr. Shawn Shaw was responsible for overall project management, direction, and technical approach. The product resulting from this project is the Distributed Wind Site Analysis Tool (DSAT), a software tool for analyzing proposed sites for distributed wind technology (DWT) systems. This user-friendly tool supports the long-term growth and stability of the DWT market by providing reliable, realistic estimates of site and system energy output and feasibility. DSAT-which is accessible online and requires no purchase or download of software-is available in two account types; Standard: This free account allows the user to analyze a limited number of sites and to produce a system performance report for each; and Professional: For a small annual fee users can analyze an unlimited number of sites, produce system performance reports, and generate other customizable reports containing key information such as visual influence and wind resources. The tool’s interactive maps allow users to create site models that incorporate the obstructions and terrain types present. Users can generate site reports immediately after entering the requisite site information. Ideally, this tool also educates users regarding good site selection and effective evaluation practices.

17 WIND ENERGY↗

Personnel Certifications for the Design, Installation and Maintenance of Photovoltaic Systems. Final Technical Report

The North American Board of Certified Energy Practitioners (NABCEP) is the most respected, well-established, and widely recognized national certification organization for professionals in the field of renewable energy. NABCEP’s certifications were created to facilitate consumer protection, improve quality assurance, and help employers judge the skills of existing or potential employees. The certifications also allow individuals to differentiate themselves from others in their field and advance their careers while fostering increased recognition of the profession. Since NABCEP’s founding in 2002, all of its certification exams have been administered in paper-and-pencil format twice per year at 30 exam sites around the United States. The biannual test administration and relatively low number of exam sites make it challenging for many qualified renewable energy professionals to take NABCEP’s certification exams. The rigorous nature of the exam, which leads to many candidates failing the exam on their first and sometimes second attempts, combined with the low number of annual test administrations means that anyone who fails will need to wait another six months for the chance to retake the exam. These factors limited the potential growth of NABCEP’s certification programs and the resultant quality assurance within the renewable energy industry. Thanks to a generous grant by the Department of Energy’s Solar Training and Education for Professional (STEP) program, NABCEP recently began updating its Photovoltaic (PV) Installation Professional Exam and developing three new specialty certifications in PV design, PV installation, and PV commissioning & maintenance. One of the primary objectives of this STEP-funded project was to develop the exams using a computer-based testing (CBT) model to increase the number of exam administrations and available exam sites for NABCEP’s certification exams. To successfully complete this project, NABCEP partnered with Castle Worldwide, Inc. With more than 25 years of experience in test development, test administration, analysis of examinations, and has a staff of 70 experienced personnel, NABCEP was confident that Castle’s team was more than qualified to help NABCEP make the transition to CBT examinations. NABCEP and Castle Worldwide jointly developed a project management plan that included key deliverables, scope management, a work breakdown structure, roles and responsibilities, and a project schedule with milestones. The project schedule was carefully monitored to ensure that activities along the critical path were not delayed and, when deemed necessary, the project was crashed to add resources so that activities could occur in parallel. NABCEP and Castle Worldwide staff met weekly to discuss any potential schedule variances and activities which might delay the closing of the project. NABCEP also recruited 46 subject matter experts (SMEs) to work with Castle’s staff on this project. NABCEP staff, SME’s, and Castle staff worked together to develop the Job Task Analyses that form the basis for the certification exams, create new examination forms, conduct passing score studies, and complete a psychometrical analysis of potential exam items. NABCEP’s SMEs utilized Castle’s item development platform during face-to-face meetings, webinars, and remote item authoring to write, review, and approve exam items. Castle also used their software to psychometrically analyze existing exam items to confirm the reliability and validity of the NABCEP’s certification exams. On January 3rd, 2018, NABCEP’s began offering its PV Installation Professional certification exam via CBT. The exam was available at Castle’s nearly 600 exam sites in the United States. A large number of sites will help to ensure better access for solar professionals in rural and remote areas, which drives down the implicit costs of taking the certification exams. Thanks to the STEP grant and the robust partnership between NABCEP and Castle Worldwide, Inc., personnel certifications will be much more accessible and affordable for renewable energy professionals.

