Search NASA⌕ Search

SEARCH · Search NASA

Results for “TECHNICAL DETAILS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Solar For Schools: A Case Study in Identifying and Implementing Solar Photovoltaic (PV) Projects in Three California School Districts

The Department of Energy's (DOE) Solar America Showcase program seeks to accelerate demand for solar technologies among key end use market sectors. As part of this activity, DOE provides technical assistance through its national laboratories to large-scale, high-visibility solar installation projects. The Solar Schools Assessment and Implementation Project (SSAIP) in the San Francisco Bay Area was selected for a 2009 DOE Solar America Showcase award. SSAIP was formed through the efforts of the nonprofit Sequoia Foundation and includes three school districts: Berkeley, West Contra Costa, and Oakland Unified School Districts. This paper summarizes the technical assistance efforts that resulted from this technical assistance support. It serves as a case study and reference document detailing the steps and processes that could be used to successfully identify, fund, and implement solar photovoltaics (PV) projects in school districts across the country.

14 SOLAR ENERGY↗

Spreadsheet Assessment Tool v. 2.4

The Spreadsheet Assessment Tool (SAT) is an easy to use, blast assessment tool that is intended to estimate the potential risk due to an explosive attack on a blood irradiator. The estimation of risk is based on the methodology, assumptions, and results of a detailed blast effects assessment study that is summarized in Sandia National Laboratories Technical Report SAND2015-6166. Risk as defined in the report and as used in the SAT is: "The potential risk of creating an air blast-induced vent opening at a buildings envelope surface". Vent openings can be created at a buildings envelope through the failure of an exterior building component—like a wall, window, or door—due to an explosive sabotage of an irradiator within the building. To estimate risk, the tool requires that users obtain and input information pertaining to the building's characteristics and the irradiator location. The tool also suggests several prescriptive mitigation strategies that can be considered to reduce risk. Given the variability in civilian building construction practices, the input parameters used by this tool may not apply to all buildings being assessed. The tool should not be used as a substitute for engineering judgment. The tool is intended for assessment purposes only.

Allen, David J.↗

New Designed Containers for Activated ILW from NPP Decommissioning - 20208

The paper focuses on packaging of dismantled and fragmented reactor components into containers and their transport to their storage and/or disposal facility within the immediate dismantling strategy applied on decommissioning of nuclear power plant (NPP) finally shutdown after standard operation. The main purpose of the paper is to present the process of design, manufacture, testing and use of new transport and storage containers for activated intermediate level waste (ILW) from V1 NPP decommissioning at Jaslovske Bohunice site. Legislation conditions, container selection process, requirements on their design and manufacture, scope of associated licensing documentation and technical procedures applied up to their use on site are described in detail. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update to the Generic Shielding Criteria

Generic shielding criteria have been employed at Fermilab to determine the shielding adequacy and to screen for areas which require more detailed analysis of beam loss events and are based on the calculations reported in technical report TM-1140. The calculations in that report were done 30 years ago using CASIM, a Monte Carlo program. CASIM uses the Hagedorn-Ranft to model inclusively hadronic interactions. It is valid in the energy range of 10 GeV to 20 TeV and has a lower momentum threshold of 300 MeV/c (47 MeV kinetic energy for nucleons). The goal of this study is to update the original soil shielding calculation with those estimated from the MARS code, which has a more robust and detailed physics model. Hadron-nuclear interactions are simulated with a combination of the modern theoretical models (CEM and LAQGSM) and up-to-date phenomenological models. All other processes of particle interactions with matter are described in MARS on the basis of the modern models and algorithms. MARS is valid for hadrons, leptons, photons and heavy ions with kinetic energy less than 100 TeV and greater than 1 keV (greater than 0.0215 eV for neutrons).

43 PARTICLE ACCELERATORS↗

A Review on Low-Grade Thermal Energy Harvesting: Materials, Methods and Devices

Combined rejected and naturally available heat constitute an enormous energy resource that remains mostly untapped. Thermal energy harvesting can provide a cost-effective and reliable way to convert available heat into mechanical motion or electricity. This extensive review analyzes the literature covering broad topical areas under solid-state low temperature thermal energy harvesting. These topics include thermoelectricity, pyroelectricity, thermomagneticity, and thermoelasticity. For each topical area, a detailed discussion is provided comprising of basic physics, working principle, performance characteristics, state-of-the-art materials, and current generation devices. Technical advancements reported in the literature are utilized to analyze the performance, identify the challenges, and provide guidance for material and mechanism selection. The review provides a detailed analysis of advantages and disadvantages of each energy harvesting mechanism, which will provide guidance towards designing a hybrid thermal energy harvester that can overcome various limitations of the individual mechanism.