14 SOLAR ENERGY↗

Information and Best Practices Related to NASA Nuclear Flight Safety for Space Flights Involving Space Nuclear Systems

The purpose of this handbook is to facilitate a repeatable and robust process that promotes clear and effective interfaces between activities and stakeholders focused on meeting nuclear flight safety requirements for missions utilizing space nuclear systems (SNS), within the context of NASA’s broader nuclear-related activities and interfaces. NPR 8715.26, Nuclear Flight Safety, requires that the NASA project manager “incorporate nuclear flight safety considerations starting with program or project formulation through the point at which the SNS or other radioactive material no longer has the potential to affect Earth’s biosphere.” NASA’s use of SNS inherently involves partnering with other stakeholders to conduct a range of related activities that interface with nuclear flight safety. From a categorical perspective these include: (i) meeting the authorities and licensing requirements for possession and use of nuclear material, as governed by other Federal authorities; (ii) conducting National Environmental Policy Act (NEPA) activities for nuclear-enabled missions; (iii) meeting Federal nuclear launch authorization requirements; (iv) conducting radiological contingency planning activities, including those associated with international commitments; (v) performing risk communication and public outreach activities; and (vi) ensuring decommissioning and disposal strategies reflect National policies and interests. It is the intent of this handbook to promote an effective interface between nuclear flight safety and these interrelated categorical activities. In addition to activities undertaken with partnering agencies, there are individual nuclear-related activities and programs that have a nexus to nuclear flight safety, and these include: (i) applicable NASA Standing Review Boards; (ii) the US Department of Energy nuclear safety activities conducted in partnership with NASA under Memoranda of Understanding; (iii) the Department of Defense’s Range Safety activities; (iv) NASA’s general involvement in interagency and international dialogues regarding nuclear safety; (v) the NASA-administered Interagency Nuclear Safety Review Board; (vi) NASA’s program and project governance activities and nuclear-specific Technical Discipline Team activities under the Office of the Chief Engineer; and others. It is the intent of this handbook to promote effective leveraging of these additional interrelated organizational activities, as appropriate.

Donald Helton↗

Aircraft simulation data management - A prototype system

Piloted flight simulations are used throughout the aircraft development process to evaluate design concepts, handling qualities and operational procedures. Simulation project managers are often inundated with data but without a convenient and efficient way to make the correlations and analyses necessary to evaluate system performance. A computer-based Simulation Management System (SIMS) is under development. SIMS will permit simulation project engineers to quickly acquire, access, display, edit, analyze, and document the information necessary to more efficiently manage the research program. SIMS features interactive, associative access to simulation data. This paper describes SIMDEM, a prototype system designed to demonstrate these concepts and procedures in order to obtain feedback from simulator users to guide system design.

Crane, D. F.↗

Using Project Complexity Determinations to Establish Required Levels of Project Rigor

This presentation discusses the project complexity determination process that was developed by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office for implementation at the Nevada National Security Site (NNSS). The complexity determination process was developed to address the diversity of NNSS project types, size, and complexity; to fill the need for one procedure but with provision for tailoring the level of rigor to the project type, size, and complexity; and to provide consistent, repeatable, effective application of project management processes across the enterprise; and to achieve higher levels of efficiency in project delivery. These needs are illustrated by the wide diversity of NNSS projects: Defense Experimentation, Global Security, weapons tests, military training areas, sensor development and testing, training in realistic environments, intelligence community support, sensor development, environmental restoration/waste management, and disposal of radioactive waste, among others.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons from Iowa: Development of a 270 Megawatt Compressed Air Energy Storage Project in Midwest Independent System Operator

The Iowa Stored Energy Park was an innovative, 270 Megawatt, $400 million compressed air energy storage (CAES) project proposed for in-service near Des Moines, Iowa, in 2015. After eight years in development the project was terminated because of site geological limitations. However, much was learned in the development process regarding what it takes to do a utility-scale, bulk energy storage facility and coordinate it with regional renewable wind energy resources in an Independent System Operator (ISO) marketplace. Lessons include the costs and long-term economics of a CAES facility compared to conventional natural gas-fired generation alternatives; market, legislative, and contract issues related to enabling energy storage in an ISO market; the importance of due diligence in project management; and community relations and marketing for siting of large energy projects. Although many of the lessons relate to CAES applications in particular, most of the lessons learned are independent of site location or geology, or even the particular energy storage technology involved.

25 ENERGY STORAGE↗

Yakima/Klickitat Fisheries Project Monitoring and Evaluation, Final Report For the Performance Period May 1, 2008 through April 30, 2009.

The Yakima-Klickitat Fisheries Project (YKFP) is a joint project of the Yakama Nation (lead entity) and the Washington State Department of Fish and Wildlife (WDFW) and is sponsored in large part by the Bonneville Power Administration (BPA) with oversight and guidance from the Northwest Power and Conservation Council (NPCC). It is among the largest and most complex fisheries management projects in the Columbia Basin in terms of data collection and management, physical facilities, habitat enhancement and management, and experimental design and research on fisheries resources. Using principles of adaptive management, the YKFP is attempting to evaluate all stocks historically present in the Yakima subbasin and apply a combination of habitat restoration and hatchery supplementation or reintroduction, to restore the Yakima Subbasin ecosystem with sustainable and harvestable populations of salmon, steelhead and other at-risk species. The original impetus for the YKFP resulted from the landmark fishing disputes of the 1970s, the ensuing legal decisions in United States versus Washington and United States versus Oregon, and the region's realization that lost natural production needed to be mitigated in upriver areas where these losses primarily occurred. The YKFP was first identified in the NPCC's 1982 Fish and Wildlife Program (FWP) and supported in the U.S. v Oregon 1988 Columbia River Fish Management Plan (CRFMP). A draft Master Plan was presented to the NPCC in 1987 and the Preliminary Design Report was presented in 1990. In both circumstances, the NPCC instructed the Yakama Nation, WDFW and BPA to carry out planning functions that addressed uncertainties in regard to the adequacy of hatchery supplementation for meeting production objectives and limiting adverse ecological and genetic impacts. At the same time, the NPCC underscored the importance of using adaptive management principles to manage the direction of the Project. The 1994 FWP reiterated the importance of proceeding with the YKFP because of the added production and learning potential the project would provide. The YKFP is unique in having been designed to rigorously test the efficacy of hatchery supplementation. Given the current dire situation of many salmon and steelhead stocks, and the heavy reliance on artificial propagation as a recovery tool, YKFP monitoring results will have great region-wide significance. Supplementation is envisioned as a means to enhance and sustain the abundance of wild and naturally-spawning populations at levels exceeding the cumulative mortality burden imposed on those populations by habitat degradation and by natural cycles in environmental conditions. A supplementation hatchery is properly operated as an adjunct to the natural production system in a watershed. By fully integrating the hatchery with a naturally-producing population, high survival rates for the component of the population in the hatchery can raise the average abundance of the total population (hatchery component + naturally-producing component) to a level that compensates for the high mortalities imposed by human development activities and fully seeds the natural environment. The objectives of the YKFP are to: use Ecosystem Diagnosis and Treatment (EDT) and other modeling tools to facilitate planning for project activities, enhance existing stocks, re-introduce extirpated stocks, protect and restore habitat in the Yakima Subbasin, and operate using a scientifically rigorous process that will foster application of the knowledge gained about hatchery supplementation and habitat restoration throughout the Columbia River Basin. The YKFP is still in the early stages of evaluation, and as such the data and findings presented in this report should be considered preliminary until results are published in the peer-reviewed literature. The following is a brief summary of current YKFP activities by species.