36 MATERIALS SCIENCE↗

DETERMINATION OF REPORTABLE RADIONUCLIDES FOR DWPF SLUDGE BATCH 5 (MACROBATCH 6)

The Waste Acceptance Product Specifications (WAPS) 1.2 require that ''The Producer shall report the inventory of radionuclides (in Curies) that have half-lives longer than 10 years and that are, or will be, present in concentrations greater than 0.05 percent of the total inventory for each waste type indexed to the years 2015 and 3115''. As part of the strategy to comply with WAPS 1.2, the Defense Waste Processing Facility (DWPF) will report for each waste type, all radionuclides (with half-lives greater than 10 years) that have concentrations greater than 0.01 percent of the total inventory from time of production through the 1100 year period from 2015 through 3115. The initial listing of radionuclides to be included is based on the design-basis glass as identified in the Waste Form Compliance Plan (WCP) and Waste Form Qualification Report (WQR). However, it is required that this list be expanded if other radionuclides with half-lives greater than 10 years are identified that may meet the greater than 0.01% criterion for Curie content. Specification 1.6 of the WAPS, International Atomic Energy Agency (IAEA) Safeguards Reporting for High Level Waste (HLW), requires that the ratio by weights of the following uranium and plutonium isotopes be reported: U-233, U-234, U-235, U-236, U-238, Pu-238, Pu-239, Pu-240, Pu-241, and Pu-242. Therefore, the complete set of reportable radionuclides must also include this set of U and Pu isotopes. The DWPF is receiving radioactive sludge slurry from HLW Tank 40. The radioactive sludge slurry in Tank 40 is a blend of the heel from Tank 40 (Sludge Batch 4 (SB4)), Sludge Batch 5 (SB5) that was transferred to Tank 40 from Tank 51, and H-Canyon Np transfers completed after the start of processing. The blend of sludge in Tank 40 is also referred to as Macrobatch 6 (MB6). This report develops the list of reportable radionuclides and associated activities and determines the radionuclide activities as a function of time. The DWPF will use this list and the activities as one of the inputs for the development of the Production Records that relate to the radionuclide inventory. This work was initiated through Technical Task Request (TTR) HLW-DWPF-TTR-2008-0010; Rev. 2 entitled Sludge Batch 5 SRNL Shielded Cells Testing. Specifically, this report details results from performing Subtask II, 5 of the TTR and, in part, meets Deliverable 7 of the TTR. The work was performed following the Task Technical and Quality Assurance Plan (TTQAP), WSRC-RP-2008-00137, Rev. 2 and Analytical Study Plan (ASP), WSRC-RP-2008-00138, Rev. 2. In order to determine the reportable radionuclides for SB5 (MB6), a list of radioisotopes that may meet the criteria as specified by the Department of Energy's (DOE) WAPS was developed. All radioactive U-235 fission products and all radioactive activation products that could be in the SRS HLW were considered. In addition, all U and Pu isotopes identified in WAPS 1.6 were included in the list. This list was then evaluated and some isotopes excluded from the projection calculations. Based on measurements and analytical detection limits, twenty-six radionuclides have been identified as reportable for DWPF SB5 as specified by WAPS 1.2. The 26 reportable radionuclides are: Cl-36, Ni-59, Ni-63, Sr-90, Zr-93, Nb-93m, Tc-99, Sn-126, Cs-137, Sm-151, U-233, U-234, Np-237, U-238, Pu-238, Pu-239, Pu-240, Am-241, Pu-241, Pu-242, Am-242m, Am-243, Cm-244, Cm-245, Cm-246, Cf-251. Chlorine-36 is reported for the first time based on the upper bounding activity determined from the aqua regia digested sludge slurry. The WCP and WQR require that all of radionuclides present in the Design Basis glass be considered as the initial set of reportable radionuclides. For SB5 (MB6), all of the radionuclides in the Design Basis glass are reportable except for four radionuclides: Se-79, Pd-107, Cs-135, and Th-230. At no time through the year 3115 did any of these three radionuclides contribute to more than 0.01% of the radioactivity on a Curie basis. Two additional uranium isotopes (U-235 and -236) must be added to the list of reportable radionuclides in order to meet WAPS 1.6. All of the Pu isotopes and other U isotopes (U-233, -234, and -238) identified in WAPS 1.6 were already determined to be reportable according to WAPS 1.2 This brings the total number of reportable radionuclides for SB5 to 28. The radionuclide measurements made for SB5 are the most extensive conducted to date. Some method development/refinement occurred during the conduct of these measurements, leading to lower detection limits and more accurate measurement of some isotopes than was previously possible. Continuous improvement in the analytical measurements will likely continue, and this in turn should lead to improved detection limit values for some radionuclides and actual measurements for still others.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DETERMINATION OF REPORTABLE RADIONUCLIDES FOR DWPF SLUDGE BATCH 6 (MACROBATCH 7)

The Waste Acceptance Product Specifications (WAPS) 1.2 require that 'The Producer shall report the inventory of radionuclides (in Curies) that have half-lives longer than 10 years and that are, or will be, present in concentrations greater than 0.05 percent of the total inventory for each waste type indexed to the years 2015 and 3115'. As part of the strategy to comply with WAPS 1.2, the Defense Waste Processing Facility (DWPF) will report for each waste type, all radionuclides (with half-lives greater than 10 years) that have concentrations greater than 0.01 percent of the total inventory from time of production through the 1100 year period from 2015 through 3115. The initial listing of radionuclides to be included is based on the design-basis glass as identified in the Waste Form Compliance Plan (WCP) and Waste Form Qualification Report (WQR). However, it is required that this list be expanded if other radionuclides with half-lives greater than 10 years are identified that may meet the greater than 0.01% criterion for Curie content. Specification 1.6 of the WAPS, International Atomic Energy Agency (IAEA) Safeguards Reporting for High Level Waste (HLW), requires that the ratio by weights of the following uranium and plutonium isotopes be reported: U-233, U-234, U-235, U-236, U-238, Pu-238, Pu-239, Pu-240, Pu-241, and Pu-242. Therefore, the complete set of reportable radionuclides must also include this set of U and Pu isotopes. The DWPF is receiving radioactive sludge slurry from HLW Tank 40. The radioactive sludge slurry in Tank 40 is a blend of the heel from Sludge Batch 5 (SB5) with H-Canyon Np transfers completed after the start of processing SB5, and Sludge Batch 6 (SB6) that was transferred to Tank 40 from Tank 51. The blend of sludge in Tank 40 is also referred to as Macrobatch 7 (MB7). This report develops the list of reportable radionuclides and associated activities as a function of time. The DWPF will use this list and the activities as one of the inputs for the development of the Production Records that relate to radionuclide inventory. This work was initiated through Technical Task Request (TTR) HLW-DWPF-TTR-2009-0014; Rev. 2 entitled Sludge Batch 6 SRNL Shielded Cells Testing. Specifically, this report details results from performing Subtask III, Item 2 of the TTR and, in part, meets Deliverable 7 of the TTR. The work was performed following the Task Technical and Quality Assurance Plan (TTQAP), SRNL-RP-2009-00473, Rev. 15 and Analytical Study Plan (ASP), SRNL-RP-2009-00474, Rev. 1. In order to determine the reportable radionuclides for SB6 (MB7), a list of radioisotopes that may meet the criteria as specified by the Department of Energy's (DOE) WAPS was developed. All radioactive U-235 fission products and all radioactive activation products that could be in the SRS HLW were considered. In addition, all U and Pu isotopes identified in WAPS 1.6 were included in the list. This list was then evaluated and some isotopes were excluded from the projection calculations. Based on measurements and analytical detection limits, 30 radionuclides have been identified as reportable for DWPF SB6 as specified by WAPS 1.2. The WCP and WQR require that all of the radionuclides present in the Design Basis glass be considered as the initial set of reportable radionuclides. For SB6, all of the radionuclides in the Design Basis glass are reportable except for three radionuclides: Pd-107, Cs-135, and Th-230. At no time during the 1100-year period between 2015 and 3115 did any of these three radionuclides contribute to more than 0.01% of the radioactivity on a Curie basis. Two additional uranium isotopes (U-235 and -236) must be added to the list of reportable radionuclides in order to meet WAPS 1.6. All of the Pu isotopes (Pu-238, -239, -240, -241, and -242) and other U isotopes (U-233, -234, and -238) identified in WAPS 1.6 were already determined to be reportable according to WAPS 1.2 This brings the total number of reportable radionuclides for SB6 to 32. The radionuclide measurements made for SB6 are the most extensive conducted to date. Some method development/refinement occurred during the conduct of these measurements, leading to lower detection limits and more accurate measurement of some isotopes than was previously possible. Improvement in the analytical measurements will likely continue, and this in turn should lead to improved detection limit values for some radionuclides and actual measurements for still others.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sources of Technical Variability in Quantitative LC-MS Proteomics: Human Brain Tissue Sample Analysis.