13 HYDRO ENERGY↗

Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challange

The Dawn Project has presented the Ground Data System (GDS) with technical challenges driven by cost and schedule constraints commonly associated with National Aeronautics and Space Administration (NASA) Discovery Projects. The Dawn mission consists of a new and exciting Deep Space partnership among: the Jet Propulsion Laboratory (JPL), responsible for project management and flight operations; Orbital Sciences Corporation (OSC), spacecraft builder and responsible for flight system test and integration; and the University of California, at Los Angeles (UCLA), responsible for science planning and operations. As a cost-capped mission, one of Dawn s implementation strategies is to leverage from both flight and ground heritage. OSC's ground data system is used for flight system test and integration as part of the flight heritage strategy. Mission operations, however, are to be conducted with JPL s ground system. The system engineering challenge of dealing with two heterogeneous ground systems emerged immediately. During the first technical interchange meeting between the JPL s GDS Team and OSC's Flight Software Team, August 2003, the need to integrate the ground system with the flight software was brought to the table. This need was driven by the project s commitment to enable instrument engineering model integration in a spacecraft simulator environment, for both demonstration and risk mitigation purposes, by April 2004. This paper will describe the system engineering approach that was undertaken by JPL's GDS Team in order to meet the technical challenge within a non-negotiable eight-month schedule. Key to the success was adherence to an overall systems engineering process and fundamental systems engineering practices: decomposition of the project request into manageable requirements; definition of a structured yet flexible development process; integration of multiple ground disciplines and experts into a focused team effort; in-process risk management; and aggregation of the intermediate products to an integrated final product. In addition, this paper will highlight the role of lessons learned from the integration experience. The lessons learned from an early GDS deployment have served as the foundation for the design and implementation of the Dawn Ground Data System.

systems engineering↗

Managing Large Scale Project Analysis Teams through a Web Accessible Database

Large scale space programs analyze thousands of requirements while mitigating safety, performance, schedule, and cost risks. These efforts involve a variety of roles with interdependent use cases and goals. For example, study managers and facilitators identify ground-rules and assumptions for a collection of studies required for a program or project milestone. Task leaders derive product requirements from the ground rules and assumptions and describe activities to produce needed analytical products. Disciplined specialists produce the specified products and load results into a file management system. Organizational and project managers provide the personnel and funds to conduct the tasks. Each role has responsibilities to establish information linkages and provide status reports to management. Projects conduct design and analysis cycles to refine designs to meet the requirements and implement risk mitigation plans. At the program level, integrated design and analysis cycles studies are conducted to eliminate every 'to-be-determined' and develop plans to mitigate every risk. At the agency level, strategic studies analyze different approaches to exploration architectures and campaigns. This paper describes a web-accessible database developed by NASA to coordinate and manage tasks at three organizational levels. Other topics in this paper cover integration technologies and techniques for process modeling and enterprise architectures.

O'Neil, Daniel A.↗

PM Science Working Group Meeting on Spacecraft Maneuvers

The EOS PM Science Working Group met on May 6, 1997, to examine the issue of spacecraft maneuvers. The meeting was held at NASA Goddard Space Flight Center and was attended by the Team Leaders of all four instrument science teams with instruments on the PM-1 spacecraft, additional representatives from each of the four teams, the PM Project management, and random others. The meeting was chaired by the PM Project Scientist and open to all. The meeting was called in order to untangle some of the concerns raised over the past several months regarding whether or not the PM-1 spacecraft should undergo spacecraft maneuvers to allow the instruments to obtain deep-space views. Two of the Science Teams, those for the Moderate-Resolution Imaging Spectroradiometer (MODIS) and the Clouds and the Earth's Radiant Energy System (CERES), had strongly expressed the need for deep-space views in order to calibrate their instruments properly and conveniently. The other two teams, those for the Advanced Microwave Scanning Radiometer (AMSR-E) and the Atmospheric Infrared Sounder (AIRS), the Advanced Microwave Sounding Unit (AMSU), and the Humidity Sounder for Brazil (HSB), had expressed concerns that the maneuvers involve risks to the instruments and undesired gaps in the data sets.

Parkinson, Claire L.↗