To design a robust quantitative proteomics study, an understanding of both the inherent heterogeneity of the biological samples being studied as well as the technical variability of the proteomics methods and platform is needed. Additionally, accurately identifying the technical steps associated with the largest variability would provide valuable information for the improvement and design of future processing pipelines. We present an experimental strategy that allows for a detailed examination of the variability of the quantitative LC-MS proteomics measurements. By replicating analyses at different stages of processing, various technical components can be estimated and their individual contribution to technical variability can be dissected. This design can be easily adapted to other quantitative proteomics pipelines. Herein, we applied this methodology to our label-free workflow for the processing of human brain tissue. For this application, the pipeline was divided into four critical components: Tissue dissection and homogenization (extraction), protein denaturation followed by trypsin digestion and SPE clean-up (digestion), short-term run-to-run instrumental response fluctuation (instrumental variance), and long-term drift of the quantitative response of the LC-MS/MS platform over the 2 week period of continuous analysis (instrumental stability). From this analysis, we found the following contributions to variability: extraction (72%) >> instrumental variance (16%) > instrumental stability (8.4%) > digestion (3.1%). Furthermore, the stability of the platform and its’ suitability for discovery proteomics studies is demonstrated.

Environmental Molecular Sciences Laboratory↗

Technical Approach and Results from the Fuels Pathway on an Alternative Selection Case Study

The report presents a detailed plan for conducting case studies to characterize probabilistic safety margins associated with different fuel cladding types in a way that supports a valid comparison of different fuels' performance. Recent work performed in other programs is described briefly and used to illustrate the challenges posed by characterization of margin in a probabilistic way. It is additionally pointed out that consistency of evaluation of performance across different cladding types is not easy to assure; a process for achieving the needed consistency is described.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Chooz A, First Pressurized Water Reactor to be Dismantled in France - 13445

Nine commercial nuclear power plants have been permanently shut down in France to date, of which the Chooz A plant underwent an extensive decommissioning and dismantling program. Chooz Nuclear Power Station is located in the municipality of Chooz, Ardennes region, in the northeast part of France. Chooz B1 and B2 are 1,500 megawatt electric (MWe) pressurized water reactors (PWRs) currently in operation. Chooz A, a 305 MWe PWR implanted in two caves within a hill, began operations in 1967 and closed in 1991, and will now become the first PWR in France to be fully dismantled. EDF CIDEN (Engineering Center for Dismantling and Environment) has awarded Westinghouse a contract for the dismantling of its Chooz A reactor vessel (RV). The project began in January 2010. Westinghouse is leading the project in a consortium with Nuvia France. The project scope includes overall project management, conditioning of the reactor vessel (RV) head, RV and RV internals segmentation, reactor nozzle cutting for lifting the RV out of the pit and seal it afterwards, dismantling of the RV thermal insulation, ALARA (As Low As Reasonably Achievable) forecast to ensure acceptable doses for the personnel, complementary vacuum cleaner to catch the chips during the segmentation work, needs and facilities, waste characterization and packaging, civil work modifications, licensing documentation. The RV and RV internals will be segmented based on the mechanical cutting technology that Westinghouse applied successfully for more than 13 years. The segmentation activities cover the cutting and packaging plan, tooling design and qualification, personnel training and site implementation. Since Chooz A is located inside two caves, the project will involve waste transportation from the reactor cave through long galleries to the waste buffer area. The project will end after the entire dismantling work is completed, and the waste storage is outside the caves and ready to be shipped either to the ANDRA (French National Radioactive Waste Management Agency) waste disposal facilities - (for low-level waste [LLW] and very low-level waste [VLLW], which are considered short lived) - or to the EDF Interim Storage Facility planned to be built on another site - (for low- and intermediate-level waste [LILW], which is considered long lived). The project has started with a detailed conceptual study that determines the step-by-step approach for dismantling the reactor and eventually supplying the packed containers ready for final disposal. All technical reports must be verified and approved by EDF and the French Nuclear Safety Authority before receiving the authorization to start the site work. The detailed conceptual study has been completed to date and equipment design and manufacturing is ongoing. This paper will present the conceptual design of the reactor internals segmentation and packaging process that will be implemented at Chooz A, including the planning, methodology, equipment, waste management, and packaging strategy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FECM/NETL Natural Gas with Hydrogen Pipeline Cost Model (2024): Description and User’s Manual

This is the user’s manual for The FECM/NETL Natural Gas with Hydrogen Pipeline Cost Model (NG-H2_P_COM) that estimates costs for transporting gaseous hydrogen with natural gas in a pipeline from a source, such as a hydrogen production facility, to a final destination which may be a user of the hydrogen and natural gas or a distribution center where hydrogen in the pipeline with natural gas is diverted to multiple end users. This user’s manual provides two main functions. First, the detailed statement describes the equations and algorithms that are used by the model to calculate technical quantities (such as blend hydrogen percentage, reuse percentage of the pipeline and stations, the pipe diameter size and length needed to transport a user-specified hydrogen with natural gas rate in a specified distance) and engineering-economic quantities (such as capital costs, operating costs, and cash flows). Second, the document is a user’s manual for the model that describes the procedures the user must follow to configure and setup the model, run the model, analyze the results, and visualize the outcomes. Such details offer user a quick and handy way to utilize the model for their application and decision making. The model can be accessed at this URL: https://www.netl.doe.gov/energy-analysis/details?id=cf3f6564-3c55-4aa5-b712-7160e558d9f6. The Model Results and Comparative Analysis can be accessed here: https://www.netl.doe.gov/energy-analysis/details?id=83862799-a28c-4944-a809-90b7e23d4af6.

03 NATURAL GAS↗

An improved global wind resource estimate for integrated assessment models

This study summarizes initial steps to improving the robustness and accuracy of global renewable resource and techno-economic assessments for use in integrated assessment models. We outline a method to construct country-level wind resource supply curves, delineated by resource quality and other parameters. Using mesoscale reanalysis data, we generate estimates for wind quality, both terrestrial and offshore, across the globe. Because not all land or water area is suitable for development, appropriate database layers provide exclusions to reduce the total resource to its technical potential. We expand upon estimates from related studies by: using a globally consistent data source of uniquely detailed wind speed characterizations; assuming a non-constant coefficient of performance for adjusting power curves for altitude; categorizing the distance from resource sites to the electric power grid; and characterizing offshore exclusions on the basis of sea ice concentrations. The product, then, is technical potential by country, classified by resource quality as determined by net capacity factor. Additional classifications dimensions are available, including distance to transmission networks for terrestrial wind and distance to shore and water depth for offshore. We estimate the total global wind generation potential of 560 PWh for terrestrial wind with 90% of resource classified as low-to-mid quality, and 315 PWh for offshore wind with 67% classified as mid-to-high quality. These estimates are based on 3.5 MW composite wind turbines with 90 m hub heights, 0.95 availability, 90% array efficiency, and 5 MW/km 2 deployment density in non-excluded areas. We compare the underlying technical assumption and results with other global assessments.

17 WIND ENERGY↗

An Improved Global Wind Resource Estimate for Integrated Assessment Models: Preprint

This paper summarizes initial steps to improving the robustness and accuracy of global renewable resource and techno-economic assessments for use in integrated assessment models. We outline a method to construct country-level wind resource supply curves, delineated by resource quality and other parameters. Using mesoscale reanalysis data, we generate estimates for wind quality, both terrestrial and offshore, across the globe. Because not all land or water area is suitable for development, appropriate database layers provide exclusions to reduce the total resource to its technical potential. We expand upon estimates from related studies by: using a globally consistent data source of uniquely detailed wind speed characterizations; assuming a non-constant coefficient of performance for adjusting power curves for altitude; categorizing the distance from resource sites to the electric power grid; and characterizing offshore exclusions on the basis of sea ice concentrations. The product, then, is technical potential by country, classified by resource quality as determined by net capacity factor. Additional classifications dimensions are available, including distance to transmission networks for terrestrial wind and distance to shore and water depth for offshore. We estimate the total global wind generation potential of 560 PWh for terrestrial wind with 90% of resource classified as low-to-mid quality, and 315 PWh for offshore wind with 67% classified as mid-to-high quality. These estimates are based on 3.5 MW composite wind turbines with 90 m hub heights, 0.95 availability, 90% array efficiency, and 5 MW/km2 deployment density in non-excluded areas. We compare the underlying technical assumption and results with other global assessments.

17 WIND ENERGY↗

New Fuel Cell Membranes with Improved Durability and Performance

The objective of this project was to meet all the DOE Fuel Cell Technologies Office Multi-Year Research, Development and Demonstration Plan for membrane performance, durability and cost targets simultaneously with a single membrane. The approach was to develop new proton exchange membranes, integrate them into membrane electrode assemblies (MEA’s) and then evaluate them in single fuel cells and finally fuel cell stacks. These membranes were based on Multi Acid Side Chain (MASC) ionomers containing stabilizing additives and reinforced with electrospun nanofibers. The ionomers developed at 3M are based on a fluorinated polymer with side chains that contain one or more sulfonamide groups and a sulfonic acid group. Both of these groups facilitate proton transport and ionomers were made that show exceptional conductivity, especially at hot and dry conditions. At the same time, 3M and Vanderbilt University developed new mechanical support technology based on electrospun nanofibers. The membranes made by combining the new ionomers and nanofiber supports were evaluated at 3M and General Motors and met all the DOE technical targets except for one; the resistance at 120°C and 40 kPa water vapor pressure. A detailed analysis of the membrane requirements needed to meet this target was completed.The DOE cost target was evaluated internally but not publicly disclosed. In the final year of the project a durability issue was identified with the sulfonimide link in the MASC polymer. Accelerated durability testing revealed a decay in performance along with an increase in membrane resistance. And, despite the fact that all but one of DOE technical targets and both Go/No Go milestones were met in the fourth and eight quarters, the membranes developed in this project could not pass the final project milestone of 2,000 hours testing in an automotive fuel cell stack at GM. Work in the final year focused on understanding the nature of the ionomer stability. New test methods were employed such as multilayer membrane tests that allowed for detailed analysis of membranes at the end of life. Model compound studies of small molecules were initiated to investigate the stability of the sulfonimide and other functional groups present in the ionomer. At the conclusion of the project, an effective strategy to improve the ionomer stability has yet to be identified. Despite the setback with the ionomer stability, this project has demonstrated significant advances in the field of fluorinated proton exchange membranes for automotive and other applications. The concept of multi-acid side chain ionomers had proven to be an effective strategy to reduce membrane resistance and electrospun nanofibers proven to be a viable mechanical support technology. We intend to build on these results in future membrane development efforts.

08 HYDROGEN↗

Governance of the International Linear Collider Project

Governance models for the International Linear Collider Project are examined in the light of experience from similar international projects around the world. Recommendations for one path which could be followed to realize the ILC successfully are outlined. The International Linear Collider (ILC) is a unique endeavour in particle physics; fully international from the outset, it has no 'host laboratory' to provide infrastructure and support. The realization of this project therefore presents unique challenges, in scientific, technical and political arenas. This document outlines the main questions that need to be answered if the ILC is to become a reality. It describes the methodology used to harness the wisdom displayed and lessons learned from current and previous large international projects. From this basis, it suggests both general principles and outlines a specific model to realize the ILC. It recognizes that there is no unique model for such a laboratory and that there are often several solutions to a particular problem. Nevertheless it proposes concrete solutions that the authors believe are currently the best choices in order to stimulate discussion and catalyze proposals as to how to bring the ILC project to fruition. The ILC Laboratory would be set up by international treaty and be governed by a strong Council to whom a Director General and an associated Directorate would report. Council would empower the Director General to give strong management to the project. It would take its decisions in a timely manner, giving appropriate weight to the financial contributions of the member states. The ILC Laboratory would be set up for a fixed term, capable of extension by agreement of all the partners. The construction of the machine would be based on a Work Breakdown Structure and value engineering and would have a common cash fund sufficiently large to allow the management flexibility to optimize the project's construction. Appropriate contingency, clearly apportioned at both a national and global level, is essential if the project is to be realised. Finally, models for running costs and decommissioning at the conclusion of the ILC project are proposed. This document represents an interim report of the bodies and individuals studying these questions inside the structure set up and supervised by the International Committee for Future Accelerators (ICFA). It represents a request for comment to the international community in all relevant disciplines, scientific, technical and most importantly, political. Many areas require further study and some, in particular the site selection process, have not yet progressed sufficiently to be addressed in detail in this document. Discussion raised by this document will be vital in framing the final proposals due to be published in 2012 in the Technical Design Report being prepared by the Global Design Effort of the ILC.

43 PARTICLE ACCELERATORS↗

Cesium Removal at Fukushima Nuclear Plant - 13215

The Great East Japan Earthquake that took place on March 11, 2011 created a number of technical challenges at the Fukushima Daiichi Nuclear Plant. One of the primary challenges involved the treatment of highly contaminated radioactive wastewater. Avantech Inc. developed a unique patent pending treatment system that addressed the numerous technical issues in an efficient and safe manner. Our paper will address the development of the process from concept through detailed design, identify the lessons learned, and provide the updated results of the project. Specific design and operational parameters/benefits discussed in the paper include: - Selection of equipment to address radionuclide issues; - Unique method of solving the additional technical issues associated with Hydrogen Generation and Residual Heat; - Operational results, including chemistry, offsite discharges and waste generation. Results show that the customized process has enabled the utility to recycle the wastewater for cooling and reuse. This technology had a direct benefit to nuclear facilities worldwide. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Rapid and Efficient Genetic Transformation of Sorghum via Agrobacterium -Mediated Method

Genetic transformation via Agrobacterium-mediated methodology has been used in many sorghum studies. However, the transformation efficiency still varies significantly due to high dependence on sorghum genotypes and technical expertise. In this article, we describe a sorghum transformation procedure in sufficient detail using a public genotype, P898012. This system utilizes a standard binary transgenic vector carrying the bar gene as a selectable marker and immature embryos as starting explants. Glufosinate is employed as the selective agent during callus and shoot induction. Further, this procedure is relatively rapid, efficient, highly reproducible, and should be applicable for many other sorghum genotypes

Agrobacterium-mediated↗

THE CARNEGIE-IRVINE GALAXY SURVEY. I. OVERVIEW AND ATLAS OF OPTICAL IMAGES

The Carnegie-Irvine Galaxy Survey (CGS) is a long-term program to investigate the photometric and spectroscopic properties of a statistically complete sample of 605 bright (B{sub T} < 12.9 mag), southern ({delta} < 0 Degree-Sign ) galaxies using the facilities at Las Campanas Observatory. This paper, the first in a series, outlines the scientific motivation of CGS, defines the sample, and describes the technical aspects of the optical broadband (BVRI) imaging component of the survey, including details of the observing program, data reduction procedures, and calibration strategy. The overall quality of the images is quite high, in terms of resolution (median seeing {approx}1''), field of view (8.'9 Multiplication-Sign 8.'9), and depth (median limiting surface brightness {approx}27.5, 26.9, 26.4, and 25.3 mag arcsec{sup -2} in the B, V, R, and I bands, respectively). We prepare a digital image atlas showing several different renditions of the data, including three-color composites, star-cleaned images, stacked images to enhance faint features, structure maps to highlight small-scale features, and color index maps suitable for studying the spatial variation of stellar content and dust. In anticipation of upcoming science analyses, we tabulate an extensive set of global properties for the galaxy sample. These include optical isophotal and photometric parameters derived from CGS itself, as well as published information on multiwavelength (ultraviolet, U-band, near-infrared, far-infrared) photometry, internal kinematics (central stellar velocity dispersions, disk rotational velocities), environment (distance to nearest neighbor, tidal parameter, group, or cluster membership), and H I content. The digital images and science-level data products will be made publicly accessible to the community.

79 ASTRONOMY AND ASTROPHYSICS↗